Comstock Bridge Parking Lot Parking Plan.pdf
PDF 10 MB Posted
- Attached to
- Comstock Bridge Parking Lot Paving
- Solicitation number
- DEEP081126CM
- Issued by
- Middlesex County, Connecticut
About this file
This is a parking plan drawing prepared by the Connecticut Department of Energy and Environmental Protection (DEEP) for the Comstock Bridge Parking Lot Paving Project located at Salmon River State Forest in Marlborough, Connecticut. The project involves resurfacing and restriping an existing gravel parking lot to improve conditions. The parking plan specifies detailed design elements including asphalt paving, handicapped-accessible parking spaces marked with epoxy paint, white epoxy-painted parking stalls, yellow epoxy pavement arrows for directional guidance, 6-inch asphalt curbing along the southern perimeter, and a 6- to 8-inch modified rip-rap swale channel to manage stormwater drainage. The plan indicates multiple handicapped spaces with appropriate signage installed in grass areas and defines parking lot dimensions of 186 feet, 83 feet, 213 feet, and 60 feet with various smaller measurements for specific features. The engineering and design work was completed on July 29, 2026, by DEEP's Engineering, Safety and Sustainability Division located in Portland, Connecticut.
The document contains the parking plan drawing at a scale of 1 inch equals 20 feet and references additional standard drawings and revision sheets. No pricing information, bidding timelines, site visit schedules, or contract award details are included in this parking plan document, which serves as a technical specification for qualified contractors to follow during the parking lot improvement project.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION
EMMA CIMINO
NED LAMONT, GOVERNOR
STATE OF CONNECTICUT
JULY 29 2026
COMSTOCK BRIDGE PARKING LOT PAVING PROJECT
LIST OF DRAWINGS
DESCRIPTIONDWG NO. SHEET NO.
LIST OF STANDARD DRAWINGS
DESCRIPTION SHEET NO.
LIST OF DRAWING REVISIONS
DESCRIPTIONSHEET NO DATE
SALMON RIVER STATE FOREST
LOCATION OF PROJECT
MASSACHUSETTS
R H
O D
E ISLA
N
D
N
EW
Y O
R K
FOR SALMON RIVER STATE FOREST
MALBOROUGH, CT
ACTING COMMISSIONER
TITLE PAGE
PARKING PLAN 1
DWG NO.
186'
83' 213'
60'
13'
45' 14'
HC
HC
HC
INITIALS
ENGINEERING, SAFETY AND SUSTAINABILITY DIVISION
DEPARTMENT OF ENERGY
STATE OF CONNECTICUT
DESIGNED:
DRAWN:
SHEET 1:
CAD FILE:
DATE:
SCALE:
DATE DESCRIPTION
REVISIONS
PORTLAND, CONNECTICUT 06480
ENGINEERING UNIT
163 GREAT HILL ROAD
PHONE: 860-424-XXXX
FAX: 860-344-2560
PROJECT NAME & NUMBER:
SHEET TITLE:
AND ENVIRONMENTAL PROTECTION
COMSTOCK BRIDGE PARKING LOT PAVING
XXXXXXXXXXXXXXXXXXXXX
MALBOROUGH, CONNECTICUT
JDM07/29/2026
1/1 1"=20'
PARKING PLAN
JDM
JDMCHECKED:
marrenj Architect 6' Handicapped Signs, installed in grass marrenj Text Box Centerline of Swale. See 'Swale Detail' For Design. Tie in Swale to Southwest corner of lot using 6-8" modified rip-rap channel.
marrenj Arrow marrenj Arrow marrenj Text Box 6" Asphalt curbing along southern perimeter of lot marrenj Arrow marrenj Arrow marrenj Architect marrenj Text Box Yellow Epoxy Cross-Hatching, with "No Parking" painted marrenj Arrow marrenj Text Box All Parking Stalls White Epoxy Paint marrenj Arrow marrenj Arrow marrenj Arrow marrenj Arrow marrenj Architect Yellow Epoxy Pavement Arrows marrenj Arrow marrenj Cloud
| Sheets and Views |
| title page |
| Cover Sheet-Layout1.pdf |
| Sheets and Views |
| Cover Sheet-Layout1 |
| Parking Lot Revision 1.pdf |
| Sheets and Views |
| Cover Sheet-Layout1 |
File details come from the government source that posted it. Updated .