Demolition of several City owned structures.pdf
PDF 363 KB Posted
- Attached to
- Demolition of several City owned structures: 1109 Porter St. , 1201 N. Main St. , and 1424 N. Main St.
- Solicitation number
- 2027-2
- Issued by
- Williamson County, Texas
About this file
This is a demolition services solicitation from the City of Taylor, Texas, seeking bids for the complete demolition of three city-owned structures located at 1109 Porter Street, 1201 North Main Street, and 1424 North Main Street. The structures are former Public Works and Utility Maintenance buildings that require removal of the building structures, slabs, and concrete foundations, while all other concrete on the properties is to remain in place. Additionally, the fence along the back side of 1201 North Main Street must be removed. The City has completed the asbestos survey and will perform asbestos abatement, and utilities have been disconnected from all sites. All debris, concrete, and trash must be removed from the properties by November 30, 2026. Bidders are required to coordinate all demolition activities with Building Maintenance Superintendent Rick Jones and must include the name and address of the debris disposal facility on their bid documents.
The City of Taylor will be responsible for obtaining and covering the cost of all required city permits, which the contractor must coordinate. Bidders must specify their intended disposal location for all demolished materials on their bid submission. No specific pricing terms, award dates, site visit requirements, or bidders' conference details are outlined in this solicitation summary, though prospective contractors should contact the city for additional specifications and procedural requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .