WIPPMO Draft RFP J-M.pdf
PDF 2 MB Posted
- Solicitation number
- DE-SOL-0002555
- Issued by
-
Department of Energy Headquarters
About this file
WIPPMO Draft RFP Sections J-M
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WIPPMO Draft RFP B-H.pdf | ||
| WIPPMO Draft RFP I.pdf | ||
| DE-SOL-0002555 pre-solicitation synopsis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DE-SOL-0002555
WIPP Draft Solicitation
J-i
PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Table of Content
ATTACHMENT A: LAWS, REGULATIONS, AND DIRECTIVES (DEC 2000)
ATTACHMENT B: SMALL, SMALL DISADVANTAGED, AND WOMEN-OWNED
SMALL BUSINESS SUBCONTRACTING PLAN
ATTACHMENT C: DRAFT PERFORMANCE EVALUATION AND MEASUREMENT
PLAN (PEMP)
ATTACHMENT D: SPECIAL FINANCIAL INSTITUTION ACCOUNT AGREEMENT
FOR USE WITH THE PAYMENTS CLEARED FINANCING
ARRANGEMENT
ATTACHMENT E: PERFORMANCE GUARANTEE AGREEMENT
ATTACHMENT F: GUIDANCE FOR PREPARATION OF DIVERSITY PLAN
ATTACHMENT G: SUMMARY OF CONTRACT DELIVERABLES
ATTACHMENT H: DEPARTMENT OF LABOR WAGE DETERMINATION
ATTACHMENT I: CONTRACTOR COMMUNITY COMMITMENT PLAN
ATTACHMENT J: FY2011 ANNUAL PERFORMANCE AGREEMENT WITH THE
ASSISTANT SECRETARY
J-1
ATTACHMENT A: LAWS, REGULATIONS, AND DIRECTIVES (DEC 2000)
J-2
ATTACHMENT A
LAWS, REGULATIONS, AND DIRECTIVES (DEC 2000)
(a) In performing work under this contract, the Contractor shall comply with the requirements of applicable Federal, State, and local laws and regulations (including DOE regulations), unless relief has been granted in writing by the appropriate regulatory agency.
(b) In performing work under this contract, the Contractor shall comply with the requirements of those Department of Energy directives, or parts thereof, identified in the List of Applicable Directives (List B) appended to this contract. Except as otherwise provided for in paragraph (d) of this clause, the Contracting Officer may, from time to time and at any time, revise List B by unilateral modification to the contract to add, modify, or delete specific requirements. Prior to revising List B, the Contracting Officer shall notify the Contractor in writing of the Department's intent to revise List B and provide the Contractor with the opportunity to assess the effect of the Contractor's compliance with the revised list on contract cost and funding, technical performance, and schedule; and identify any potential inconsistencies between the revised list and the other terms and conditions of the contract. Within 30 days after receipt of the Contracting Officer's notice, the Contractor shall advise the Contracting Officer in writing of the potential impact of the Contractor's compliance with the revised list. Based on the information provided by the Contractor and any other information available, the Contracting Officer shall decide whether to revise List B and so advise the Contractor not later than 30 days prior to the effective date of the revision of List B. The Contractor and the Contracting Officer shall identify and, if appropriate, agree to any changes to other contract terms and conditions, including cost and schedule, associated with the revision of List B pursuant to the clause of this contract entitled, "Changes."
(c) Environmental, safety, and health (ES&H) requirements appropriate for work conducted under this contract may be determined by a DOE approved process to evaluate the work and the associated hazards and identify an appropriately tailored set of standards, practices, and controls, such as a tailoring process included in a DOE approved Safety Management System implemented under the clause entitled "Integration of Environment, Safety, and Health into Work Planning and Execution."
When such a process is used, the set of tailored (ES&H) requirements, as approved by DOE pursuant to the process, shall be incorporated into List B as contract requirements with full force and effect. These requirements shall supersede, in whole or in part, the contractual environmental, safety, and health requirements previously made applicable to the contract by List B. If the tailored set of requirements identifies an alternative requirement varying from an ES&H requirement of an applicable law or regulation, the Contractor shall request an exemption or other appropriate regulatory relief specified in the regulation.
J-3
(d) Except as otherwise directed by the Contracting Officer, the Contractor shall procure all necessary permits or licenses required for the performance of work under this contract.
(e) Regardless of the performer of the work, the Contractor is responsible for compliance with the requirements of this clause. The Contractor is responsible for flowing down the requirements of this clause to subcontracts at any tier to the extent necessary to ensure the Contractor's compliance with the requirements.
J-4
LIST B:
DOE Order Title
DOE O 110.3A Conference Management DOE O 130.1 Budget Formulation DOE O 142.1 Classified Visits Involving Foreign Nationals DOE O 142.3A, CRD Unclassified Foreign Visits and Assignments Program DOE O 150.1 Continuity Programs DOE O 151.1C Comprehensive Emergency Management System DOE O 153.1 Departmental Radiological Emergency Response Assets DOE O 200.1A Information Technology Management
DOE O 203.1
Limited Personal use of Government Office Equipment including Information Technology
DOE O 205.1A Department of Energy Cyber Security Management DOE O 206.1 DOE Privacy Program DOE O 210.2 DOE Corporate Operating Experience Program
DOE O 221.1A
Reporting Fraud, Waste and Abuse to the Office of Inspector General
DOE O 221.2A Cooperation with the Office of Inspector General DOE O 225.1A Accident Investigations DOE O 226.1A Implementation of Department of Energy Oversight Policy DOE O 231.1A, Change 1 Environment, Safety and Health Reporting DOE O 241.1B, CRD Scientific and Technical Information Management DOE O 243.1 Records Management Program DOE O 243.2 Vital Records DOE O 251.1C Departmental Directives Program DOE O 252.1A, CRD Technical Standards Program DOE O 311.1B Equal Opportunity and Diversity Program DOE O 350.1, Change 3 Contractor Human Resource Management Programs DOE O 350.2A Use of Management and Operating or Other Facility Management
Contractor Employees for Services to DOE in the Washington, D.C., Area
DOE O 412.1A Work Authorization System DOE O 413.1B Internal Control Program DOE O 413.3B CRD Program and Project Management for the Acquisition of Capital
Assets DOE O 414.1C Quality Assurance DOE O 420.1B Change 1 Facility Safety DOE O 425.1D Verification of Readiness to Startup or Restart of Nuclear Facilities
DOE O 426.2
Personnel Selection, Training, Qualification, and Certification Requirements for DOE Nuclear Facilities
DOE O 430.1B Change 1 Real Property Asset Management
DOE O 430.2B
Departmental Energy, Renewable Energy and Transportation Management
DOE O 433.1B Maintenance Management Program for DOE Nuclear Facilities DOE O 435.1, Change 1 Radioactive Waste Management DOE O 442.1A Department of Energy Employee Concerns Program DOE O 450.1A Environmental Protection Program
J-5
DOE O 451.1B Change 1 National Environmental Policy Act Compliance Program DOE O 458.1, CRD Radiation Protection of the Public and the Environment DOE O 460.1C Packaging and Transportation Safety DOE O 460.2A Departmental Materials Transportation and Packaging Management DOE O 461.2, CRD Onsite Packaging and Transfer of Materials of National Security
Interest DOE O 461.1B Packaging and Offsite Transportation of Materials of National Security
Interest DOE O 470.2B Independent Oversight and Performance Assurance Program DOE O 470.3B Graded Security Protection (GSP) Policy DOE O 470.4A Safeguards and Security Program DOE O 471.1B Identification and Protection of Unclassified Controlled Nuclear
Information DOE O 471.3, Change 1 Identifying and Protecting Official Use Only Information DOE O 475.2A, CRD Identifying Classified Information DOE O 482.1 DOE Facilities Technology Partnering Programs DOE O 483.1 DOE Cooperative Research and Developments Agreements DOE O 522.1 Pricing of Departmental Materials and Services DOE O 534.1B Accounting DOE O 544.1 Priorities and Allocations Program DOE O 551.1C Official Foreign Travel DOE O 580.1 Chg 1 Department of Energy Personal Property Management Program DOE O 1220.1A Chg 1 Congressional and Intergovernmental Affairs DOE O 1340.1B Management of Public Communications Publications and Scientific, Technical, and Engineering Publications DOE O 5400.5 Change 2 Radiation Protection of the Public and the Environment DOE O 5480.19 Change 2 Conduct of Operations Requirements for DOE Facilities DOE O 5670.1A Management and Control of Foreign Intelligence
DOE Manual Title DOE M 231.1-1A Change 2 Environment, Safety and Health Reporting Manual DOE M 231.1-2 Occurrence Reporting and Processing of Operations Information DOE M 435.1-1 Change 1 Radioactive Waste Management Manual DOE M 140.1-1B Interface with the Defense Nuclear Facilities Safety Board DOE M 205.1-3 Telecommunications Security Manual DOE M 205.1-4 National Security System Manual DOE M 205.1-5 Adm Chg 2 Cybersecurity Process Requirements Manual DOE M 205.1-6 Adm Chg 2 Media Sanitization Manual DOE M 205.1-7 Adm Chg 2 Security Controls for Unclassified Information Systems Manual DOE M 205.1-8 Adm Chg 2 Cyber Security Incident Management Manual DOE M 413.3B CRD Project Management for the Acquisition of Capital Assets DOE M 442.1-1 Differing Professional Opinions Manual for Technical Issues
Involving Environment, Safety and Health DOE M 450.4-1 Integrated Safety Management System Manual DOE M 460.2-1A Radioactive Material Transportation Practices DOE M 461.1-1 Change 1 Packaging and Transfer of Materials of National Security Interest
J-6
Manual DOE M 470.4-1 Change 1 Safeguards and Security Program Planning and Management DOE M 470.4-2A Physical Protection DOE M 470.4-3A Contractor Protective Force DOE M 470.4-4A Information Security DOE M 470.4-5 Personnel Security DOE M 470.4-6 Change 1 Nuclear Material Control and Accountability DOE M 470.4-7 Safeguards and Security Program References DOE M 471.1-1 Change 1 Identification and Protection of Unclassified Controlled Nuclear
Information Manual DOE M 471.3-1, Change 1 Manual for Identifying and Protecting Official Use Only Information
DOE Notice Title
DOE N 206.5 Response and Notification Procedures for Data Breaches Involving Personally Identifiable Information
DOE N 234.1 Reporting of Radioactive Sealed Sources
J-7
ATTACHMENT B: SMALL, SMALL DISADVANTAGED, AND WOMEN-OWNED
SMALL BUSINESS SUBCONTRACTING PLAN
J-8
ATTACHMENT C: DRAFT PERFORMANCE EVALUATION AND MEASUREMENT
PLAN (PEMP)
[October 1, 2012 through September, 2013]
J-9
Draft PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP)
OCTOBER 1 (2013) through SEPTEMBER 30, (2014)
Contract No. DE- TBD
ATTACHMENT C
I. INTRODUCTION
This Performance Evaluation and Measurement Plan (PEMP) provides a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract.
Fee determinations are not subject to the Disputes Clause of the contract.
II. ORGANIZATIONAL STRUCTURE AND DUTIES
The following organizational structure is established for administering the fee provisions of the contract.
A. Roles and Responsibilities
1. Fee Determination Official (FDO) – Head of Contracting Activity
(HCA) or designee. The FDO determines the final performance fee amount based upon all the information furnished and assigns a final percent of performance fee amount earned for the evaluation period. The FDO will notify the CO in writing or via electronic correspondence of his/her final determination of performance fee amount.
2. Carlsbad Field Office Manager
The Carlsbad Field Office Manager or the lead COR will be the point of organizational authority within CBFO for: development and coordination of the PEMP; approval of minor changes to the PEMP; obtaining HCA approval of major changes, if required;
performance monitoring; performance validation; performance reporting; and payment of fees related to PBIs. Primary responsibilities are:
a. Develops and establishes the evaluation criteria and incorporates them into the PEMP.
J-10
b. Assures appropriate coordination of performance expectations and the evaluation criteria with HQ program and policy organizations.
c. If required, submits the PEMP and/or the evaluation criteria for necessary HCA approval and headquarters reviews.
d. After final approval, forwards the PEMP and/or the evaluation criteria to the Contractor through a contract modification.
e. If required, coordinates major changes with the HCA and provides minor changes to performance expectations and the evaluation criteria to the HCA.
3. Contracting Officer
a. The CO is an advisor in the development and establishment of the Evaluation Criteria and Fee amounts.
b. The CO will prepare a letter for the FDO’s signature notifying the contractor of the amount of performance fee amount earned for the evaluation period. Additionally, the letter will identify any specific areas of strengths and weaknesses in the contractor’s performance.
c. The CO will unilaterally modify the contract to reflect the FDO’s final determination of performance fee amount. The modification will reflect earned and unearned fee and will be issued to the contractor within 14 days after the CO receives the FDO’s decision.
4. Carlsbad Field Office COR and Technical Monitors
Technical Monitors are members of the Carlsbad Field Office responsible for the work to be measured by the PBIs that assist the lead COR in carrying out the following responsibilities as requested:
a. Develop the evaluation criteria related to assigned area.
b. Assist in negotiation of the evaluation criteria and fee allocations with contractor.
c. Review Contractor’s request for change to the evaluation criteria and recommend approval or disapproval.
d. Monitor, evaluate, and assess the Contractor’s performance against the PBIs in the PEMP.
e. Validate Contractor’s performance as it relates to the PBIs.
III. EVALUATION CRITERIA
While PEMP incentives may be unilaterally developed by DOE, a teaming approach between the Carlsbad Field Office and the Contractor provides significant benefits. When incentives are developed jointly, performance expectations are better understood by the parties and tend to focus more on
J-11 substantive outcomes. A teaming approach enhances communication and partnering between and among the parties, which results in greater trust, openness, alignment, and cooperation for achieving DOE’s goals and objectives.
Following each evaluation period, the Contractor may submit a self-assessment within 30 calendar days after the end of the period. This self-assessment shall address both the strengths and weaknesses of the Contractor’s performance during the evaluation period. Where deficiencies in performance are noted, the Contractor shall describe the actions planned or taken to correct such deficiencies and avoid their recurrence. The FDO will review the Contractor’s self-assessment, if submitted, as part of the evaluation of the Contractor’s management during the period. An unrealistic self-assessment will result in lower performance fee amount determinations. The Contractor will not be penalized for a realistic self-assessment, although deficiencies noted by the Contractor may be reflected in the Government’s evaluation. The self-assessment itself will not be the basis for the performance fee determination.
The performance fee amount will consist of 1) a subjective fee component and 2) a objective fee component. The PEMP has associated PBIs, which are assessed on an objective and subjective basis (as appropriate) with all earnable fees at risk.
1. Subjective Criteria
Subjective criteria will be established that may include schedule performance;
management performance; technical performance; and cost performance.
Means to measure fulfillment of the criteria will be described in the PEMP on an annual basis along with a mechanism to proportion the fee based on performance. The fee amount associated with the subjective component of the criteria will not exceed 25% of the available fee during any year of the contract.
(1) Schedule Performance – The Contractor’s performance in meeting schedules will be assessed based on:
(i) The degree of Contractor conformance with schedules as established;
(ii) The Contractor’s early identification of schedule problems and inventiveness in overcoming them to maintain progress; and
(iii) The extent to which deliverables were submitted in accordance with established schedules.
(2) Management Performance - The Contractor’s effective and economical organization of all areas of effort including management and technical effort required to meet contract requirements. Particularly to be considered are:
(i) Achieving the community commitments.
(ii) Maintenance and upkeep of site facilities, systems and equipment.
(iii) Establishment of internal controls to assure proper supervision of the work force and economical completion of assigned tasks;
(iv) Coordination and cooperation with cognizant DOE officials to resolve problems that may arise in communications, planning, scheduling or other related areas; and
J-12
(v) Overall effective use of available resources, dependability and general coordination with the program office, including response to dynamic/urgent requirements.
(vi) Whether the Contractor’s project management status reports report monthly costs and show budget/schedule deviations at major milestones or from planned expenditures.
(3) Technical Performance - The Contractor’s technical performance to assess the following:
(i) Overall technical approach and rationale;
(ii) Thoroughness of approach;
(iii) Innovativeness and creativity in approach; and
(iv) Integration of technical efforts.
(v) Quality of delivered products and services including:
a. whether products/services delivered comply with DOE and federal orders, directives, regulations, and statutes, as well as management instructions;
b. whether products/services demonstrate an appropriate level of professional due diligence, accuracy, clarity, and mission focus;
c. the overall quality of the Contractor’s deliverable work products;
d. the extent and accuracy of any documentation, references, and background material accompanying a finished deliverable product; and
e. the appropriateness of the format and clarity of written products, considering the intended audience for the deliverable product.
(4) Cost Control - The Contractor’s cost control will be evaluated to assess:
(i) Whether the actual costs for the performance are reasonable for the work effort completed and within task order estimates;
(ii) Effectiveness of cost planning;
(iii) Timeliness and accuracy of cost reporting;
(iv) Clarity of and ability to trace cost relative to work schedule/technical progress; and
(v) Effectiveness of cost reduction/cost avoidance initiatives.
2. Objective Criteria
Performance Based Incentives (PBIs):
PBIs are typically characterized by objectively measurable evaluation of Contractor performance. Such incentives reflect specified criteria against which actual performance will be evaluated. In most cases, PBIs will be evaluated based on quantifiable measurements. PBI’s may be subjective, but attempts will be made where possible to identify measurable indicators of successful performance.
PBIs have specified fee allocated and payable upon completion of identified levels of work accomplished.
J-13
PBIs can be determined to be annual or Multi-year. Annual PBIs will be measured and evaluated at the end of the fiscal year. Multi-year incentives will be measured and evaluated upon completion of identified work.
IV. PERFORMANCE EVALUATION AND FEE DETERMINATION
A. Approval of Evaluation Criteria and Fee Amount
The evaluation criteria and fee amount are developed by the CBFO Manager, the CO, and CBFO program staff prior to obtaining any HCA approval, if required.
The CBFO Manager or CO provides the PEMP to the Contractor via a contract modification.
B. Changes to Evaluation Criteria and Fee Amount
Approval by the CO and the FDO will be required for any changes to the evaluation criteria and fee amount.
C. Monitoring and Evaluation of Performance
1. Monitoring Performance: CBFO will monitor Contractor performance against the established subjective and objective evaluation criteria throughout the year and term of the PBI. Performance feedback to contractor may be provided periodically throughout the year.
2. Evaluating Performance: CBFO will perform evaluation of all subjective and objective evaluation criteria including validating its performance.
Performance evaluation will include, but not limited to: physical walk-throughs, documentation of accomplishments, and any other methods that can validate the established evaluation criteria. Validation is accomplished before payment of earned fee can be made. Validation of performance is documented by CBFO.
J-14
For subjective criteria evaluation, the following adjectival ratings will be used:
EXCELLENT Contractor has exceeded all or almost all of the significant award-fee criteria and has met overall cost, schedule, and technical performance requirements of the contract as defined and measured against the criteria in the award fee plan for the award fee evaluation period.
VERY GOOD Contractor has exceeded many of the significant award fee criteria and has met overall cost, schedule, and technical performance requirements of the contract as defined and measured against the criteria in the award fee plan for the award fee evaluation period.
GOOD Contractor has exceeded some of the significant award fee criteria and has met overall cost, schedule, and technical performance requirements of the contract as defined and measured against the criteria in the award fee plan for the award fee
SATISFACTORY Contractor has met overall cost, schedule, and technical performance requirements of the contract as defined and measured against the criteria in the award fee plan for the award fee evaluation period.
UNSATISFACTORY Contractor has failed to meet overall cost, schedule, and technical performance requirements of the contract as defined and measured against the criteria in the award-fee plan for the award-fee
The following is applied to the final adjectival rating(s) for the subjective evaluation criteria:
Adjective Rating Percentage of Subjective Component of Fee Earned
EXCELLENT 91 to 100% VERY GOOD 76 to 90% GOOD 51 to 75% SATISFACTORY No Greater than 50%
UNSATISFACTORY 0%
J-15
D. Fee Pool
At the discretion of DOE, if an evaluation criterion is cancelled or modified, any unearned fee may be allocated to another evaluation criterion or criteria. Fee which is not earned due to nonperformance of the performance incentive requirements set forth in the PEMP shall not be returned to the fee pool, but shall be forfeited.
The Carlsbad Field Office Manager or the Contracting Officer’s Representative (COR) will determine the amount of Performance Based Incentive (PBI) fee earned and authorize payments within 30 calendar days of receipt of validation that a PBI has been accomplished.
J-16
ATTACHMENT D: SPECIAL FINANCIAL INSTITUTION ACCOUNT AGREEMENT
FOR USE WITH THE PAYMENTS CLEARED FINANCING
ARRANGEMENT
J-17
ATTACHMENT D
SPECIAL FINANCIAL INSTITUTION ACCOUNT AGREEMENT FOR USE WITH THE
PAYMENTS CLEARED FINANCING ARRANGEMENT
Agreement entered into this, _______ day of ___________, ________, between the UNITED STATES OF AMERICA, represented by the Department of Energy (hereinafter referred to as “DOE”), and _____________________________, a corporation/legal entity existing under the laws of the State of _____________________________ (hereinafter referred to as the Contractor) and ______________________________, a financial institution corporation existing under the laws of the State of ________________________________, located at ___________________________ (hereinafter referred to as the Financial Institution).
RECITALS
(a) On the effective date of ___________, _________________, ________, DOE and the Contractor entered into Agreement(s) No. ______, or a Supplemental Agreement(s) thereto, providing for the transfer of funds on a payments-cleared basis.
(b) DOE requires that amounts transferred to the Contractor there under be deposited in a special demand deposit account at a financial institution covered by Treasury approved Government deposit insurance organizations that are identified in I TFM 6-9000.
These special demand deposits must be kept separate from the
Contractor’s general or other funds, and the parties are agreeable to so depositing said amounts with the Financial Institution.
(c) The special demand deposit account shall be designated [name of
Contractor] [account title] account.
COVENANTS
In consideration of the foregoing, and for other good and valuable considerations, it is agreed that–
1. The Government shall have a title to the credit balance in said account to secure the repayment of all funds transferred to the Contractor, and said title shall be superior to any lien, title, or claim of the Financial Institution or others with respect to such accounts.
J-18
2. The Financial Institution shall be bound by the provisions of said Agreement(s) between DOE and the Contractor relating to the transfer of funds into the and withdrawal of funds from the above special demand deposit account, which are hereby incorporated into this Agreement by reference, but the Financial Institution shall not be responsible for the application of funds withdrawn from said account. After receipt by the Financial Institution of directions from DOE, the Financial Institution shall act thereon and shall be under no liability to any party hereto for any action taken in accordance with the said written directions.
Any written directions received by the Financial Institution from the Government upon DOE stationery and purporting to be signed by, or signed at the written direction of, the Government may, insofar as the rights, duties, and liabilities of the Financial Institution are concerned, be considered as having been properly issued and filed with the Financial Institution by DOE.
3. DOE, or its authorized representatives, shall have access to financial records maintained by the Financial Institution with respect to such special demand deposit account at all reasonable times and for all reasonable purposes, including, but without limitation to, the inspection or copying of such financial records and any or all memoranda, checks, payment requests, correspondence, or documents pertaining thereto. Such financial records shall be preserved by the Financial Institution for a period of 6 years after the final payment under the Agreement.
4. In the event of the service of any writ of attachment, levy of execution, or commencement of garnishment proceedings with respect to the special demand deposit account, the Financial Institution shall promptly notify DOE at:
[Name of office] [Street address] [City] [State and Zip Code]
5. DOE shall authority funds that shall remain available to the extent that obligations have been incurrent in good faith there under by the Contractor to the Financial Institution for the benefit of the special demand deposit account. The Financial Institution agrees to honor upon presentation for payment all payments issued by the Contractor and to restrict all withdrawals against the funds authorized to an amount sufficient to maintain the average daily balance in the special demand deposit account in a net positive and as close to zero as administratively possible.
The Financial Institution agrees to service the account in this manner based on the requirements and specifications contained in DOE solicitation No. DE-SOL- 0002555, dated ____________. The Financial Institution agrees that per-item costs, detailed in the form “Schedule of Financial Institution Processing Charges,” contained in the Financial Institution’s aforesaid bid will remain constant during the term of this Agreement. The Financial Institution shall calculate the monthly fees based on services rendered and invoice the Contractor. The Contractor shall issue a check or automated clearinghouse authorization transfer to the Financial Institution in payment thereof.
J-19
6. The Financial Institution shall post collateral in accordance with 31 CFR 202 with the Federal Reserve bank in an amount equal to the net balances in all of the accounts included in this Agreement (including the noninterest-bearing time deposit account), less the Treasury-approved deposit insurance.
7. This Agreement, with all its provisions and covenants, shall be in effect for a term of _________ years, beginning on the __________ day of ________, __________, and ending on the day of ________, _________.
8. DOE, the Contractor, or the Financial Institution may terminate this Agreement at any time within the agreement period upon submitting written notification to the other parties 90 days prior to the desired termination date. The specific provisions for operating the account during this 90-day period are contained in Covenant 11.
9. DOE or the Contractor may terminate this Agreement at any time upon 30 days’ written notice to the Financial Institution if DOE or the Contractor, or both parties, find that the Financial Institution has failed to substantially perform its obligations under this Agreement or that the Financial Institution is performing its obligation in a manner that precludes administering the program in an effective and efficient manner of that precludes the effective utilization of the Government’s cash resources.
10. Nothwithstanding the provisions of Covenants 8 and 9, in the event that the
Agreement, referenced in Recital (a), between DOE and the Contractor is not renewed or is terminated, this Agreement between DOE, the Contractor, and the Financial Institution shall be terminated automatically upon the delivery of written notice to the Financial Institution.
11. In the event of termination, the Financial Institution agrees to retain the
Contractor’s special demand deposit account for an additional 90-day period to clear outstanding payment items.
This Agreement shall continue in effect for the 90-day additional period, with exception of the following:
1. Term Agreement (Covenant 7)
2. Termination of Agreement (Covenant 8 and 9)
All terms and conditions of the aforesaid bid submitted by the Financial Institution that are not inconsistent with this 90-day additional term shall remain in effect for this period.
The Financial Institution has submitted the forms entitled “Technical Representations and Certifications” and “Schedule of Financial Institution Processing Charges.” These forms have been accepted by the Contractor and the Government and are incorporated herein with the document entitled “Financial Institution’s Information on Payments Cleared Financing Arrangement” as an integral part of this Agreement.
J-20
IN WITNESS WHEREOF the parties hereto have caused this Agreement, which consists of _______ pages, including the signature pages, to be executed as of the day and year first above written.
_______________________ By ________________________ Date Signed (Typed Name of Contractor Officer)
(Signature of Contracting Officer)
WITNESS
(Typed Name of Witness) (Name of Contractor)
_______________________ By ___________________________ (Signature of Witness) (Name of Contractor’s Representative)
Note: In the case of a corporation, a witness is not required. Type or ___________________________________ print names under all signatures. (Signature of Contractor’s Representative)
(Title)
(Address)
(Date Signed)
(Name of Witness) (Name of Financial Institution)
(Name of Financial Institution Representative)
(Signature of Witness) (Signature of Financial Institution Representative)
Note: In the case of a corporation, a witness is not required. Type _____________________________________ or print names under all signatures. (Title)
(Address)
(Date Signed)
J-21
NOTE
The Contractor, if a corporation, shall cause the following Certificate to be executed under its corporate seal, provided that the same officer shall not execute both the Agreement and the Certificate.
CERTIFICATE
I, ______________________, certify that I am the _____________________ of the corporation named as Contractor herein; that _________________, who signed this Agreement on behalf of the Contractor, was then ________________of said corporation and that said Agreement was duly signed for the and in behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.
(Corporate Seal) (Signature)
NOTE
Financial Institution, if a corporation, shall cause the following Certificate to be executed under its corporate seal, provided that the same officer shall not execute both the Agreement and the Certificate.
I, ___________________, certify that I am the ____________________ of the corporation named as Contractor herein; that __________________, who signed this Agreement on behalf of the Contractor, was then _______________of said corporation and that said Agreement was duly signed for the and in behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.
J-22
I, ___________________________, certify that I am the ________________________ of corporation named as Contractor herein; that_______________________________, who signed this Special Bank Account Agreement on behalf of the Contractor, was then ____________________________ of said corporation; and that said Special Bank Account Agreement was duly signed for in behalf of said corporation by authority of its governing body and is within the scope of its corporation powers.
I, _______________________________________, certify that I am the ____________________ of the corporation named as the Financial Institution herein;
that _________________________, who signed this Agreement on behalf of the Financial Institution, was then _________________ of said Bank; and that said Special Bank Account Agreement was duly signed for and in behalf of said Bank by authority of its governing body and is within the scope of its corporate powers.
J-23
ATTACHMENT E: PERFORMANCE GUARANTEE AGREEMENT
J-24
ATTACHMENT F: GUIDANCE FOR PREPARATION OF DIVERSITY PLAN
J-25
ATTACHMENT F
GUIDANCE FOR PREPARATION OF DIVERSITY PLAN
(See Contract Clause entitled "Diversity Plan")
This Guidance is to assist the Contractor in understanding the information being sought by the Department for each of the Diversity elements and where these issues are already addressed in a Contract, the Contractor need only cross reference the location.
Work Force
This Contract includes clauses on Equal Opportunity and Affirmative Action. The Contractor should discuss its policies and plans for implementation of these clauses in its operations. If the Contractor already has procedures in place, these should be discussed and copies provided.
Educational Outreach
The Contractor should outline or discuss any programs already provided, or which it intends to provide, which will provide employees an opportunity to improve their employment skills and opportunities. These programs may already be discussed in the proposal submitted for this Contract or in the Contract itself and could include: educational assistance allowance, provision for outside training programs either during or outside regular work hours, and executive training programs for non-executive employees. The Contractor should also discuss any plans to participate in any program supporting Historically Black Colleges and Universities, Hispanic Serving Institutions and Native American Institutions.
Community Involvement and Outreach
An Offeror's proposal or this Contract may include a section dealing with community involvement and outreach activities. In that event, those sections may be cross-referenced and do not need to be repeated. Contractor community relation activities could include support for the following activities: support for science, mathematics and engineering education; support for community service organizations; assistance to Governmental and community service organizations and for equal opportunity activities; and community assistance in connection with work force reduction plans. The Contractor may provide support to these activities through direct sponsorship or making individual employees available to work with the specific community activity. The Contractor's Diversity Plan should discuss the Contractor's existing and planned activities promoting community involvement of its employees as well as the corporation.
J-26
Subcontracting
If appropriate to the Contractor, the contract will contain FAR 52.219-9 "Small Business Subcontracting Plan" and other small business related clauses. Additionally, the RFP may have contained additional guidance on small business subcontracting. The Contractor should briefly summarize its subcontracting plan. If the Contractor is participating, or plans to participate, in the Department's Mentor-Protégé Program, this involvement or planned involvement, should be summarized. Information concerning its subcontracting plans already submitted and approved do not need to be redeveloped or renegotiated.
Economic Development (Including Technology Transfer)
Many of the Department's contracts include clauses dealing with technology transfer. Planning or activities developed under such clauses may apply to this element of the Contractor's Diversity Plan. Additionally, some of the subcontracting activities planned by the Contractor with small business, small disadvantaged businesses, or woman-owned small businesses may be entered into for the purpose of assisting the economic development of or transferring technology to such a business. The Contractor's Diversity Plan should outline and discuss its planned activities promoting economic diversification of the local community.
J-27
ATTACHMENT G: SUMMARY OF CONTRACT DELIVERABLES
J-28
SUMMARY OF CONTRACT DELIVERABLES
Deliverable Reference
Deliverable
DOE
Action
Deliverable Due Date1
1. C.3.1.5 Maintenance Plan Approve Within 6 months of contract award, updated annually
2. C.3.1.6 Activity Based Cost Documents
Approve Start of each fiscal year, after receipt of new fiscal year funding from EM
3. C.3.1.7 Work Authorization Package and status of changes
Information Monthly
4. C.3.3.1 Integrated Safety Management System Description (ISMSD)
Approve Within 60 days of contract award, and subsequent updates as required
5. C.3.4.1 Quality Assurance Project Plan
Approve Within 30 days of contract award
6. C.4.3.1 Research and Development Initiatives
Approve As Required
7. H.4 Contractor Employee Compensation Plan
Approve no later than 30 days before the end of transition
8. H.4 Annual Contractor Salary- Wage Increase Expenditure Report
Information Annual
9. H.4 Annual Report of Contractor Expenditures for Employee Supplemental Compensation
Information March 1 of every year
10. H.4 A performance self-assessment of the Total Compensation System implementation and results
Approval TBD and update
11. H.4 A determination of cost allowability for reimbursement
Approval TBD
12. H.4 Pension Management Plan
(PMP)
Approval Annual, 45 days after the last day of the Plan year along with its draft actuarial valuation
13. H.4 Actuarial Valuation Reports, Forms 5500, Forms 5300
Approval B=By the due date for filling IRS Form 5500.
All days refer to calendar days.
J-29
Deliverable
14. H.5 Workforce Transition Plan (WF Transition Plan)
Approval Within 10, 15, 30, and 60 days of contract award
15. H.5 Benefits Transition Plan Approval 20 and 30, 45, and 60 days after contract award
16. H.10 Small Business Subcontracting Plan
Approve With proposal and prior to the beginning of each fiscal year
17. H.11 Small Business and Small Disadvantaged Business Participation Targets
Approve With proposal
18. H.22 Work Breakdown Structure
(WBS)
Approve TBD, update as required
19. H.22 General Management Reports
Information TBD
20. H.22 Schedule/Labor Cost Reports
Information TBD
21. H.22 Performance Measurement Reports
Information TBD
22. H.22 Technical Reports Information TBD
23. H.22, H.23 Description Of Work Approve Prior to the start of each fiscal year
24. H.22 Budget Of Estimated Costs Approve Prior to the start of each fiscal year
25. H.22, H.23 Schedule Of Performance
For The Work To Be Performed
Approve Prior to the start of each fiscal year
26. H.27 Implementation Plan for Employee Concerns Program (ECP)
Approve Within 90 days of contract award
27. H.28 Updated Integrated Safety Management System (ISMS) Description Document
Approve Within 60 days of contract award and annually on September 1st
28. H.44 Management of Litigation Procedure(s)
Approve Within 60 days after effective date of contract, updated as required
29. H.45 Cyber Security Program (Standards for Security Categorization of Federal Information and Information Systems; Computer Security Threat and Vulnerabilities Statement; and Computer Security Risk Assessment and Mitigation; System
Approve Within 90 days of contract award; TBD for subsequent deliverables
J-30
Deliverable
Security Plan); and other subsequent deliverables
30. H.49 1. Records Management Plan
2. Vital Records Program / Plan
3. Records Disposition Plan
Approve (CBFO RMFO review)
Within 60 days of contract award
31. H.49 1. Records File Plan Update
2. Vital Records Update
Approve (CBFO RMFO review)
Annually
32. H.49 Privacy Act List of Systems of Records
Approve (Also DOE Privacy Act Officer)
Within 90 days of contract award
33. H.49 Records Disposition Plan Update
Approve (CBFO RMFO review)
Prior to implementation
34. H.51 Contractor Community Commitment Plan
Approve Annually
35. K.16 Written Workplace Substance Abuse Program
Approve Within 30 days of contract award
36. I.10 Code Of Business Ethics And Conduct
Information Within 30 days after contract award
37. I.10 Business Ethics Awareness And Compliance Program
Information Within 90 days after contract award
38. I.10 Internal Control System Information Within 90 days after contract award
39. I.29 Certificate of Current Cost or Pricing Data
Approve Prior to contract award
40. I.37 Small Disadvantaged Business Participation Targets
Information At contract completion if required
41. I.40 Hazardous Material List Approve With proposal, updated as required
42. I.40 Material Safety Data Sheet Information Required when offeror is deemed an "apparent successful offeror", update as required
43. I.85 Property management plans, systems, and procedures
Approve Within 30 days after the Contractor assumes full responsibility of the contract
44. I.85 1) Report of periodic physical inventory results
2) Reports of property inventory data into the database system (PIDS)
Approve Annually NLT Sep 30
45. I.85 1) GSA report of property Approve Annually NLT Oct 31
J-31
Deliverable furnished to non federal activities
2) GSA report of sales and exchange transactions
46. I.85 1) Balanced scorecard self-assessment report for the current FY
2) Motor vehicle fleet reports
(FAST)
Approve Annually NLT Dec 15
47. I.85 Balanced scorecard self-assessment plan for the new FY
Approve Annually NLT Oct 15
48. I.85 1) Reports of loss, damage, destruction or theft of property
2) Special reports for motor vehicles
Approve 1) When it becomes known
2) as required
49. I.85 Final physical completion or termination inventory
Approve 45 days prior to contract completion or upon termination
50. I.99 Organization Chart Approve Within 30 days after the Contractor assumes full responsibility of the contract
51. I.107 Cost Reduction Proposals (CRPs)
Approve As required
52. I.109 Work For Others Program Approve As required
53. I.112 Documentation of Safety
Management System (System)
Approve TBD
54. I.115 Diversity Plan Approve Within 90 days after effective date of contract
55. I.124 List of All Subject Inventions Information As requested and within 3 months of the date of completion of contracted work
56. I.129 Statement of Costs Incurred and Claimed
Approve Annually
57. I.130 Internal Audit Implementation Design
Approve Upon contract award, the exercise of any contract option, or the extension of the contract
