DEMOLITION PACKAGE #1-27 INVITATION TO BID SUMMARY
This Invitation to Bid document is issued by the City of Rochester, Department of Finance, Bureau of Purchasing for a demolition project in Rochester, New York. The project scope encompasses the controlled demolition of forty-six (46) structures, with forty-four (44) presumed to contain asbestos requiring controlled demolition in compliance with New York State Industrial Code Rule 56, and two (2) structures with no asbestos. The contractor must perform all demolition work including debris removal, backfilling, fine grading, hydroseeding, and lot posting. Sealed hard copy bids must be submitted to the Office of the Director of Purchasing, City Hall Room 105A, 30 Church Street, Rochester, NY 14614, by Thursday, November 5, 2026, at 2:00 p.m. The City anticipates awarding one or more contracts based on each bidder's certified capacity to complete assigned structures by the Certification Date of February 26, 2027. Bidders must certify the number of structures they can complete by this date, and the City reserves the right to award multiple contracts based on contractor capacity and lowest bid. All work must commence immediately upon receipt of the Notice to Proceed, which the City expects to issue no later than December 4, 2026. The contract term extends through completion of all awarded demolition work, with no renewal options specified.
Bidders must submit a bid deposit of $500 per property and provide performance security equal to 100% of the contract price within ten days of award notification. Contractors must meet a 30% Minority and Women Business Enterprise (MWBE) participation goal (consisting of 20% minority-owned and 10% women-owned businesses) and workforce goals of 20% minority workers and 6.9% female workers, as established by City Ordinance No. 2018-54. Contractors must submit completed MWBE Form P with their bid and subsequently submit Forms A, B, and C upon request. All employees must have valid New York State Department of Labor Asbestos Handling Certificates and federal training records, and contractors must maintain current Asbestos Handlers Firm Licenses. Contractors bear all transportation costs to the designated Mill Seat Landfill in Bergen, New York, with debris disposal fees paid by the City through its agreement with Monroe County. Comprehensive general liability insurance with limits of $1,000,000 per occurrence and $2,000,000 aggregate, along with pollution liability insurance of $1,000,000 per loss and $2,000,000 annual aggregate, are required. Prevailing wage rates as established by the New York State Department of Labor apply, including wages for travel time to and from the disposal site. The City is exempt from sales and use taxes, and contractors must register with the New York State Public Work Contractor and Subcontractor Registry prior to contract award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phone: 585.428.7146 Fax: 585.428.6038 TTY: 585.428.6054 EEO/ADA Employer
Department of Finance Bureau of Purchasing City Hall Room 105A, 30 Church Street Rochester, New York 14614-1290 www.cityofrochester.gov
PRINTED NAME OF BIDDER
DEMOLITION PACKAGE #1-27
Invitation to Bid No. D00400 Issued: October 19, 2026
PURCHASING BUREAU CONTACT: Shemeka Davis, Assistant Director of Purchasing, 585-428-
Bid Closing: Thursday, November 5, 2026, at 2:00 p.m.
Sealed Bids must be submitted in hard copy to the Office of the Director of Purchasing, City Hall Room 105A, Rochester, NY 14614, prior to the closing date and time. After the closing, the City will open, read, and record all properly received bids. The City does not accept electronic bids submitted through BidNet.
This Invitation to Bid includes the Terms and Conditions specified herein, the Proposal Form, the attached General Terms and Conditions and Instructions to Bidders, and any addenda and other documents and/or specifications incorporated by reference herein.
ATTENTION BIDDERS:
This contract includes new MWBE and Workforce Goals. See Appendix C for details.
CONTRACT CHARACTERISTICS
(For definitions or explanations, see General Conditions)
Type of Contract: DEMOLITION
Scope: Forty-Six (46) structures
Asbestos: The demolition package contains forty-six (46) structures. The City presumes that forty-four (44) structures contain asbestos. The contractor must perform controlled demolition with asbestos in place, in compliance with New York State Industrial Code Rule 56 - Controlled
Demolition with Asbestos in Place. The two (2) remaining structures contain no asbestos and shall be demolished accordingly.
Bid Deposit Requirement: $500 PER PROPERTY
Performance Security Requirement: 100% OF THE CONTRACT PRICE
Insurance Requirement: YES, SEE SECTION 14
Samples Requirement: NONE
Descriptive Literature/Technical Data Requirement: NONE
BIDDERS: Complete the Proposal Form with prices, company identification, and an authorized signature.
D00400 1
1. SCOPE
1.1 This demolition package contains forty-six (46) properties. The contractor shall bid and perform controlled demolitions with asbestos in place for forty-four (44) structures. The two (2) remaining structures listed has had the asbestos abated.
1.2 Demolition of these structures is a high-priority public safety matter. The City requires that demolition work begin immediately upon contract award. The City aims to complete as many structures as possible by February 26, 2027.
Accordingly, the City may award multiple contracts based on each bidder’s capacity to complete the structures awarded by February 26, 2027.
1.3 MWBE and Workforce Requirements
1.3.1 All work awarded under this Contract shall comply with the City’s MWBE participation goals and workforce participation requirements as established by Ordinance No. 2018-54
1.3.2 Compliance with participation goals, utilization plans, documentation requirements, and good faith effort standards is mandatory.
1.3.3 The City reserves the right to declare any bid informal and reject their bid if the required MWBE Form P pages are not submitted with their bid. Complete MWBE Form P requirements are found on page in Appendix E.
1.3.4 MWBE Goals. This contract incorporates new MWBE and Workforce goal requirements, as required by Ordinance No. 2018-54. This contract has a 30% MWBE Goal. This contract has workforce goals of 20% M and 6.9% W. Details about these goals, and the contract requirements for meeting these goals, are provided herein and in Appendix E. MWBE Form P must be included with this Proposal and Goal Form P.
