This Design Criteria Package provides specifications and requirements for the Ralph Brennan Water Treatment Plant (WTP) Hardening and Upgrades Project, a progressive design-build initiative by the City of Daytona Beach to address critical infrastructure needs at the region's only water treatment facility serving over 100,000 customers across eastern Volusia County. The project encompasses four primary components: replacement of the electrical system, expansion of lime softening basins, implementation of onsite chlorine generation, and increased finished water storage capacity, with an optional fifth component addressing distribution system hardening contingent on available funding. The WTP, originally constructed in the 1970s and expanded in the 1980s to a 24 million gallons per day (MGD) capacity, has experienced documented vulnerabilities to extreme weather events including power loss from downed trees, equipment damage from wind-driven rain, and site flooding. The design-build team will be responsible for prioritizing the electrical system replacement as a standalone component with its own guaranteed maximum price to expedite construction, ensuring that critical treatment processes remain operational throughout replacement activities while addressing hardening, flood-proofing, and adding generator redundancy.
The project is estimated at $35 million and will be primarily funded through the State Revolving Fund (SRF) Drinking Water program with supplemental city funding for design phases and additional grant opportunities. The City was placed on the SAHM (Supplemental Appropriation for Hurricanes Helene and Milton) Priority List in November 2025 with a sponsor cap allocation of $35,139,169 in 100 percent principal forgiveness funding, with an additional $7,435,831 on the waiting list. The project must be fully completed by December 15, 2031, with final reimbursement submitted by January 31, 2032. SAHM-eligible components are exempt from Build America Buy America (BABA) requirements but must incorporate resiliency and hardening measures. The design-build team will handle SRF administration during construction, ensuring compliance with Davis-Bacon and American Iron and Steel requirements. If project costs exceed the allocated SAHM amount or scope increases, general SRF funding may be pursued to cover the remainder, with the design-build team assisting in facility planning, request for inclusion submissions, and loan administration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design Criteria Package Ralph Brennan Water Treatment Plant Hardening and Upgrades
Project
Project Overview
The City of Daytona Beach (City) is undertaking the Ralph Brennan Water Treatment Plant (WTP) Hardening and Upgrades Project. This project will address several key needs within the City’s only water treatment facility, including:
1. Harden critical infrastructure from extreme weather events.
2. Improve operational efficiency through the replacement of obsolete infrastructure and addressing condition concerns.
3. Increase process reliability through the addition of system redundancy.
This project consists of four (4) individual components located at the WTP as listed below in Table 1.
Table 1 – Project Components Facility Project Component**
Ralph Brennan WTP
Replacement of electrical system Expansion of lime softening basins Implementation of onsite chlorine generation Increase finished water storage capacity Distribution system hardening1
** All project components were included in Hurricane Milton funding request. Refer to Funding Overview section for additional details.
1. Additional project component only applicable if sufficient budget is available.
Project Need
As noted above, this project will address critical needs within and at the City’s only water treatment facility.
Below provides additional background to the individual needs.
Ralph Brennan WTP Hardening
The Ralph Brennan WTP is the only source of drinking water to over 100,000 residents in eastern Volusia County. Despite being located on the western edge of the City along LPGA Blvd, the facility is still highly vulnerable to damage from extreme weather events such as hurricanes. The City has witnessed these vulnerabilities firsthand over the past decade, including:
Loss of power from downed trees/power lines;
Loss of critical equipment from wind-driven rain;
Localized flooding of the LPGA Facility from rainfall;
Appendix A provides pictures of site flooding from past events.
Given the criticality of this facility, it is imperative that the facility be able to withstand future extreme weather events as well as increase its overall reliability to ensure the residents have access to safe drinking water, regardless of the weather. It is anticipated that the hardening efforts will include:
Increasing redundancy within systems
Flood-proofing of structures/processes
Elevating critical components above flood-levels, as needed
Obsolesce and Condition
The components of this project include systems/processes that are between 25- and 50-years old. As such, these components are either past their useful life or obsolete. Additionally, the associated structures/systems are in poor condition and need to be replaced. Further detail will be provided on this item within each component write-up.
Increasing Plant Operational Reliability
While the WTP is sized and permitted to treat up to 24 MGD of potable water, not all processes have full operational reliability. Thus, when systems need to be taken offline for maintenance, or due to damage, the ability of the facility to reliably meet customer demands is further strained. This issue will continue to worsen as the potable water demand increases with additional development. This project will provide the components needed to provide the facility with operational reliability, similar to Class I Reliability requirements for WRFs
Funding Overview
This project is estimated to cost $35M. The City plans to fund this through the State Revolving Fund (SRF) Drinking Water program, however limited portions of the project will also be funded directly by the City. Additionally, the City, alongside of the Design Build Team, may choose to seek additional grant funding to help offset project costs if they exceed the SRF allocation. It should be noted that if the guaranteed maximum price (GMP) for the total project exceeds the City’s budget, project components may be removed to reduce the total costs to within budgetary limits.
SAHM Allocation – In June 2025, the City submitted a Request for Inclusion (RFI) for SAHM funding related to damage sustained from Hurricane Milton. The RFI included all of the projects listed in Table 1 above, making them SAHM-eligible. In November 2025, the City was placed on the SAHM Priority List for the sponsor cap allocation of $35,139,169 (100 percent Principal Forgiveness), with another $7,435,831 of the City’s request being placed on the waiting list should funding come available.
SAHM-eligible projects must address resiliency/hardening as part of the project to ensure they meet the funding requirements but are exempt from Build America Buy America (BABA). The project must be fully completed by December 15, 2031 with final reimbursement submitted by January 31, 2032.
The City is working to get the loan agreement in place, with access to design funding by the time this project begins. The Design Build Team will work with the City to meet all requirements to ensure that construction funds are secured. Additionally, the Design Build Team will be responsible for SRF administration during construction ensuring compliance with Davis-Bacon and American Iron and Steel.
General SRF – If project costs rise about the allocated amount, or if the project scope increases, the City may pursue general SRF funding to fund the remainder of the project, with the amount requested being dependent upon the City’s budget. The Design Build Team will assist the City with acquiring general SRF funding. It is anticipated that this will include work associated with:
Facilities Plan, RFI, loan application and administration.
City Funding – The City plans to fund the Phase I (design) portion of this project.
Grant Funding – The Design Build Team will assist the City in identifying and pursuing grant opportunities that best align with this project, while taking the time constraints of this project into consideration.
It should be noted that multiple guaranteed maximum prices (GMPs) are anticipated to expedite the most critical project components.
Treatment Facilities Overview
The City owns and operates one (1) WTP that provides treatment to over 100,000 customers within the City of Daytona Beach, the City of South Daytona, portions of Daytona Beach Shores, and areas of unincorporated Volusia County.
Ralph Brennan WTP The Ralph Brennan WTP (Facility ID FL3640275) was constructed in the 1970’s and was expanded in the 1980’s to the current capacity of 24 MGD. The WTP treats raw water from 26 Upper Floridan wells utilizing a conventional lime softening treatment process. The treatment process also includes ozonization, pH adjustment, filtration, and disinfection utilizing chloramines.
Figure 1 provides the most recent process flow diagram for this facility. Figure 2 provides an overview of the Ralph Brennan WTP.
DATEREV BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
11253G.40
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
OFAUGUST 2021
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
CA No. 8571
Phone (407) 478-4642
Orlando, FL 32801
200 East Robinson Street, Suite1400
® CITY OF DAYTONA BEACH
BRENNAN WTP FILTER UPGRADE
100% DOCUMENTS
No 75487
E
R
IC
ADIANESTO
N E
COPIES.
BE VERIFIED ON ANY ELECTRONIC
SEALED AND THE SIGNATURE MUST
ARE NOT CONSIDERED SIGNED AND
PRINTED COPIES OF THIS DOCUMENT
P lo t
D a te
-A
U G -2
:4
:5
P
M U s e r:
s v c P
W
M o d e l:
L a y o u t1
C o lo rT a b le g s h a d e .c tb
D e s ig n S c ri p t:
C a ro ll o S td
P e n v .p e n
P lo tS c a le :1
00G05
L A
S T S
A V
E D B
Y
PROJECT NO. FILE NAME:11253G40
GENERAL
PROCESS FLOW SCHEMATIC
11253G40_00G05.dgn g g o n z a le z
(TYP. 3)
GROUND STORAGE TANKS
TRANSFER PUMPS
CLEAR WELL AND
(TYP. OF 6)
FILTERS
SLUDGE HAULING
(TYP. OF 2)
THICKENER
SLUDGE
PUMPS
SLUDGE
OVERFLOW
RETURN PUMPS
WASHWATER
RETURN PUMPS
SLUDGE
HYPOCHLORITE
SODIUM
AMMONIA
DIOXIDE
CARBON
LIME
RECARB
POLYPHOSPHATE
HYPOCHLORITE
SODIUM
CONTACT
CHLORINE
OZONE
PRE
26 WELLS
LINE FROM
RAW WATER
RECARB
OZONE
PRE
SOFTNER NO. 1
SOFTNER NO. 3
SOFTNER NO. 2
DIOXIDE
CARBON
LIME
LIME
(TYP. OF 2)
RECOVERY BASIN
WASHWATER
M
PUMP
BACKWASH
HIGH SERVICE PUMPS
(TYP. OF 2)
BLOWERS
AIR SCOUR
PROTECTION
OVERPRESSURE
EDS
GG
MSR
Brennan WTP Storm Hardening and Resiliency Project
State of Florida, Maxar, Microsoft
FEMA Flood Risk Zones
AH
Daytona Beach City Boundary
6/25/2025, 10:16:01 AM
0 0.03 0.060.01 mi
0 0.05 0.10.03 km
1:2,257
City of Daytona Beach State of Florida, Maxar, Microsoft |
SmithEric Rectangle
SmithEric Rectangle
SmithEric Rectangle
SmithEric Rectangle
SmithEric Rectangle
SmithEric Rectangle
SmithEric Ellipse
SmithEric Ellipse
SmithEric Ellipse
SmithEric Rectangle
SmithEric Ellipse
SmithEric Ellipse
SmithEric Ellipse
SmithEric Ellipse
SmithEric Ellipse
SmithEric Ellipse
SmithEric Ellipse
SmithEric Rectangle
SmithEric Rectangle
SmithEric Rectangle
SmithEric Rectangle
SmithEric Rectangle
SmithEric Rectangle
SmithEric Text Box Admin/Control Building
SmithEric Text Box A
SmithEric Polygon
SmithEric Polygon
SmithEric Text Box Location available for improvements. Infrastructure impacts TBD
SmithEric Polygon
SmithEric Text Box A
SmithEric Text Box G
SmithEric Text Box B
SmithEric Text Box I
SmithEric Text Box I
SmithEric Text Box I
SmithEric Text Box J
SmithEric Text Box M
SmithEric Text Box H
SmithEric Text Box C
SmithEric Text Box C
SmithEric Text Box C
SmithEric Text Box K
SmithEric Text Box E
SmithEric Text Box F
SmithEric Text Box L
SmithEric Text Box E
SmithEric Arrow
SmithEric Text Box D
SmithEric Arrow
SmithEric Arrow
SmithEric Text Box Ozone Building
SmithEric Text Box B
SmithEric Text Box Lime Softening Basin
SmithEric Text Box C
SmithEric Text Box Lime Silo
SmithEric Text Box D
SmithEric Text Box Recarbination Basin
SmithEric Text Box E
SmithEric Text Box CO2 Tanks
SmithEric Text Box F
SmithEric Text Box Gravity Filters
SmithEric Text Box G
SmithEric Text Box Chlorine Storage
SmithEric Text Box H
SmithEric Text Box Finished Water Storage
SmithEric Text Box I
SmithEric Text Box Lime Thickener
SmithEric Text Box J
SmithEric Text Box Vacuum Drum Press
SmithEric Text Box K
SmithEric Text Box Washwater Basins
SmithEric Text Box L
SmithEric Text Box Emergency Generators
SmithEric Text Box M
SmithEric Text Box
FIGURE 2:
Ralph Brennan WTP SITE LAYOUT
Project Components
As noted previously, this project consists of four (4) different project components all located at the Ralph Brennan WTP. The following provides more in-depth information for each component. Appendix B provides limited design/record drawings for the initial plant construction as well as the subsequent plant expansion.
Ralph Brennan WTP – Electrical System Replacement
While initially constructed in the 1970’s, the last major construction at the Ralph Brennan WTP was when the facility was expanded to 24 MGD capacity in the mid-1980’s. Since that time, minor upgrades/improvements have been made. As such, much of the electrical system is original and is either past its useful life, or obsolete. Being the only source of potable water to over 100,000 customers in eastern Volusia County, the condition of the electrical system, leaves the customers highly vulnerable to loss of service resulting from electrical issues that are common during storm events. In 2022, the City completed an evaluation (see Appendix C) to document the condition of the electrical system in order to better prepare/plan for replacements/upgrades. The evaluation showed that most of the electrical system is either past its useful life, obsolete or both. This matches the City’s experience of only being able to find some replacement gear either in a refurbished state or on aftermarket websites.
In addition to the age/condition of the electrical systems, the electrical system is vulnerable to water damage from both rising water and wind-driven rain. During past storm events, wind-driven rain has entered electrical buildings and damaged critical electrical equipment.
It is critical that the existing treatment processes remain operational throughout the replacement process.
It is anticipated that the Design-Build Team will address the following items related to this project component:
1. Prioritization
a. Due to the consequences of failure associated with this project component, it is anticipated that it will be prioritized with an individual GMP such that construction can begin ahead of other project components.
b. This is a “must-have” project and will proceed regardless of other project components.
2. Electrical system replacement
a. Anticipated to include all electrical gear within the treatment process, including all standby emergency power. Consideration will be given to adding additional standby generators for redundancy.
b. Include grounding, bonding and lightning protection.
c. Arc flash and safety considerations should be accounted for.
d. In the event that a project component is eliminated from construction due to budgetary restrictions, associated electrical gear will still be replaced as part of this project component.
3. Electrical building hardening/protection
a. Consideration of how best to harden and protect the new electrical system from storm events. This could include new structures or utilizing existing on-site structures. If existing structures are utilized, hardening and flood-proofing must be included.
b. If new structures are deemed to be most feasible, consideration should be given to combining with other project component structures to reduce overall costs.
Ralph Brennan WTP – Lime Softening Basin Expansion
The treatment process currently incorporates three (3) lime softening basins to meet water quality requirements. Lime softening serves as a major step in the treatment process. Two (2) of the basins are sized to treat 6 MGD each, while the third basin can treat 12 MGD. With half of the treatment capacity in a single basin, loss of basin functionality due to storm impacts or even downtime resulting from maintenance puts strain the remaining basins, in turn affecting overall water quality.
This operational limitation has become more apparent in recent years as finished water demands have pushed above 14 MGD on an average day, exceeding the rated capacity of the two (2) 6 MGD basins.
This project component will provide much needed redundancy/reliability to the lime softening system by expanding the treatment capacity to greater than 24 MGD.
It is anticipated that the Design-Build Team will address the following items related to this project
1. Lime Softening Expansion
a. Technology consideration including evaluating the ability to increase capacity via pellet softening versus conventional softening.
b. Sizing/siting of lime softening expansion.
c. Evaluation of existing lime silos and upgrades as needed.
d. Integration of new system into existing treatment process.
e. Consideration for pipe routing/tie-ins to provide increased redundancy.
f. Inclusion of provisions to ensure lime system is hardened/protected.
Ralph Brennan WTP – Finished Storage Expansion
The Ralph Brennan WTP includes three (3) finished water storage tanks totaling 5 MG in capacity.
During an average day, the tanks are turned over in approximately 8 hours. Additionally, the City has another 5 MG of offsite storage located in the middle of the service area. This project component would include the installation of another finished water storage tank to provide additional storage. Additionally, the project will also include upgrades to the transfer pumps needed to accommodate the additional storage.
It is anticipated that the Design-Build Team will address the following items related to this project
1. Finished Water Storage
a. Hydraulic evaluation to determine most appropriate size of new tank.
b. Operational analysis to determine how best to integrate the tank into the existing finished water storage process.
c. Siting of the tank, including research into possible conservation easements in the undeveloped area immediately west of the WTP.
d. Pipe routing analysis with focus on redundancy.
2. Transfer Pump System
a. Upgrades/replacement of transfer pumps/system to account for additional storage tank.
Ralph Brennan WTP – Chlorine Generation System
The Ralph Brennan WTP currently purchases bulk liquid chlorine for use in the disinfection process. Bulk 12.5% sodium hypochlorite is trucked in and offloaded into a 36,000-gallon fiberglass tank. The bulk solution is then diluted to 1% strength and transferred into one of two other 36,000-gallon fiberglass tanks. The fiberglass tanks do not have any secondary containment and are in need of refurbishment.
Prior to bulk purchase, an on-site hypo generation system was utilized to produce the sodium hypochlorite needed for disinfection. However, due to the age of the system and the constant maintenance requirements, the decision was made to resume bulk purchases. Since resuming bulk purchases, chemical costs have greatly increased and there are always concerns related to the reliability of supply during major events such as hurricanes.
It is anticipated that the Design-Build Team will address the following items related to this project
1. On-site Generation System
a. Consideration of the chlorine generation systems available on the market with respect to items such as but not limited to: capital cost; operational cost; installation history;
references.
2. On-site Storage
a. Quantity of storage needed to ensure reliability.
b. Type of storage tanks (i.e. refurbish existing fiberglass tanks vs. install new FRP tanks).
c. Inclusion of secondary containment.
d. Building modifications necessary to accommodate storage modifications.
Ralph Brennan WTP – Distribution System Hardening
The Ralph Brennan WTP provides water to customers through miles of interconnected distribution pipes.
A majority of the residents live within areas that are at risk from flooding or storm surge. The nature and layout of the water system includes the “beachside” island east of the Halifax River, which is supplied by one water treatment plant on the west end of the City. This component will improve upon the resiliency of the water system, such that storm impacts can be better prepared for, mitigated, and that post-storm system recovery efficiency can be increased. This project will develop strategic management zones for use in storm response in order to be able to limit water outages, minimize boil water requirements, and maintain water quality in the system. It should be noted that this project component is contingent upon sufficient funding being available, including if the City receives any of the SAHM waiting list allocation.
It is anticipated that the Design-Build Team will address the following items related to this project
1. Distribution System Analysis
a. Desktop analysis, using the City’s hydraulic model, is needed to evaluate the distribution system and create flushing plans and maps for various scenarios.
2. Booster Station and Valving
a. Addition of booster station along southern border of town for pressure boosting to southern service areas.
b. Hydraulic evaluation to determine most beneficial location.
c. Consideration of chemical addition at booster station.
Appendix A
LPGA Facility Flooding Photos
Appendix B
Design/Record Drawings
Original Plant Construction – 1970s
1980’s WTP Expansion mrnrnmimmmmmmmmmmmmmmBMmmmmmMmmmmmmmmmnmm 'mmmmms:SSI*® wMmmmmmmmm-Mmmm msMmmmmMwmMMsmmmMmMMmmmmwMmMmmmiUSSliSSl wmmmmmmmmmm
I
I
ELECTRICALMECHANICALlitNb H AI V*'' a * "tIk «'W- w</s"
1 G-i CGvlp SH' HYDRAULIC PROFILE GENERAL NOTES LEGEND Ar52 E-1 IP\ ULE
SITE PLAN, DUCT BANK AND YARD D53 E-2MAIN YARD PIPING PLANG-2 INDEX 28 M-2 i i\ I ’ ? S CD2 f
54 E-3 SINGLE LINE DIAGRAMMISCELLANEOUS PIPING PLAN29 M-3
EXISTING SINGLE LINE DIAGRAM MODGjCE DONA $ A-usOZONE & RECARBONATiON BASIN PLAN 55 E-430 M-4CIVIL LOW VOLTAGE SWITCHGEAR ADC DuGS LAYOUT56 E-5OZONE & RECARBONATION BASIN SECTIONS31 M-5
C-1 SITE PLAN3 CONTROL BUILDING 1ST FLOOR MODiF IGA DONSOZONE & RECARBONATION BASIN SECTIONS & DETAILS 57 E-632 M-6
C-2 GRADING, PAVING AND DRAINAGE PLAN — EAST4 CONTROL BUILDING 2ND FLOOR MOD'58 E-7SOFTENING BASIN - PLAN & DETAILS ‘CRT'CRTS33 M-7
C-3 GRADING, PAVING AND DRAINAGE PLAN - WEST5 GENERATOR BUILDING POWER & LiGrDsNGSOFTENING BASIN - SECTIONS & DETAILS 59 E-834 M-8
C-4 PAVING AND DRAINAGE DETAILS6 MODIFICATIONS TO EXISTING SOFTENING BASINS OZONE BUILDING POWER & LIGHTING60 E-935 M-9
FILTER BUILDING PLAN OZONE & RECARBONATION BASIN POWER & uGrDWG61 E-1036 M-10
ARCHITECTURAL FILTER BUILDING - PARTIAL PLAN & SECTIONS THICKENER #2, SOF FENER #3 and62 E-11 n37 M-11 r • ■uW S cCH .V/ * w
FILTER BUH-DING - SECTIONS & DETAILS WASHWATER RECOVERY BASIN *2 PC -V63 E-1238 M-12 ' •••; Jc-OHT
GENERATOR BUILDING - PLANS & ELEVATIONSA-17
LIME BUILDING POWER AHIGH SERVICE & TRANSFER PUMPS & PIPING 64 E-13 GHYC-; C39 M-13 Li
GENERATOR BUILDING SECTIONS AND ARCHITECTURALA-28
SCHEMATIC DIAGRAMS IGROUND STORAGE RESERVOIR - PLAN, SECTIONS & DETAILS 65 E-1440 M-14
SCHEDULES
SLUDGE THICKENER - PLANS & SECTIONS SCHEMATI DIAGRAMS d66 E-1541 M-15
OZONE BUILDING - FLOOR PLANS & ELEVATIONSA-39
LIGHTING FIXTURE SCHE-CGA C * ND lS - ,DDSLUDGE THIDKENER - SECTIONS & DETAILS 67 E-1642 M-16
OZONE BUILDING - ROOF PLAN & SECTIONSA-410
68 E-17 LIGHTING PANEL SCHWASHWATER RECOVERY BASIN - PLAN SECTIONS & DETAILS ***■'
43 M-17 LIME BUILDING - PLAN, ELEVATIONS & SECTIONSA-511 I69 E-18 CONTROL WIR.NG SOMEMISCELLANEOUS SLUDGE PUMP DETAILS44 M-18 I s
, i V K
A-6 ARCHITECTURAL DETAILS12
LIME BUILDING - MECHANICAL EQUIPMENT45 M-19
CONTROL BUILDING MODIFICATIONS - FIRST FLOORA-713
46 M-20 OZONE BUILDING - MECHANICAL EQUIPMENT INSTRUMENTATIONCONTROL BUILDING MODIFICATIONS - SECOND FLOOR14 A-8
47 M-21 OZONE SYSTEM SCHEMATIC
70 1-1 PROCESS CONTROL 6 1 I48 M-22 CHEMICAL FEED SYSTEMS MODIFICATIONS «-
STRUCTURAL 71 I-2 COMPUTbR SYS'i c M f
49 M-23 MISCELLANEOUS MECHANICAL DETAILS
72 I-3 CONTRO: ROOM POL F ! ic i'Ai,.
STRUCTURAL DETAILS AND GENERAL NOTESS-115
73 i-4 INSTRUMENTATION vV i1- N ’ /'• ;
HVAC AND PLUMBINGGENERATOR BUILDING - PLANS & DETAILSS-216
S-3 OZONE BUILDING - FOUNDATION PLAN & DETAILS17 I
50 H-1 GENERATOR LIME & OZONE BUILDINGS - PLUMBING & HVAC
OZONE BUILDING - ROOF FRAMING PLAN & DETAILSS-418
51 H-2 CONTROL BUILDING MODIFICATIONS & PLUMBING AND HVAC
S-5 LIME BUILDING - PLANS & SECTIONS19
SCHEDULES 1
OZONE AND RECARBONATION BASIN - PLANS & SECTIONSS-620
OZONE AND RECARBONATION BASIN - SECTIONS & DETAILSS-721
S-8 MISCELLANEOUS STRUCTURAL DETAILS22
WASHWATER RECOVERY BASIN - PLAN & SECTIONSS-923
S-10 WASHWATER RECOVERY BASIN - SECTION & DETAILS24
S-11 HANDRAIL & BRIDGE PLANS25
MISCELLANEOUS SECTIONS & DETAILSS-1226
mgmts&esmmmmemm CHECKED Tv SC, A L, EDESIGNED bvLr 1 f K. C Idfvi
'• E •; -. FXKSDlUN :M C B rJE’ D E
INC %T“ r~
V/ *RCSSBLL & AXI >A\ INC. DC CDS NS;DRAWS BY
D C W PWCDCNN A;CKDi bnNC
CnO EE3JUO, EiHODAYTONA 1:0- ' FLORv - A dp 7 3Pi E' , .a wmm p.;:r ■mamm 1 \zmsmsm
28 27
TOP RAILS BARBED WIRE TRANSITION
FROM ANGLE TO VERTICAL
AT GATE3 STRANDS BARBED WIREWIRE MESH
WIRE TIESCORNER POSTo GATE POSTXXX XXX XXX29 XXX XXX XXXi -XXX- -x*x- -xxx-XX -XX; XXX -xxx-z -XXX >ee«z xxx"2 T
WIRE TIES
WIRE MESH
FRAME
BRACE
\ 28lO'-O" MAX. IO'-0" MAX.-ts'o LINE POST J • t y;CD O s=?o CROWN TO SHED
WATER (TYP)
HORIZONTAL BRACE
ALL CORNERS EACH
WAY AND ALL TERM
INAL AND SWING
GATE POSTS
FINISH GRADE CD
§i— TRUSS RODSRETCHE
BARSr
COo ofCD FINISH GRADEi
CM
kn 4CMPO ro I£ >:[]•;po £ i rrn rr i vA w:i 5IEf o6
CD XI\
[Up iCM ?I*PO LiA •.UPCONC. ENCASEMENT AT
LINE POST SHALL BE A
MIN. OF 12" DIAMETER
AT TOP
CONC. ENCASEMENT AT
CORNER 8 GATE POSTS
SHALL BE A MIN. OF 16
DIAMETER AT TOP
*o! ©10 ii
=T -•£>■12 ii 12 ii CDii
TYPICAL VEHICAL GATE DETAIL
TYPICAL FENCE DETAIL NOT TO SCALE \
28 NOT TO SCALE
i DRAWER NO. DWG. NO. C - 3SCALE a
RALPH F. BRENNAN
WATER TREATMENT PLANT EXPANSION ©i30‘-0ii
SHEET 1I
MO.PROJECT NO.
01053
FILE NO.CKD.
REVISIONS OP 73DAYTONA SEA© - FLQP 5 A.
msmmmmm.
I ftfl m*
Iii |S P
I
WEST EDGE OF ROAD ,— RELOCATE EXISTING FENCE TO NEW
/ LOCATION 81-0" WEST EDGE OF ROAD
■ wmmmmm m
MATCH LINE WITH SHEET C2
<m m wgmmssm ■mmssmassm. mo . ■ M-x- z.X-v: x- x= 22^ •x- ■x- x-z—30 30o
3 J2Ero 30 28r29 7JL29- £8- LIMITS OF CLEARING28
•27 RELOCATE FENCE
LIMITS OF CLEAR I NO Z 26-A
RELOCATE
FENCE
8 GATE-
I0'X 10' RIP RAP
SP1LLWAYCONST. RIP RAP WEIR
WEIR SILL 26.54--------
SEE DETAILS SHT.04 •26 SNV.25.39% //
26\ —LIMITS OF CLEARiNG7Z
10 * X 10'
SPILLWAY
RIP RAP
28 — 'h it3’ CONST. 200EF-6" UNDERDRAIN/I Yo©
— -jp • V
28 28EXISTING RIP RAP
EMBANKMENT29
;io 26120'±
27//
•s <o\ Ip'
XXX XXXX*3<r -xxx- xxx-
DESIGNED BY CHECKED BY
MJPPAVING, GRAD ING AND DRAINAGE
WEST DATE
JUN. 1985
DRAWN BYPLAN
BB
RUSSELL & AXON, INC.
DESCRIPTION BYLU H
<o 1o1 rx 1
'm m
BR
U
N iN
G
4-
1-
DcO
RIP-RAP
BANK TO
EXiST.
I
RIP-RAP BANK
TO EXIST.
T 6,! UNDERDRAIN
o i
WEIR - PLAN
NOT TO SCALE
I"H:I2"V
BATTER"*’
MEET PROPOSED GRADE UNDERDRAIN
D1SCHARGE
1NV. EL. 26.00 MATCH
EXISTING. 28.00
SS^-WEIR lS LLL
EL.26.54 —SSJ
I ■I-cacacac V <r v."-gz=3
EL 25,50
WEIR - SECTION
NOT TO SCALE
00<n
CM
CD
CM
a CKD.DATENO.
Z> REVISIONSa:
DEDUCTIVE ALTERNATE NO.3
ALTERNATE SITE GRADING -
V
T I o!
oCM 30 I
& X
CONNECT TO
EXIST!NG 31
^9 ,32 i'3;
3\
XWASHWATER
RECOVERY BASIN
i-30
BRUSH LINE
I oro
X t o1 ro
CXJ
o 1 t Io
X•4" 1CM 3132/X X6 Z^T33
NOTE:
ALTERNATE SITE GRAD ING
FOR DEDUCTiVE ALTERNATE
NO.3 SEE SHEET N0.C4
23 rtf V
I
Q . I
& XX
CL1 03 O' O< no o Q.03 O2 cco
CO PROPOSED NEW
FENCE LOCAT1 ON& i in r-
CM
<p X i
5'O)\ cv28BRUSH LINE . O limits of/clearingI no ono i
X* i t/
<9
•aP A
TI50'-I8"RCP 0 0.11%
X 80'-l8"RCP
©0.11%
ALTERNATE SITE GRADING
(DEDUCTIVE ALTERNATE NO.3)
SCALE: 30'-0 I!I! _
I
DWG. NO. C ~ 4
6SHEET I
NO.
OF 73 SHEETS
assists®’®;
10'-0 it
I '-0 4 1 -0 ti
5 1 -0" u
RIP-RAP
BANK TO
EXIST. -
FLOW
EL.28.00
Ml^k. ■»-g?FTE.26.
1 y EL.26.00SB£LEL.26.00
CZ>
3-O-
6" UNDERDRAIN •*
WEIR - PROFILE
NOT TO SCALE
CONSTRUCTION NOTES:
I . ALL CATCH BAS I NS FOOT TYPE V
UNLESS OTHERWISE NOTED
IX
I 1
T i SEED a
MULCH
SEED a
MULCH |SOLID SODSOLID SOD
-OO-■o g 4 1 -0nt4 ' -08 1 -0 u4 1 -0"4 1 -0 a 6 1 -0 8 ! -0 » it 6 1 -0 it1!RIP-RAP SPILLWAY »
-tUoO «=3 c=» o -Cs* O- 4“ WHITE
PAINTED
STRIPE-
I ’-0 I! £• o* oPIPE DIAMETER * -4oX9// iI !-0■ v iO <7 T , 4 , Q
-o.« • 12ti12ii DRAINAGE FABRIC. o
00 oPARK ING
STALL
l *
'■~0 0.55rrm SAND MEDIA oVARIES SEE PLAN, \ 1 CXJ6 2"o 6• <lys&riFmszam i0 *MAX.lx! 1 *MAX.CL 0Iro TtrIi 6 1 +0 u iCL, 45 *iCDX I I
I • v i 2-#3 BARS t
51 -611 LONGy \ 0A'* O I 1/2” TYPE S-i ASPHALT PAVEMENT #*fto iV- 1 . V
■ V • V*6" PERF. PVC PIPE
WRAP W/ DRAINAGE FABRIC
i<7 lolW ii i <s. o IA'8“ TYPE Ii ASPHALT BASE$ <7 *I V1 ii04 Jt 1
T8" STABILIZED SUBGRADE
(75 LB. F.B.V.)
6" 2 HOLES FOR #4 BARS
12" FROM EACH END
6" 6" -O
10I •0"I ’-6 it
6" STABILIZED SHOULDER
(75 LB. F.B.V.}
#4 BARS, I 2"LONG(2)
EMBEDDED IN PAVEMENTSTORM SEWER MITERED END SECTION
IAND COLLAR DETAIL SECTION A-APLAN
NOT TO SCALE
TYPICAL PAVEMENT SECTIONUNDER DRAIN DETAIL TYPICAL CONCRETE WHEEL STOP
NOT TO SCALE NOT TO SCALENOT TO SCALE
6 1 -0 ii6 1 -0"
CB# 10
TOP 27.8
1NV.25.64 NE
1NV.25.48
DRAWER NO.DESIGNED BY CHECKED BY SCALE
RALPH F. BRENNAN
WATER TREATMENT PLANT EXPANSION
1!MJP AS NOTEDRUSSELL & AXON, INC. PAVING AND DRAINAGE DETAILS PROJECT NO.DATEDRAWN BY FILE NO.
01053JUN. 1985BBDAYTONA BEACH FLORIDA
CB#9
TOP 28.I
INV.25,65
DESCRIPTION BY
CB#8
TOP 28.9
1NV.25.95
•T O
P O
F
BA
N K
L a
T
T .r r
H M o
H
M
P
Oo
FL
O
W
O '-O it oo
0“ 19 ii o
IU
L
.i- A irr a o
TO
P
O F
BA
N
K
I— i f: , FLOOR PLAN
0"1!SCALE: 1/4
re1'.'*5 1/4" 5 i/4" TOPPiNG THICKNESS
ROOF PLAN
SCALE: 1/4 I 0 II
DESIGNED BY • CHECKED BY
WRW
DRAWER NO. DWG. NO. A - ISCALE
AS NOTEDRALPH F. BRENNAN
WATER TREATMENT PLANT EXPANSION
i
GENERATE
PLANS
NG| ' 1/ 7-SHEETRUSSELL & AXON, INC *1 NO.■■
iiBSL
PROJECT NO / |% RLE NO.DRAWCKD.BYDESCRIPTION
- (figsiI BNHgpA BEACHDA'*REVISIONS 7 Si"75S! W fillsO/ ■
1EBI--V jN:; :g00Oil-- fillipw NN Sj*«w»S5a5W|^|
|NE IIA i tMmS-—
METAL FASCIA PANELS
44'-8" PRECAST CONC. SLAB CANOPY<3- MUFFLERMUFFLER MUFFLER METAL FASCIA PANELS
3'-4 IfS'-8 aa5 r“461 -8 I!! 2 1 -4a3 * “07*-4" o*£> <3-*£> <3~~£>0 CONC. TIE BEAM-NDOWNSPOUT-
SPLASH
BLOCK
CONC. TIE BEAM
BASPLASH BLOCKc ROOF
SLAB
BEAR ING
•AC UN IT, SEE
SHT H-lDOWNSPOUT ,~l A-i-1 AH,— I a-;
t IO AS-1I AS-1W-4L-4 co TIENETf—f J DAY
TANK
ACCESS LADDER
SEE DETAIL
SHT A-6
o TEXTURED COAT ING► ro
CM
- CANVAS-
EXPANSION
JOINT
8 it8' -0"61 -0 It8 o FL00F:LiiSTG. OFFICE o GRADE103 oL-3 GRADE
DOWNSPOUT
DISCHARGE
ON PVMT.
CM PAVEMENTo Is-
EAST ELEVATION SOUTH ELEVATION
HSCALE: 1/8 H _ i SCALE: 1/80 ii _ i -0U D-103
MUFFLER MUFFLER MUFFLERMETAL FASCIA PANELS
■CONC. TIE BEAM
METAL FASCIA PANELS
CONC. TIE BEAMS£ I3 TEXTURED COAT ING03O00
I
CO ROOF
SLAB
BEAR ING
CMCO CMCM
ROOF SLAB
BEAR 1NGT Im i i.D o W-4 A-3 A#--M-
CM SHOP EXISTING ENG/GEN
SET - RELOCATED
!Oor~ iTEXTURED
COAT ING
m m
102 CM CML-3 oNEW ENG/GEN SET
CM
FLOORFLOOFLi i i
GRADEGRADE CONC.
SILL
8" DOWNSPOUTDOWNSPOUT-8“oo 28,-0"14'-8 itI 8"
•O’ SPLASHBLOCKSPLASHBLOCK-co
FILL CELL
RE INF.
GENERATOR RM.
WEST ELEVATION NORTH ELEVATION4-CO
D-102 A ii I '-0 I!SCALE.* I /8 ii _ SCALE: 1/8 it _ I ’-0 ii fir*TIiii 3i 4 L-2m L-2mI
CD CONC.
COLUMN
(TYP.)
ElmTYP1 CAL?
"FIN." 1
co
■DOWNSPOUT/
DISCHARGE ,
ON PVMT.
BJ Maii8 D-IOID-102CM 33i ,-i A-;W-3 ABOVEW-3 ,-i a-;
t J'-Q9' -0 IIiiii9' -05'-4"-0"IMI 3'-4S'-O III -8" -*=»O
PRECAST CONC.
CANOPY ABOVE
SEE SHT. A-6
5 1/4 II N5 1/4
o o
•2'-6 "x3'-0'' I 1/2
THICK
IfACCESS HATCH
SEE SHT.A-6
3"ROOF DRAIN
TOR CURB 8 FLASHiNG SEE SHT. S-2vV
TAPERED CANT.
0" TO 3 1/2 H -o-
ISI 1/2
THICK3" ROOF DRAIN-
FINISH NOTES *
FLOORS - NATURAL CONCRETE WITH HARDENER
BASES - NONE
WALLS - GLAZED COATiNG
CEILINGS - GLAZED COATING
rqH<QOz
BR
U N
IN
G
4-
1-f: .
’-0
VE
R
IF
YIf o<>2C Dzc
“Om
-e
SL
O
PE
SL
O PEo
X
H
C
MN
Z
I '-
H
C M
XIC
M
O \ x rox
O X z ro x
DESCRlPTfON GLAZEMATERiALSIZE
8 X 16 CONC. LINTEL W/
2#5 T 8 B, #3 STIRRUPS
AT 12"
NEW RESIDENTIAL TYPE
MUFFLER„ SEE DETAILSCONC. L1NTEL W/ 2#5
NOTE COURSING LUGS £CONC. LINTEL W/2#5
NOTE COURSING LUGS 3" ROOF DRAINCANOPY CANOPY
MEMBRANE ROOFING/BALLASTED
r- GRADIENT CONC. TOPPING
I 1/2" TO 3 1/2 it ]SLOPE SLOPE ri1/4" CLEAR GLASS ---- 1 xttn■o- I r B-101 -a—NEW 10" EXH. PIPE W/3
INSULATION 8 ALUM. JACKET
NEW AL. SHROUD
BEAM B-IOIl -c*
1/4" CLEAR
TEMPERED
GLASS---- -
II I
CANVAS EXPANSION
JOINT'----------- -v
2"X 5 5/8" PRESSED STEEL1 3/4"X 4 1/2" ALUMINUM TUBE2“X 5 5/8
PRESSED STEEL
NEW 10" FLEX.
EXH. PIPEF-3F-2F-l 3" PVC
DOWNSPOUT'X u>©mDOOR FRAME TYPES SCHEDULE EXISTING ENG/GEN
D348 CAT . RELOCATEDCM
11 - I '-0 IISCALE: 1/4
r\=r
1/2" JOINT
ALL AROUNDSPLASHBLOCK- i2... r lax i* i i i 3 m.m.wa 3TI o F-4J GLASS AS SCHED.GLASS AS SCHED.* noF-i
B-B-B-BGRADE i
#6 © 10" EW7
SECTION THRU RELOCATED GENERATOR AA
SCALE: I/4 II _ I 0" Al A2
EDCBA
DOOR TYPES RESIDENTIAL TYPE
MUFFLER, SEE DETAILS
I '-0 IIII _SCALE: I/4
3" ROOF DRAIN
MEMBRANE ROOF ING/BALLASTED
r- GRADIENT CONC. TOPPING
I 1/2" TO 3 1/2W-3, W-4 - HEADS AT CONC. TIE BEAMW-1, W-2 I!
MATERIAL NUMBER TAKES PRECEDENT OVER SPACE LOCATIONNOTE SLOPE nSLOPE•o-i6'-2 1/4 UH xttnREMARKS:31-10 1/4" -*>| INSTALL AS PER MANUFACTURERS DIRECTIONS.
SEE TYPES SCHEDULE FOR SIDE LIGHTS 8 TRANSOM.
PROVIDE GASKETS AT HEAD 8 JAMBS 8 SWEEP AT FLOOR.
SEE DETAILS SHEET A-6 FOR PRECAST CONCRETE CANOPY.
SEE EXISTING ELEVATIONS FOR CHAIN-LINK FABRIC "WALL".
jH-IQ 1/|HpizX.l/4,^ 2.TI /\ 3. ^ .~TI/ \ B-IOiBEAM B-IOIi -o-4.7------^CM 5. 12" EXH. PIPE WITH
3" INSULATION 8 ALUM. JACKET
AL. SHROUD---
CANVAS EXPANSION N
JOINT-------------- v
TNOTE«/ \o II10 1/4i!Y> CONC. LINTEL W/ 2#5
M* EXHAUST PIPING SYSTEM
SIZE TO BE VERIFI ED
BY EQUIPMENT MF6.
st* in ro iiI m vsr1 tol / \I 12" FLEX.
EXH. PIPEI 33I 3/4"X
4 1/2“
AL TUBE
r------x SLIMLINE FASCIA CAP-
METAL FURRING STRIPS
KAWNER 55-725 ------
cr>PRECAST
CANOPY
PRECAST
CANOPY 3" PVC
DOWNSPOUT' NEW ENG/GEN SET
3512 CATERPILLER/\ *I 1-10”i ROOF DRAIN
MEMBRANE ROOFING (BALLASTED)
ti* i7.--X. s <0ro<4* / \ro i CMGRADIENT CONC. TOPPING/! 1/2" TO 3 1/2D-iOl
D-102 i I X 5i-£L<0 2 PCS. 2x6 W/2x6 SPACER
2"C/C ANC. W/L CLIP 4'-0"C/C—
oJ oI DOUBLE-TEE SLABSi 1/2" JOINT
ALL AROUND
FLOOR oo 2x4 W/3/8" EXP. BOLT
EACH STEM-------- -----
"4* CM SPLASHBLOCK- 1LPREMOLDED CLOSURE BETWEEN STEMS iW-4 W-5W-3W-2W-l i—tALUMINUM FASCIA PANELS
KAWNER 55-706--------- Xj.FIXED L1TES B—©—©—©<zT I c) *2x4 W/3/8"EXP.BOLT 2,-0"C/CALUMINUM ARCHITECTURAL PROJECTED-DSB CLEAR GLASS
PROVIDE POLE FOR OPERATION IN ALL BLDGS WHERE WINDOW
SILLS EXCEED 5*-0«
“S“ s F-4O2x4.2,-0"C/C %Qf I1 J F-l ro
B-BSOFFIT TRANSITION
KAWNER 55-739--
GRADE 5WINDOW SCHEDULE I >-8" ■CONC. TIE BEAM-1014“ #6 © 10" EWI '-0 IISCALE *. I /4 ii _ «=» -— <PERFORATED ALUMINUM SOFFIT-
J"EDGE
ALUMINUM STRAP W/2 EXPANSION
SCREWS INTO WALL 8 2 ST. SCREWS
INTO DOWN SPOUT (TYP 3 PLACES)- SECTION THRU NEW GENERATOR/ BHEADS AT CONC. TIE BEAML-2, L-3, AS-I
IIII 6'-8 i9' -0 I 21 -0 JO SCALE: l/4 1 '-0M _ 11i A2Al<?ITI I CM3“0 PVC DOWNSPOUT- •--- #5 BAR, FILL CELL W/CONCRETE
SEE FLOOR a FOUNDATION PLANSW-lCM TYPICAL 8x8 CMU "FIN" BEYOND-
HORIZ. JT. REINF. 16"C/Cro I in 1/2" PREMOLDED EXP. JT. MATERIAL W/!/2"x1/2" SEALANT4' -0 (L-l i PRECAST SPLASHBLOCK-LA
•6" CONC. FLOORI J (0I
M* / f 77 -«*o;v. L .qC.
,*fi**f. ‘ * ‘ t\ GRADE
1JO
5 = VJO <$• VAPOR BARRIERFOOTING F-l□, \M* CONC. LINTEL W/ 2#4i COMPACTED FILL
#5 DOWEL
(o
J
A iaa SoSo COCOFLOOR. & J L-4AS-1L-3L-2L
LOUVER SCHEDULE SECT I ON CI '-0SCALE: I/4 II - II
SCALE tI/2 u 0ui Al A2
3'q H^ 7i q u 7D-301 F-l A
LIME BUILDING (300)
4PR 31-0"X 6 710"204A F-3 A
8 ' -0!1X 1 2 ' —8 2ti204B B
77 *-0
PR 3‘-0“X 7'-0"
it206 F-I A 5z|.206A E
37PR 3’-0HX 71-0 »204 F-3 A
PR 3'-0"X 71-0"203 F-l C
202 C 31-0"X 7 i 0 ISF-l 73‘-0"X 7 1 -0 it201A F-l A
28PR 3 1 -011X 7 ' -0 ii 3D-201 F-2 D
OZONE BUILDING (200)
73'-0"X 6'-10“102 F-I A 29'-0"X I 21-0“I02A B
31-0"X 71-0F-l a103 A
3‘~OnX 6'-10D-IOI F-I A ii
GENERATOR BUILDING (100)
23456789
DOOR SCHEDULE
rr
7 V
7 Y
D-205A
7Y
7-------V
L-l
DRAWER NO. DWG. NO.SCALECHECKED BY
GAY
DESIGNED BY
WRW
A-2
GENERATOR BUILDING SECT IONS AS NOTED 8SHEETRUSSELL & AXON, INC. NO.AND ARCH ITECTURAL SCHEDULES PROJECT NO.
01053
FILE NO.DATE
JUN. 1985
DRAWN BYBYDESCRIPTION CKD.NO. DATE
BB
OF 73FLORI DAREVISIONS DAYTONA BEACH SHEETS
R
EM
AR
KS
1/ 4"
C
LE
AR
T
EM
PE
R
ED
1/ 4"
C
LE
AR
.W
IR
ED
I 1 /2
" P
IP
E W
/ C H
AI
N
L
IN
K
AL
S
U R
R O
U N
D W
/ G
LA
SS
AL
S
LA
T
R O
LL
IN
G
FL
U
SH
A
LU
M
IN
U
M
I 3 /4
" T H
IC
K
U N
LE
SS
O
TH
ER
W
IS
E
N O
TE
D
D O
O R
T
YP
E
FR
AM
E N
AM
E
M
AR
K
FA
SC
IA
FA
SC
IA
mO ~ i i?
4* -0
BR
U
N
IN
G
4-
M
X
METAL FASCIA PANELSCONC. TIE BEAM
52‘- 8 H r-416'- 8 II ROOF SLAB BEARINGa4‘- 8it 4'-8 it 4‘-0 nitr-4 4l-0 ...4‘- 8 it 4* - 0 a «—«♦4|~4- ¥
N CANOPY
x
CONC. COLUMN
SEE SHT. $-3
i r
CONC. SLAB W-lW-l W-l W-l oTEXTURED
COATING
ooL-iL-1L-IL-I rK H, ioo fi« mL ■ m
-Rr-.— - f1- I00lBl 00 stJL H 04 05 i7x !■4 -x -X■ ! 00D-206A ir_
FLOOR
GRADE
x XAA.A00 £CHAIN LINK FABRIC IN PIPE FRAMEI I It DOWNSPOUT a SPLASHBL0CK—3 - 4 CANOPY OVERV
CONCRETE SLABNORTH ELEVATION SCALE: 1/8" = l'-0 II
• JE
a
W-2 D-204Ast i ti18'- 0 ItII32'-8lo 2-8 it8
-CONC. TIE BEAMMETAL FASCIA PANELS
4' - o“i L^ I IIk'-oH 4l - r\" 4- II5uO ii 5'-0 L 4*~ 0"± ROOF SLAB BEARING5-0 TEXTURED COATINGn
A* 8 Ooo X
I i Ita 04 It i4 CONC. CANOPY04 “inY04TRANSFORMER ROOMD JL oiraA3 A4 14-0.206 i
Sto+1o 2 I 2o i i oI
$ ^ FLOORTo i Xo
* GRADEDRIVECONC. SLAB
II
7*-4
II3*-47‘” 4
it EAST ELEVATION scale: i/s" = i'-o it
' r ii
JL
X D-206~1 130T v
At30Ui i l
METAL FASCIA PANELS CONC. TIE BEAMBACCESS LADDER^
SEE SHT. A-6
OZONE GENERATING ROOM o iA3 A4oo CO 04o II ROOF SLAB BEARING!4'-0.204:Xt PASSAGE~o i^tio
^A3 A4/
X00 irToDRIVE oi 04 st,u i ain X04 i00 irQ "00 ww<DQ ¥I 22 B WfA3 A4 OO oo iiJLV ~,t'04A 04 v JL HtD-201 AD-2023 “oo■ p ill.. D-203aa
ACOUSTICAL CMU o v FLOOR'xr O —JLXI I d~3 x^=lTtTo i ii ti6l-4“ 8 uII I II I ItII I ItIIIin *314 7 43-4 1-42-88 3 GRADECHAIN LINK FABRIC-1
SOUTH ELEVATION
d.s. a S.B. -TEXTURED
COATING
a i-fe-o!f=* ■mX i i aJL SCALE: l/8“= l'-0iSTORAGE14m i in iu9‘- 0202W-l ito 8 iii ,u6'-4' •#iL-I -*■i i
-H-trW- i Tt i
2'-3 "h—^ ii
METAL FASCIA PANELSCONC. TIE BEAMAIR PREPARATION ROOMy > ir 1/4" X 2-0" WIDE AL. CHECKERED
PLATE WITH 1/2"GASKET, FASTEN
TO TOP OF EQUIPMENT PAD W/ It 10 STAINLESS STEEL SCREWS a PLASTIC
ANCHORS 4-0" O.C.
I
=/ii14-0;203 I t l'-0" WIDE OPENING
THROUGH EQUIP. PAD
AND FLOOR SLAB.
COVER W/AL.CHK.FL
PORTIONS OF TRENCH
\A3 A 4/
ROOF SLAB BEARINGl I I
I 22 xt00 i-vi l o X
CD ii ti32- 8 ooDNOT COVERED BY SWITCH GEAR-------- i 4A3 A4 i o!
00XICONTROL ROOM 00t TEXTURED COATINGoo iiu »i 7tiiir i i Toii 04i O) 9 0 i04 i 04 i04 i "O W-l ni
1-0 II h-8Iiiii 2-3 FLOORL-I It* XE I GRADEI i'-0" WIDE OPENING THRU EQUIPMENT PAD a FLOOR
SLAB FOR FUTURE EXPANSION
>*■A3A4 Iir WEST ELEVATION iiSCALE: l/8"= I'-Ou18-0 i c 1oo i i
I“<t « 3'-4" ID i
JL.-W. X D-20ICTi i X■ mV u 1ST h1x>W-lW*l CDii
ARCHITECTECTURAL SYMBOLSL-IL-I i8 04W*l ABOVE * — <$r V SECTION BELOW i 3-8“ CANOPY OVER
CONC. SLAB
ROOM NUMBER ATYPICAL FIN 4- ------------ J. > SECTION
MARK
DOWNSPOUT
SPLASHBLOCK
SHOWN ON FLOOR PLAN
IN INDIVIDUAL ROOMS
SHEET WHERE DRAWN> Alli*9 ii9-0 CEILING HEIGHTS SHEET WHERE CUT3-4II I!I2'-8iiI2'-8iiii 4'-0 uii 4'-0 4‘- 04'-0a4'-0ii
4'“0 ~Pl
CMU WALLS
FLOOR PLAN SCALE: 1/4 = I' - 0 II
CMU W REINFORCED FILLED CELL
4.
WALLSFLOOR ACOUSTICAL CMU (SLOTTED)FINISH SCHEDULE }
L-3-
CEILINGWALLSBASEFLOORNO. 22 DOOR MARK, NUMBER SAME AS ROOM NUMBERD* 201
ACOUSTICAL PANELS,
SUSPENDED
n GLAZED COATINGQUARRY TILE, 6QUARRY TILEI CEILINGBASE
WINDOW MARKW-EXPOSED TEES W/
GLAZED COATING
CONC. COLORED,
W/ HARDENER FINISH DESIGNATION2
LOUVER MARKSHOWN ON FLOOR PLAN
IN INDIVIDUAL ROOMS
L-I
DRAWER NO.DESIGNED BY CHECKED BY SCALE DWG. NO. A-3RALPH F. BRENNAN
WATER TREATMENT PLANT EXPANSION ” OZONE BUILDING
FLOOR PLANS a ELEVATIONS
AS SHOWNWRW GAY 9SHEETRUSSELL & AXON, INC. NO.PROJECT NO.
01053
DRAWN BY
JGG
DATE
JUN. 1985
FILE NO.BY CKD.DESCRIPTIONDATENO. |
DAYTONA BEACH FLORIDAREVISIONS OF 7 3 SHEE'aBR U
N 1N
G
4-
1-c.
m 77
L|—TJ
J 4'-0" 2x4 W/ 3/8" THRU BOLT 2'-Ou C/C
2x4,2'-0 C/C -7 2x4 W/ 3/8"EXP.
BOLT, 2'-0"C/C
“l2x4 J
I I I1 / .... 'I
J" EDGE
VENTED ALUMINUM
SOFFIT -----------------
Ld
2-8 Emi SUPPORT WALL AT EACH END
-|^n
ESECTION AT ENTRY CANOPY
SCALE : I 1/2" = l‘-0 A3 A4
HVAC - SUPPLY
RETURN
O- ■0D- U
RECESSED FLUORESCENT
FIXTURE CEILING
MOUNTED
REFLECTED CEILING PLAN
SCALE-- l/4"= I*-0
4“ PRECAST CONC. SLAB
fo o
8x16" CONC. LINTEL, SEE DOOR SCHEDULE
\ CEILING AS SCHEDULED
DOORS a SIDELIGHT
AS SCHEDULED
o o
H 11r- io
ROOF DRAIN
MEMBRANE ROOFING ( BALLASTED)
NEOPRENE JOINT COVER W/
COPPER EDGES
SLIMLINE FASCIA CAP
TTa iiii SLOPESLOPEMETAL FURRING STRIPS
KAWNEER 55-725--------- --
GRADIENT CONC. TOPPING/ I 1/2 TO 4Ii i rat■*>
't /£¥2 PCS. 2x6 W/ 2x6 SPACER
2" C/C ANC. W/ L CLIP 4-0" C/C
is Sr■ir't
O Oi DOUBLE-TEE SLABS2x4 W/ 3/8" EXP. BOLT
EACH STEM CM
PREMOLDED CLOSURE BETWEEN STEMS
i ±..LJ.ALUMINUM FASCIA PANELS
KAWNEER 55-706-----------------
2x4,2'-0" C/C------------------ ------h i2x4 W/3/8 EXP. BOLT 2 -0 C/CfW 1° < 6O o ■°0 CONC. TIE BEAM B 205!■CONC. TIE BEAM B- 203 !ri •"41 Q°:l to.;...a o oVSOFFIT TRANSITION
KAWNEER 55-739 - I].mi tie 8" =
2"2" 4"ni4"ar-8 i CONC. TIE BEAM B-202 -te
=E
/ Til HILTPERFORATED ALUMINUM SOFFIT it aJ 'EDGE
ALUMINUM STRAP W/ 2 EXPANSION
SCREWS INTO WALL a 2 ST. SCREWS
INTO DOWN S.POUT (TYP 3 PLACES)
ACOUSTICAL CMU
SEE FLOOR PLANoco i i H0R1Z. JT. REINF. 16" C/C
CM
\A*3" 0 PVC DOWNSPOUT -j
#5BAR,FILL CELL W/ CONCRETE
SEE FLOOR 8 FOUNDATION PLANS cSECTIONTYPICAL 8x8 CMU "FIN" BEYOND r-o uHSCALE: 3/4 A3 A4
•HORIZ. JT. REINF. 16 C/C
PRECAST SPLASHBLOCK
1- 6"CONC. FLOOR
TYPICAL
1/2" X 1/2" SEALANT
mm
INVERTED U-BLOCK
1!
=r. ' , =i - oo-GRADE ' ' ■ ‘
- OQ .7 o - o0 '■ ¥ Op■iif • - OwflJt l/2" PREMOLDED EXPANSION JOINT MATERIAL! VAPOR BARRIERCOMPACTED
FILL
#5 DOWEL
FOOTING F • 2 FOOTING F • 3
0^9
BSECTIONASECTION
iiSCALE: 3/4"= I'-O" V A3 A4itia A3 A4-0SCALE: 3/4
SEE SECTIONS BELOW FOR
FASCIA, FURRING , TRIM t WATER DAM , ETC.
METAL COUNTER FLASHING
OVER TURNED UP ---------------
2" ROOF DRAIN W/
2" PVC DOWNSPOUT
C
4" CMU
& 3" CONC. CANT.
DWG. NO. a- 4
IOSHEET
NO.
n
I
N a ii5 I/4 5I/4
TAPERED CANT.
0" TO 3 3/4 a ii5 I/4 j**------------- CANOPY l l/2" TK. AT 2" R.D.
5I/4" TOPPING THICKNESS I I/2 TK. AT 2" R.D.
ROOF PLAN SCALE: |/8" = l'-0 ii
6" HI. CMU
CLOSE W/ MORTAR
4" CMU
LI o o oo.o
CONC. TIE BEAM B-206
O°o.
O in
CEILING AS SCHEDULEDl ■‘^METAL EDGEoroo
ClO i
<J) o
VH
DSECTION
SCALE: 3/4"= l'-0 II A3 A4
CKD.
CANOPY
NO.
tt Y-4 H ^"R.D.3" ROOF DRAINI 1/2 I 1/2
•“t LU
CL
O
CO
ACCESS HATCH
SEE SHT. A-6
4 THICK AT
JOINT COVER
BYDESCRIPTIONDATE
OF 7 3 SHEETSREVISIONS
3 C
DESIGNED BY CHECKED BY SCALE DRAWER NO.
RALPH F BRENNAN
WATER TREATMENT PLANT EXPANSION OZONE BUILDING
ROOF PLAN 8 SECTIONS
AS SHOWNGAYWRW
RUSSELL & AXON, INC. PROJECT NO.FILE NO.DRAWN BY DATE
01053DC J JUN. 1985DAYTONA BEACH FLORIDA
TO
F
LO
O
R£b
8-,8
1 -8 it it ii ro oorroh
SL
O
PE
Qorro hK>
BR
U
N 1N
G
4-
1-
Sr i %
A
TB
A5 A5.
34'-8 H ll1f METAL FASCIA METAL FASCIA8' -0"41 -8“ 41 -8" 41 -0"41 -011M8' -0 BOTTOM OF SLAB-O <3- o
<0*
Ti «
(TYP)(TYP) SEE SHEET A2, WINDOWS 8
LOUVER SCHEDULES FOR LINTEL1 W-5W-5L-4 L-4
inttes m I Fi—r CD ITI i
CONC. TIE COLUMN (TYPICAL)
% t oCOCO
I •&TEXTURED
COAT ING ir-r- Is-
Is-
PRE-MFGD
DRAIN TRENCH
W/ S.S. GRATING
SEE DETAIL SHT.#S-5
o
FIN. FL. FIN. FL.
04. FLOOR___ t .4____i GRADECDCD GRADEI oin itoo 56 AI •tf-
][M- A5 A5a
CDiii
SOUTH ELEVATIONEAST ELEVATIONCD
T <?oI •4- SCALE: I/4 it _ I '-0 1!SCALE; I/4 I ‘-0I! _ tl i (0to
CMCM
LIME FEEDER
SLAKER NO.2
LIME FEEDER
SLAKER NO.I
CD OI I
Is- 3' -0“ to lime!
SOLUTION
TANK
AIR 1
COMPRESSOR
LIMB
SOLUTION
TANK
4" CONC.
STOOP
M- I
#iA METAL FASCIA METAL FASCIA 4-=^ jL BOTTOM OF SLABROOM -3 jLD-301 CATCH BAS IN-
W/ SOLID COVER 301o I I
M-N>
IJ- mCDCO ii sRCD ICM ^mr=nsmmj TEXTURED
COATING
Si i CD
L-4L-48“ O M-i► Is-
! '-4 III S'-816*-8 oII
FIN. FL.i-fSs« •—£5* FIN. FL.
FLOOR A3 1
GRADE
GRADEFLOOR PLAN
? i 0 iiSCALE: 1/4 ii _
NORTH ELEVATIONWEST ELEVATION
SCALE: 1/4 it _ I '-0 iiSCALE .• I /4 i iiii _ o ill1!L I.
T *' CM
uo i
CM,fc
M- I
O I£3 -
Is-
NEOPRENE CLOSURE
6" SLAB
6X6-6/6 WWFEL.31.00X 6X6—6/6
WWF----^
CARRY ROOF ING UP CURB 8
CEMENT W/ PLASTIC ROOFING
CEMENT. USE A 90# FELT CAP
OVER FIBER CANT STRIP.
totoI ±i ± X
T Ti o FINISH NOTES:-A IIL2" X 2" X 1/4¥¥ * # at
* *to 4"4 FLOOR - NATURAL CONC. W/ HARDENER Jt
BASE - NONEALUM. GRAVEL STOP 8 FASCIA
2X4 TREATED NAILER-------J WALLS - GLAZED COATINGCMl
SECT I ON A 1X4 TREATED NAILER
MEMBRANE ROOF ING
(BALLASTED)
CEILING GLAZED COATINGCD
SCALE: I/4 it _ I '-0 ii A5 A5
EXTERIOR CMU, CONC. COLS.
TEXTURED COATING4 i cs:i.’stw sr A. :ONT. CLIP STRIP+ +
Cc lU CLAMP-s
CONC. TIE BEAM
cstse:..hszsza T=
GRAVEL
STOP- T~ ■WATER DAM
co
ROOF ING\
CO to ■+
2 X 6 PT NAILER
TYPICAL HORIZONTAL
JOINT REINF. 16"C/C
VERTICALLY
Iri
EL. 31.00
GRADE
GRAVEL STOP DETAILCANT 8 FLASHING FASCIA
=U=L SCALE:3 II _ I '-0 IIIISCALE: I 1/2 n _ i 0
SECT I ON B
iiSCALE: 1/4 " = <'i| A5 A5
DWG. NO. A-5DRAWER NO.CHECKED BY SCALEDESIGNED BY
WRW ©RALPH F. BRENNAN
WATER TREATMENT PLANT EXPANSION
GAYLIME BUILDING PLAN,
ELEVATIONS,a SECT IONS
AS NOTED SHEETRUSSELL & AXON, INC. NO.PROJECT NO.
01053
FILE NO.DATE
JUN. 1985
DRAWN BYCKD.BYDESCRIPTIONNO. DATE
BB OF 73 SHEETSFLORI DAREVISIONS DAYTONA BEACH
BR
U
N
IN
G
4-
1-j;
J
" I
AL SHROUD
CALK
2" ii
Q AL GRAVITY SHUTTERS
AS NOTED AT "HEADI!
JAMB
AiR FLOW
DOOR AS SCHEDULED3 5K8
■AL THRESHOLD. SET IN MASTIC
ANC W/3 FH EXP SCREWS
•FLOOR AS SCHED
•D*£^* * • * *•
/ b- AL LOUVER.SEE NOTE AT "HEADii
2"
«. CALK 3/4" CHAMFER
FLOOR AS SCHEDULED
L0 Wtis' tt)
’ % O' •• #
CONCRETE SILL W/2#4 BARS
*D 1/2"\ ro
SILL
7 5/8" CD 81Hto i ii* j ^
5 > CONCRETE LINTELO "o'.
i LUGtoCALK PRESSED STEEL (PsT^
FRAME. FILL W/ GROUT
GLASS AS SCHEDULED
04 04I ■V LINTEL
ELEVATI ON
CALK
it-j.
Q
TRANSOM HEAD
BEND DOWN ANCHORS
i is® CALK
PS FRM, FILL W/GROUT (JAMB ONLY)
3 CORRUGATED GALVANIZED
ANCHORS PER JAMB
04 IrnJt r\% CALK— s a
JAMB/HEAD AT DOOR
AL GRAVITY SHUTTERS
AL SHROUD=>
2" 4"OIq s
04itlktito r. FLOOR AS SCHEDULED1to
■■*.0
J
PAVEMENT
SEE F.4/GEN. BLDG.
SILL
AUTOMATIC SHUTTERS AS-I
ii _ i i itSCALE r I -0
LOUVER L-I,L-2,L-3.L-4
SCALE:I I /2" =1'-0 H
7 5/8" i>|b
CONC TIE BEAM
AL SHROUD TO RADIATOR
T CALK
> AL GRAVITY SHUTTERS. ANC
W/R H EXPANSION SCREWS
16" C/C
2O 2" 4"3 o
HEAD
HEAD
1 I I I aJ ANCHOR W/RH EXPANSION
SCREWS 16" C/CJCALK2 ■I
2" 4"Q
ISC
tU> =3 JAMBo
SEE PLAN FOR
LOCATION OF FIN
CALK
2 M
PAVEMENT
DRIP-
8"C0NC.CMU
FIN BEYOND-
4"PRE CAST
CONC SLAB-
AL LOUVER STORMPROOF BLADES
W/DRAIN AT EACH JAMB
BIRD SCREEN
•WALL BEYOND
SILL
DOOR IN PRESSED STEEL FRAME
'» « j 0”ISCALE:
L7-5/8^.
• t - CONC TIE BEAM -SHIM a CALK
SEE "CALKING DETAILS
ALUMINUM TUBE FRAME.
FLUSH GLAZING
GLASS AS SCHEDULED
X
Oj ii f‘ *s.ro.3 sCO
Q<
OC
I 1/2" II
1/2 X 1/2" AL
CHANNEL STOP
AL TUBE FRM WEATHERED STOP
raJ
DOOR AS SCHED
DOOR a TRANSOM HEAD 41H11
SHIM a CALK9
-Jl s latrupsia NnoI AL TUBE FRM. ANC W/FH
EXP SCREWS 16" C/C2
§ Q DR AS SCHED/2I 1/2, II It4
JAMB
GL AS SCHEDQo tn WEATHERED STOP AT
DOOR FRAME
DR AS SCHED
f3 £§Q
MPOST
4 1/2"2"Q GL AS SCHED
AL TUBE FRM. ANC W/FH EXP
SCREWS. 16" C/C
VCD
FLOOR AS SCHED
SHIM a CALK•o • «• .
."*«** f7GRADE
WALL BEYOND
BASE
I 1/2" M
2 DR AS SCHED
AL THRESHOLD. SET IN MASTIC.
AND W/3 FH EXP SCREWS
Q oc Q f FLOOR AS SCHEDSLAB-x
\ *0 * <** • n .* <*Of; . • 0• »•;. 4:
WALL BEYOND
SILL
DOOR IN ALUMINUM TUBEFRAME
it _ I '-0 itSCALE:I
ACCESS HATCH 8 LADDER DETAIL
NOT TO SCALE
41 -Q”
CALK WDW AS SCHED
3/4" CHAMFER
o—CONC SILL W/#4 BAR
7N
\Q*’
AS* ... •W **
•RAKE JOINT a CALK AS PER"DOOR FRAME" •CALKf/v
CALK •PRESS STEEL FRAME
8“
DOOR AS SCHEDULED
2'-8"-c»o-p c
P J
PRECAST CONC. CANOPY
SCALE:I I '-0it it
CONCRETE TIE BEAM
J 5/8 ii
\^'-0"x2'-6"
ACCESS HATCH WITH INSUL.
TOP AND SIDES AND SELF
FLASH ING CURB.ANCHOR W/
3/8"EXP.BOLT.ONE EA.SIDE
Ifj i
( 'Ico iCM ROOF INGO jytft 0ItM.m f> t. * --a-* i ' '' > i
DOUBLE
TEE SLAB- O
31 -0"
5/8"x2 1/2
ALUMINUM RAILS
16" APART-----
H
•PREMOLDED
CLOSURE
O
TIE BEAM ••• o* • 4.
*4
O Ln3/8"x3"AL.FLAT BAR ANCHOR
WELD TO RAILS,3/8-EXP.
BOLT TO BLOCK ------------- 31
I re
SOLID 3/4"AL. RUNGS
12"MAX.SPACING.WELD
INTO DRILLED RAILS-
x
3 O to
1 711io_£_
ANGLE ANCHOR,WELD TO EACH
RAIL,ATTACH TO FLOOR WITH
3/8“EXPANSION BOLTS----
J 5/8" ■ /—CONC TIE BEAM W/
j DROPPED SOFFIT
-----3/4" PT BUCK.ANC W/
RH EXP SCREWS 16" C/C
SEE 'CALKING DETAILS'>o*
X CD I ^ jy ■ M
.040 AL TRIM
CALK-Q
WINDOW AS SCHEDULED3c Q
HEAD
pimiLiig 3f infaim
REPEAT NOTES AT 'HEADCDX
h* CALK
WINDOW AS SCHEDULED
51 JAMB
Q CALK<4- WDW AS SCHED3ea
CD.
3/4" CHAMFERTVX
VO'-
CD"
•CONC SILL W/#4 BAR
3“1 1/2"ADJUST FOR
CONC CANOPY
DRIP
SILL
WINDOWS
SCALE: r«l ’-0 It
WALL
COMPRESSIBLE
BACKER ROD
1/ ii -T ¥
CALK
SHIMCALK
AL TUBE DOOR FRAME
WALL
s
Li
T T)SET BUCK IN CONTS
BEAD OF CALK COMPOUND
(DCALK PERIMETER-
BEFORE PA I NT ING
(2)"BUTTER" BACK OF FIN-
CONTS W/COMPOUND
AT INSTALLATION
WINDOW
CALKING DETAILS
HALF SIZE
l I4"
DRAWER NO. DWG. NO.DESIGNED BY
WRW
CHECKED BY
GAY
SCALE
AS NOTED
A-6
RALPH F. BRENNAN
WATER TREATMENT PLANT EXPANSION ©II
SHEETARCHITECTURAL DETAILSRUSSELL & AXON, INC. NO.PROJECT NO.
01053
DRAWN BY DATE
JUN. 1985
FILE NO.DESCRIPTION BY CKD.NO. DATE
BBREVISIONS OF 7 3 SHEETSFLORI DADAYTONA BEACHj
LO
U
V
1/
2" .D
O O
R D
IM
8"
LO
U V
D
IM
Ls2o
LO
U
VE
R
D
IM
-o*
1~Q
"T Q
F
LO
O R
.B R
U N
IN
G
4-
1-c, i
§ j
.4i-^^ig%^s!gs»^agaa,?ra>^rrs?sgsggw^Sfe^«ga»gM^g^ 2&*&Mm>ammM&zm. an
RELOCATE EXIST FAN2 i
A 7 A7 RELOCATE EXIST. DUCT WORK
AND ADD FLEX. CONNECTIONS
AS REQUIRED
O-r
\ m A—ArdB: i+r□ XT'
♦ I, f=Lh gT
ROLLING DOOR -
FLUORIDE
STORAGEI REMOVE
EXIST. DOOR
GFD: d 6Kf -nI 00
_ IPUMP
ROOM o_ Cj“ OFLUORIDE STORAGET oo w > SHOP 1c 3 FILTER GALLERY1 LJ 3 5 CONC.
RAMP
i
IX A7 A7 REMOVE EXIST. BLOCK
THIS AREAAUX.
GEN. iCD4 ? <=\r DEMOLITION 2A7 A7 SECTIONAc- SCALE l/4"=l'-0
H A7 A7o ITSCALE 1/4= 1-09 A 7 A 7 i£=JXX V
NEW 8 X8 X 16 CMU
Pm. rdD:
RELOCATED FANKEY PLAN NEW 8"X8"XI6"CMUII 5-0 it
6-0 II 1-8NOT TO SCALE PRECAST CONC. LINTEL& "ft
1itr-o 4-0 n
PRECAST CONC.
LINTEL r: iI
T T r FINISH TO
MATCH EXISTING■4- nEXIST. DOORSZa -•hD-401
ROLLING
DOOR-7
_H— i O \ L~n
6“ CONC. W/ 6X6 6/6 WWF
POUR ON EXIST. FLOOR
SLAB -
i \1 L\ ii
6 STEP EXIST. DOOR 402\ D-\ \
\NEW CMU ~vPUMP ROOM FLOOR2'-0 it N
~>r. X
6" II 6"
i
% r-o FINISH TO MATCH EXIST.
4"ii CDli
ELEVATIONa
ELEVATIONa SCALE 1/4" = l'-0 it
SCALE 1/4" = I'-o it
4“ oo
II
ooN- A FILTER
GALLERY
FLUORIDE
FEEDER
REMOVE WALL AND DOOR
A7 A7
CD^r Vo □I a
CD
EQUIP. —OPENING THROUGH
/ EQUIP. PAD AND FLOOR
K SLAB. COVER W/AL
CHK.FL PORTIONS OF
OF TRENCH NOT
COVERED BY EQUIP.
REMOVE AND RELOCATE
BATTERY CHARGER PAD
o PuI
II<T) EXIST 16 0
DUCTLr g iCXI V CD iiu aa 4"
B FLUORIDE
STORAGEE7E8
REMOVE AND RELOCATE
GENERATOR SET
REMOVE GENERATOR
PAD TO FINISH FLOOR
ELEVATION --------- --------
O* i
CD itCM CD 6-0 X 8-0 ROLLING DOORii i
D-402"cm k /D-401REMOVE DAY TANK AND FUEL PIPING k\ nnurnn mtixa ii INACT.
LEAF-] NEW CMU
M tl
NEW 8 X 8 X 16 CMUCD. r II If6-0 1-0 tCDV o -0
IfIILlI 5-48
I <*> V Q.ID= ii ii oo CONC. RAMP W
6X6 10/10 WWF
ii ii
_ i coCM 1VV ii EXIST. PUMP ROOMII16-8O i
O CDZ i
6"STEP
PARTIAL PLANPARTIAL PLAN 32u n ITi i iiSCALE 1/4 = 1-0 A7 A7 SCALE 1/4" = 1-0 A 7 A 7f I
1-0 n
6"2-0 ii
6"3-0---------
II
REMOVE EXHAUST PIPE
AND GROUT OPENING
i n1-0 ti 2'-0
-------- jp
II
6-0 4’-0"----- -—^ i DOOR SCHEDULE
J5 3 FRAME
MATERIAL
MARK DOOR SIZEu DOOR MATERIAL REMARKSHZ II 6-0* X 8-0D-401 ALUMINUM ROLLING DOOR1 n I 3-0" X r-O" x I 3/4“ (PAIR)D-402 ALUMINUM CLAD ALUMINUM 4" HEAD, HALF LITE
4~, 1 “
Q,i nit ii
D-403 3-0 X 7 -0 XI 3/4 LAMINATED PLASTICDEMOLITION PARTIAL PLAN
II
SCALE 1/4 = 1-0 A 7 A 7 IISCALE 1/4" = I’-O A7 A7 H2-8" X 7'-0“X! 3/4 LAMINATED PLASTICD-404 \-:
DW(i NO A -7DEA/VER NOCHECKED BYDESIGNED BY SCALE
RALPH F. BRENNAN
WATER TREATMENT PLANT EXPANSION CONTROL BUILDING MODIFICATIONS
FIRST FLOOR
G.A.Y. AS SHOWNR.O.V. 13SHF t T<3 RUSSEIJL & AXON, INC.t VNOPROJECT NOFILE NODRAWN BY DATEDESCRIPTION') A T E BY CKDNC /
JFLORIDA JUN.1985DAYTONA BEACH 01053D.C.W.REVISIONS or 73a SHE \
°J %-oPRE-MFGD MOVEABLE
WALL PANELS W/HALF
LITE a 3-0" X 6'-0" DOOR —
ACCESS FLOOR 2-O'
SQ. PANELS Lx EL 45.58
....... ...................... ........... gg...................■■■ion.................. Jy» IX Ta
EXIST. QUARRY TILE
EL. 45.08ACCESS FLOOR SUPPORTS
SECTION A
SCALE 3/8* = f-0 \ A8 IA8
LEGEND
□ RECESSED FLUORESCENT FIXTURE
HVAC SUPPLY
HVAC RETURN
STUD WALL WITH GYP. BOARD
FINISH SCHEDULEI 2 3—
\v
DWu NO A-QORAWFR Nl 'CHECKED BY
G.A.Y.
SC AI FDESIGNED BY
R O.V. AS SHOWN I IBUILDING MODIFICATIONS
SECOND FLOOR
! 4 ■l-Ht f
Nv ^DATE
JUN. 1985
PRO Y O'* Ns. 'FILE NODRAWN BY
1D.C.W. 01053 o> 73
^—OPENING FOR
ELECT. CONDUIT
EQUIP. PAD
6" SLAB W/ 6 X 6 6/6 WWF
^-»4(TYP)n~n \#;
OQ . • &— X X -5-O-X- X—-•X* ■0‘
EXISTING FLOOR SLAB
I
SECTION B
SCALE 3/8“ =1-0 it A7 A8
2-0“ X 2-0
CEILING GRID
it
'■So m
A zn
~ SUSPENDED CEILING
jL7 A
1/4“ CLEAR
PLATE GLASS
16-8
6-0 5-0 5-1 St-**■
3 1/2 3 1/2 TOWEL
DISP.
nSHELF a ROD“Oi * O-»
CM
) CLOSET
iD-404^CVJ* I6"X24"
MIRROR wi 7?!ro i00 iD2 I lD-404 000 TISS
DISP.
STORAGE a cmCVJ
D-40'2 I I ipo
[yiHW-BP JSHt~&ak>mSr<OiiV i<r
1 t in
STOP GYP BOARD
1/4“ FROM COLUMNKITCHEN UNIT
BREAK ROOM
2 I I
5 1 si
CL1 D
CL
UJ
H cn iD
T
Z I
ACCESS FLOOR
2-0" SQ. PANELS
CONTROL ROOM
K
4VA8 A8 J------
PRE-MFGD MOVEABLE
WALL PANELS W/HALF
LITE a 3-0" X 6-8" DOOR
REFLECTED CEILING PLAN
SCALE 1/4" = l'-0"
SECOND FLOOR MODIFICATIONS
SCALE 1/4"* I'-O'
^jj RALPH F. BRENNAN
WATER TREATMENT PLANT EXPANSION
CONTROLIU SSI Ll & AXON. INC.
FLORIDADAYTONA BEACH
I\
O SINK
12 GAL WATER HEATER
NOTE ;
REMOVE ALL EXIST
CASEWORK
ziX 1 11
SECOND FLOOR DEMOLITION
SCALE 1/4" = i'- 0 h i k.
fas LKPi Sf Sir1 ionMAM■St '•
RF VISK ''NS
DOUBLE SINK
CENTER TABLE
Y z BASE CABINETS
FINISH SCHEDULE
NO. FLOOR CEILINGWALLS
ACCESS FLOOR SUSPENDED ACOUSTICGLAZED COATING
MATCH EXISTING2
s i
C
EI
LI
N
G H
EI
G
H T
,0-8
NOTE: BACKER ROD TO BE PLACED 1/2 DEPTH
OF JOINT WIDTH (TYP.)
HYPALON GASKET TO BE CONTINUOUS
AT ALL JOINTS WITHIN BASINS.
0.
4*5 VERT.o
• d°-
* . oII# 4 TIES a 8
HOOK
BAR TOP OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .