DE-FOA-0003472 Next-Generation Geothermal Field Tests and Geothermal Resource Characterization and Confirmation Part 2_MOD0003.pdf
PDF 11 MB Posted
- Attached to
- Next-Generation Geothermal Field Tests and Geothermal Resource Characterization and Confirmation
- Opportunity number
- DE-FOA-0003472
About this file
This is NOFO Part 2 (Notice of Funding Opportunity Part 2), a comprehensive companion document to the primary NOFO Part 1 for the Next-Generation Geothermal Field Tests and Geothermal Resource Characterization and Confirmation funding opportunity under the Department of Energy's Office of Energy Efficiency and Renewable Energy (CFDA 81.087, Renewable Energy Research and Development). Part 2 establishes standard application, eligibility, and post-award requirements applicable across DOE financial assistance awards. Key application requirements include mandatory registrations with SAM.gov (with Unique Entity Identifier), Grants.gov, and the appropriate eXCHANGE portal; submission through eXCHANGE rather than Grants.gov; and adherence to strict formatting standards (PDF files, 12-point Calibri font, 1-inch margins, maximum file size 50MB). Required application documents encompass SF-424 forms, Letters of Commitment, resumes/biosketches for covered individuals, Current and Pending Support disclosures, budget justifications, Locations of Work, Data Management Plans, Transparency of Foreign Connections disclosures, and various certifications regarding lobbying, malign foreign talent recruitment programs, and Entity of Concern status. Cost-sharing requirements mandate non-federal sources, with allowable contributions including cash and in-kind support verified from recipient records and approved by the Grants Officer prior to expenditure.
Post-award requirements impose comprehensive federal compliance obligations including adherence to 2 CFR Parts 200 and 910 cost principles, Research Security Training certification for covered individuals, Conflict of Interest Policy compliance with 180-day implementation flexibility, subaward reporting under FFATA, Davis-Bacon Act requirements for construction work utilizing LCPtracker for payroll compliance, Build America Buy America (BABA) requirements for public infrastructure projects (applicable only to non-profit and government prime recipients), U.S. Competitiveness Provisions for subject inventions, performance work within the United States absent approved waivers, cybersecurity and export control compliance, and quarterly reporting through the Federal Assistance Reporting Checklist. The merit review process includes initial eligibility screening, technical evaluation by expert reviewers, pre-selection interviews and clarifications at DOE's discretion, Research Technology and Economic Security (RTES) due diligence reviews covering foreign connections and malign talent recruitment programs, and evaluation by the EERE Assistant Secretary with selection based on technical merit, program policy factors, and available funding. Applicants selected for negotiation must be registered in FedConnect to receive executed award packages and may be required to submit post-selection information including Construction or Operations Workforce Continuity Plans (for projects exceeding $35M construction or 100+ operational employees where DOE contributes ≥10%), environmental documentation for NEPA compliance, and go/no-go review commitments for periodic project evaluations tied to continuation funding availability.
DE-FOA-0003472 Next-Generation Geothermal Field Tests and Geothermal Resource Characterization and Confirmation Part 2_MOD0003
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Financial Assistance Notice of Funding Opportunity
Part 2
This is Part 2 of the Notice of Funding Opportunity (NOFO). The NOFO Part 2 is intended as a companion document to the NOFO Part 1. The NOFO Part 1 describes the specific DOE programmatic goals and evaluation criteria, eligibility, and other components that are specific to each funding opportunity.
Part 2 includes fixed DOE requirements that generally do not change from NOFO to NOFO. This document includes standard information for the application phase and describes expectations for award negotiations and post-award requirements for selected applications. Applicants should review both the NOFO Part 1 and the NOFO Part 2 prior to applying.
Version 2.1 Page 2 of 68
Modifications
All modifications to the Notice of Funding Opportunity (NOFO) are HIGHLIGHTED in the body of the NOFO.
Mod.
No.
Date Description of Modification
0001 March 9, 2026
Added correct description to section 18. Research Security Training Requirement
0003 April 15, Removed all references to Environmental related documentation and removed references to required template for the Project Management Plan (PMP).
Version 2.1 Page 3 of 68
Notice of Funding Opportunity Part 2 Table of Contents
I. GET REGISTERED
SAM.gov Registration Unique Entity Identifier (UEI) Grants.gov Registration eXCHANGE
II. ELIGIBILITY
A. Cost Sharing
1. Legal Responsibility
2. Cost Share Allocation
3. Cost Share Types and Allowability
4. Unallowable Cost Share Sources
5. Cost Share Contributions by FFRDCs
6. Cost Share Verification
7. Cost Share Calculation Examples
B. Other Eligibility Information
1. Questions Regarding Eligibility
2. Entity of Concern Prohibition
3. Artificial Intelligence (AI) Application Use
III. PROGRAM DESCRIPTION
A. Informational Webinar
IV. APPLICATION CONTENT AND FORM
A. Application Format Summary B. Application Content Requirements
1. Application for Federal Assistance (SF-424)
2. Letters of Commitment
3. Impacted Indian Tribes Documentation
4. Statement of Project Objectives (SOPO)
5. Project Management Plan (PMP)
6. Budget Information—Non-Construction Programs (SF-424A)
7. RESERVED
8. Budget Justification Workbook
9. Subrecipient Budget Justification
10. Work Proposal for DOE FFRDC
11. Authorization for Non-DOE or DOE FFRDCs (if applicable)
12. Waiver for Foreign Entity Participation
13. Performance of Work in the United States (Foreign Work Waiver)
14. Resumes for Research and Development (R&D) NOFOs
15. Resumes for Non-R&D NOFOs
Version 2.1 Page 4 of 68
16. Current and Pending Support
17. Digital Persistent Identifier (PID)
18. Research Security Training Requirement
19. Transparency of Foreign Connections
20. Potentially Duplicative Funding Notice
21. Data Management Plan
22. Locations of Work
23. Lobbying Activities
24. Summary for Public Release
25. Summary Slide
C. Additional Requirements
1. Content and Form of Replies to Reviewer Comments
D. Funding Restrictions
1. Allowable Costs
2. Pre-Award Costs
3. Performance of Work in the United States (Foreign Work Waiver) Requirement
4. Foreign Travel
5. Lobbying
6. Equipment and Supplies
7. Davis-Bacon Act Requirements
V. SUBMISSION REQUIREMENTS AND DEADLINES
VI. APPLICATION REVIEW INFORMATION
A. Standard Evaluation and Selection Processes
1. Overview
2. Pre-Selection Interviews
3. Pre-Selection Clarification
4. Recipient Responsibility and Qualifications
5. Due Diligence Review for Research, Technology, and Economic Security
6. Evaluation and Administration by Non-Federal Personnel
7. Selection
VII. SELECTION AND AWARD NOTICES
A. Selection Notices
1. Ineligible Submissions
2. Concept Paper Notifications
3. Application Notifications
4. Applicants Selected for Award Negotiations
5. Alternate Selections
6. Applicants Not Selected for Award Negotiations
B. Post-Selection Information Requests
1. Example Information Requests
2. Entity Risk Assessment
3. Environmental Review in Accordance with National Environmental Policy Act (NEPA)
4. Flood Resilience
5. Trafficking in Persons
Version 2.1 Page 5 of 68
6. Construction Workforce Continuity Plan
7. Operations Workforce Continuity Plan
C. Award Notices
VIII. AWARD ADMINISTRATION INFORMATION
A. Post-Award Requirements and Administration
1. Award Administrative Requirements
2. Subaward and Executive Reporting
3. National Policy Requirements
4. Applicant Representations and Certifications
5. Statement of Federal Stewardship
6. Uniform Commercial Code (UCC) Financing Statements
7. Interim Conflict of Interest Policy for Financial Assistance
8. Whistleblower Protections
9. Fraud, Waste, and Abuse
10. Participants and Collaborating Organizations
11. Current and Pending Support
12. Prohibition Related to Malign Foreign Talent Recruitment Programs
13. Foreign Collaboration Considerations
14. U.S. Manufacturing Commitments
15. Subject Invention Utilization Reporting
16. Intellectual Property Provisions
17. Go/No-Go Review
18. Conference Spending
19. Invoice Review and Approval
20. Cost Share Payment
21. Notice of Infrastructure Investment and Jobs (IIJA) Act or Inflation Reduction Act Specific Requirements .. 57
22. Implementation of Executive Order 13798, Promoting Free Speech and Religious Liberty
23. Human Subjects Research
B. Reporting
IX. OTHER INFORMATION
A. Government Right to Reject or Negotiate B. Commitment of Public Funds C. Treatment of Application Information E. Notice Regarding Eligible/Ineligible Activities F. Notice of Right to Conduct a Review of Financial Capability G. Requirement for Full and Complete Disclosure H. Retention of Submissions I. Title to Subject Inventions J. Government Rights in Subject Inventions K. Copyright L. Export Control M. Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment N. Personally Identifiable Information (PII) O. Annual Independent Audits P. Build America, Buy American Requirement
Version 2.1 Page 6 of 68
Q. Acronyms
Version 2.1 Page 7 of 68
Section I: Get Registered
I. Get Registered
Applicants must take several one-time actions before applying to this NOFO. Some of these actions may take several weeks, so it is vital applicants build in enough time to complete them. Failure to complete these actions could interfere with application or negotiation deadlines or the ability to receive an award if selected. If you are already registered, make sure your registration is active and up to date. All registrations are free.
See Step 3: Submit Your Application
SAM.gov Registration You must have an active account with SAM.gov, the System for Award Management (SAM), including having a Unique Entity Identifier (UEI).
• What is it? SAM is a federal procurement database. All entities that want to do business with the federal government MUST be registered in SAM.
• Existing SAM registrations must be updated annually.
• Duration to complete: possibly several weeks
• Registration Link: https://sam.gov/content/home o Note: Subrecipients are not required to obtain an active SAM registration but must obtain a Unique Entity Identifier.
• HELP: https://sam.gov/content/help. Applicants must allow several weeks for the SAM process to complete. All registrations rely on completion of the SAM registration, so start early.
Unique Entity Identifier (UEI)
• What is it? UEI is a non-proprietary identifier that has replaced the Federal Government’s use of the Data Universal Numbering System (DUNS) number effective April 4, 2022.
• Applicants must obtain a UEI from the SAM to uniquely identify the entity. The UEI is available in the SAM entity registration record.
o Note: Subawardees/subrecipients at all tiers must also obtain a UEI from the SAM and provide the UEI to the recipient before the subaward can be issued.
• Duration to complete: possibly several weeks
• Registration Link: https://sam.gov/content/entity-registration
• HELP: https://www.fsd.gov/gsafsd_sp
Grants.gov Registration You must have an active Grants.gov registration to receive automatic updates when modifications to this NOFO are posted. Doing so requires a Login.gov registration as well.
• What is it? Grants.gov is a website used to enable federal grant-making agencies to notify potential applicants of funding opportunities. Please note that letters of intent, concept papers, and applications will not be accepted through Grants.gov (see eXCHANGE information below).
• Step-by step instructions for applicants at How to Apply for Grants, https://www.grants.gov/applicants/grant-applications/how-to-apply-for -grants
• Duration to complete: possibly several days https://sam.gov/content/home https://sam.gov/content/home https://sam.gov/content/help https://sam.gov/content/entity-registration https://www.fsd.gov/gsafsd_sp https://www.grants.gov/forms/forms-repository/sf-424-family https://www.grants.gov/applicants/grant-applications/how-to-apply-for%20-grants
Version 2.1 Page 8 of 68
Section I: Get Registered
• Registration Link: https://grants.gov
• HELP: https://apply07.grants.gov/help/html/help/index.htm#t=GetStarted%2FGetStarted.htm eXCHANGE Register with eXCHANGE, with Login.gov or ID.me.
• What is it? The Department of Energy (DOE) has several eXCHANGE databases that are useful in searching for funding opportunities.
• As part of eXCHANGE registration process, new users will be directed to create an account in Login.gov. Please note that the email address associated with Login.gov must match the email address associated with eXCHANGE account.
• Submission of application documents in any DOE eXCHANGE system constitutes the authorized representative’s approval and electronic signature.
• Duration to complete: two to three days
• Registration Links:
o Energy Efficiency and Renewable Energy eXCHANGE: EERE eXCHANGE: Funding Opportunity (energy.gov) o Indian Energy eXCHANGE: IE-Exchange: Funding Opportunity (energy.gov) o Infrastructure eXCHANGE: Infrastructure eXCHANGE: Funding Opportunity (energy.gov) supporting the following DOE Offices:
Office of Cybersecurity, Energy Security, & Emergency Response (CESER) Office of Federal Energy Management Programs (FEMP) Grid Deployment Office (GDO) Office of Manufacturing and Energy Supply Chains (MESC) Office of State and Community Energy Programs (SCEP)
DISCLAIMER:
Applicants are discouraged from submitting information considered proprietary unless it is deemed essential for proper evaluation of the application. If the application contains information that the applicant organization considers to be trade secrets, information that is commercial or financial, or information that is privileged or confidential, the pages containing that information should be identified as specified in the application instructions. When such information is included in the application, it is furnished to the federal government in confidence, with the understanding that the information will be used or disclosed only for evaluation of the application.
The information contained in the application will be protected by DOE from unauthorized disclosure, consistent with the need for merit review of applications of financial assistance awards to assure the integrity of the competitive process and the accuracy and completeness of the information. If a federal financial assistance award is made as a result of or in connection with an application, the federal government has the right to use or disclose the information to the extent authorized by law. This restriction does not limit the federal government’s right to use the information if it is obtained without restriction from another source.
https://grants.gov/ https://apply07.grants.gov/help/html/help/index.htm#t=GetStarted%2FGetStarted.htm https://eere-exchange.energy.gov/ https://eere-exchange.energy.gov/ https://ie-exchange.energy.gov/ https://infrastructure-exchange.energy.gov/
Version 2.1 Page 9 of 68
Section II. Eligibility
II. Eligibility
Please refer to the NOFO Part 1, Eligibility, for the eligibility criteria specific to your application. This section includes additional information to help applicants understand the standard eligibility requirements across all DOE NOFOs.
A. Cost Sharing This section contains additional information to help applicants understand federal cost sharing requirements. Please refer to the NOFO Part 1, Eligibility—Cost Sharing, for the cost sharing criteria specific to your application.
1. Legal Responsibility Although the cost share requirement applies to the entire project, including work performed by members of the project team other than the recipient, the recipient is legally responsible for paying the entire cost share. The recipient’s cost share obligation is expressed in the Assistance Agreement as a static amount in U.S. dollars (cost share amount) and as a percentage of the Total Project Cost (cost share percentage). If the funding agreement is terminated prior to the end of the project period, the recipient is required to contribute at least the cost share percentage of total expenditures incurred through the date of termination.
The recipient is solely responsible for managing cost share contributions by the project team and enforcing cost share obligation assumed by project team members in subawards or related agreements.
2. Cost Share Allocation Each project team is free to determine how best to allocate the cost share requirement among the team members. The amount contributed by individual project team members may vary, as long as the cost share requirement for the entire project is met.
3. Cost Share Types and Allowability Cost share must meet requirements set forth in 2 C.F.R. §§ 200.306 and 910.130 as well as cost principles set forth in 2 C.F.R. §§ 200.400-476 and 2 C.F.R. §§ 910.352. In addition, cost share must be verifiable upon submission of the full application. Cost share may be provided in the form of cash, cash equivalents, or in-kind contributions. Cost share must come from non-federal sources (unless otherwise allowed by law), such as project participants, state or local governments, or other third-party financing.
DOE Loan Guarantees cannot be leveraged by applicants to provide the required cost share or otherwise support the same scope that is proposed under a project.
Cost share may be provided by the recipient, subrecipients, or third parties (entities that do not have a role in performing the scope of work). Vendors/contractors may not provide cost share. Any partial donation of goods or services is considered a discount and is not allowable.
Cash contributions include but are not limited to personnel costs, fringe costs, supply and equipment costs, indirect costs, and other direct costs.
https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/section-200.306 https://www.ecfr.gov/current/title-2/subtitle-B/chapter-IX/part-910/subpart-B/section-910.130 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-E/subject-group-ECFR1f52baf5ea70fff/section-200.400 https://www.ecfr.gov/current/title-2/subtitle-B/chapter-IX/part-910/subpart-D/section-910.352
Version 2.1 Page 10 of 68
In-kind contributions are those where the value of the contribution can be readily determined, verified, and justified but where no actual cash is transacted in securing the good or service comprising the contribution. Allowable in-kind contributions include but are not limited to the donation of volunteer time or the donation of space or use of equipment.
Funding or property received from state or local governments may be used to meet the cost share requirement, so long as the federal government did not provide the funding to the state or local government.
Cost share contributions must be specified in the project budget, verifiable from the recipient’s records, and necessary and reasonable for proper and efficient accomplishment of the project. Because all sources of cost share are considered part of total project cost, DOE will review the cost share dollars according to the same federal regulations as federal dollars to the project. Every cost share contribution must be reviewed and approved in advance by the Grants Officer and incorporated into the project budget before the expenditures are incurred.
4. Unallowable Cost Share Sources The recipient and subrecipient(s) may not use the following sources to meet cost share obligations:
• Cost share derived from federal sources (unless otherwise authorized by law)
• Cost share that does not meet:
o Requirements set forth in 2 C.F.R. §§ 200.306 and 910.130 o Cost principles set forth in 2 C.F.R. §§ 200.400-476 and 2 C.F.R. §§ 910.352 o For State Energy Programs guidelines in 10 C.F.R. §§ 420.
• Cost share derived from the DOE loan program
• Revenues or royalties from the prospective operation of an activity beyond the project period
• Proceeds from the prospective sale of an asset of an activity
• Federal funding or property (e.g., federal grants or equipment owned by the federal government)
• Expenditures that were reimbursed under a separate federal program
• Cash or in-kind contributions used to meet cost share requirements for another federal project or program
• Existing data as an in-kind contribution (e.g., data owned by an entity that is not routinely sold commercially but is instead donated to the project and assigned a value)
• In general, deferred or avoided costs such as unrealized tax credits
• If applicable, other items as identified by DOE Programs and as specified in the applicable NOFO
Part 1, Eligibility—Cost Sharing.
Cost share contributions must be specified in the project budget, verifiable from the recipient’s records, and necessary and reasonable for proper and efficient accomplishment of the project. Because all sources of cost share are considered part of total project cost, the cost share dollars will be scrutinized under the same federal regulations as federal dollars to the project. Every cost share contribution must be reviewed and approved in advance by the Grants Officer and incorporated into the project budget before the expenditures are incurred.
5. Cost Share Contributions by FFRDCs Because federally funded research and development centers (FFRDCs) are funded by the federal government, costs incurred by FFRDCs generally may not be used to meet the cost share requirement.
Version 2.1 Page 11 of 68
FFRDCs may contribute cost share only if the contributions are paid directly from the contractor’s Management Fee or another non-federal source.
6. Cost Share Verification Applicants are required to provide written assurance of their proposed cost share contributions in their applications. If selected for award negotiations, applicants are required to provide additional information and documentation regarding their cost share contributions. Please refer to the NOFO Part 1, Eligibility—Cost Sharing, for specific requirements.
7. Cost Share Calculation Examples Cost sharing is calculated as a percentage of the Total Project Cost. FFRDC costs must be included in Total Project Costs.
Example 1. Standard Cost Share Calculation The following is an example of how to calculate cost sharing amounts for a project with $1 million in federal funds with a minimum 20% non-federal cost sharing requirement:
• Formula: Federal share ($) divided by federal share (%) = Total Project Cost
Example: $1,000,000 divided by 80% = $1,250,000
• Formula: Total Project Cost ($) minus federal share ($) = Non-federal share ($) Example: $1,250,000 minus $1,000,000 = $250,000
• Formula: Non-federal share ($) divided by Total Project Cost ($) = Non-federal share (%) Example: $250,000 divided by $1,250,000 = 20%
Example 2. Blended Cost Share Calculation The following example shows the math for calculating required cost share for a project with $2 million in federal funds, with four tasks requiring different non-federal cost share percentages.
Task Proposed Federal Share
Federal Share % Recipient Share %
Task 1 (R&D) $1,000,000 80% 20% Task 2 (R&D) $500,000 80% 20% Task 3 (Demonstration) $400,000 50% 50% Task 4 (Outreach) $100,000 100% 0%
Federal share ($) divided by federal share (%) = Task Cost
Each task must be calculated individually as follows:
Task 1
• $1,000,000 divided by 80% = $1,250,000 (Task 1 Cost)
• Task 1 Cost minus federal share = non-federal share
• $1,250,000 - $1,000,000 = $250,000 (non-federal share)
Task 2
Version 2.1 Page 12 of 68
• $500,000 divided by 80% = $625,000 (Task 2 Cost)
• Task 2 Cost minus federal share = non-federal share
• $625,000 - $500,000 = $125,000 (non-federal share)
Task 3
• $400,000 divided by 50% = $800,000 (Task 3 Cost)
• Task 3 Cost minus federal share = non-federal share
• $800,000 - $400,000 = $400,000 (non-federal share)
Task 4
• Federal share = $100,000
• Non-federal cost share is not mandated for outreach = $0 (non-federal share)
The calculation may then be completed as follows.
Tasks $ Federal Share
% Federal Share
$ Non-Federal Share
% Non-Federal Share
Total Project Cost
Task 1 $1,000,000 80% $250,000 20% $1,250,000 Task 2 $500,000 80% $125,000 20% $625,000 Task 3 $400,000 50% $400,000 50% $800,000 Task 4 $100,000 100% $0 0% $100,000 Totals $2,000,000 $775,000 $2,775,000
Blended Cost Share %
• Non-federal share ($775,000) divided by Total Project Cost ($2,775,000) = 27.9% (non-federal)
• Federal share ($2,000,000) divided by Total Project Cost ($2,775,000) = 72.1% (federal)
B. Other Eligibility Information Refer to NOFO Part 1, Eligibility—Eligible Applicants, for NOFO-specific eligibility information. The information below is standard for DOE NOFOs.
1. Questions Regarding Eligibility DOE will not make eligibility determinations for potential applicants prior to the date on which applications to the NOFO Part 1 must be submitted. The decision to apply in response to the NOFO Part 1 lies solely with the applicant.
2. Entity of Concern Prohibition
Prohibition No Entity of Concern as defined in Section 10114 of Public Law 117-167 (42 USC 18912) may receive any grant, contract, cooperative agreement, or loan of $10 million or more in Department of Energy funds, including funds made available by the Consolidated Appropriations Act, 2024 (Public Law 118-42).
In addition, for all awards involving Departmental activities authorized under Public Law 117-167, no Entity of Concern (including an individual that owns or controls, is owned or controlled by, or is under common ownership or control with an Entity of Concern) may receive DOE funds or perform work under any award, subject to certain penalties. See Section 10114 of Public Law 117-167 (42 USC 18912) and https://www.congress.gov/117/plaws/publ167/PLAW-117publ167.pdf#page=105 https://www.congress.gov/118/bills/hr4366/BILLS-118hr4366enr.pdf https://www.congress.gov/117/plaws/publ167/PLAW-117publ167.pdf#page=105 https://www.congress.gov/117/plaws/publ167/PLAW-117publ167.pdf#page=105
Version 2.1 Page 13 of 68
Division D, Title III, Section 310 of Division D of the Consolidated Appropriations Act of 2024 (Pub. L.
No. 118-42) for additional information.
By applying to this NOFO, the applicant is certifying that neither the applicant nor any of the project participants qualify as Entities of Concern.
Definitions Entity of Concern is defined as in section 10114 of Public Law 117-167 (42 USC 18912), also known as the CHIPS and Science Act, as any entity, including a national, that is—
(A) identified under section 1237(b) of the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999 (50 U.S.C. 1701 note; Public Law 105–261);
(B) identified under section 1260H of the William M. (Mac) Thornberry National Defense Authorization Act for Fiscal Year 2021 (10 U.S.C. 113 note; Public Law 116– 283);
(C) on the Entity List maintained by the Bureau of Industry and Security of the Department of Commerce and set forth in Supplement No. 4 to part 744 of title 15, Code of Federal Regulations;
(D) included in the list required by section 9(b)(3) of the Uyghur Human Rights Policy Act of 2020 (Public Law 116–145; 134 Stat. 656); or
(E) identified by the Secretary, in coordination with the Director of the Office of Intelligence and Counterintelligence and the applicable office that would provide, or is providing, covered support, as posing an unmanageable threat—
(i) to the national security of the United States; or
(ii) of theft or loss of United States intellectual property.
3. Artificial Intelligence (AI) Application Use
Any use of artificial intelligence in the creation of any part of an application for this NOFO must be appropriately attributed. Even with the use of artificial intelligence, each applicant is responsible for and is representing to the U.S. Government that the information in its application documents is accurate, that the applicant is fully capable of performing the work described in the application, and that the submission of the application does not and will not infringe or violate any rights of any third party or entity.
https://www.congress.gov/118/bills/hr4366/BILLS-118hr4366enr.pdf https://www.congress.gov/118/bills/hr4366/BILLS-118hr4366enr.pdf https://media.defense.gov/2025/Jan/07/2003625471/-1/-1/1/ENTITIES-IDENTIFIED-AS-CHINESE-MILITARY-COMPANIES-OPERATING-IN-THE-UNITED-STATES.PDF https://www.ecfr.gov/current/title-15/subtitle-B/chapter-VII/subchapter-C/part-744/appendix-Supplement%20No.%204%20to%20Part%20744
Version 2.1 Page 14 of 68
Section III. Program Description
III. Program Description
Refer to NOFO Part 1, Program Description, for all information related to the specific NOFO goals, objectives, and topic areas, if any.
A. Informational Webinar Refer to NOFO Part 1, Basic Information—Key Dates, to determine if DOE plans to conduct an informational webinar while the NOFO is open.
If applicable, DOE will conduct an informational webinar during the NOFO process. It will be held after the initial NOFO release but before the due date for concept papers or the application if concept papers are not required.
Attendance is not mandatory and will not positively or negatively impact the overall review of any applicant submissions. The webinar will be open to all potential applicants who wish to participate.
Applicants should refrain from asking questions or communicating information that would reveal confidential and/or proprietary information specific to their project.
The rest of this page is intentionally left blank.
Version 2.1 Page 15 of 68
Section IV. Application Content and Form
IV. Application Content and Form
This section contains supplemental information to help applicants understand the application content and form requirements outlined in the NOFO including detailed information on the content and naming conventions of the application content. Please refer to NOFO Part 1, Application Content and Form, for the application contents and form specific to your application.
Note that some of the required application elements below have separate requirements for Research and Development (R&D) versus non-R&D NOFOs. Refer to NOFO Part 1, Application Content Requirements, for specific instructions.
A. Application Format Summary All submissions must conform to the form and content requirements described below. Refer to the NOFO Part 1, Application Content and Form, for the page limits.
Format Requirements
Parameter Requirement
File Format Portable Document Format (PDF) unless stated otherwise
Language English
Paper Size 8.5" x 11"
Margins Not less than 1" (>= 1") on every side
Font Calibri typeface, a black font color, and a font size of 12-point or larger (except in figures or tables, which may be 10-point font). A symbol font may be used to insert Greek letters or special characters, but the font size requirement still applies.
References References must be included as footnotes or endnotes in a font size of 10 or larger. Footnotes and endnotes are counted toward the maximum page requirement.
Control Number A control number will be issued when an applicant begins the eXCHANGE application process. The control number must be included with all application documents. Specifically, the control number must be prominently displayed on the upper right corner of the header of every page and included in the file name (i.e., Control Number_Applicant Name_Application).
Page Numbers Page numbers must be included in the footer of every page.
Each submission must not exceed the specified maximum page limit, including cover page, charts, graphs, maps, and photographs when printed using the formatting requirements set forth above and single spaced.
Page Count Limitations If applicants exceed the maximum page limitations, DOE will review only the authorized number of pages and disregard any additional pages.
Version 2.1 Page 16 of 68
The following information is intended to address eXCHANGE issues typically encountered during the application process. Refer to NOFO Part 1, Submission Requirements and Deadlines—Application Package, for the eXCHANGE site location and support for technical assistance information.
Additional eXCHANGE Information
Deadlines for Submission
EXCHANGE is designed to enforce the deadlines specified in this NOFO. The “Apply” and “Submit” buttons will automatically disable at the defined submission deadlines.
Submission Difficulties
Applicants who experience technical difficulties with submission PRIOR to the NOFO deadline should contact the eXCHANGE helpdesk for assistance.
Application Forms
To access application forms and instructions available on eXCHANGE, select the appropriate funding opportunity number on the Opportunities page.
Size Limitations The maximum file size that can be uploaded to the eXCHANGE website is 50MB. Files larger than 50MB cannot be uploaded and therefore cannot be submitted for review. If a file is larger than 50MB but is still within the maximum page limit specified in the NOFO, it must be broken into parts and denoted to that effect.
For example: "TechnicalVolume_Part_1", "TechnicalVolume_Part_2".
DOE will not accept late submissions that resulted from technical difficulties due to uploading files that exceed 50MB.
B. Application Content Requirements NOFO Part 1, Application Content Requirements, identifies which of the following application documents are required, including the program-specific requirements such as the technical volume and specified page limits. Each application must be limited to a single concept and must not exceed the stated page limits.
1. Application for Federal Assistance (SF-424) Applicants must complete the SF-424: Application for Federal Assistance, which is available in eXCHANGE on Financial Assistance Forms and Information For Applicants and Recipients | Department of Energy. The list of certifications and assurances can also be found on this site. Complete all required fields in accordance with the instructions on the form. The System for Award Management (SAM) is the central repository for common government-wide certifications and representations required of Federal grants recipients. As registration in SAM is required for eligibility for a federal award and registration must be updated annually, Federal agencies use SAM information to comply with award requirements and avoid increased burden and costs of separate requests for such information, unless the recipient fails to meet a federal award requirement or there is a need to make updates to the recipient’s SAM registration for other purposes.
Please ensure that the dates (Block 17) and dollar amounts (Block 18) on the SF-424 are for the complete project period and not just the first project year, first phase, or another subset of the project period.
https://www.energy.gov/management/financial-assistance-forms-and-information-applicants-and-recipients https://www.energy.gov/management/financial-assistance-forms-and-information-applicants-and-recipients
Version 2.1 Page 17 of 68
2. Letters of Commitment Submit letters of commitment from all subrecipients. In addition, submit letters of commitment from all third-party cost share providers. If applicable, the letter must state that the third party is committed to providing a specific minimum dollar amount or value of in-kind contributions allocated to cost sharing.
Letters of support or endorsement for the project from entities that do not have a substantive role in the project will not be accepted. The following information for each third party contributing to cost sharing should be identified.
Letters of Commitment Content
Organization Name Phone, email, and address
Proposed Dollar Amount to be Provided
Value of the contribution
Cost Sharing Type Cash or in-kind contribution (or both)
Each letter must not exceed one page.
3. Impacted Indian Tribes Documentation For any application that potentially impacts Indian Tribes or is on Tribal land1 including when the potentially impacted Indian Tribe is the applicant, applicants are required to submit additional documentation at the time of application, and possibly during negotiation and prior to award. For any project that potentially impacts Indian Tribes, applicants are required to submit documentation demonstrating that an authorized representative of each potentially impacted Indian Tribe is, at a minimum, aware of the nature of the application and its potential impacts to the relevant Indian Tribes.
The notified authorized representative2 must be holding their position while the award is open for applications, and documentation must demonstrate affirmative awareness of the application (e.g. a delivery record from certified mail or a reply by the authorized representative).
For any project intended to be sited on Tribal land(s) or intersecting with Tribal subsurface rights, applicants are required to submit documentation demonstrating support from the relevant Indian Tribes at the time of application.
1 Tribal land is as defined in 25 U.S.C. §§ 3501(2), (3), (4)(A) and (13).
2 An authorized representative must be an elected official or designated leader according to the traditions, constitution, or charter of the Indian Tribe, or someone with relevant delegated authority within the Tribal government. Examples include Chief, Chairman, Chairwoman, Governor, Nation Representative, President, Chief Executive Officer, Chief Financial Officer, Speaker of the Council, Speaker of the Congress, Tribal Administrator.
Version 2.1 Page 18 of 68
Documentation Requirements
Item Criteria Letter of Support from Tribal Leadership The letter must be signed by an authorized representative of the Indian Tribe. The signer(s) must be holding their position while the award is open for applications or negotiations.
Tribal Council Resolution, Board resolution (including the Board of Directors of an Alaska Native Corporation (ANC)), or similar act passed by the legislative body of the Tribal government or Board of Directors of an ANC
The resolution must express support for the project.
For projects not intended to be sited on Tribal land(s) or intersecting with Tribal subsurface rights, but that may have other potential impacts on Tribal resources or reserved rights, letters of support or resolutions of support are strongly encouraged and, depending on the nature of the impact, may be required if selected for negotiation of an agreement. Applicants are encouraged to reach out to Indian Tribes as early as possible in the application process to give Indian Tribes ample time to evaluate and respond.
The following resources may be useful to help determine if a project may impact Indian Tribe(s) resources or reserved rights and the appropriate contacts. These resources are not exhaustive, and many Indian Tribes have resources or reserved rights that extend beyond their Tribal lands or are covered within treaties, statutes, or case-law. Applicants are encouraged to do additional research.
Helpful Resources
Item Location Map of Indian Lands BIA Tract Viewer
Tribal Treaties Database https://treaties.okstate.edu/
Directory of federally recognized Tribes and Tribal leaders https://www.bia.gov/service/tribal-leaders-directory
Best Practices for Identifying and Protecting Tribal Treaty Rights, Reserved Rights, and Other Similar Rights in Federal Regulatory Actions
BEST PRACTICES FOR IDENTIFYING AND PROTECTING
TRIBAL TREATY RIGHTS, RESERVED RIGHTS, AND OTHER
SIMILAR RIGHTS IN FEDERAL REGULATORY ACTIONS
AND FEDERAL DECISION-MAKING
To help determine if an Indian Tribe’s resources or reserved rights may be impacted by the project, applicants must address the following elements, as applicable to the application. If the applicant is an Indian Tribe, these elements should be addressed to ascertain impacts to Indian Tribes other than the applicant. Applicants do not need to reveal specific details about sacred sites, such as a specific location or specific ceremonies.
https://biamaps.geoplatform.gov/biatracts/ https://treaties.okstate.edu/ https://www.bia.gov/service/tribal-leaders-directory https://www.bia.gov/sites/default/files/dup/inline-files/best_practices_guide.pdf https://www.bia.gov/sites/default/files/dup/inline-files/best_practices_guide.pdf https://www.bia.gov/sites/default/files/dup/inline-files/best_practices_guide.pdf https://www.bia.gov/sites/default/files/dup/inline-files/best_practices_guide.pdf
Version 2.1 Page 19 of 68
Indian Tribe Resource or Reserved Rights Impact Assessment
Type of Action Assessment Mitigation If Research and Development (R&D)
Identify any [specific resources] that will be [quantified/modeled] on or near Tribal land, traditional homelands, Tribal historic sites, sacred sites, or in areas where an Indian Tribe maintains rights to [specific resources]. Identify which Indian Tribe(s) may be impacted. Explain any instances of uncertainty or confidentiality.
Explain any actions taken by the applicant to mitigate or address any potential impacts identified, including engaging with the potentially impacted Indian Tribe(s), in the application.
If Demonstration and Deployment (D&D)
Identify any elements of the project that will occur on or near Indian land, Tribal historic sites, or sacred sites and describe its potential impacts to Indian Tribes.
Identify the potentially impacted Indian Tribe(s).
Subsurface Resource Activities (carbon sequestration, oil & gas, geothermal, critical minerals, groundwater, etc.)
Identify any Tribal mineral rights, subsurface rights, or water rights at or near the proposed project location.
Explain any relevant studies already performed, such as groundwater studies. Identify which Indian Tribe(s) might be impacted. Explain any instances of uncertainty and any potential for subsurface resource migration that has been considered.
If Hydropower, Offshore Wind, or Other Water- Related Projects
Identify any Tribal resources or reserved rights (e.g., water, fishing, or other treaty rights) that could be impacted by the proposed project. Identify any Tribal historic sites, sacred sites, or relevant vistas that could be impacted by the project. Identify the potentially impacted Indian Tribe(s) and explain any sources of uncertainty or confidentiality.
If Infrastructure (e.g., transmission and pipeline) Projects
Identify any Indian Land (as defined in 25 U.S.C. § 3501), traditional homelands, or Tribal historic and sacred sites that will be crossed or are near the proposed infrastructure. Identify which Indian Tribe(s) might be impacted and explain any instances of uncertainty or confidentiality.
Other Actions Not Categorized Above
Identify any [other] proposed actions that may impact an Indian Tribe(s) resources or reserved rights. Tribal resources and reserved rights include, and are not limited to, an Indian Reservation or Land (as defined in 25 U.S.C. § 3501) [or intersecting Tribal subsurface rights], historic homelands from which they were removed, cultural sites, sacred sites, water rights, mineral and other subsurface rights, fishing rights, and hunting rights. Identify the Tribe(s) potentially impacted and any sources of uncertainty or confidentiality.
Version 2.1 Page 20 of 68
Applicants are required to document any efforts taken to identify any potential impacts to Indian Tribes, Indian lands, Alaska Native regional and village land, traditional homelands, Tribal rights, Tribal historic sites, or sacred sites. This documentation includes any correspondence with Indian Tribes. These documents should be available on request to DOE. An applicant’s failure to submit documentation of an Indian Tribe’s awareness, or a letter of support (when required as described previously), may constitute grounds for determining an application ineligible, non-responsive to the NOFO, not subject to further review, and/or not otherwise subject to selection or award.
Any application that may potentially impact Indian Tribe(s) may be shared with the potentially impacted Indian Tribe(s). Applicants should include a Notice of Restriction on Disclosure and Use of Data identifying any business sensitive, trade secrets, proprietary, or otherwise confidential information.
Such information will be used or disclosed only for evaluation of the application or to determine whether the proposed project affects an Indian Tribe(s). If an applicant determines an Indian Tribe(s) will be impacted, the applicant must provide information on the project location, potential impacts, and how the applicant will engage with Indian Tribe(s) during the period of performance of the agreement and, if necessary, after the end of the agreement. If the applicant proposes any activities that could impact Tribal resources or reserved rights, including but not limited to lands, cultural sites, sacred sites, water rights, mineral rights, fishing rights, and hunting rights, they must notify DOE as outlined below in the application submission requirements. DOE will determine if formal government-to-government consultation is needed, and DOE will conduct that consultation accordingly, in addition to any engagement by applicant.
4. Statement of Project Objectives (SOPO) Refer to the NOFO Part 1, Technical Volume, for specific requirements. If required, applicants must submit a SOPO. The SOPO template is available in eXCHANGE, which is provided for the administrative convenience of the applicant. Applicants are strongly encouraged to use the template to complete their SOPO. If the template is not used, the SOPO must address all of the elements described in NOFO Part 1, Technical Volume, and as outlined in the template.
5. Project Management Plan (PMP) Refer to the NOFO Part 1, Technical Volume, for specific requirements. If required, applicants must submit a PMP. The PMP must address all of the elements described in NOFO Part 1, Technical Volume.
6. Budget Information—Non-Construction Programs (SF-424A) If applicants elect to use the budget justification workbook in eXCHANGE, they do not need to submit a separate SF-424A. Applicants must provide a separate budget for each year of support requested and a cumulative budget for the total project period of performance. Use the SF-424A Excel, "Budget Information - Non-Construction Programs" form on the DOE Financial Assistance Forms Page at Financial Assistance Forms and Information For Applicants and Recipients | Department of Energy.
You may request funds under any of the Object Class Categories as long as the item and amount are necessary to perform the proposed work, meet all the criteria for allowability under the applicable federal cost principles, and are not prohibited by the standard funding restrictions described below or any program-specific restrictions in the NOFO Part 1, Application Content and Form—Funding Restrictions.
7. RESERVED
https://www.energy.gov/management/financial-assistance-forms-and-information-applicants-and-recipients https://www.energy.gov/management/financial-assistance-forms-and-information-applicants-and-recipients
Version 2.1 Page 21 of 68
8. Budget Justification Workbook
Please refer to the Budget Justification Workbook template in eXCHANGE. Applicants are strongly encouraged to use the suggested template. If applicants choose not use the suggested template, they must also submit an SF-424A Budget Information form (available on grants.gov) and include a breakdown of all costs by Budget Category as outlined in the SF-424A and the Budget Justification suggested template, including all work to be performed by the recipient and its subrecipients and contractors. The SF-424A budget justification form must be saved as PDF file using the following convention for the title, Control Number_LeadOrganization_424A_Budget.
In addition to project-specific costs, applicants should include costs associated with the following activities, as applicable:
• Oversight;
• Required annual audits and incurred cost proposals (such costs may be reimbursed as a direct or indirect cost);
• Implementing award-specific requirements such as Buy America requirements and Davis-Bacon
Act requirements; and
• Reporting.
The “Instructions and Summary” and “SF-424A” tabs included with the Budget Justification Workbook will auto-populate as the applicant enters information into the Workbook. Applicants must carefully read the “Instructions and Summary” tab provided within the Budget Justification Workbook.
9. Subrecipient Budget Justification Applicants must provide a separate budget justification for each subrecipient that is expected to perform work estimated to be more than $500,000 of the total work effort. The budget justification must include the same justification information described in the Budget Justification Workbook section above.
10. Work Proposal for DOE FFRDC If a DOE FFRDC is to perform a portion of the work, the applicant must provide a DOE work proposal (WP) in accordance with the requirements in DOE Order 412.1A, Work Authorization System, available at https://www.directives.doe.gov/directives-documents/400-series/0412.1-BOrder-a-chg1-AdmChg.
11. Authorization for Non-DOE or DOE FFRDCs (if applicable) If an FFRDC is to perform a portion of the work, the federal agency sponsoring the FFRDC must authorize in writing the use of the FFRDC on the proposed project. This authorization must be submitted with the application. The use of a FFRDC must be consistent with the contractor’s authority under its award.
12. Waiver for Foreign Entity Participation All recipients receiving funding under the applicable NOFO Part 1 must be incorporated (or otherwise formed) under the laws of a state or territory of the United States and have a physical location for business operations in the United States. To request a waiver of this requirement, an applicant must submit an explicit waiver request in the application.
Waiver Criteria A foreign entity seeking to participate in a project funded under this NOFO must demonstrate to the satisfaction of DOE that:
https://www.grants.gov/forms/forms-repository/sf-424-family https://www.directives.doe.gov/directives-documents/400-series/0412.1-BOrder-a-chg1-AdmChg
Version 2.1 Page 22 of 68
1. Its participation is in the best interest of the United States industry and United States economic development;
2. The project team has appropriate measures in place to control sensitive information and protect against unauthorized transfer of scientific and technical information;
3. Adequate protocols exist between the United States subsidiary and its foreign parent organization to comply with export control laws and any obligations to protect proprietary information from the foreign parent organization;
4. The work is conducted within the United States, and the entity acknowledges and demonstrates that it has the intent and ability to comply with the U.S. Competitiveness Provision (see Post- Award Requirements--U.S. Manufacturing Commitments below); and
5. It will satisfy other conditions that DOE may deem necessary to protect U.S. government interests.
Content for Waiver Request A foreign entity waiver request must include all of the following:
1. Information about the entity(ies) involved in the proposed work to be conducted outside the United States (i.e., the entity seeking a waiver and the entity(ies) that will conduct the work):
name, point of contact, and proposed type of involvement in the project;
2. Country of incorporation, the extent of the ownership/level control by foreign entities, whether the entity is state owned or controlled, a summary of the ownership breakdown of the foreign entity, and the percentage of ownership/control by foreign entities, foreign shareholders, foreign states, or foreign individuals;
3. The rationale for proposing a foreign entity participate (must address criteria above);
4. A description of the project’s anticipated contributions to the United States economy;
a. How the project will benefit United States R&D and manufacturing, including contributions to employment in the United States and growth in new markets and jobs in the United States;
b. How the project will promote domestic American manufacturing of products and/or services;
5. A description of how the foreign entity’s participation is essential to the project;
6. A description of the likelihood of IP being created from the work and the treatment of any such
IP; and
7. A list of countries where the work will be performed. (Note: If any work is proposed to be conducted outside the United States, the applicant must also complete a separate request for foreign work waiver.)
DOE may also require:
1. A risk assessment with respect to IP and data protection protocols that includes the export control risk based on the data protection protocols, the technology being developed, and the foreign entity and country. These submissions could be prepared by the project lead (if not the recipient), but the recipient must make a representation to DOE as to whether it believes the data protection protocols are adequate and make a representation of the risk assessment— high, medium, or low risk of data leakage to a foreign entity.
2. Additional language be added to any agreement or subagreement to protect IP, mitigate risk, or other related purposes.
DOE may require additional information before considering the waiver request. DOE’s decision concerning a waiver request is not appealable.
Version 2.1 Page 23 of 68
13. Performance of Work in the United States (Foreign Work Waiver)
All work for the projects selected must be performed in the United States, absent a written waiver approved by DOE and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .