AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
07/05/11
6. ISSUED BY CODE
7. ADMINISTERED BY (If other than Item 6)
CODE
U.S. Department of Energy Western Area Power Administration Desert Southwest Region P.O. Box 6457, (615 South 43rd Avenue) ATTN: G5600 Phoenix, AZ 85005-6457 (85009-5313)
8. NAME AND ADDRESS CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
Prospective Bidders
DE-RP65-11WG92383
9B. DATED (SEE ITEM 11)
MAY 26, 2011
10A. MODIFICATION OF CONTRACT/ORDER
NO.
1 0B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS___________________________
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers is is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
XX
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
X
HEAVY DUTY TRANSMISSION LINE STEEL POLE STRUCTURES FOR THE DESERT SOUTHWEST
REGIONAL OFFICE, WESTERN AREA POWER ADMINISTRATION
SOLICITATION NO. DE-RP65-11WG92383
(See Attached)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.
Solicitation DE-RP65-11WG92383 Amendment 001
The purpose of this amendment is provide answers to questions that have been received for this solicitation.
1. In the Specifications document, on the pole drawing labeled “Attachment C”, Note 14 states, (”H” indicates height portion of pole structure designations listed in specifications). When we look at H, it just refers us back to Note 14. We haven’t been able to find the value/s of “H” anywhere in the Specifications; all that was found was that there is a tolerance of plus or minus 12 inches on “H” (pg.
5-23). Please assist us in clarifying this issue.
ANSWER: “H” refers to height portion of structure designation which is distance from ground line to bottom insulator attachment.
See attached drawing 43-281S 2200. For a Type 281S-100 (DE), The "100" is the "H" dimension and means the distance from ground line to bottom insulator attachment is 100 feet. The (DE) means the structure is "direct-embedded". The "H" dimension is on the left side of the drawing and is explained in Note 14 on Transmission Line Structures 281S Pole Structures – Outline and Design Loads #43-281S-2200 drawing dated August 16, 2010.
2. In the document “WAPA1-Solicitation_052611”, on page 2, Section B: Schedule of Supplies/Services and Prices, the estimated Quantity of poles is given in pounds. We need some clarification on these quantities given in pounds in order to determine the quantity of poles to quote for. Are you just wanting a price per pound? Or can we please get actual estimated quantities?
ANSWER: The estimated quantities of poles in pounds is an estimate of the total number of pounds of each type of structure Western anticipates to buy over the next 5 years. And yes, we just want a price per pound. These are the actual estimated quantities.
Western has no way of knowing in advance of a completed design the actual quantities and types of structures or weight or each structure. I suggest you use the sample Type 281S-100 (DE) which you are designing for this proposal as a typical structure.
3. On page 20 of the contract documents, in Section m.8, you all state “Offerors shall send the past performance questionnaires attached to this RFP to their past performance references. The questionnaire recipient will email or fax the completed questionnaire DIRECTLY to the CONTRACTING POINT OF CONTACT listed below NO LATER THAN THE STATED CLOSING
DATE OF THE RFP.”
Answer: Past Performance Questionnaire is included in RP6511WA92383.Attachments.pdf file.
N O T H I N G F O L L O W S
| 10A. MODIFICATION OF CONTRACT/ORDER NO. |
| HEAVY DUTY TRANSMISSION LINE STEEL POLE STRUCTURES FOR THE DESERT SOUTHWEST REGIONAL OFFICE, WESTERN AREA POWER ADMINISTRATION |
| SOLICITATION NO. DE-RP65-11WG92383 |
| Solicitation DE-RP65-11WG92383 |
| Amendment 001 |
| Page 2 |
| N O T H I N G F O L L O W S |