Description - RFP - CA MATOC - Volume II - Alder Creek Bridge Task Order.pdf
PDF 66 KB Posted
- Attached to
- California Road & Bridge Construction MATOC - Volume II, CA ERFO FS ELDOR 2021-02(4), Alder Creek Bridge
- Solicitation number
- 6982AF23R000012
About this file
This document is a request for proposal for a multiple award task order contract to provide road construction services in California. The contract will have a one-year base period and two two-year option periods, with individual task orders ranging from $500,000 to $5,000,000. The first two task orders are for replacement of the Alder Creek Bridge over Alder Creek in Eldorado National Forest and replacement of the Powderhorn Bridge over Bear Creek. Proposals are due for the MATOC and both task orders, with award intended for the lowest-priced proposal for each task order. The purpose of the MATOC is to provide rapid response road construction services, including earthwork, structures, bridges, drainage, and surfacing, which may be located in environmentally sensitive areas. The predominant geographic area is California.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS IS A REQUEST FOR PROPOSAL. PLANS AND SPECIFICATIONS ARE CURRENTLY AVAILABLE. THIS
PROJECT WILL BE ADVERTISED ON A SMALL BUSINESS SET ASIDE BASIS. THIS IS VOLUME II OF THE
CALIFORNIA ROAD & BRIDGE CONSTRUCTION MATOC.
PROJECT NUMBER: CA ERFO FS ELDOR 2021‐02(4)
PROJECT NAME: ALDER CREEK BRIDGE
PROJECT DESCRIPTION: This project is located in the Eldorado National Forest in eastern‐central
California. The terrain is rolling and mountainous with elevations ranging up to 5600 ft.
The existing bridge (Structure 050356000001022) on Route 11N46, approximately 30 miles east from
Placerville, CA, was constructed in 1966, as reported in the inspection report. Prior to fire damage, the bridge was a one lane, two‐way traffic single span structure with no skew. It had an overall bridge length of 50 feet, roadway width (curb to curb) of 14.0 ft, and deck width (outside to outside) of 15.0 ft.
SCOPE OF THE WORK: The purpose of the project is to replace the Alder Creek Bridge over Alder Creek within Eldorado National Forest in El Dorado County, California. The bridge was completely damaged by the Caldor fire in the summer of 2021 and is proposed to be fully replaced with a prefabricated steel bridge.
The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration anticipates awarding a Multiple Award Task Order Contract (MATOC) for California Road & Bridge Construction.
Please see the links to the other Volumes within this post on SAM.gov for additional information and requirements of this MATOC.
MATOC contracts will be for a 1‐year base and two 2‐year option periods. Individual projects will be issued as Task Orders. The Government anticipates individual Task Orders ranging from $500,000 to
$5,000,000. Each minimum guarantee will be for $10,000 and the maximum value of the MATOC will not exceed $60,000,000 shared capacity.
Offerors must submit a price for the first two (2) Task Orders, Alder Creek Bridge (Volume II) and Powderhorn Bridge over Bear Creek (Volume III), which are being issued simultaneously with this MATOC Request for Proposal. The Government intends to award Alder Creek Bridge and Powderhorn Bridge over Bear Creek Task Orders to the successful MATOC Offeror with the lowest individual Task Order price. For the MATOC (Technical Proposal) RFP and Task Order‐RFP's, whenever possible, award will be made without discussions.
The purpose of this Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple‐Award Task Order Contract
(MATOC) is to provide rapid response road construction for work in the state of California. Projects will primarily involve improvements to low‐volume and low‐speed roadways ranging from 3R (resurfacing, restoration, and rehabilitation) to full reconstruction. Projects may include, but are not limited to the following: earthwork, soil stabilization, structures, bridges, walls, drainage, surfacing, culverts, and parking lots. Projects may be located in environmentally sensitive areas that necessitate context‐ sensitive construction techniques and processes.
It is anticipated that the average construction task order under the MATOC will be below $5,000,000.
The predominant geographic area is the state of California.
File details come from the government source that posted it. Updated .