Description of Requirement_- Revised MAR2022_.pdf
PDF 3 MB Posted
- Attached to
- Concrete Oval Arch Federal contract opportunity
- Solicitation number
- W912HZ22Q3107
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers Document 12 April 2022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description of Requirement for
ECM Pre-Cast Oval Arch Segments Revised – 23 March 2022
REQUIREMENT: The Geotechnical and Structures Lab (GSL) has a need for the purchase of (1) concrete oval arch assembly with the option to purchase segments for an additional unit, according to the attached drawing details and specifications shown below:
a. Individual arch segments must be constructed according to the attached drawings (See details for Section Types 1, 2, & 3).
b. A minimum of 4000 PSI, not to exceed 7000 PSI, compressive strength concrete at 28 days per ASTM C39
c. Auger cast grout or aggregate mix sufficient to provide proper consolidation with required reinforcing covers must be used and mix design sent to USACE for approval prior to placement
d. All concrete shall conform to ASTM C94
e. Reinforcing bars shall be deformed type conforming to ASTM A615 Grade 60
f. Welded wire reinforcement shall conform to ASTM A185, minimum lap and embedment to be the greater of one cross section wire spacing plus 2” or 6”, whichever is greater
g. Concrete coverage of reinforcement shall be a minimum of 0.5”, not exceeding 0.75”
h. 7 and 28 day concrete compressive strength break data must be provided (3 breaks at each day using
4x8 cylinders). Three additional test cylinders must be cast and sent to ERDC for follow-on testing.
i. If cold joints are required, details shall be provided to technical POC
j. Section will be inspected upon delivery to ensure no structural cracking is present and overall dimensions are within a tolerance of +/- 0.5”. Thicknesses must be within +/- 0.375”.
k. Lifting eyes/supports must be included (not detailed). Plans must be submitted to technical POC prior to concrete placement. Adequate supports and shoring must be included during shipment to prevent cracking of concrete section(s). Adequate lifting points must be provided in each section to lift in their vertical orientation for final placement.
l. Offload rigging, including necessary slings and lifting hardware must be provided
PRICING: The contractor shall provide pricing for one complete unit (composed of 5 individual segments, Types 1, 2, & 3) as specified in the requirement with pricing for an additional unit as an option. Pricing must include shipping costs to delivery location.
DELIVERY Details: Concrete unit(s) must be delivered NLT June 10, 2022. A minimum notice of 14 days is required ahead of delivery. USACE will offload concrete sections on site. An on-site truck wait time of 2hrs must be allotted. Inspection will be made upon delivery to ensure dimensions are within tolerance and no structural cracking is present.
DELIVERY LOCATION: ETF Test Site (previously known as Range 16), Fort Polk Military Installation.
POC will be Joshua Payne, 601-634-2716, or William Griffiths (769-231-6957).
Isometric View
120.00
Male end View
Section Type 1 Joint must follow cross-section All units are in Inches
F
2.00 74.50
72.50
\Male End
J
Closed end - See Reinforcement Details
Side View
NAME DATE TITLE:
�---+----t--
DETAIL E
SCALE 1 : 10
2.00
DETAIL F
SCALE 1 : 10
1-- D R_A W_N--+_J. _R a_ll_l O_S -+--- Magazine_Modular Assembly _DRCHECKED
COMMENTS: REV
SCALE: 1:50 SHEET 2 OF 7
Magazine_Modular Assembly_DRW
SHEET 3 OF 7
DRAWN
SCALE: 1:50
REV
TITLE:NAME DATE
COMMENTS:
CHECKED
J.Ramos
Section Type 1 - Reinforcement Details
Note:
- 4x4 mesh can be overlapped to achieve a 2x2 spacing -Concrete coverage must be a minimum of 0.5" not to exceed 0.75"
- All units are inches
Full Assembly Side View - Type 1
Type 3 Type 2
I
Type1
J
7.
7.75
364.50
SCALE 1 : 10
DETAIL J
3x3 #3 Rebar
3x3 #4 Rebar
#3 12x6 Hooks @ 8" O.C#3 12x6 Hooks @ 8" O.C
3x3 #3 Rebar
SCALE 1 : 10
DETAIL I
#3 12x6 Hook around curvature#3 12x6 Hook around curvature @8" O.C
Joint Reinforcement Details Joint Reinforcement must follow cross-section *See sheet 7 for reinforcement details
DRAWN
SHEET 6 OF 7
Magazine_Modular Assembly_DRW
SCALE: 1:50
REV
TITLE:NAME DATE
COMMENTS:
CHECKED
J.Ramos
DETAIL G
SCALE 1 : 10
3x3 #3 Rebar 0.75
2.00
G
Type 2 Type 2
AB
DETAIL AB
SCALE 1 : 10
2x2w2.1w2.1*
.5
.5
2x2w5w5*
24.98
21.44
4.
.0
22.19
6.
1.
Note:
- 4x4 mesh can be overlapped to achieve a 2x2 spacing
- concrete coverage must be a minimum of 0.5" not to exceed 0.75"
- All units are inches
CHECKED
DRAWN
SHEET 7 OF 7
Magazine_Modular Assembly_DRW
SCALE: 1:20
REV
TITLE:NAME DATE
COMMENTS:
J.Ramos
2x2w2.1w2.1
Front View
2x2w2.1w2.1
2x2w4.5w4.52x2w4.5w4.5
3x3 #3 Rebar
3x3 #4 Rebar
2x2w2.1w2.1
2x2w5w5
Mesh must overlap min 6"
H
12.84 R16.59
R 116.05
2.
R38.99
R12.84
R44.91
.5
R124.03
56.25 3.75
21.75
9.00
9.00
3x3 #3 Rebar
#3 12x6 Hooks @ 15" O.C.
3x3 #3 Rebar
SCALE 1 : 10
DETAIL H
#3 12x6 Hooks @ 15" O.C.
.0
.5
3.75
21.75
| 7 Description of Requirement_Oval Arch_MAR2022_rev |
| Oval Arch Details_Modular_MAR2022 |
File details come from the government source that posted it. Updated .