DEEP081126CM_Aug_24_26_solicitation_doc.pdf
PDF 14 KB Posted
- Attached to
- Comstock Bridge Parking Lot Paving
- Solicitation number
- DEEP081126CM
- Issued by
- Middlesex County, Connecticut
About this file
This is an Invitation to Bid (ITB) document issued by the Connecticut Department of Energy and Environmental Protection (DEEP) for parking lot paving, resurfacing, and stormwater management work at Comstock Bridge in Salmon River State Forest, East Hampton. The project involves excavation and disposal of four inches of surface material from approximately 12,000 square feet of gravel parking lot; re-grading and compacting base material; constructing a 75-foot drainage swale with six-inch perforated HDPE underdrain and native vegetation; installing corrugated HDPE pipe; paving with two inches of HMA binder course and two inches of HMA surface course; installing six-inch asphalt curbing; applying epoxy paint markings and handicapped-accessible signage; and performing hydroseeding and erosion control work. The bidding period opens August 11, 2026 at 9:00 AM EDT and closes August 28, 2026 at 4:00 PM EDT, with vendor questions accepted through August 27, 2026 at 3:45 PM EDT. A pre-bid meeting is scheduled for August 20, 2026 at 9:00 AM at the project site. The contract allows 30 calendar days for completion, with liquidated damages of $200 per calendar day assessed for delays. Award is anticipated on or about October 1, 2026.
Contractor prequalification requirements are tiered by bid amount: bids of $1,000,000 or less require Certified Set-aside Contractor status, while bids exceeding $1,000,000 require DAS-Prequalified Contractor status. Bidders must submit two separate bids—one assuming unsuitable native material requiring imported base material and one assuming satisfactory native material test results. Evaluation criteria include project approach, contractor experience with excavation, parking lot and highway paving, and drainage construction; relevant staff resumes and references; detailed cost and time breakdowns; and schedule feasibility. Deliverables submitted with bids must include haul tickets, delivery tickets, manufacturer specifications, and laboratory reports. The swale specifications require a 30-linear-foot perforated underdrain with 2:1 side slopes, non-woven filter fabric complying with Connecticut DOT Standard M.08.01.19, and maximum 36-inch ponding depth during 10-year storm events. Inquiries regarding the solicitation should be directed to Eric Gileau at (860) 538-3016 or eric.gileau@ct.gov.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: DEEP081126CM
Comstock Bridge Parking Lot Paving
Invitation to Bid (ITB)
Energy & Environmental Protection
August 11, 2026 - August 28, 2026
Page:2
General Header Information
This bid has no questions defined.
DEEP081126CM
No. DEEP081126CM Title: Comstock Bridge Parking Lot Paving Start Date: August 11, 2026 at 9:00:00 AM EDT End Date: August 28, 2026 at 4:00:00 PM EDT Vendor Q&A Start Date: August 11, 2026 at 9:15:00 AM EDT Vendor Q&A End Date: August 27, 2026 at 3:45:00 PM EDT Estimated Total Value:
Who can respond to this bid? : All Vendors Description: State Of CT DEEP is looking to have the Comstock Bridge Parking Lot regarded paved and line striped to improve the existing gravel parking lot. Qualified contractors to follow the detailed scope of work attached.
Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: Energy & Environmental Protection
Attention: Eric Gileau Phone: (860) 538-3016 / Email: eric.gileau@ct.gov
Contact Details: If you have any questions, please contact:
Attention: Eric Gileau Phone: (860) 538-3016 / Email: eric.gileau@ct.gov
Selected Categories:
Page:3
Documents:
Comstock Bridge Parking Lot Parking Plan.pdf
Swale Detail.pdf
Invitation to Bid Comstock Bridge Parking Lot Paving.pdf
Page:4
Item Specifications Solicitation has been designated as having no line items.
Page:5
File details come from the government source that posted it. Updated .