DDTP Straight Line Rip Saw Better than or Equal to Diehl SL65-56
Solicitation number
SP330020Q0134
Issued by

View the file

Other files

File Type Posted
SP3300-20-Q-0134 Amendment 0001.docx DOCX document
Amendment 0001 SF30 SP3300-20-Q-0134.pdf PDF
SP3300-20-Q-0134.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Straight Line Rip Saws one (1) each.

Background:

a. Requiring Organization Defense Distribution Depot Tobyhanna PA (DDTP)

b. History Saw is required to replace outdated machine that is maintenance intensive and lacks necessary safety equipment required to meet OSHA standards.

c. Purpose of the Statement of Work (SOW):

Purchase new Straight Line Rip Saws one (1) ea.

1. Scope of Work to be Performed by Contractor:

The contractor shall provide all necessary labor and material to construct, deliver and place into operation one (1) new straight line rip saw. All equipment furnished shall be new from the manufacturer’s most current production. The saws shall be in compliance with all OSHA, federal, state, and local codes and regulations and shall conform to the best quality of materials and workmanship. Accessories not specifically mentioned herein, but necessary to furnish complete systems ready for use, shall also be included and named. All transportation/shipping of the purchased saw shall be provided by the contractor. The contractor shall coordinate a Site Visit with the receiving location in order to ensure all necessary electrical and ventilation connections are in place prior to scheduling the installation of the Rip Saws.

The machine must be the below listed straight line rip saw:

1ea Manufacturer Diehl model SL65-56 (or equivalent) for cutting wood (replacing existing DIEHL SLR)

Salient Characteristics:

· 480 volt, 3 phase, 60 cycle electrical operation

· Line Reactor (isolation transformer)

· 20 HP belt driven spindle with automatic "dead man" style brake

· 3 HP feed drive motor w/AC inverter for 70 - 200 FPM variable feed speed

· 56" of throat capacity

· 30" of table support to the left of the blade

· Work table surfaces are sand blasted and clear coated

· Lower anti-kickback fingers mounted in the work table at the infeed 4-1/4" thickness capacity

· Multi-V chain, chain race, and drive cam

· Precision spindle, spindle housing, bearings, and saw collars

· Electro-pneumatic feed chain lubrication system

· NEMA Type 12, Operator control panel and fascia

· Heavy duty pressure beam, pressure rolls/brackets, and springs

· Infeed safety features w/cam controlled claw type upper anti-kickback fingers, lower infeed anti-kickback fingers, LH & RH side pressure beam and outfeed guards

· Two, (2), 18" diameter, 30 tooth, carbide tipped saw blade

Exterior color – Manufacturer’s standard.

Warranty Coverage - Warranty coverage shall be manufacturer’s standard warranty but not less than one year parts and labor.

Operator, Parts and Service Manual(s) and Training – The contractor shall provide with delivery, one (1) complete set of manuals with each machine.

2. Definitions of Terms and Abbreviations:

a. DDTP: Defense Distribution Depot Tobyhanna PA

b. OSHA: Occupational Safety Health Administration

3. Description of Contractor’s Tasks:

Task 1:Fabricate and Deliver one (1) each straight line rip saws. Saw to be connected to existing electrical connections, no requirement for additional electrical work is required. Saws to be connected to existing ventilation system, no additional ventilation system modification is required.
Task 2:Install one (1) Rip Saw in the location identified in section 7.
Task 3:Provide one (1) 8 hour period of training instruction on the safe operation of the installed Rip Saw. Training to be conducted at one location to be identified by personnel at the receiving location on the day of delivery and installation.

4. Certification and Acceptance:

Final acceptance of the straight line rip saw will be performed by personnel at the receiving location.

5. Project Management Approach:

6. Performance and/or Delivery Schedule:

The contractor shall coordinate the delivery to the locations listed below with the POC listed below.

7. Shipping Location

QTY: 1ea Defense Logistics Agency Defense Distribution Depot Tobyhanna

5th and Squire St, Building 6 Bay 4.