1.3.5 Minority and Women Business Enterprise (MWBE) Requirements:
The City has a Minority and Women Business Enterprise (MWBE) policy that ensures participation of Minority and Women-owned businesses on City public works projects, including demolitions. Ordinance No. 2018-54 established a goal that MWBE’s will receive 30% of the aggregate total annual contract awards for City public works contracts over $20,000, with the goal for minority owned businesses (M) being 15% and women owned businesses (W) being 15%. For the purpose of this contract and aggregate goal of 30% using any combination of M and/or W’s is acceptable.
The requirements specified herein are established in order to accomplish these goals. Included within these bid documents are the following sections that identify the policy requirements, participation requirements, utilization requirements and good faith effort requirements. Information about MWBE goals may be obtained on an advisory basis by contacting the City of Rochester MWBE Officer at (585) 428-3673.Once the bid is awarded, MWBE forms A,B and C will be forwarded to the lowest Bidder and will become the final MWBE to be incorporated in the contract documents.
D00400 2
1.4. Workforce Goals and Requirements
1.4.4.1 Ordinance 2018-54 established a goal that 20% of the workers on this project are minorities (M) and that 6.9% of the workers on this project are females (W ) .The requirements specified herein are established in order to accomplish these goals.
1.4.4.2 Workforce requirement procedures and documents and forms are provided on the City's website at http://www.cityofrochester.gov/mwbe/ and are hereby incorporated by reference. Additional Information about workforce goals may be obtained on an advisory basis by contacting the City of Rochester MWBE Officer at (585) 428-3673.
1.4.4.3 Commitment to Workforce Goals
Bidders are required to affirm their understanding of and commitment to meet the 20% M and 6.9% W workforce goals by checking the box affirming their understanding and commitment found on the Bid Proposal Submissions Checklist.
1.4.4.4 Workforce Staffing Plan
The Contractor shall submit a Workforce S t a f f i n g Plan on forms required by the City and distributed before or at the pre-construction meeting. The form may be paper or on a web based system provided by the City. The workforce plan is to include, but not be limited to the following information:
1.4.4.4.1 Name, l.D. (last 4 digits of social security number), ethnicity, gender, and if required OSHA-10 certification, for each employee the Contractor expects to employ on the job; Name of each subcontractor; Name, l.D. (last 4 digits of social security number),ethnicity, gender, and if required OSHA-10 certification, for each employee the each subcontractor expects to employ on the job;
1.4.4.4.2 Should additional subcontractors be added during the term of the contract, the same information must be provided.
1.4.4.4.3 Subcontractors shall mean subcontractors of any tier.
1.4.4.4.4 If the Workforce Staffing Plan does not indicate that the Contractor will be able to meet the workforce required workforce goals, the City will require the Contractor to provide a revised workforce plan that indicates the Contractor's intent and ability to meet the workforce goals.
2. STANDARD DEMOLITION CONTRACT DOCUMENTS
2.1 Contractors must follow the Standard Demolition Contract Documents (dated November 15, 2000), except where Special Instructions to Bidders modify them.
2.2 All bidders shall comply with the Standard Demolition Contract Documents.
These documents form part of the awarded contract.
http://www.cityofrochester.gov/mwbe/
D00400 3
2.3 Bidders may obtain one (1) copy free from the City of Rochester Director of Purchasing. Additional copies cost $10.00.
3. SUBMITTAL OF BIDS
3.1 Submit bid proposals in a marked, sealed envelope including:
Signed original Proposal
Bid specifications
Addenda
Required support documentation
Bid bond.
Deliver the envelope to the Director of Purchasing, Bureau of Purchasing, Room 105-A, City Hall, Rochester, NY 14614, before the closing date and time specified in the Invitation to Bid or any addenda. The City does not accept electronic bids submitted through BidNet.
3.2 Hard copy bids shall include the entire Invitation to Bid package, including cover page, bid specifications, addenda, required documentation, and Proposal.
3.3 Complete and submit all information requested on the Proposal. In particular, bidders must provide information and certifications required to meet MWBE and Workforce goals.
3.4 The City reserves the right to reject any bid that do not include all of these documents.
4. CONTRACT AWARD
4.1 The City will award contracts to responsible and responsive bidders based on Unit Price per property or, where applicable, Lump Sum bid. The City calculates low bid using the following factors:
4.1.1 Each bidder shall certify on the Proposal the number of structures they can demolish and complete by February 26, 2027 (Certification Date).
4.1.2 Bidders may submit bids for more structures than they can complete by the Certification Date. The City may award excess structures under Secondary Contracts. Primary contracts will be awarded based on each bidder’s certified capacity.
4.1.3 The City will verify that each bidder’s capacity to complete awarded structures by the Certification Date (per Section 10.2).
4.1.4 The City will award Primary contracts according to the number of structures each bidder certifies it can complete by February 26, 2027.
4.1.4.1 If a bidder submits the lowest bid for more structures than certified, the City reserves the right to select which structures to award.
D00400 4
4.1.4.2 The City reserves the right to award the remaining structures to the next lowest bidder up to that bidder’s certified capacity.
4.1.4.3 Example. Assume the City receives three bids:
Bidder A certifies capacity: 20 structures
Bidder B certifies capacity: 25 structures
Bidder C certifies capacity: 10 structures
The low bids are as follows:
Bidder A: 30 structures
Bidder B: 10 structures
Bidder C: 19 structures
Primary awards:
Bidder A receives 20 structures low bidder.
The City awards the remaining 10 structures not awarded to Bidder A to the next lowest bidder, Bidder B. Bidder B now holds a primary contract for 10 structures they initially bid low on, plus the 10 structures from Bidder A.
The City awards Bidder C a Primary contract for 10 structures where they were the low bid.
The City awards the remaining 5 structures from Bidder C to the next lowest bidder, Bidder B.
All bidders now reached their certified capacities. The City awards the remaining four structures through a Secondary contract.
4.1.5 The City will award Secondary contracts based on the lowest Unit Price or Lump Sum bid. The City reserves the right not to award a Secondary award if the bidder cannot meet Section 10.5 completion requirements.
4.1.6 The City reserves the right, in its sole discretion, to determine the number and selection of structures to award to any bidder based on low bid, capacity, timing, or other factors. For example, the City reserves the right to award structures to the lowest or lower bidder even though they might not fall within that bidder’s certification date if it is in the City’s best interest to do so based upon a significant price differential between bids received and/or other capacity restraints/timing requirements.
4.2 Upon receiving award recommendations, the Bureau of Purchasing will issue an award letter to the successful bidder, constituting the formal contract award.
D00400 5
4.3 The Bureau of Purchasing will issue a Purchase Order upon receipt of the required documents. The contractor shall not begin work until receiving the Purchase Order and Notice to Proceed.
4.4 For purposes of certifying the number of structures a bidder will complete by the
Certification Date, bidders may assume that the City will issue a Notice to Proceed no later than December 4, 2026. If the City delays issuing the Notice to Proceed through no fault of the contractor, the City will extend the Certification Date by an equivalent number of days.
5. WITHDRAWAL OF A PROPERTY
5.1 The City reserves the right to withdraw any property at any time, for any reason, before demolition begins.
5.2 If the City removes one or more structures from a lump-sum bid group, the City will calculate the remaining cost for that group using the Unit Price bid for each property.
5.3 If the City withdraws a property before demolition starts, the City is not responsible for any costs incurred by the contractor prior to withdrawal.
6. SPECIFICATIONS - STRUCTURES AND DESCRIPTIONS
Item No.
No. Street Name Owner Units Storie s
Style Garage
6.1 96 Angle St. Private Single-Family 2.5 Wood Frame No
6.2 515 Avenue D City Single-Family 1 Wood Frame No
6.3 101 Avenue E Private Single-Family 1.7 Wood Frame No
6.4 61 Barker St. Private Single-Family 1.7 Wood Frame Yes -attached
6.5 88 Barons St. Private Single-Family 1 Wood Frame No
6.6 148 Bay St. Private Religious 2 Wood Frame No
6.7 449-449.5 Campbell St. Private Two-Family 2.5 Wood Frame No
6.8 600 Campbell St. Private Single-Family 1.5 Wood Frame No
6.9 48 Cedar St. Private Single-Family 1.5 Wood Frame No
6.10 370 Central Pk. Private Two-Family 2.5 Wood Frame Yes
6.11 345 Child St. Private Single-Family 1.7 Wood Frame No
6.12 957 Clifford Ave. Private Single-Family 1.5 Wood Frame Yes
6.13 136 Clifton St. Private Three-Family 2 Wood Frame No
6.14 186 Driving Park Ave. Private Two-Family 2.5 Wood Frame No
6.15 387 Durnan St. City Two-Family 2.5 Wood Frame No
6.16 404 Emerson St. Private Single-Family 2.5 Wood Frame Yes
6.17 81 Fernwood Ave. Private Single-Family 1.7 Wood Frame Yes -attached
6.18 324 Glenwood Ave Private Single-Family 2.5 Wood Frame No
D00400 6
6.19 19 Heidelberg St. Land Bank Single-Family 1.5 Wood Frame No
6.20 13 Hoeltzer St. Private Single-Family 1.5 Wood Frame No
6.21 755 Jay St. Private Two-Family 2.5 Wood Frame No
6.22 1469 Jay St. Private Single-Family 2 Wood Frame Yes
6.23 238 Lexington Ave. Private Two-Family 2 Wood Frame No
6.24 87 Lime St. (Garage Only) Private Single-Family 1 Masonry Yes
6.25 39-39.5 Locust St. Private Two-Family 2.5 Wood Frame Yes
6.26 295-297 Magnolia St. Private Two-Family 2.5 Wood Frame No
6.27 323 Magnolia St. City Single-Family 1.5 Wood Frame No
6.28 57 Montrose St. Private Two-Family 2 Wood Frame Yes 2 Car Garage
6.29 707 N. Plymouth Ave. Private Single-Family 1 Wood Frame No
6.30 41 Otis St. Private Two-Family 2.5 Wood Frame No
6.31 192 Pennsylvania Ave.
(Garage Only) Private Single-Family 1.5 Wood Frame Yes
6.32 33 Petrel St. Private Single-Family 2 Wood Frame No
6.33 35 Petrel St. Private Single-Family 1.5 Wood Frame No
6.34 516 Post Ave. Private Single-Family 2 Wood Frame No
6.35 282 Ravine Ave. Private Two-Family 2.5 Wood Frame No
6.36 312 Remington St. Private Single-Family 1.5 Wood Frame No
6.37 363 Remington St. Private Single-Family 2.5 Wood Frame No
6.38 204 Roycroft Dr. Private Single-Family 2.5 Wood Frame Yes
6.39 212 Saratoga Ave. Private Single-Family 2 Wood Frame No
6.40 27 Sixth St Private Single-Family 1.5 Wood Frame No
6.41 575 Smith St. Private Two-Family 2 Masonry No
6.42 1516-1520 St Paul St. Private Three-Family 2.5 Wood Frame No
6.43 177 St. Bridgets Dr. Private Religious 4 Masonry No
6.44 26 Wadsworth St. Private Single-Family 1 Wood Frame No
6.45 10 Weigel Al. Private Single-Family 1.5 Wood Frame No
6.46 149 Wilder St. Private Single-Family 1.7 Wood Frame Yes
7. SPECIAL INSTRUCTIONS
7.1 Unless specified otherwise, the contractor shall fine-grade and hydroseed all lots after demolition. The contractor shall:
York-rake each site to create a smooth, even surface with well-drained, positive grades.
Apply screened topsoil for the top three (3) inches, free of rock and stone.
7.2 Posts:
The contractor shall furnish and install six-foot-long, six-inch-diameter, pressure-treated timber posts. Install each post six feet on center and set it
D00400 7 three feet deep in concrete footings. Cut the top two inches of the post at a forty-five-degree angle with the sloped side facing outward. Ensure posts are uniform in line and height along the front lot line of all structures except:
Item No. Street Name Posts
6.1 96 Angle St. Angle St front and west side of property
6.2 515 Avenue D Ave D front and west property line
6.3 101 Avenue E Avenue E Side Front west property line and rear
6.5 88 Barons St. Barons St side and Weigel Al
6.9 48 Cedar St. Cedar front and left property line driveway
6.11 345 Child St. Front and right side of the property line
6.15 387 Durnan St. Durnan st front and left side of property line
6.16 404 Emerson St. Emerson front and left side of property line
6.17 81 Fernwood Ave. Fernwood side and Spiegel Park
6.18 324 Glenwood Ave. Front and right side of property
6.20 13 Hoeltzer St. Front and west side of property line
6.22 1469 Jay St. Front and right property line
6.24 87 Lime St. (Garage Only) Perimeter around the garage
6.25 39-39.5 Locust St. Front and right property line
6.27 323 Magnolia St. Front and vacant lot at 329 Magnolia St
6.28 57 Montrose St. Front left side to parking lot and rear to alley
6.29 707 N. Plymouth Ave. Front and rear of property to parking lot
6.34 516 Post Ave. Front and left side
6.37 363 Remington St. Corner lot front and right side
6.38 204 Roycroft Dr. Front and left side
6.39 212 Saratoga Ave. Corner lot, front and left side
6.42 1516- 1520 St Paul St. Corner lot, front and left side
6.43 177 St. Bridgets Dr. Front and property line to driveway on the right
6.46 149 Wilder St. Corner lot front and left side
7.3 Concrete Substrates and Backfill Requirements
The contractor shall remove all concrete substructures (basement walls, footers, floors, and similar components) and excavate to virgin ground. The contractor shall excavate basements down to virgin ground. Transport non-native material to an approved recycling location at the contractor’s expense.
The contractor shall use imported fill and topsoil free of staining and odors.
The contractor shall provide the City with a Certificate of Origin for all imported materials. The City may require laboratory testing and reject material that does not meet City standards.
D00400 8
The contractor shall place screened topsoil for the top three inches (3”) of backfill. Do not use asphalt, metal, or organic matter as backfill material.
The contractor shall include all costs for removing, transporting, and disposing of recyclable concrete and asphalt in the bid.
7.4 COMPLETION
The work on a property shall be complete after demolition of the structure, debris removal, backfilling, fine grading, hydroseeding, and posting the lot in accordance with these specifications.
If the City awards multiple structures to a contractor, the contractor shall fully complete each property before proceeding to the next, unless the City grants written approval to do otherwise.
The contractor shall submit invoices on a property-by-property basis once the demolition work is complete on that property.
The contractor shall submit a payment application at least once every thirty-
(30) days after the Notice to Proceed and continue doing so throughout the term of the contract. Each payment application shall include invoices for every completed property not previously invoiced, consistent with Section 7.3.3. A separate invoice shall be submitted for each property; multiple properties shall not be combined on a single invoice.
7.5 PERMIT FEES
The City of Rochester shall pay the water abandonment permit fee.
The contractor shall be responsible for paying the hydrant permit fee and other demolition-related permits.
The contractor shall not be responsible for demolition permit fees on City owned structures.
The contractor shall be responsible for demolition permit fees on privately owned structures.
7.6 NOTIFICATION FOR UTILITY DISCONNECT
The contractor shall notify all utility companies, including the underground facilities protective organization, to abandon utilities serving the structures. Before starting demolition, the contractor shall verify that each utility company has completed the abandonment.
D00400 9
7.7 ACCESSORY BUILDINGS, DEBRIS, TREES, AND VEGETATION
The bidder shall include in the bid price the demolition and disposal of all accessory buildings on the property, concrete slabs, driveways, or parking surfaces that may be present on the property.
The bidder shall include in the bid price, the removal and disposal of concrete slabs, driveways, parking surfaces, trees, vegetation, and fencing, that directly obstructs their ability to complete the demolition of the structure.
The bidder shall include in the bid price the removal and disposal of all miscellaneous debris on the property. Miscellaneous debris includes brush, trash, trees, fencing, and building materials not related to the demolition, as required by the City.
The bidder shall include the disposal of up to twenty (20) tires per property in the bid price. The contractor shall remove additional tires and document the work through an approved change order.
7.8 FUEL OIL TANKS
The contractor shall inspect the premises for the presence of fuel oil tanks before starting demolition.
If the contractor discovers a tank, the contractor shall immediately notify the City demolition inspector. The contractor may not begin demolition until the City confirms that the fuel oil tank was properly removed.
The contractor shall adhere to all applicable laws and regulations applicable with the removal and disposal of any fuel oil and tanks.
8. ASBESTOS
8.1 Asbestos Abated Prior to Contract Award
The City of Rochester shall abate all identified asbestos under a separate contract for the property listed in Section 8.1 below. All asbestos abatement will be completed prior to the issuance of the Notice to Proceed for demolition.
The successful bidder shall not be responsible for any pre-demolition asbestos abatement activities. The properties where asbestos abatement has been completed are listed below:
Item No. No. Property
6.19 19 Heidelberg St.
