This document contains the design requirements for the Ripplebrook Work Center Infrastructure project, which includes the construction of a 20-person bunkhouse, a 250 SF hazmat storage structure, a 7,225 SF fire warehouse, and a 2,100 SF tree cooler building. The requirements address architectural, structural, mechanical, electrical, IT, and site development details for these buildings. The project is being procured by the Department of Agriculture Forest Service through a Request for Information solicitation. The document provides comprehensive technical specifications and design criteria to be used in developing design documents and construction plans for the project.

View the file

Other files

File Type Posted
Scope of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE DESIGN REQUIREMENTS

5/22/2023 Ripplebrook Work Center Infrastructure Page 1 of 38

United States Department of Agriculture Forest Service

Region Six

Design Requirements

Ripplebrook Work Center Infrastructure

Mt. Hood National Forest

May 22, 2023

5/22/2023 Ripplebrook Work Center Infrastructure Page 2 of 38

1. PROJECT DESCRIPTION AND GENERAL INFORMATION

1.01 LOCATION

1.02 DESCRIPTION OF PROJECT

1.03 EXISTING UTILITIES

1.04 SITE DEVELOPMENT PLAN

1.05 BUILDING CODE REQUIREMENTS

2. BUNKHOUSE ROOM SCHEDULE AND DETAILS

2.01 GENERAL DESIGN CONSIDERATIONS

2.02 GENERAL BUNKHOUSE

2.03 KITCHEN

2.04 LIVING ROOM

2.05 DINING AREA

2.06 BATHROOM

2.07 BEDROOM

2.08 MUDROOM

2.09 LAUNDRY AREA

2.10 STORAGE AREA

2.11 STAIRS

2.12 PORCHES

3. FIRE WAREHOUSE ROOM SCHEDULE AND DETAILS

3.01 INTRODUCTION

3.02 ROOM SCHEDULE

3.03 GENERAL OFFICE

3.04 READY ROOM

3.05 SMALL CONFERENCE ROOM

3.06 EMPLOYEE RESTROOMS

3.07 SHOWERS

3.08 BREAK ROOM

3.09 LOCKER AREA

3.10 LAUNDRY

3.11 FIRE CACHE/STORAGE

3.12 ENGINE BAY

3.13 JANITOR’S CLOSET

3.14 MECHANICAL AND ELECTRICAL ROOMS

3.15 IT CLOSET

3.16 EXTERIOR SAW CLEANING/MAINTENANCE AREA

4. HAZMAT STORAGE DETAILS

4.01 HAZMAT STORAGE BUILDING DETAILS

5. TREE COOLER ROOM SCHEDULE AND DETAILS

5.01 ROOM SCHEDULES

5.02 ELECTRICAL / MECHANICAL ROOM

5.03 STORAGE AREA

5.04 LOADING DOCK

5.05 TREE COOLER INTERIOR BOX CONSTRUCTION METAL INSULATED PANELS

6. GENERAL ARCHITECTURAL REQUIREMENTS

6.01 ARCHITECTURAL THEME

6.02 GENERAL ACCESSIBILITY

6.03 BUNKHOUSE ACCESSIBILITY

6.04 ACOUSTICS

6.05 CABINETRY

6.06 DOOR AND DOOR HARDWARE

6.07 FLOORING

6.08 GLAZING

5/22/2023 Ripplebrook Work Center Infrastructure Page 3 of 38

6.09 WINDOW TREATMENTS

6.10 PAINTING AND COATING

6.11 WINDOWS

7. GENERAL STRUCTURAL REQUIREMENTS

7.01 GENERAL STRUCTURAL

8. GENERAL ENERGY REQUIREMENTS

1.01 ENERGY ANALYSIS REQUIREMENTS

1.02 ON-SITE RENEWABLE ENERGY PRODUCTION

9. GENERAL MECHANICAL REQUIREMENTS

9.01 PLUMBING

9.02 DRINKING FOUNTAINS – FIRE WAREHOUSE

9.03 WATER HEATERS

9.04 GENERAL HEATING, VENTILATING, AIR CONDITIONING (HVAC)

9.05 VENTILATION EQUIPMENT:

9.06 AIR DISTRIBUTION DUCTWORK:

9.07 HVAC CONTROLS – FIRE WAREHOUSE

9.08 RESTROOMS, SHOWERS, COPY, SUPPLY, JANITOR AND OTHER SPECIAL PURPOSE ROOMS 21

10. TREE COOLER MECHANICAL REQUIREMENTS

10.01 GENERAL DESCRIPTION:

10.02 DESIGN CONSIDERATION:

10.03 COOLING SYSTEM DESIGN:

10.04 REFRIGERATION SYSTEM:

11. TREE COOLER CONTROL & WIRING REQUIREMENTS

11.01 CONTROLS

11.02 REMOTE ACCESS FOR CONTROL SYSTEM

11.03 CONTROLS DESIGN AND CONTROL ENCLOSURES

11.04 PHASE MONITOR RELAY & INDICATOR LIGHT

11.05 ALARM SYSTEM & TELEPHONE DIALER CONNECTION

11.06 ALARM SYSTEM ANALOG TELEPHONE DIALER

11.07 TREE COOLER WIRING METHODS

12. GENERAL FIRE PROTECTION SYSTEM REQUIREMENTS

12.01 GENERAL

1.03 SMOKE DETECTORS

1.04 SPRINKLER SYSTEM

13. GENERAL SECURITY REQUIREMENTS

1.05 GENERAL

1.06 ACCESS CONTROL

1.07 LOCKS

1.08 KEYS

13.02 PUBLIC ADDRESS SYSTEM – FIRE WAREHOUSE

14. GENERAL ELECTRICAL REQUIREMENTS

14.01 ELECTRICAL SERVICE REQUIREMENT

14.02 GENERAL ELECTRICAL

14.03 WSI (WORKSTATION INTERFACE) DEFINITION

14.04 EQUIPMENT REQUIREMENTS

14.05 LIGHTING

14.06 EMERGENCY LIGHTING

14.07 POWER AND DATA OUTLETS

14.08 SPECIAL PURPOSE OUTLETS

14.09 SURGE SUPPRESSION DEVICES (SPD)

14.10 GROUNDING

14.11 QUALITY ASSURANCE

14.12 SHORT CIRCUIT CURRENT AND ARC FLASH ANALYSIS

5/22/2023 Ripplebrook Work Center Infrastructure Page 4 of 38

14.13 WIRING METHODS

14.14 WIRELESS ACCESS POINTS FULL BUILDING COVERAGE – FIRE WAREHOUSE

15. BUNKHOUSE ELECTRICAL REQUIREMENTS

15.02 RECEPTACLES

15.03 LIGHTING

16. TREE COOLER ELECTRICAL REQUIREMENTS

16.01 GENERATOR AND AUTOMATIC TRANSFER SWITCH

16.02 LIGHTING

16.03 EQUIPMENT REQUIRING ELECTRICAL POWER OR CONTROLS

16.04 NETWORK EQUIPMENT & POWER

17. GENERAL IT REQUIREMENTS

1.02 GENERAL IT REQUIREMENTS

17.02 TELECOMMUNICATIONS

17.03 IT CLOSET – FIRE WAREHOUSE

17.04 IT ELECTRICAL

17.05 UPS

17.06 IT SECURITY

18. SITE REQUIREMENTS

18.01 GENERAL DEVELOPMENT CONSIDERATIONS

18.02 BUILDING ORIENTATION

18.03 VEHICLE CIRCULATION

18.04 SIGNING AND MARKERS:

18.05 PARKING

18.06 GARBAGE AND RECYCLING COLLECTION

18.07 SITE ELECTRICAL

18.08 EXTERIOR LIGHTING

18.09 WATER SYSTEM

18.10 SEWAGE SYSTEM

18.11 LANDSCAPING

5/22/2023 Ripplebrook Work Center Infrastructure Page 5 of 38

PROJECT DESCRIPTION AND GENERAL INFORMATION

1.01 LOCATION

A. The Ripplebrook Work Center is located on the Clackamas River Ranger District, on Highway 224, Milepost 49.4.

1.02 DESCRIPTION OF PROJECT

A. This document displays project criteria for the design development and the construction documents necessary to construct the following:

1. A twenty (20) person bunkhouse that is two (2) stories, accommodating ten (10) people on each floor.

2. A 250 SF hazmat storage structure.

3. A 7,225 SF Fire Warehouse that includes office space, engine bays, and fire operations space.

4. A 2,100 SF Tree Cooler building

5. An emergency standby generator and automatic transfer switch for the Tree Cooler.

6. All associated site work including parking, vehicle circulation, grading, and utility connections.

a. Utility connections may include upgrading the single phase overhead power system to three phase underground, adding a sewer pump station, and replacing waterlines. The scope of this work will be determined after field investigations.

B. This document describes Forest Service needs and requirements for equipment and systems that exceed provisions outlined in the building codes.

1.03 EXISTING UTILITIES

A. In general, for all utilities; verify existing conditions and capacities, update “as-built” drawings as needed, coordinate and design for the new buildings.

1. Electrical – PGE

a. Intent is to convert overhead primary single phase to underground primary three phase for the Fire Warehouse and the Tree Cooler.

2. Data/Communications – Reliance Connect

3. Water – USDA Forest Service

a. Water comes from the Timberlake Job Corps water tank. The existing piping is old and an analysis of this system and piping is needed to serve these three new buildings.

b. A limited site plan will be provided.

4. Wastewater – USDA Forest Service

a. There is a below grade Cornell, 50-year-old pump station for Ripplebrook housing.

The system will need to be analyzed to determine if the old pump station needs to be replaced, and a new pump station will need to be added for the Fire Warehouse and Tree Cooler.

b. Bunkhouse sewer will use existing Cornell pump station with gravity feed. Sewer system needs evaluations.

1.04 SITE DEVELOPMENT PLAN

A. Include parking, circulation, and utilities for the new and existing buildings.

B. The existing 75 SF paint storage building, and the 75 SF hazardous materials building may be relocated to better align with the new site design.

5/22/2023 Ripplebrook Work Center Infrastructure Page 6 of 38

1.05 BUILDING CODE REQUIREMENTS

A. All products shall comply with the latest editions of all local, state and national codes and standards including any addenda, supplements, amendments or modifications by national, state or local authorities having jurisdiction and in effect on the day the construction phase is started.

Where more than one criterion applies, the more stringent criteria shall be used.

B. Applicable Forest Service standards and design criteria include the following:

1. Forest Service Build Environment Image Guide

2. Building Physical Security Requirements

3. IT and Electrical Design Guidelines

4. Forest Service Handbook 7309.11 Chapters 20, 30, and 70

BUNKHOUSE ROOM SCHEDULE AND DETAILS

2.01 GENERAL DESIGN CONSIDERATIONS

A. To provide flexibility the Bunkhouse should be set up in a five (5) person modular arrangement so that sections not in use can be closed.

B. Bunkhouse should be designed and constructed for year-round use; however, the design should accommodate winterizing in the event individual module(s) will not be occupied.

2.02 GENERAL BUNKHOUSE

A. There shall be one (1) one of the following on each floor:

1. Kitchen

2. Dining area

3. Living room

4. Laundry room

B. There shall be two (2) of the following on each floor:

1. Bathroom

2. Storage Area

C. The Mud Room shall be located adjacent to the most used building entrance.

1. If the second floor is accessed with exterior stairs, provide a mud room for the second floor, as well.

D. Each of the bedroom modules shall be able to be secured behind a locked door.

2.03 KITCHEN

A. Provide the following:

1. A minimum of 20 lineal feet of countertop

2. Base cabinets and wall cabinets, including wall cabinets above range hoods.

3. Ten (10) cabinets, each measuring approximately 3 feet tall by 18 inches deep, shall be provided and be lockable for individual food storage.

a. Cabinets shall have adjustable shelves.

4. Provide two (2) double sinks. One (1) on the first floor shall meet accessibility requirements. Sinks shall be separated by a minimum 4 feet of countertop.

B. All kitchen appliances shall be furnished with construction. Appliances include:

1. Two (2) freestanding range/ovens

2. Two (2) matching, exterior vented, range hoods.

5/22/2023 Ripplebrook Work Center Infrastructure Page 7 of 38

3. Two (2) microwave ovens, 1.7 cubic foot. Can be combined with the range hood and mounted over the range.

4. Four (4) high energy efficiency refrigerators, 25 cubic foot.

5. One (1) dishwasher, large capacity, high energy efficiency, water saver model.

C. Ranges shall be located so they can be used at the same time and shall have a minimum of 3 feet of countertop between them.

D. All units should be designed to maximize storage and cabinet space.

2.04 LIVING ROOM

A. Locate living room so that it is easily accessible to the front door and the kitchen/dining area.

B. Provide sufficient space for at least eight (8) people to comfortably lounge (sofa, chairs, coffee table, end tables) C. This area should have at least two (2) electrical outlets on each wall.

D. This area shall have internet connection capability.

2.05 DINING AREA

A. Provide open access between the kitchen and the dining area.

B. Provide sufficient dining space for ten (10) people.

2.06 BATHROOM

A. Each bathroom shall, at a minimum, have one (1) toilet, one (1) lavatory, and one (1) shower.

B. If bathroom is designed for more than one (1) occupant at a time, arrange bathroom door to provide privacy to someone in that space.

C. If bathroom is designed for one (1) occupant at a time, provide a privacy lock that shows

“Occupied” when in use and is keyed to the master lock set.

D. Lavatory shall be mounted in a minimum 4-foot-wide countertop.

1. Provide at least one (1) GFCI electrical duplex outlet above the countertop.

E. Provide the following accessories:

1. Dual roll toilet paper dispenser

2. Towel bar and towel hooks

3. Mirror

F. Provide an exhaust fan directly to the exterior of the building.

2.07 BEDROOM

A. At a minimum, bedrooms shall be 80-100 square feet, including minimum of one (1) – 8 square foot closet for single occupancy.

B. Bedrooms shall be designed in such a way to maximize living space and natural light.

2.08 MUDROOM

A. Mudroom should have necessary features for occupants including, but not limited to coat rail with hooks, bench, and storage.

B. Provide four (4) duplex dedicated outlets for plug-in boot dryers that would not obstruct walkway.

2.09 LAUNDRY AREA

A. Provide the following:

1. One each (1) front control and front-loading washing machine and dryer.

2. One (1) service sink.

5/22/2023 Ripplebrook Work Center Infrastructure Page 8 of 38

3. One (1) – 4 foot wide by 2-foot-deep clothes folding countertop.

4. Minimum 2 linear feet of base and upper cabinets with plastic laminate countertop and integral backsplash. Cabinets will have concealed hinges and exposed pulls.

5. One (1) GFCI outlet above counter.

6. Provide exhaust fan and wall vent for dryer.

2.10 STORAGE AREA

A. Each module shall have a common storage closet of 40 square feet with 32 lineal feet of shelving for linen and cleaning supplies, and space for storage of mops, brooms, etc.

2.11 STAIRS

A. Exterior stair entries shall be covered. Roof coverage shall include landings, stairs, and a 5 square foot minimum area at bottom of stairs. The roofing shall match building in appearance.

2.12 PORCHES

A. Provide a porch area by the kitchen and dining space. It should provide a space for residents to set up a grill and to lounge.

FIRE WAREHOUSE ROOM SCHEDULE AND DETAILS

3.01 INTRODUCTION

A. The following spaces will be provided within an approximate 7,225 SF building. Actual space need will be determined through design.

3.02 ROOM SCHEDULE

Table 1 Room Schedule Fire Warehouse

Room Type Size (NSF) Quantity Total

NSF Floor Finish Notes/Comments

General Office Area

2,500 1 2,500 Vinyl See breakdown below.

Ready Room 800 1 800 Vinyl Small Conference Room

150 1 150 Vinyl

Employee Restroom

* 2 * Vinyl Size for 28 people. Special HVAC, ABA compliant.

Showers * 4 * Vinyl May be combined with employee restrooms. Special HVAC, ABA compliant.

Break Room 250 1 250 Tile/ Vinyl Special HVAC Locker Area 210 1 210 Vinyl or sealed concrete

NOT integrated with the Restroom/ Showers. May be located with the Engine Bay

Laundry 50 1 50 Vinyl Near showers/restrooms Engine Bay 375 3 1,125 Three (3) Type 3 Engines that are 10’ W x 11’ H x 28’ L Fire Cache/Storage

1,500 1 1,500 Concrete

5/22/2023 Ripplebrook Work Center Infrastructure Page 9 of 38

IT Closet 40 1 40 Anti-static vinyl or concrete

Mechanical Room TBD 1 125 Vinyl or concrete

Size according to need

Electrical Room TBD 1 75 Anti-static Vinyl or Concrete

Size according to need

Janitor’s Closet 50 1 50 Vinyl Subtotal Fire Warehouse 7,225

3.03 GENERAL OFFICE

A. The General Office area breakdown includes space for the following groups. Provide some separation between the Devil’s Ridge Crew and the rest of the staff. The design of these spaces will be individually and collectively determined during Design Intent Meeting:

1. Devil’s Ridge Crew – 25 people

2. Engine 312 Crew – 8 people

3. Prevention 1 – 2 people

4. District Employees – 5 people

B. Systems Furniture will be utilized in this project. Each workstation shall have one (1) WSI (see Electrical Section for WSI definition). Power and data connections will be through systems furniture splice through whips to the respective power and data connection points.

C. Provide wiring and data ports for wireless access points that will provide full building coverage.

D. Locate one (1) printer area within the open office space. The printer area will require a minimum of one (1) – 20 amp, 120 Volt dedicated 4 plex normal power electrical outlet and one (1) CAT 6 data outlet.

3.04 READY ROOM

A. The Ready Room provides a multi-use space for approximately up to 40 personnel. Space will be used for general office space, morning briefings and an operations room for fire incidents.

Windows are desired but not required.

B. The Ready Room shall be capable of being divided into two (2) equally sized rooms using high quality acoustical partitions.

C. All perimeter walls shall be fixed and run to ceiling joists.

D. Room shall have a width to length ratio not to exceed 1:1.5. Final dimensions to be determined during Design Intent Meeting.

E. Provide separately zoned and individually controlled HVAC system for each section of the conference room including ceiling energy recovery unit as an auxiliary means of ventilation during high occupancy periods.

F. Room will be designed for use as a briefing area with extruded aluminum and cork tack strip shall run around the room at 6’ above the finished floor along at least one (1) wall or two (2) partial walls for operations maps.

G. Provide an 8’ x 8’ data and electrical floor grid layout. At each grid point provide a recessed floor mounted WSI. Provide four (4) CAT 6 data outlets in each floor box and two (2) computer receptacles. Add normal power for floor boxes.

H. Provide a WSI wall outlet every 8 linear feet along each wall.

5/22/2023 Ripplebrook Work Center Infrastructure Page 10 of 38

I. Provide four (4) CAT 6A data ports – two (2) in each dividable room – placed either high on the wall or in the ceiling for wireless access points.

J. Audio-Visual System Control: Provide a wall mounted touchpad controller in each room and a handheld remote to select inputs and output for presentations, select one room or separate rooms and sound levels for overhead speakers. Each controller shall be able to control both rooms and be user intuitive. The control must give the ability to: adjust audio, virtual participation, and projection from monitors and projectors.

K. Provide space and structural backing, power, and data within wall for two (2) Government provided side by side flat screen TVs, up to 65”. Location of TVs will be determined at Design Intent Meeting.

1. Provide wall carrier for TV mounting to wall.

2. Provide a duplex power outlet, CAT 6 data jack, and RG-6 coax cable jack behind TV.

Cables shall be home run to IT closet to connect to internet or SAT TV box.

3. Provide an HDMI 4K data cable from back of TV into wall and place in conduit down to a

4K HDMI recessed jack below TV to plug in computer for TV display.

L. Provide space for metal wall map on one (1) wall within the “Ops area” sized 52” W x 73” H.

Wall map shall be illuminated by lighting on a separate switch.

M. Provide a 48” H x 72” W white board on one (1) wall.

3.05 SMALL CONFERENCE ROOM

A. Provide one (1) wall mounted WSI outlet on two (2) walls.

B. Provide one (1) tack board.

C. Door shall contain a side lite or ½ window with mini blind and privacy “Occupied” lock keyed to master.

D. Install a combination document suspension and tack strip (such as Tack-Bite) on one (1) wall

3.06 EMPLOYEE RESTROOMS

A. Design the most efficient restroom/shower layout for the building.

B. If two (2) gender specific bathrooms are designed, arrange bathroom entrance door to provide privacy to someone in the restroom.

C. Provide a minimum of one (1) GFCI outlet at wash basin locations for each restroom.

D. Urinals shall have privacy partitions.

E. If gender neutral, single stall restrooms are designed, provide a privacy door lock that shows

“Occupied” when in use and keyed to master lock set.

F. Provide paper towel dispenser.

G. At each stall provide a coat hook, toilet seat cover dispenser, toilet paper dispenser, and sanitary napkin disposal.

H. Provide mirror and shelf above the sink.

I. Provide soap dispenser.

J. See Mechanical Section for Plumbing and HVAC requirements.

3.07 SHOWERS

A. Provide three (3) gender neutral shower stalls, or four (4) shower stalls in the gendered restrooms

– two (2) in each restroom.

B. Provide one (1) ABA compliant restroom/shower combo. Provide a base cabinet with sink and mirror. Provide a GFCI outlet next to sink.

5/22/2023 Ripplebrook Work Center Infrastructure Page 11 of 38

C. Provide visual privacy between the access door and the shower stall. Design shower rooms as “wet” rooms with necessary waterproof materials and drainage. Avoid use of shower curtains for privacy or delineation.

D. If gender neutral stalls are designed, provide a minimum 50 SF space that is not part of the shower stall for changing.

1. Provide towel hooks and bench.

2. Doors will be solid with privacy “Occupied” locks and hard keyed to master lockset.

E. If a gendered, multi-shower room, provide towel hooks or racks to handle four (4) towels in each shower room.

F. Doors will be solid with privacy “Occupied” locks and hard keyed to master lockset.

3.08 BREAK ROOM

A. Break Room shall be centrally located to be accessible to all employees.

B. Provide a minimum of ten (10) linear feet of base and upper cabinets with plastic laminate countertop and integral backsplash. Cabinets will have concealed hinges and exposed pulls.

Integrate a double basin stainless steel sink (minimum 33” wide) with pull out sprayer and all associated plumbing. Integrate Government provided Freezer, Refrigerator, and Range/Oven.

C. Provide one (1) WSI outlet D. Provide one (1) dedicated 20A GFCI outlet per three (3) linear feet of counter and dedicated outlets:

1. Two (2) Microwaves (on counter)

2. One (1) Commercial Coffee Pot (on counter)

3. One (1) Toaster (on Counter)

4. Two (2) Full Size Refrigerators

5. One (1) Freezer

6. One (1) Range/Oven

E. Provide exhaust from break room in compliance with the Oregon State Mechanical code.

3.09 LOCKER AREA

A. The Locker Area will provide space for fire fighters to store and access gear in upright lockers.

This area does not require privacy and should NOT be integrated with the Restroom/Showers. It may be integrated with the Engine Bay area.

B. Provide space for forty (40) Government provided 2’x 2’ x 6’ upright lockers and a sitting bench at least 3’ in front of the lockers. Provide blocking in wall(s) for anchoring lockers.

C. Provide two (2) service outlets equally distributed along each wall in this space.

3.10 LAUNDRY

A. This space will support laundry equipment, storage and folding counter.

B. Provide appropriate plumbing and dedicated outlets for one (1) Government provided stackable washer and dryer.

C. Provide a minimum of two (2) linear feet of base and upper cabinets with plastic laminate countertop and integral backsplash. Cabinets will have concealed hinges and exposed pulls.

D. Provide one (1) GFCI above counter.

3.11 FIRE CACHE/STORAGE

A. Provide heating system to prevent space temperatures from dropping below 50oF.

5/22/2023 Ripplebrook Work Center Infrastructure Page 12 of 38

B. All warehouse space should be ground level, but a second floor or mezzanine can be considered to take best advantage of available space.

C. Provide plumbing and a dedicated electrical outlet for ice machine. Locate near laundry area.

D. Floor shall be sealed concrete with a live load capacity of 250 lbs. psf.

E. Ceiling and walls may remain unfinished.

F. Shall have one (1) double door to the exterior that is a minimum 60” wide. Door shall be steel and meet heavy duty commercial standards.

G. Install horizontal anchoring/blocking around the interior perimeter of general warehouse storage area to be used for securing government provided shelving. Anchors shall be installed so they don’t preclude a flush finish wall surface.

H. Warehouse shall be ventilated based on UMC, 2018 or the most current State code. Provide heat recovery ventilator if the exhaust air CFM is 5,000 or more.

3.12 ENGINE BAY

A. Provide space for three (3), Type 3 fire engines.

B. Engine Bay shall be separated from the General Warehouse with wall partitions that continue all the way to ceiling joists. Walls and doors will provide and STC of 45 if adjacent to Ready Room.

Otherwise provide standard STC.

C. Floor shall be sealed concrete slope to a linear, under apparatus, trench. Concrete will be reinforced to accommodate a 30,000 pound fire engine.

D. Provide a dedicated and independent ventilation and heating system. Integrate heating with the overhead doors to de-energize the heating when a respective door is open.

E. Provide at least one (1) exterior person door.

F. Provide at least one (1) interior door connecting to Warehouse.

G. Provide a minimum of three (3) overhead doors. Provide six (6) overhead doors if engine bay has a pull through design.

H. Provide duplex 20A, 120VAC electrical outlets every 8’ along each wall. Provide maximum four

(4) outlets per 20A circuit.

I. Provide space and plumbing for an eyewash station.

J. Provide a 5HP vertical mount air compressor, with water filter and regulator.

3.13 JANITOR’S CLOSET

A. Provide a storage space with mop sink and shelving to hold restroom supplies such as toilet paper, paper towels, soap, cleaners, vacuum cleaner, dusters, etc.

B. Walls should be washable.

C. This room could be incorporated with the laundry room, restrooms, or shower rooms.

3.14 MECHANICAL AND ELECTRICAL ROOMS

A. Size rooms to fit equipment.

B. See Mechanical Section for HVAC Requirements in Special Purpose Rooms.

C. Electrical Room shall house the following items:

1. Main switchgear

2. Stepdown transformers, if used

3. Subpanels as required to feed all loads

4. Provide Surge Protection Devices on service switchgear and all panels feeding computer loads and IT room panel.

5/22/2023 Ripplebrook Work Center Infrastructure Page 13 of 38

3.15 IT CLOSET

A. See IT Section for details.

3.16 EXTERIOR SAW CLEANING/MAINTENANCE AREA

A. Provide a covered, exterior workbench for cleaning and servicing four (4) chainsaws.

1. Provide duplex receptacles above the workbench, located at 4 foot intervals. Receptacles should be covered in a locking box.

B. Provide a service panel on exterior of building. Provide class 1 div 1 wiring and fixtures in building.

HAZMAT STORAGE DETAILS

4.01 HAZMAT STORAGE BUILDING DETAILS

A. The hazardous materials building shall be approximately 250 SF and will be the storage space for the following types of liquids:

1. Gas, diesel, and various mixes of fuels

2. Bar oil and motor oil

3. Glycol Alcohol and antifreeze

4. Herbicide and Insecticide

5. Paint

6. Fuzees

7. Aerosol

8. Penetrating Oil

9. Teflon

10. Silicon based lubricants.

TREE COOLER ROOM SCHEDULE AND DETAILS

5.01 ROOM SCHEDULES

Table 2 Tree Cooler (Approximate Sizes)

Room Type Size (NSF) Quantity Total

NSF

Floor Finish Notes/Comments

Cooler 1296 1 1296 Concrete 36’ L x 36’ W x 12’ H. Floor shall be insulated from the ground.

Mech/Elec Room 100 1 * Concrete Size room to fit equipment and its required code clearances.

Storage/staging area

700 1 700 Concrete

Total 2096 Approximate size

5.02 ELECTRICAL / MECHANICAL ROOM

A. Provide a combination electrical / mechanical room to house building power panel, control panel, alarm system, network equipment, dehumidifier, and generator emergency automatic transfer switch.

5.03 STORAGE AREA

A. Provide a sink in the storage area. Size and location to be determined in Design Intent Meeting.

5/22/2023 Ripplebrook Work Center Infrastructure Page 14 of 38

5.04 LOADING DOCK

A. Provide cover over the loading dock.

B. Loading dock should be hydraulically adjustable to enable the forklift entrance to different truck heights. Typical height should be 55 inches.

C. Adjacent to the cooler access, provide a ramp up to the loading dock for both accessibility and moving the forklift around.

D. Provide one (1) overhead door.

5.05 TREE COOLER INTERIOR BOX CONSTRUCTION METAL INSULATED PANELS

A. Provide metal skin insulated cooler box panels for construction of cooler box.

B. Provide a metal skin insulated door with a horizontal track slide opener with an electric motor operated door.

C. Provide an overhead limit switch with a cord for a forklift operator to pull on both inside and outside.

D. Proivde a wall design based on mechanical equipment loads and product in cooler box.

E. Insulate the walls to provide for efficient temperature control against a different outside temperature (which may be a warmer inside space) F. Seal corners and seams to prevent air and rodent infiltration.

G. Protect framing and insulation with smooth, cleanable materials and vapor barrier to prevent moisture and condensation inside the walls.

H. Room will be at 90-100% RH with free water in cooler box.

GENERAL ARCHITECTURAL REQUIREMENTS

6.01 ARCHITECTURAL THEME

A. It is important that the building fits into the local area context while still presenting the Forest Service as a natural resource agency. Natural materials should be incorporated into the building wherever possible.

B. Conform to the Forest Service Built Environment Image Guide (BEIG), and specifically the North Pacific Province.

6.02 GENERAL ACCESSIBILITY

A. All exterior and interior design components shall meet Architectural Barriers Act (ABA) requirements.

6.03 BUNKHOUSE ACCESSIBILITY

A. One of the first-floor modules shall contain the following:

1. One (1) bedroom and one (1) bathroom shall be designed to be fully accessible.

a. Closet in accessible bedroom shall have adjustable shelf and clothes rod.

2. Accessible kitchen appliances, including range hood controls and front access oven/range controls.

3. Accessible washer and dryer.

6.04 ACOUSTICS

A. Provide soundproofing materials such as mineral fiber acoustic insulation, caulking, and construction techniques specifically made for interior walls. Rooms with acoustic treatment shall extend from floor to ceiling, as well as the ceiling. The minimum Sound Transmission Class (STC) shall be 45. Room doors shall have a minimum STC of 45.

5/22/2023 Ripplebrook Work Center Infrastructure Page 15 of 38

B. Provide acoustic treatments for walls and ceilings of the following areas:

1. Ready Room and Conference Rooms

2. Rest Rooms and Showers – acoustical treatment shall be in the walls, not exposed surfaces for these rooms.

3. Between Floor and Ceiling Assemblies.

4. Bunkhouse Bedrooms

6.05 CABINETRY

A. Cabinets shall be modular, fully lined cabinet systems with solid wood face frames and doors, and fully jointed construction. Shelves shall be ¾ inch thick and adjustable height.

B. Provide commercial grade laminate countertops.

6.06 DOOR AND DOOR HARDWARE

A. Interior doors shall be solid core, with levered handles.

B. Closet doors shall have latch sets with padlock eyes.

C. All exterior doors shall have a concrete slab adjacent to the building and directly in front of the door. Slab dimensions will be 5’ D x door width + 2’ with the slab centered on the door.

D. Exterior doors

1. Solid (no window), be constructed of steel, and meet heavy duty commercial standards.

Bunkhouse doors can be fire rated wood.

2. Shall have hinge pins and hasps to be secured against unauthorized removal by using spot welds or pinned mounting bolts. Hinges on the secure side of the enclosed space do not need this requirement.

E. Overhead doors

1. Overhead doors shall be sized at a minimum 14’ x 14’.

2. Overhead door shall have manual operation via open/close pushbutton inside building, with manual override for power loss requiring no more than five (5) pounds to open and have interior lockable controls.

3. Door shall be constructed of steel and meet heavy duty commercial standards.

4. Door shall not completely block overhead lighting when open.

F. Mechanical locks should meet or exceed ANSI A156.5, Grade 1 and UL 437 listing standards.

6.07 FLOORING

A. Flooring shall be as shown in the Room Schedules. If not listed in the Room schedule, it shall be as follows:

1. Commercial grade, sheet vinyl resilient flooring shall be in the bathrooms, kitchen, dining area, laundry room, mud room, bunkhouse storage room, and equipment rooms.

2. Carpeting tiles shall be installed in bedrooms, bunkhouse halls, and living room areas.

B. Baseboards shall be the type recommended by the manufacturer of the floor coverings.

C. Utilize durable, recyclable, or recycled floor materials where possible.

D. A central drain shall be placed in the storage area of the Tree Cooler and the Fire Cache/Storage in the Fire Warehouse.

6.08 GLAZING

A. Glass shall be shatter resistant in critical areas of the building, as described in the Physical Security Requirements. Shatter resistance may be achieved by selecting an appropriate type of glass, applying security window film, and/or using laminated glass.

5/22/2023 Ripplebrook Work Center Infrastructure Page 16 of 38

B. Exterior windows in the toilet room and showers shall have obscure glass.

6.09 WINDOW TREATMENTS

A. All interior and exterior windows, except those in the bathroom, shall have window blinds.

B. Specific brands, styles, colors, material, etc. shall be submitted by the A/E via samples or catalog data for Government approval.

C. Windows in the Ready Room and Conference Room shall be provided with black out blinds.

6.10 PAINTING AND COATING

A. Exterior paint color(s) will be consistent with the Built Environment Image Guide.

B. Specific product, colors, application, and finish to be submitted by the A/E via samples for

Government approval.

C. If paint is selected for the exterior walls, paint shall be Stain/Latex for repeat applications without stripping for low maintenance. Sidings, roof, and base material should be complimentary to existing buildings.

D. Interior wall board shall have a high quality, durable, long lasting, scrub-able, satin or semi-gloss latex paint. One (1) prime coat, two (2) top coats.

E. Utilize low or no VOC paints.

6.11 WINDOWS

A. Building shall be designed in a way to maximize window space and natural light.

B. Windows located in sleeping rooms shall be sized and located for egress requirements.

C. All interior and exterior windows, except those in the bathroom, shall have window blinds.

Bathrooms shall have obscure glass.

D. Specific brands, styles, colors, material, etc. shall be submitted by the A/E via samples or catalog data for Government approval.

E. Windows should be operable with screens.

GENERAL STRUCTURAL REQUIREMENTS

7.01 GENERAL STRUCTURAL

A. Structural design shall be completed and stamped by a structural engineer licensed in the State of Oregon.

B. Design structure in accordance with the International Building Code and the ASCE 7, “Minimum Design Loads for Buildings and Other Structures.”

C. Cross Laminated Timber is a desired feature.

D. Timber sourced for the project should demonstrate sustainable forest management that contributes to forest and watershed health. Several approaches may be used to ensure sustainable supply of wood products, including federal, state, and local regulations, third party certifications, best management practices, and ASTM Standard D7612-10.

E. All tested products (such as post-installed anchors, structural insulated panels, power-actuated fasteners, premanufactured shearwalls, premanufactured metal construction connectors and straps, etc.) must have currently approved reports with the International Code Council Evaluation Service (ICC-ES) under the latest Acceptance Criteria and must be rated for use in Seismic Design Category D. Reference http://www.icc-es.org/reports/index.cfm for current listings.

5/22/2023 Ripplebrook Work Center Infrastructure Page 17 of 38

GENERAL ENERGY REQUIREMENTS

1.01 ENERGY ANALYSIS REQUIREMENTS

A. An energy analysis on the mechanical system design shall be completed using DOE generated/ approved open analysis software such as eQUEST modeling tool. Input and output data in the analysis software will be provided as part of the energy analysis report.

B. Carbon content of each energy efficiency measures along with the Life-Cycle-Cost of each measure will be included in the energy analysis.

C. Energy models will use all electric power as the fuel. Actual electric rates for the site will be used in utility cost analysis.

D. Alternative mechanical systems for relevant projects will include following:

1. Variable Refrigeration Flow system or heat pump system dependent on project size, location, and maintenance services accessibility. Indoor units will have MERV-13 filters.

VRF will have heat recovery capabilities and will have Dedicated Outside Air units with energy recovery that provide:

a. Minimum code required ventilation.

b. Oversize DOAS to provide optimum free cooling. Full economizer system verses partial economizer cycle will be analyzed based on hours/year suitable ambient temperatures.

2. Variable air volume rooftop unit (VAV RTU) with heat pump cooling and heating. Space terminal units could use electric heating coils. RTUs will have minimum of MERV-13 filters.

3. Chilled beam and radiant panel heating and cooling systems. Hydronic loops will have variable speed pumps. Ventilation system will consist of DOAS as described in C.1.b above.

4. Water source heat pump system with variable flow hydronic loops. Advanced control system will maximize system efficiency to provide optimum hydronic loop temperature.

Heat recovery ventilation system will be sized to provide partial cooling

5. Geothermal heat pump system with horizontal or vertical wells. Determine soil type and effectiveness of this system to provide heating and cooling by transferring heat via buried coils connected to a heat pump system.

6. Hydronic heat pump system. System employing air to water and water to water heat pump units to generate heating and cooling water. Water source heat pump unit(s) will provide heating when the load cannot be met by air source heat pump system. A cooling tower (with possibly double helix wind turbine) will be considered for heat rejection. Underground water storage tanks could be used to store extra heated water for reuse. Solar thermal and PV panels will be considered to supplement meeting the energy demands (see Section 1.03B2 below).

7. Evaluate energy savings associated with passive cooling systems. Evaluate use of windows for passive cooling. HVAC operation will be interfaced with the window position, i.e., open or closed.

8. Evaluate Positive Displacement air distribution system and associated energy savings. This air distribution system is preferred if cost effective.

1.02 ON-SITE RENEWABLE ENERGY PRODUCTION

A. Prepare a narrative with supporting documentation on feasibilities of installing on-site energy production systems that will provide optimal output.

B. Consider following:

5/22/2023 Ripplebrook Work Center Infrastructure Page 18 of 38

1. Consider Photovoltaic (PV) panel installation and building-integrated PV that takes advantage of architectural components beyond the roof to include building façade, curtain walls, canopies, etc. as well as other PV innovations such as PV solar skin currently tested by the NREL for increased efficiency and crystalline silicon glass that yields twice energy as amorphous silicon glass. Provide initial analysis using NREL PVWatts software for solar panels and other appropriate software for solar energy harvesting. Provide following information as minimum:

a. Building Integrated Photovoltaic (BIPV) applicable architectural features and percentage of building power provided by the BIPV.

b. Array sizes and location

c. Array power outputs and percentage of building power provided by the PV panels.

d. Initial costs

e. 30-Year life cycle cost and simple payback period

2. Prepare a narrative with supporting documentation on installation of solar thermal panels that would provide optimal output. Provide following information as minimum:

a. Panel sizes and location

b. Maximum operational weight

c. Solar thermal usages other than plumbing system such as heating.

d. System efficiency

e. 30-Year life cycle cost and simple payback period

3. Prepare a narrative with supporting documentation on installation of any energy and/or heat generation systems. Systems including on-site hydrogen generation to provide heat and power. Wind power will be considered if medium wind velocity is adequate to yield cost effective power. On-site hydrogen production will use solar or wind power to yield complete renewable energy. These systems will be considered when the scope of work includes multiple buildings. Provide following information:

i. System efficiency.

ii. Percentage of overall energy demand.

iii. 30-year life cycle cost analysis.

C. Present renewable energy sources and methods for discussion with the Forest Service. Creative utilization of resources such as using natural ponds for heat source, and hybrid synergic systems are strongly recommended.

GENERAL MECHANICAL REQUIREMENTS

9.01 PLUMBING

A. Water fixtures: Plumbing fixtures will be rated for low water flow as recommended by the EPA as maximum. Plumbing fixtures flow rates will be as follows:

1. Water closets will be dual flush type with maximum 1 gallon flow rates per flush. Water

Closet fixtures with 1.1 gallons per flush will be considered.

2. Urinals with 0.125 GPM maximum flow rates.

3. Lavatory faucets will have 0.35 GPM flow rates.

4. Showers heads will have maximum 1.3 GPM flow rates.

5. Kitchen faucets will have maximum 1.5 GPM flow rates.

B. One (1) hose bib (non-freeze wall hydrant, key type, with integral vacuum breaker) should be provided on two (2) sides of the Fire Warehouse and Bunkhouse, and on one (1) side of the Tree Cooler.

5/22/2023 Ripplebrook Work Center Infrastructure Page 19 of 38

C. All piping exposed to freezing and/or used for domestic hot water shall be insulated with 1” wall insulation. Domestic water piping shall be insulated with service jacketed, pre-formed fiberglass insulation with PVC fitting covers.

D. Trap prime all floor drains.

9.02 DRINKING FOUNTAINS – FIRE WAREHOUSE

A. Locate drinking fountains with water bottle fillers near restrooms and in Engine Bay area.

B. Fountains will be filtered and have a sensor activated water bottle fill station and a visual filter sensor.

9.03 WATER HEATERS

A. Provide energy efficient water heater(s). Domestic hot water generation shall be independent of heating hot water system.

B. Consider heat pump water heaters if the mechanical room has excessive heat to be utilized by the heat pump system.

C. Locate water heaters to minimize hot water line runs to lavatories/showers, kitchen sink and laundry.

D. Place water heaters in service closets or cabinets.

E. Size water heaters to ensure hot water when all showers and lavatories are in use.

F. Water heater serving kitchen sinks and washing machine shall not serve bathrooms.

G. All domestic hot water shall be circulated. Domestic hot water circulation pumps shall be controlled by building occupancy schedules and aquastats.

1. The design temperature in potable water heaters and recirculating lines to be no less than

130o F, to minimize bacteria growth, including Legionella. Use mixing valves at all fixtures to reduce temperature and prevent scalding.

9.04 GENERAL HEATING, VENTILATING, AIR CONDITIONING (HVAC)

A. These requirements are for the Fire Warehouse and the Bunkhouse. The storage area for the Tree

Cooler will not need conditioning.

B. The system should be designed to encompass the best engineering solution for the building or situation, considering cost (first and operating), climate, available fuels, and type of construction.

Constant volume, variable air volume, variable volume with terminal reheat, space heating, unit heaters, geothermal, and hydronic systems should be considered during the design process.

1. Meet requirements of the latest edition of ASHRAE’s Energy Conservation in New Building

Design,” including ASHRAE 90.1 and the State Energy Code. Energy conservation measures exceeding the minimum requirements of these standards are encouraged provided a life-cycle cost analysis shows a favorable savings to investment ratio.

2. Ventilation rates for all spaces shall meet the most current ASHRAE 62.2 Standards for mechanical and natural ventilation requirements.

C. The system shall provide temperature, relative humidity and air velocities within the comfort envelope as defined in ASHRAE Standards. Design the system to provide the temperature conditions stipulated in each space during ‘normal’ operation hours. Pressurize the building interior to minimize infiltration.

D. Central air handling units shall be able to reset supply air temperatures based on ambient air temperature and space temperatures in building thermal zones.

E. Areas requiring only part time occupancy, with conditions being maintained at the unoccupied level the remainder of the time, to be isolated from the full-time occupied area. Use either separate equipment or zones to meet the needs of these areas.

5/22/2023 Ripplebrook Work Center Infrastructure Page 20 of 38

F. Preserve the integrity of fire corridors. Fire wall and corridor penetrations shall have fire dampers in accordance with code. In buildings where fire corridors are not clearly identified, obtain the services of a licensed Architect to review the area and report on their findings in a document bearing their certification or seal.

G. Areas having excessive heat gain or heat loss, seasonal imbalances, or affected by solar radiation at different times of the day, shall be independently zoned or controlled.

H. Ventilation systems that require the monitoring of carbon dioxide levels may be used as allowed by code. Carbon dioxide concentrations shall never exceed 800-ppm during occupied hours.

I. Where straight zoning with conventional constant volume systems cannot adequately maintain occupied area(s) within the temperature and relative humidity range specified, utilize variable air volume (VAV) system. If VAV system is not feasible, either split system heat pump units or variable refrigeration flow (VRF) with heat recovery should be considered. Also consider variable flow hydronic heating system with an independent thermostat at each zone.

J. Design air distribution systems to provide supply air without objectionable drafts, abnormal air velocities, disturbing noises or undesirable emission of dirt or odors into the zone. Diffuser throat air velocities shall not exceed 475 FPM and ducting design shall be according to the ANSI/SMACNA standards 006-2006 for the project specific duct pressure ratings.

K. Heat pump or equivalent systems if installed should be located so that they are not damaged by snow or pile snow against building walls or windows. Also located so that operating noise is not disruptive to occupants.

9.05 VENTILATION EQUIPMENT:

A. A Heat Recovery Ventilator (HRV) shall be used for general ventilation and restroom exhaust.

The HRV shall be capable of recovering a minimum of 65% of the available energy within the exhaust air stream. A hydronic preheating coil on the HRV outside air inlet shall be used for tempering outdoor air.

B. Refrigeration or ventilation systems that have air streams which pass through water shall have the water treated with an EPA registered biocide to control etiological organisms. Heating and/or refrigeration systems that use water as the heat transfer medium shall include a propylene glycol-based freeze preventative and a corrosion inhibitor.

9.06 AIR DISTRIBUTION DUCTWORK:

A. Ductwork shall be constructed of galvanized steel per SMACNA standards. All ductwork shall be located within conditioned spaces. Any ductwork located near or in unconditioned space shall be insulated with fiberglass insulation. Protected spaces and ductwork located in the attic can be 1 ½” cleanable fiberglass duct board with a mold/mildew resistant surface.

B. Fresh air intakes shall be relocated, extended, or secured to prevent easy ground or roof access.

Locate intakes on the roof or as high as practical. Locating intakes high on a wall is preferred over a roof location.

C. Intakes shall be equipped with pre-heat coils for freeze protection on extremely cold days.

D. Outside air intake system shall have control dampers operated by electric actuators. Dampers shall close during unoccupied periods as well as during the optimal start and stop periods. All intake and relief louvers shall have ¼” mesh screens.

9.07 HVAC CONTROLS – FIRE WAREHOUSE

A. Features to include: independent programmable seven day temperature settings; automatic night, weekend and holiday setback; automatic season changeover; tamper resistant sensors and battery back-up. Include sequence of operations for HVAC controls on plan drawings and/or in mechanical specifications.

5/22/2023 Ripplebrook Work Center Infrastructure Page 21 of 38

B. Where straight zoning with conventional constant volume systems cannot adequately maintain occupied area(s) within the temperature and relative humidity range specified, utilize VVT sub-zoning or modulated bypass flow regulation. Design air quantities and create zones to maximize comfort in both heating and cooling modes.

C. Minimize the ‘human element’ in building management, maximize energy efficiency and automate building operation. Centralize office building HVAC controls with a computerized building management system, integrated control panel or equivalent devices. Components located in occupied spaces to consist of remote sensors.

D. Pneumatic controls are not acceptable.

9.08 RESTROOMS, SHOWERS, COPY, SUPPLY, JANITOR AND OTHER SPECIAL PURPOSE

ROOMS

A. Provide exhaust in compliance with the Oregon State ventilation code.

B. Address each room, heating, cooling, and exhausting fumes in a separately zoned or dedicated

HVAC system, as required.

C. Exhaust fans shall be controlled by a countdown timer, on/off switch, or by an appropriate means.

Fans to exhaust to the outside.

D. Toilet and shower room exhaust fans to operate on motion sensors. Fan to turn on with space occupancy followed by a 30-minute delay off. Do not return air into the building air supply.

E. Special Purpose Rooms - Address each room, heating, cooling and exhausting fumes as required.

Provide automatic controlled, timer controlled or switch controlled exhaust fans as appropriate.

Fans to exhaust to the outside.

TREE COOLER MECHANICAL REQUIREMENTS

10.01 GENERAL DESCRIPTION:

A. Tree cooler will receive approximately 300,000 trees per planting season. Planting seasons are in spring and fall of each year.

1. Spring Season: All trees show up at the same time and the Forest is responsible for thawing and organizing them. Trees are delivered to the tree cooler frozen and remain frozen for up to 4 weeks prior to gradual thawing.

2. Fall Season: There are multiple deliveries; a week’s worth of trees are delivered at a time.

Their temperature at arrival at the cooler is about 36oF. During this period, cooler will maintain 36oF to 37oF indoor temperature.

B. Cooler will also be used to store seeds or cones intermittently.

10.02 DESIGN CONSIDERATION:

A. Mechanical design shall be completed and stamped by a mechanical engineer licensed in the State of Oregon.

B. Tree cooler will operate at 28oF to 30oF indoor temperatures when frozen trees are received.

Number and types of trees will vary depending on fire season. Cooler will be capable of maintaining the setpoint temperatures containing various number of trees.

1. No humidification when cooler temperature is below freezing.

C. Thawing will be gradual with 1oF increments per 1-2 days up to 36oF cooler temperature.

1. 80% to 90% relative humidity ratio.

2. Specify high air circulation to minimize temperature and humidity gradients.

3. Thermal characteristics of seedlings:

5/22/2023 Ripplebrook Work Center Infrastructure Page 22 of 38

Table 3 Seedling Characteristics Seedling Characteristics Weight 40 to 60 lbs per bag Storage Unit 220 seedlings per box, average Boxes per Stack 20, average Pallet Stacks in freezer 30 Trees per cooler 132,000 average Specific Heat, above freezing 0.90 Btu/lb/ºF Specific Heat, below freezing 0.40 Btu/lb/ºF Latent Heat 125 Btu/lb Respiration Heat.

in Btu/lb-24 hours 30ºF 40ºF 50ºF 60ºF

2.0 6.0 9.0 12.0 Freeze Point 30ºF

D. Conifer Seed Cone After-Ripening:

1. Within seed cones, fungus and mold…