J-32
Deliverable
58. I.130 Annual Audit Report Of Audit Activities Undertaken During The Previous Fiscal Year
Information Annually, prior to January 31 of the contract performance period
59. I.130 Annual Audit Plan For The Activities To Be Undertaken By The Internal Audit Organization During The Next Fiscal Year
Information Annually, prior to June 30 of the contract performance period
60. I.134 Plan For New Financial Management Systems And/Or Subsystems And Major Enhancements And/Or Upgrades To The Currently Existing Financial Systems And/Or Subsystems
Approve Annually
61. I.140 Accounting of Government Property
Information Upon completion of work or termination of contract
62. I.140 Baseline Inventory Of Government Property
Information Within six months after execution of the contract
J-33
ATTACHMENT H: DEPARTMENT OF LABOR WAGE DETERMINATION
J-34
ATTACHMENT I: CONTRACTOR COMMUNITY COMMITMENT PLAN
J-35
ATTACHMENT J: FY2011 ANNUAL PERFORMANCE AGREEMENT WITH THE
ASSISTANT SECRETARY
Office of Environmental Management Performance Agreement with the Assistant Secretary
Overview
The Office of Environmental Management (EM) is working to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. For FY 2011, EM’s commitments advance the program and management goals, priorities, and expectations of Assistant Secretary Inés Triay and move us toward a more efficient and effective organization. We have begun the difficult task of developing and implementing a new business model that reflects a management philosophy of empowering the Field with the authorities and resources necessary to successfully execute the EM Program mission. This business model also supports EM leadership’s vision of creating an enduring management model that normalizes and enhances EM’s ability to function as a high-performing organization. The expectation is that EM will perform at such a high level that the Government Accountability Office removes it from the list of high-risk organizations.
This new business model will be a major step forward in achieving this goal.
Building on Our Success
Since the start of the EM organization in the late 1980s, we have accomplished much for the Nation in fulfilling our cleanup mission. In FY 2011, we will continue to build on our progress by improving our safety performance; realigning the Headquarters/Field authorities and resources; improving project performance; achieving excellence in leadership; and establishing strategic options for the EM portfolio.
Improving Our Processes
With the new business model, we are improving the measures for these commitments. They are more specific, quantified, and meaningful for managers, employees, and stakeholders. This agreement is the commitment by the Environmental Management leadership team to turn resources into results. We will continually improve EM as we create an organization that works better and costs less.
EM’s primary responsibility is the safe cleanup of the environmental legacy. It is the purpose for which Congress established the EM Program. Programmatic success will be measured by what is accomplished, i.e., the number of sites restored, quantities of material treated and disposed of, amounts of soil and groundwater remediated, etc. However, overall success will also be measured by how the program is managed, i.e., through critical management goals such as safety performance, project and contract management, and excellence in business management practices and leadership.
Mission
To safely transform the environmental legacy into assets available for the Nation's future by completing quality cleanup work on schedule and within cost, delivering demonstrated value to the American taxpayer.
Vision
To be viewed as one of the best managed government programs and the employer of choice in the Federal Government.
Principles and Values
In February 2010, Secretary of Energy Chu issued seven management principles to guide the Department of Energy in fulfilling its mission and in its daily operations. The Office of Environmental Management has fully embraced these principles.
1. Our mission is vital and urgent.
2. Science and technology lie at the heart of our mission.
3. We will treat our people as our greatest asset.
4. We will pursue our mission in a manner that is safe, secure, legally and ethically sound, and fiscally responsible.
5. We will manage risk in fulfilling our mission.
6. We will apply validated standards and rigorous peer review.
7. We will succeed only through teamwork and continuous improvement.
In addition to the Department’s Management Principles, the Office of Environmental Management has developed a set of core values that serve as the “rules of the road” on our journey to excellence.
1. We care about our mission, have a sense of urgency in the pursuit of our goals and a desire for quality in our work.
2. We demonstrate accountability by taking ownership, meeting our commitments, and admitting our mistakes.
3. We acknowledge and reward individual and team successes.
4. We talk directly and honestly to each other to resolve conflict in a timely and respectful manner.
5. We communicate clearly and concisely and check for understanding.
6. We ask for help when we need it and we look for ways to help each other succeed.
7. We have a questioning attitude and pursue issues until a decision is made.
Program-Related Commitments
EM continues to pursue its cleanup objectives within the overall framework of achieving the greatest risk reduction benefit per radioactive content and overlaying regulatory compliance commitments and best business practices to maximize cleanup progress. To support this approach EM has prioritized its cleanup activities:
• Essential activities to maintain a safe, secure, and compliant posture in the EM complex
• Radioactive tank waste stabilization, treatment, and disposal
• Spent nuclear fuel (SNF) storage, receipt, and disposition
• Special nuclear material (SNM) consolidation, stabilization, and disposition
• Transuranic (TRU) and mixed/low-level waste (M/LLW) disposition
• Groundwater and soil remediation
• Excess facilities deactivation and decommissioning (D&D)
Under each of our Program Goals, EM has established…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .