DD1423 (Solicitation).pdf
PDF 245 KB Posted
- Attached to
- Mach 6+ Rig
- Solicitation number
- W911QX22R0008
About this file
This Contract Data Requirements List (CDRL) outlines four technical data items required under a contract to design, build, and deliver a Mach 6+ hypersonic wind tunnel rig. The Army Research Laboratory is the requiring office. The contractor must deliver a design plan within two months of award, followed by rig specification documentation, maintenance manuals and safety procedures one week before commissioning, and software for the data acquisition system upon rig delivery. All documentation must be submitted electronically and in hard copy, with drafts allowed for government review and comment before final submission. The distribution statement on the data is For Official Use Only.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Template last updated 10/21/2021
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC.
D. SYSTEM/ITEM
Mach 6+ Rig
E. CONTRACT/PR NO.
To Be Determined (TBD)
/0011760410
F. CONTRACTOR
To Be Determined
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Scientific and Technical Report
3. SUBTITLE
Design Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711
5. CONTRACT REFERENCE
PWS C.4.1.1
6. REQUIRING OFFICE
FCDD-RLW-VA
7. DD 250 REQ
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE TIME
12. DATE OF FIRST
SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft Final Reg Repro
16. REMARKS
BLK 4: EACH DOCUMENT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIUM
SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. SOME MEDIA TYPES WHICH
CAN BE ACCEPTED INCLUDE: E-MAIL SUBMISSION, SECURE ACCESS FILE EXCHANGE
(SAFE), CD, AND DVD. THE FINAL DOCUMENTS SHALL BE DELIVERED IN BOTH HARD
(PHYSICAL) COPIES AND ELECTRONIC COPIES.
BLK 12: THE CONTRACTOR SHALL PROVIDE THE DRAFT DESIGN PLAN TO THE
GOVERNMENT WITHIN TWO (2) MONTHS AFTER CONTRACT AWARD (ACA).
BLK 13: THE GOVERNMENT WILL REVIEW THE DOCUMENTATION AND PROVIDE
COMMENTS WITHIN SEVEN (7) DAYS OF RECEIPT. THE FINAL VERSION OF THE
AFOREMENTIONED DOCUMENTS SHALL BE SUBMITTED TO THE GOVERNMENT WITHIN
SEVEN (7) DAYS AFTER RECEIPT OF THE GOVERNMENT’S COMMENTS.
BLK 14a: ADDRESSEE –
UNITED STATES ARMY RESEARCH LABORATORY
POINT OF CONTACT: TBD at Time of Award E-MAIL ADDRESS: TBD at Time of Award Aberdeen Proving Ground, MD 21005-5066
FCDD-RLW-VA 1 1 0
15. TOTAL 1 1 0
G. PREPARED BY
TBD at Time of Award
H. DATE
I. APPROVED BY
Ariel M. Amey
J. DATE
19 May 2022
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 4 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC.
D. SYSTEM/ITEM
Mach 6+ Rig
E. CONTRACT/PR NO.
To Be Determined (TBD)
/0011760410
F. CONTRACTOR
To Be Determined
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Scientific and Technical Report
3. SUBTITLE
Rig Specification Documentation
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711
5. CONTRACT REFERENCE
PWS C.4.1.2
6. REQUIRING OFFICE
FCDD-RLW-VA
7. DD 250 REQ
N/A
ONE TIME
12. DATE OF FIRST
SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft Final Reg Repro
16. REMARKS
BLK 4: EACH DOCUMENT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIUM
SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. SOME MEDIA TYPES WHICH
CAN BE ACCEPTED INCLUDE: E-MAIL SUBMISSION, SECURE ACCESS FILE EXCHANGE
(SAFE), CD, AND DVD. THE FINAL DOCUMENTS SHALL BE DELIVERED IN BOTH HARD
(PHYSICAL) COPIES AND ELECTRONIC COPIES.
BLK 12: THE CONTRACTOR SHALL PROVIDE THE FOLLOWING RIG SPECIFICATION
DOCUMENTATION FOR THE MACH 6+ RIG TO THE GOVERNMENT WITHIN TWO (2)
MONTHS ACA.
BLK 13: THE GOVERNMENT WILL REVIEW THE DOCUMENTATION AND PROVIDE
COMMENTS WITHIN SEVEN (7) DAYS OF RECEIPT. THE FINAL VERSION OF THE
AFOREMENTIONED DOCUMENTS SHALL BE SUBMITTED TO THE GOVERNMENT WITHIN
SEVEN (7) DAYS AFTER RECEIPT OF THE GOVERNMENT’S COMMENTS.
BLK 14a: ADDRESSEE –
UNITED STATES ARMY RESEARCH LABORATORY
POINT OF CONTACT: TBD at Time of Award E-MAIL ADDRESS: TBD at Time of Award
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 of 4 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC.
D. SYSTEM/ITEM
Mach 6+ Rig
E. CONTRACT/PR NO.
To Be Determined (TBD)
/0011760410
F. CONTRACTOR
To Be Determined
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Scientific and Technical Report
3. SUBTITLE
Rig Maintenance, Procedural, and Safety
Documentation
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711
5. CONTRACT REFERENCE
PWS C.4.2
6. REQUIRING OFFICE
FCDD-RLW-VA
7. DD 250 REQ
N/A
ONE TIME
12. DATE OF FIRST
SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft Final Reg Repro
16. REMARKS
BLK 4: EACH DOCUMENT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIUM
SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. SOME MEDIA TYPES WHICH
CAN BE ACCEPTED INCLUDE: E-MAIL SUBMISSION, SECURE ACCESS FILE EXCHANGE
(SAFE), CD, AND DVD. THE FINAL DOCUMENTS SHALL BE DELIVERED IN BOTH HARD
(PHYSICAL) COPIES AND ELECTRONIC COPIES.
BLK 12: THE CONTRACTOR SHALL PROVIDE THE FOLLOWING RELEVANT RIG
MAINTENANCE, PROCEDURAL, AND SAFETY DOCUMENTATION FOR THE MACH 6+ RIG
TO ARL SEVEN (7) DAYS PRIOR TO THE COMPLETION OF THE COMMISSIONING.
BLK 13: THE GOVERNMENT WILL REVIEW THE DOCUMENTATION AND PROVIDE
COMMENTS WITHIN SEVEN (7) DAYS OF RECEIPT. THE FINAL VERSION OF THE
AFOREMENTIONED DOCUMENTS SHALL BE SUBMITTED TO THE GOVERNMENT WITHIN
SEVEN (7) DAYS AFTER RECEIPT OF THE GOVERNMENT’S COMMENTS.
BLK 14a: ADDRESSEE –
UNITED STATES ARMY RESEARCH LABORATORY
POINT OF CONTACT: TBD at Time of Award E-MAIL ADDRESS: TBD at Time of Award
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 3 of 4 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: MISC.
D. SYSTEM/ITEM
Mach 6+ Rig
E. CONTRACT/PR NO.
To Be Determined (TBD)
/0011760410
F. CONTRACTOR
To Be Determined
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Scientific and Technical Report
3. SUBTITLE
DAC System Software
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711
5. CONTRACT REFERENCE
PWS C.4.3
6. REQUIRING OFFICE
FCDD-RLW-VA
7. DD 250 REQ
N/A
ONE TIME
12. DATE OF FIRST
SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft Final Reg Repro
16. REMARKS
BLK 4: EACH DOCUMENT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIUM
SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. SOME MEDIA TYPES WHICH
CAN BE ACCEPTED INCLUDE: E-MAIL SUBMISSION, SECURE ACCESS FILE EXCHANGE
(SAFE), CD, AND DVD. THE FINAL DOCUMENTS SHALL BE DELIVERED IN BOTH HARD
(PHYSICAL) COPIES AND ELECTRONIC COPIES.
BLK 12: THE CONTRACTOR SHALL PROVIDE ALL INSTRUCTIONAL TEXTS, MANUALS,
INSTALLATION DISCS, PRODUCT KEYS, AND BACKUPS OF ALL SOFTWARE
APPLICATION PROGRAMS AND IMAGES RELATED TO THE DAC SYSTEM COMPUTER
UPON THE DELIVERY OF THE MACH 6+ RIG.
BLK 13: THE GOVERNMENT WILL REVIEW THE DOCUMENTATION AND PROVIDE
COMMENTS WITHIN SEVEN (7) DAYS OF RECEIPT. THE FINAL VERSION OF THE
AFOREMENTIONED DOCUMENTS SHALL BE SUBMITTED TO THE GOVERNMENT WITHIN
SEVEN (7) DAYS AFTER RECEIPT OF THE GOVERNMENT’S COMMENTS.
BLK 14a: ADDRESSEE –
UNITED STATES ARMY RESEARCH LABORATORY
POINT OF CONTACT: TBD at Time of Award E-MAIL ADDRESS: TBD at Time of Award
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 4 of 4 Pages
6/23/2022
X Walker T. Hare
Contract Specialist Signed by: USA
6/23/2022
X Ariel M. Amey
Contracting Officer (KO) Signed by: AMEY.ARIEL.M.1469952971
EXHIBIT A – ATTACHMENT 1
ARMY RESEARCH LABORATORY
Report Title Goes Here Any Subtitles Go Here
By Some Author and Another Author
Month XXXX
Prepared by
Whatever Technology Corporation 0000 Research Drive
Anywhere, ST 20006-1000
Under contract
W911QX-XX-C-XXXX
DISTRIBUTION STATEMENT GOES HERE
EXHIBIT A – ATTACHMENT 2
The findings in this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents.
Citation of manufacturer's or trade names does not constitute an official endorsement or approval of the use thereof.
DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual, Chapter 5, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
File details come from the government source that posted it. Updated .