6.24 87 Lime St. (Garage Only)
8.1.1 During the course of the demolition project, if any additional asbestos-containing materials are discovered, the Contractor shall immediately stop
D00400 10 all work in the affected area and notify the City’s Demolition Inspector. The City will be responsible for arranging the removal and disposal of any newly discovered asbestos-containing materials.
8.1.2 The Contractor’s Pollution Liability Insurance, as referenced in Section 14.4.2.B, is not required for the properties listed in Section 8.1 where asbestos abatement has been completed prior to demolition. For these properties only, pollution liability coverage included within the Contractor’s Comprehensive General Liability Insurance and Umbrella/Excess Liability policies shall be sufficient to meet the City’s insurance requirements.
For all other properties, Contractor’s Pollution Liability Insurance as stated in Section 14.4.2.B is required.
8.2 Controlled Demolition with Asbestos in Place
The contractor shall perform controlled demolition with asbestos in place per New York State Industrial Code Rule 56, Sub-Part Section 56-11.5.
The contractor shall notify New York State Department of Labor Asbestos Control Bureau and the United States Environmental Protection Agency (USEPA). The City shall provide the contractor a letter of condemnation to include with the project notification.
The City shall provide a NYS Department of Labor Asbestos Fee Waiver Form for each controlled demolition. Include the Waiver Form, with the Project Notification, to avoid any fees.
The City shall be responsible for providing third-party asbestos air monitoring during the project. The contractor does not provide or pay for asbestos air monitoring.
The contractor shall maintain Pollution Liability insurance as required by Section 14.4.2.B for the structures listed in Section 6, which contain asbestos.
The insurance shall include all endorsements and satisfy all requirements of Section 14.4.2. The contractor must provide coverage even if it is included in the Comprehensive General Liability or Umbrella/Excess Liability policies. The coverage may be on a blanket policy or project-specific, covering only the structures awarded to the contractor.
8.3 ASBESTOS LICENSE REQUIREMENT
The contractor shall submit documentation showing that all employees received required medical examinations and successfully passed respirator fit test in accordance with OSHA 1926.1101.
The contractor shall provide valid NYDOL Asbestos Handling Certificates and federal training records (DOSH 2832 form) for all employees. All employees shall have completed initial or refresher training within one calendar year of the work dates completed under this contract.
The contractor shall maintain a current Asbestos Handlers Firm License.
D00400 11
If the contractor does not have an Asbestos Handlers Firm License, the contractor shall submit certified payrolls that confirm a NYSDOL-licensed abatement firm with a current license employs and supervises all asbestos workers.
9. WASTE DISPOSAL
9.1 The City has entered into an agreement with the Monroe County for solid waste disposal of all debris to:
Mill Seat Landfill 303 Brew Road
Bergen, New York 14416
The contractor shall not be responsible for disposal charges for debris generated from the demolition of structures awarded through this bid.
9.2 The contractor shall be responsible for transporting all debris to the Mill Seat Landfill.
9.3 The contractor shall include all associated transporting cost in the bid.
9.4 The City demolition inspector shall inspect, stamp, and sign all waste shipment documents before the trucks leave the site for the Mill Seat Landfill. Waste Management will accept only trucks with the City’s authorization stamp and signature. Trucks without the City’s authorization stamp and signature will be subject to the full tonnage charges by Waste Management, which the City will not reimburse.
9.5 The contractor shall submit any request to use a landfill other than the Mill Seat Landfill in writing and state the circumstances for the request. The City may approve the exception, but the City reserves the right to require the contractor to pay all disposal costs associated with the exception.
9.6 The bidder shall base all bids for disposing of asbestos-containing material on the use of trucks without walking floors. Mill Seat Landfill prohibits trucks with walking floors from dumping asbestos-containing debris but allows them for non-asbestos-containing demolition debris.
9.7 The contractor shall be responsible for complying with Mill Seat operating hours for both asbestos- and non-asbestos-containing materials.
10. TIME OF COMPLETION
10.1 The City of Rochester considers the demolition of the structures identified in this bid a critical public safety need. The City expects contractors awarded structures under this contract to complete demolition within the time requirements stated in this bid. If a contractor fails to meet these requirements, the City may declare the contractor in default and take additional actions, including but not limited to limiting the contractor’s future participation in City demolition contracts.
D00400 12
10.2 Each bidder shall state in the Proposal the number of structures the bidder commits to complete by February 26, 2027 (the “Certification Date”). Upon receipt of the City’s Notice to Proceed, the bidder shall begin work and complete the number of structures identified for the Certification Date according to the bidder’s Primary contract award.
10.3 Upon request of the City, a bidder shall demonstrate that they have the capacity to complete, on time, the structures for which they submitted the low bid. The bidder’s demonstration of capacity shall include, but not be limited to:
1. A listing of all current contracts for work similar to the work described in this bid;
2. A demonstration that the bidder has the capacity to complete the work under those contracts within the required timeframes;
3. A bidder’s demonstration, to the City’s satisfaction, that the bidder has the capacity to complete the work under this bid in the timeframe specified if awarded structures for which the bidder submitted the low bid.
10.4 Because these demolitions address a critical public safety need, the City reserves the right not to award all structures to the lowest bidder. The bidder shall demonstrate, to the City’s satisfaction, their ability to demolish all structures awarded as a Primary contract by February 26, 2027, and complete structures awarded as a secondary contract in accordance with the timeframes in Section 10.6.
10.5 Section 7.4 defines the time of completion for demolition. The City will issue one Notice to Proceed for all structures awarded to the contractor, and the contractor shall begin counting completion time from that date.
The contractor shall complete every structure awarded under a Primary contract by February 26, 2027.
The contractor shall begin demolition within a reasonable time after receiving the Notice to Proceed and shall continue demolishing structures on a steady and consistent basis through February 26, 2027.
The contractor shall maintain a work pace that demonstrates, to the City’s satisfaction, that they will complete all awarded structures by the February 26, 2027 deadline.
If the contractor is not progressing at a sufficient pace, which demonstrates the contractor will meet the February 26, 2027 deadline, the City reserves the right, in its sole discretion, to withdraw any or all structures awarded to the contractor, and assign them to another contractor.
10.6 The contractor shall complete the demolition of all structures awarded under a secondary contract according to the following schedule. Awarded structures refers to individual structures, including those in any lump-sum groups.
D00400 13
If the City awards the contractor one (1) to five (5) structures, the contractor shall complete demolition of all awarded structures within thirty (30) days of the Notice to Proceed.
If the City awards the contractor one (1) to ten (10) structures, the contractor shall complete demolition of at least five (5) structures within thirty (30) days and complete the remaining structures within forty-five (45) days of the Notice to Proceed.
If awarded one (1) to fifteen (15) structures, the contractor shall complete demolition of at least five (5) structures within thirty (30) days, complete at least five (5) more structures within forty-five (45) days, and the remaining structures within sixty (60) days of the Notice to Proceed.
10.7 Upon receipt of the Notice to Proceed, the contractor shall provide the City’s
Division of Contract Services with a written demolition schedule for approval. The schedule shall include the start and completion dates for every structures awarded to the contractor. The contractor shall submit the demolition scheduled to nbdrehabanddemo@cityofrochester.gov. The City reserves the right to request a modification of the schedule if needed to address public safety needs or unexpected conditions. The contractor shall document any change to the approved schedule in writing.
11. PUBLIC SAFETY
11.1 During the demolition of front facades, the contractor shall install temporary barricades along the curb line to prevent debris from falling in the street.
11.2 The contractor shall assign a flagman at all times to control trucking operations and safely direct pedestrian and vehicle traffic.
11.3 The contractor shall install “Sidewalk Closed” signs at each end of the site. Signs shall be secure and clearly visible.
11.4 If demolition work abuts or encroaches upon the public-right-of-way, the contractor shall obtain a Right-of-Way permit prior to commencing the work.
11.5 During non-working hours, the contractor shall enclose the entire site with fencing strong and tall enough to prevent public entry and to prevent children and animals from entering the site.
11.6 Immediately before demolition begins, the contractor and City representative shall inspect the interior of each property, when accessible, to check for any signs of illegal occupant or trespassers.
12. BID SECURITY
Each bidder shall include a bid security for Five Hundred Dollars ($500) for each property. Bidders may provide the security in the form of cash, a certified check, a bank letter of credit, or a surety bond issued by a surety company licensed to do business in the State of New York.
mailto:nbdrehabanddemo@cityofrochester.gov
D00400 14
13. PERFORMANCE SECURITY
13.1 Within ten (10) days of the award letter, the contractor shall furnish the Director of Purchasing with performance security in an amount equal to one hundred (100%) percent of the contract price. Performance Security may be in the form of cash, certified check, or surety bond issued by a surety company licensed to do business in the State of New York.
13.2 If the bidder does not provide the performance bond within ten (10) days, the department may retain the bidder’s bid security and award the contract to the second-lowest bidder.
14. INSURANCE
14.1 The contractor shall procure and maintain at its own expense until final acceptance of the work covered by the Contract Documents, insurance for liability for damages imposed by law of the kinds and in the amounts hereinafter provided from insurance companies licensed to do such business in the State of New York and maintaining an A.M. Best rating of A- XV covering all operations under the Contract Documents whether performed by the contractor or its subcontractors. If the contractor is comprised of more than one legal entity (excluding subcontractors), each such entity will be jointly named.
14.2 Within ten days of the request, the contractor shall furnish to the City Finance Director a certificate or certificates of insurance in form satisfactory to the City Director of Purchasing showing that he/she has complied with this Section, which certificate or certificates shall provide that the policies shall not be materially changed or canceled until ten days' written notice has been given to the City Director of Purchasing.
14.3 In each policy of insurance except insurance for Workers' Compensation and Disability Insurance, the City of Rochester shall be named as an additional insured for liability arising under this agreement. Except for Workers' Compensation and Disability Insurance, no insurance required herein shall contain any exclusion of municipal operations performed in connection with the project.
14.4 The kinds and amounts of insurance are as follows:
14.4.1 WORKERS' COMPENSATION AND NYS DISABILITY INSURANCE
The agreement shall be void and of no effect unless the person or corporation making or executing same shall secure Compensation and NYS Disability coverage, covering all operations under the contract–whether performed by him or his subcontractors, for the benefit of and keep insured during the life of the said agreement, employees in compliance with the provisions of the Workers’ Compensation Law.
A. Workers' Compensation Insurance
A policy covering the operations of the contractor in accordance with the provisions of Chapter 41 of the Laws of 1914, as amended, known as the Workers' Compensation Law. The policy shall be endorsed to
D00400 15 provide 30 days prior written notice of cancellation or non-renewal and Waiver of Subrogation in favor of the City of Rochester. A copy of these endorsements shall be included with the Certificate of Insurance.
B. NYS Disability Insurance
A policy covering the operations of the contractor in accordance with the provisions of Article 9 of the Workers’ Compensation Law, known as the Disability Benefits Law (Chapter 600 of the Laws of 1949) and amendments thereto.
14.4.2 CASUALTY INSURANCE
The contractor’s Comprehensive General Liability Insurance is issued to the contractor and covers the liability for damages imposed by law upon the contractor with respect to all work performed by him under the within agreement. The coverage shall be written on an occurrence form utilizing ISO coverage form CG 00 01 12 07 or its equivalent. The comprehensive general liability policy shall furnish limits of not less than:
Bodily Injury and Property Damage
Limit $1,000,000 each occurrence
Products/Completed Operations Limit
$2,000,000 aggregate
Personal Injury and Advertising Injury Limit
$1, 000,000 each person or Organization
General Aggregate
$2,000,000 applicable on a per project basis
The City of Rochester, their officers, employees and agents and all other appropriate Funding Agencies shall be named as an additional insured for liability arising under this Contract applicable to both ongoing and completed operations on a primary and non-contributory basis.
There shall be no exclusions relating to NYS Labor Law or municipal operations.
A. Commercial Automobile Liability. Issued to the contractor and covering all owned, non-owned and hired automobiles with limits not less than:
Bodily Injury and Property Damage Liability
Combined Single Limit $1,000,000
B. The Contractors Pollution Liability. Issued to the contractor covering all operations with limits not less than:
$1,000,000 per loss
$2,000,000 annual aggregate
D00400 16
C. Umbrella Excess Liability. Issued to the contractor providing follow form coverage over the General Liability and Automobile Liability requirements stipulated above with minimum limits of:
Bodily Injury and Property Damage Limit
$5,000,000 Products/Completed Operations Limit
$5,000,000 General Aggregate
$5,000,000
All policies shall be endorsed to provide Waiver of Subrogation in favor of the City of Rochester. All policies shall be endorsed to provide 30 days prior written notice of cancellation or non-renewal. A copy of the Additional Insured and Waiver of Subrogation Endorsement(s) shall be included with the Certificate of Insurance.
15. LABOR STANDARDS REQUIREMENTS
15.1 COMPLIANCE WITH LABOR LAWS
15.1.1 The contractor's attention is directed to the requirements of Sections 220 and 220-a through 220-e of the Labor Law of the State of New York, compliance with the provisions of which shall be deemed a condition to the satisfactory performance of this contract.
15.1.2 The contractor shall cause to be posted and maintained at all times in a conspicuous place at the Site of the Work, a clearly legible copy of the Schedule of Wage Rates as prescribed by the State Commissioner of Labor.
The contractor shall further certify, on any statement to the City for a partial or final payment, that the wage rates paid to employees on this project have been in conformity with the wage rates so set forth as determined by the State Commissioner of Labor pursuant to and in conformity with Section 220 of the New York State Labor Law.
15.1.3 The contractor shall keep a copy of his payrolls for this project available at all times for inspection by representatives of the City or other public agency having jurisdiction over the project and shall produce them for such inspection at the request of said duly authorized representatives. The contractor and subcontractors shall submit weekly-certified payroll records to the Division of Contract Services and the Director of Finance or his designee. The contractor shall be responsible for the submission of copies of certified payrolls of all subcontractors. Payments shall be withheld from the contractor for failure to comply with this requirement.
15.1.4 In all operations related to the Work, all other State or Federal Laws, Local Ordinances, and Laws controlling or limiting in any way the actions of those engaged in the Work shall be strictly complied with by the contractor and all employees working under his direction. The foregoing shall apply to subcontractors of the contractor.
D00400 17
16. NYS Public Work Contractor and Subcontractor Registry
New York State Labor Law Section 220-i is in effect for this contract.
Documentation of online registry with the New York State Public Work
Contractor and Subcontractor Registry (https://dol.ny.gov/contractor-and-subcontractor-landing) is required with any bid in order for it to be read.
Per the New York State Department of Labor website: “Starting December
30, 2024, all contractors and subcontractors submitting bids or performing construction work on public work projects or private projects covered by
Article 8 of the Labor Law are required to register with the New York State
Department of Labor (NYSDOL) under Labor Law Section 220-i.”
16.1 ANTI-KICKBACK RULES
Employees of the contractor and his subcontractors performing work under this contract shall be paid unconditionally and not less often than once a week without deduction or rebate on any account, except only such payroll deductions that are mandatory by law or permitted by the applicable regulations issued by the State Commissioner of Labor pursuant to the New York Labor Law. The contractor shall comply with applicable "Anti-Kickback" regulations and shall insert appropriate provisions in all subcontracts covering work under this contract to insure compliance by subcontractors with such regulations, and shall be responsible for the submissions of affidavits required of subcontractors there under, except as the Commissioner of Labor may specifically provide for variations of or exemptions from the requirements thereof.
16.2 WITHHOLDING OF PAYMENTS FROM CONTRACTOR
When a complaint is filed with the City of Rochester alleging the failure of a contractor or subcontractor to pay or provide the prevailing wages or supplements, or when the City of Rochester has reason to believe that unpaid wages or supplements may be due, payments on the public work contract may be withheld from the prime contractor in sufficient amount to satisfy the alleged unpaid wages and supplements, including interest and civil penalty which may be imposed. The amounts withheld may be disbursed by the City of Rochester for and on account of the contractor or subcontractor to the respective employees to whom they are due.
17. PREVAILING WAGE RATES
17.1 Incorporated in these Contract Documents is the Prevailing Wage Schedule in effect at the time of publication of these Contract Documents. Any Prevailing Wage Rates Redetermination, which may arise prior to the bid opening, will be distributed by addendum.
17.1.1 Paragraph 9.1, above, designates a specified disposal site for all debris from work under this contract. Per direction from the New York State Department
D00400 18 of Labor: when a disposal site is contractually specified, travel time between the demolition site and the disposal site, in addition to the time spent at both locations, is subject to payment of prevailing wage rates. In the event of multiple trips from the demolition site to the disposal site on the same day and by the same driver, the return trip from the disposal site to the demolition site is also subject to prevailing wage rates.
In addition, the following language found in paragraph f of subdivision 3-a of section 220 of the NYS labor law has been modified to read-
“Prevailing wage rate shall be paid for work performed on a public works worksite pursuant to this section for any work involving delivery to and hauling from such worksites of aggregate supply construction materials, as well as any return hauls, whether empty or loaded and any time spent loading/unloading.”
This legislation was signed by the Governor and is effective on February 24, 2022.
17.2 In the event that the prevailing rate of wages or supplements change after the bids have been opened, or after the contract is let, an updated schedule will be issued by the State Department of Labor. Said updated schedule will be transmitted to the contractor by the City. Each worker, laborer, or mechanic shall be paid or provided not less than the new updated rates.
17.3 The City will not be responsible for any of the contractor's increased labor costs which result from defects in the Prevailing Wage Schedule provided, or from amendments to the Prevailing Wage Schedule, whether that increase occurs before advertisement, before Bid opening, before award of the contract, after the contract has been let, or during the life of the contract. No change in the contract price shall be allowed to the contractor for any such increases, except as provided for elsewhere in these documents.
17.4 Information about current wage rates may be obtained on an advisory basis by contacting the City's Contract Administrator, Department of Finance, City Hall, Rochester, New York, (585) 428-7398.
17.5 NYS Public Work Contractor and Subcontractor Registry
16.5.1 New York State Labor Law Section 220-i applies to work performed under this contract. All contractors and subcontractors submitting bids or performing construction work on public work projects or private projects covered by Article 8 of the Labor Law are required to register with the New York State Department of Labor (NYSDOL). The City strongly encourages all contractors and subcontractors to register as soon as possible to obtain a Certificate of Registration to avoid negatively impacting a bidding period or project schedule.
16.5.2 Documentation of registration with the New York State Public Work
Contractor and Subcontractor Registry (https://dol.ny.gov/contractor-and-subcontractor-landing) is required with any sealed bid in order for it to be read.
https://dol.ny.gov/contractor-and-%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20subcontractor-landing https://dol.ny.gov/contractor-and-%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20subcontractor-landing
D00400 19
16.5.3 If a Certificate of Registration is not included with the sealed bid, bidders shall include their email Receipt of Application from the New York State
Department of Labor (NYSDOL) along with their sealed bid. Bidders should refer to Appendix R – Sample NYS Contractor Registration
Certificate.
16.5.4 Bidder understands that the City shall confirm the validity of contractor and subcontractor registration with NYSDOL.
16.5.5 Bidder understands that each contractor and subcontractor must be registered with NYSDOL prior to contract award.
16.5.6 The City reserves the right to consult with NYSDOL to consider other forms of documentation as proof of contractor and subcontractor registration.
16.5.7 The City reserves the right not to award contract without the required documentation specified herein.
18. CERTIFICATION OF COMPLIANCE WITH THE IRAN DIVESTMENT ACT
18.1 The contract resulting from this bid shall be subject to the requirements of the Iran Divestment Act of 2012 (the “Act”), Chapter 1 of the 2012 Laws of New York, State Finance Law (SFL) § 165-a, and New York General Municipal Law § 103-g both effective April 12, 2012. Under the Act, the Commissioner of the Office of General Services (OGS) is responsible for developing a list of “persons” who are engaged in “investment activities in Iran” (both are defined terms in the law) (the “Prohibited Entities List”). The Prohibited Entities List as required by SFL § 165-a
(3) (b) is found on the OGS website at http://www.ogs.ny.gov/about/regs/docs/ListofEntities.pdf.
18.2 CERTIFICATION. “By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each bidder is not on the list created pursuant to paragraph (b) of subdivision 3 of section 165-a of the State Finance Law.”
18.3 Any bidder/contractor seeking to renew or extend this contract or assume the responsibility of the contract awarded in response to this bid solicitation shall certify at the time the contract is renewed, extended or assigned that it is not included on the Prohibited Entities List.
18.4 During the term of the contract or any extension, should the City receive information that the contractor is in violation of the above-referenced certification, the City will offer the person or entity an opportunity to respond. If the person or entity fails to demonstrate that he/she/it has ceased engagement in the investment which is in violation of the Act within 90 days after the determination of such violation, then the City shall take such action as may be appropriate http://www.ogs.ny.gov/about/regs/docs/ListofEntities.pdf
D00400 20 including, but not limited to, imposing sanctions, seeking compliance, recovering damages or declaring the contractor in default.
18.5 The City reserves the right to reject any bid or request for assignment for a bidder/contractor that appears on the Prohibited Entities List prior to the award of a contract and to pursue a responsibility review with respect to any bidder/contractor that is awarded a contract and subsequently appears on the Prohibited Entities List.
19. BIDDER IDENTIFICATION DOCUMENTS
Bidders who have not previously submitted a W-9 Form shall submit a completed, signed W-9 Form along with Proposal Page.
20. CITY RESIDENT INCENTIVE PROGRAM
This contract includes an incentive program for hiring qualified city residents as specified in Appendix “B”. The contractors who qualify for this incentive will receive additional revenue from this contract.
21. MINORITY AND WOMEN BUSINESS ENTERPRISE (MWBE) UTILIZATION PLAN
20.1 Policy Goals
City of Rochester Ordinance No. 2018-54 sets forth the following policy goals for all City Demolition Procurement contracts:
20.1.1 Commodities Goods and Services Purchasing contracts goals: 30% Aggregate Goal to Minority and Women Owned Enterprises (MWBE).
20.1.2 A contractor, vendor or consultant shall be eligible for meeting the MWBE goals if:
20.1.2.1 It is a state-certified MWBE at the time of the contract award.
State certification requires that a business be at least 51% owned and controlled by minorities (M), women (W), or both. Minority shall be defined consistent with state and federal definitions, e.g.
Black Hispanic, American Indian or Alaskan Native, Asian – Indian Subcontinent, and Asian Pacific.
20.1.2.2 The contractor, vendor or consultant has bona fide offices and operations in the Empire State Development (ESD) Finger Lakes Region, which includes the following counties: Genesee, Livingston, Monroe, Ontario, Orleans, Seneca, Wayne, Wyoming and Yates.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .