Demolition of several City owned structures.pdf

PDF 363 KB Posted

Attached to
Demolition of several City owned structures: 1109 Porter St. , 1201 N. Main St. , and 1424 N. Main St.
Solicitation number
2027-2
Issued by
Williamson County, Texas

About this file

This is a demolition services solicitation from the City of Taylor, Texas, seeking bids for the complete demolition of three city-owned structures located at 1109 Porter Street, 1201 North Main Street, and 1424 North Main Street. The structures are former Public Works and Utility Maintenance buildings that require removal of the building structures, slabs, and concrete foundations, while all other concrete on the properties is to remain in place. Additionally, the fence along the back side of 1201 North Main Street must be removed. The City has completed the asbestos survey and will perform asbestos abatement, and utilities have been disconnected from all sites. All debris, concrete, and trash must be removed from the properties by November 30, 2026. Bidders are required to coordinate all demolition activities with Building Maintenance Superintendent Rick Jones and must include the name and address of the debris disposal facility on their bid documents.

The City of Taylor will be responsible for obtaining and covering the cost of all required city permits, which the contractor must coordinate. Bidders must specify their intended disposal location for all demolished materials on their bid submission. No specific pricing terms, award dates, site visit requirements, or bidders' conference details are outlined in this solicitation summary, though prospective contractors should contact the city for additional specifications and procedural requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .