DD Form 1423-1_CDRL_Draft.docx
DoD Form DOCX document 67 KB Posted
- Solicitation number
- FA9453-23-R-A004_PROPOSALSOLICITATION-001
About this file
This document is a solicitation for a federal contract to provide professional engineering and technical advisory services supporting nuclear deterrence operations for the Air Force Research Laboratory. The solicitation requests proposals for four technical topics: system design, engineering and integration; test and evaluation; concept development and requirements analysis; and program planning and acquisition planning/support. Proposals are due by February 16, 2024 and the anticipated period of performance is 60 months. The government anticipates awarding one cost-plus-fixed-fee contract with a total estimated value of $4.1 million over five years. Key deliverables include management plans, status reports, performance/cost reports, personnel rosters, presentation materials, and technical reports. Proposing organizations must have a facility security clearance of SECRET or higher.
View the file
Other versions and copies of DD Form 1423-1
Show all 20
Who attaches DD Form 1423-1
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
aDvisory sErvices For rEsearch aNd Development (DEFEND)
CONTRACT DATA REQUIREMENTS LIST (CDRL)
| Item |
| Title |
| Subtitle |
| DID |
| A001 |
| Management Plan |
DI-MGMT-80004A
| A002 |
| Status Report |
| Monthly Report |
| DI-MGMT-80368A |
| A003 |
| Performance and Cost Report |
DI-FNCL-80912A
| A004 |
| Contractor’s Personnel Roster |
DI-MGMT-81834A
| A005 |
| Presentation Material |
DI-NDTI- 80566A
| A006 |
| Technical Report – Study/Services |
DI-NDTI-80809B
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO.: | See Contract, Section B | |
| B. EXHIBIT....................................: | A | |
| C. CATEGORY..............................: | Other | |
| D. SYSTEM/ITEM........: | DEFEND | |
| E. CONTRACT/PR NO.: | Insert Contract Number | |
| F. CONTRACTOR.........: | Insert Contractor’s Name |
| 1. DATA ITEM NO........................: |
| A001 |
| 2. TITLE OF DATA ITEM............: |
| Management Plan |
3. SUBTITLE..................................:
| 4. AUTHORITY.............................: |
| DI-MGMT-80004A (http://quicksearch.dla.mil) |
| 5. CONTRACT REFERENCE......: |
| PWS Section 4.14 |
6. REQUIRING OFFICE..............: AFRL/RVBN
7. DD250 REQ................................: LT
| 8. APP CODE.................................: | N/A | |
| 9. DIST. STATEMENT REQUIRED......: | B | |
| 10. FREQUENCY......................................: | ANNLY | |
| 11. AS OF DATE........................................: | See blk 16 | |
| 12. DATE OF FIRST SUBMISSION: | 15DAC | |
| 13. DATE OF SUBSEQUENT SUBM.: | 15DARP |
14. DISTRIBUTION
| A. ADDRESSEES |
| B. COPIES |
LT – Letter of Transmittal ANNLY – Annually 15DAC – 15 Days after Contract Start 15DARP – 15 Days after Reporting Period
| DRAFT |
| FINAL |
AFRL/RVBN
AFRL/RVBK
LT
ACO
LT
15. TOTAL:
16. REMARKS
Blk. 4: Tailored. Delete paragraphs 3.2a, 3.2b, 3.2c, 3.2d, 3.2f, 3.2h, 3.2i, 3.2k, 3.2l, 3.5, 3.6 and 3.7b. Under paragraph 3.7a, comply with the first sentence only regarding security standard practice procedures (Government approval not required).
Blk. 9: All technical data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement B, and other required markings, shown below:
“Distribution authorized to U.S. Government agencies; Proprietary Business Information, [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RVBN 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF 298.)
DESTRUCTION NOTICE—CUI documents may be destroyed by means approved for destroying classified information or by any other means making it unreadable, indecipherable, and unrecoverable.”
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY:
I. APPROVED BY:
H. DATE:
J. DATE:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 6 Pages
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO.: | See Contract, Section B | |
| B. EXHIBIT....................................: | A | |
| C. CATEGORY..............................: | OTHER | |
| D. SYSTEM/ITEM........: | DEFEND | |
| E. CONTRACT/PR NO.: | Insert Contract Number | |
| F. CONTRACTOR.........: | Insert Contractor’s Name |
| 1. DATA ITEM NO........................: |
| A002 |
| 2. TITLE OF DATA ITEM............: |
| Status Report |
| 3. SUBTITLE..................................: |
| Monthly Report |
| 4. AUTHORITY.............................: |
| DI-MGMT-80368A (http://quicksearch.dla.mil) |
| 5. CONTRACT REFERENCE......: |
| PWS Section 4.14 |
6. REQUIRING OFFICE..............: AFRL/RVBN
7. DD250 REQ................................: LT
| 8. APP CODE.................................: | See blk 16 | |
| 9. DIST. STATEMENT REQUIRED......: | B | |
| 10. FREQUENCY......................................: | MTHLY | |
| 11. AS OF DATE........................................: | N/A | |
| 12. DATE OF FIRST SUBMISSION: | 60DAC | |
| 13. DATE OF SUBSEQUENT SUBM.: | 15DARP |
14. DISTRIBUTION
| A. ADDRESSEES |
| B. COPIES |
MTHLY – Monthly 60DAC – 60 Days after contract start.
15DARP – 15 Days after reporting period.
| DRAFT |
| FINAL |
AFRL/RVBN
AFRL/RVBK
LT
ACO
LT
15. TOTAL:
16. REMARKS
Blk 8: Approval of contractor format and content is required on initial submittal. All subsequent submittals shall be non-approval items, and re-submittals may be required if contractor submits a delivery item that is unsatisfactory.
Blk 9: All technical data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement B, and other required markings, shown below:
“Distribution authorized to U.S. Government agencies; Critical Technology, Export Controlled, [contractor fill in date of report [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RVBN 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF 298.)
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
DESTRUCTION NOTICE—CUI documents may be destroyed by means approved for destroying classified information or by any other means making it unreadable, indecipherable, and unrecoverable.”
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY:
I. APPROVED BY:
H. DATE:
J. DATE:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 6 Pages
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO.: | See Contract, Section B | |
| B. EXHIBIT....................................: | A | |
| C. CATEGORY..............................: | OTHER | |
| D. SYSTEM/ITEM........: | DEFEND | |
| E. CONTRACT/PR NO.: | Insert Contract Number | |
| F. CONTRACTOR.........: | Insert Contractor’s Name |
| 1. DATA ITEM NO........................: |
| A003 |
| 2. TITLE OF DATA ITEM............: |
| Performance and Cost Report |
3. SUBTITLE..................................:
| 4. AUTHORITY.............................: |
| DI-FNCL-80912A (http://quicksearch.dla.mil) |
| 5. CONTRACT REFERENCE......: |
| PWS Section 4.14 |
6. REQUIRING OFFICE..............: AFRL/RVBN
7. DD250 REQ................................: LT
| 8. APP CODE.................................: | See blk 16 | |
| 9. DIST. STATEMENT REQUIRED......: | B | |
| 10. FREQUENCY......................................: | MTHLY | |
| 11. AS OF DATE........................................: | See blk 16 | |
| 12. DATE OF FIRST SUBMISSION: | 45DAC | |
| 13. DATE OF SUBSEQUENT SUBM.: | 15DARP |
14. DISTRIBUTION
| A. ADDRESSEES |
| B. COPIES |
MTHLY – Monthly 45DAC – 45 Days after contract start.
15DARP – 15 Days after reporting period.
| DRAFT |
| FINAL |
AFRL/RVBN
AFRL/RVBK
LT
ACO
LT
15. TOTAL:
16. REMARKS
Blk 8: Approval of contractor format and content is required on initial submittal. All subsequent submittals shall be non-approval items, and re-submittals may be required if contractor submits a delivery item that is unsatisfactory.
Blk 9: All financial performance data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement B, and other required markings, shown below:
“Distribution authorized to U.S. Government agencies; Critical Technology [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RVBN 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF 298.)
DESTRUCTION NOTICE—CUI documents may be destroyed by means approved for destroying classified information or by any other means making it unreadable, indecipherable, and unrecoverable.”
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY:
I. APPROVED BY:
H. DATE:
J. DATE:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 6 Pages
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO.: | See Contract, Section B | |
| B. EXHIBIT....................................: | A | |
| C. CATEGORY..............................: | OTHER | |
| D. SYSTEM/ITEM........: | DEFEND | |
| E. CONTRACT/PR NO.: | Insert Contract Number | |
| F. CONTRACTOR.........: | Insert Contractor’s Name |
| 1. DATA ITEM NO........................: |
| A004 |
| 2. TITLE OF DATA ITEM............: |
| Contractor’s Personnel Roster |
3. SUBTITLE..................................:
| 4. AUTHORITY.............................: |
| DI-MGMT-81834A (http://quicksearch.dla.mil) |
| 5. CONTRACT REFERENCE......: |
| PWS Section 4.14 |
6. REQUIRING OFFICE..............: AFRL/RVBN
7. DD250 REQ................................: LT
| 8. APP CODE.................................: | N/A | |
| 9. DIST. STATEMENT REQUIRED......: | B | |
| 10. FREQUENCY......................................: | BI-MO | |
| 11. AS OF DATE........................................: | EOM | |
| 12. DATE OF FIRST SUBMISSION: | 30DAC | |
| 13. DATE OF SUBSEQUENT SUBM.: | 10DARP |
14. DISTRIBUTION
| A. ADDRESSEES |
| B. COPIES |
BI-MO – Every 2 Months EOM – End of Month 30DAC – 30 Days after Contract Start.
10DARP – 10 Days after Reporting Period.
| DRAFT |
| FINAL |
AFRL/RVBN
AFRL/RVBK
LT
ACO
LT
15. TOTAL:
16. REMARKS
Blk 4: From DI-MGMT-81834 address only paragraphs 3 and 3.1b - d (delete 3.1.a); under DI-MGMT-81834A address only paragraphs 2.1a - c and 2.2.
Blk 9: All technical data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement B, and other required markings, shown below:
“Distribution authorized to U.S. Government agencies; Critical Technology, Proprietary Business Information [contractor fill in date of report [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RVBN 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF 298.)
DESTRUCTION NOTICE—CUI documents may be destroyed by means approved for destroying classified information or by any other means making it unreadable, indecipherable, and unrecoverable.”
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE :
G. PREPARED BY:
I. APPROVED BY:
H. DATE:
J. DATE:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 6 Pages
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO.: | See Contract, Section B | |
| B. EXHIBIT....................................: | A | |
| C. CATEGORY..............................: | OTHER | |
| D. SYSTEM/ITEM........: | DEFEND | |
| E. CONTRACT/PR NO.: | Insert Contract Number | |
| F. CONTRACTOR.........: | Insert Contractor’s Name |
| 1. DATA ITEM NO........................: |
| A005 |
| 2. TITLE OF DATA ITEM............: |
| Presentation Material |
3. SUBTITLE..................................:
| 4. AUTHORITY.............................: |
| DI-ADMN-81373 (http://quicksearch.dla.mil) |
| 5. CONTRACT REFERENCE......: |
| PWS Section 4.14 |
| 6. REQUIRING OFFICE..............: | AFRL/RVBN | |
| 7. DD250 REQ................................: | LT | |
| 8. APP CODE.................................: | N/A | |
| 9. DIST. STATEMENT REQUIRED......: | B | |
| 10. FREQUENCY......................................: | ASREQ | |
| 11. AS OF DATE........................................: | N/A | |
| 12. DATE OF FIRST SUBMISSION: | ASREQ | |
| 13. DATE OF SUBSEQUENT SUBM.: | ASREQ |
14. DISTRIBUTION
| A. ADDRESSEES |
| B. COPIES |
ASREQ – As Required
| DRAFT |
| FINAL |
| AFRL/RVBN |
| 1 |
| 1 |
| AFRL/RVBK |
| 0 |
| LT |
| ACO |
| 0 |
| LT |
| 15. TOTAL: |
| 1 |
| 1 |
16. REMARKS
Blk 9: All technical data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement B, and other required markings, shown below:
“Distribution authorized to U.S. Government agencies; Critical Technology [contractor fill in date of report [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RVBN 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF 298.)
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
DESTRUCTION NOTICE—CUI documents may be destroyed by means approved for destroying classified information or by any other means making it unreadable, indecipherable, and unrecoverable.”
Blk. 10 - 13: As directed by the Government Program Manager, draft presentation material shall be delivered 5 business days before the scheduled review. Final presentation material will be delivered 5 business days after the review unless otherwise indicated.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY:
I. APPROVED BY:
H. DATE:
J. DATE:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 6 Pages
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO.: | See Contract, Section B | |
| B. EXHIBIT....................................: | A | |
| C. CATEGORY..............................: | OTHER | |
| D. SYSTEM/ITEM........: | DEFEND | |
| E. CONTRACT/PR NO.: | Insert Contract Number | |
| F. CONTRACTOR.........: | Insert Contractor’s Name |
| 1. DATA ITEM NO........................: |
| A006 |
| 2. TITLE OF DATA ITEM............: |
| Technical Report – Study/Services |
3. SUBTITLE..................................:
| 4. AUTHORITY.............................: |
| DI-MISC-80508B (http://quicksearch.dla.mil) |
| 5. CONTRACT REFERENCE......: |
| PWS Section 4.14 |
| 6. REQUIRING OFFICE..............: | AFRL/RVBN | |
| 7. DD250 REQ................................: | LT | |
| 8. APP CODE.................................: | N/A | |
| 9. DIST. STATEMENT REQUIRED......: | B | |
| 10. FREQUENCY......................................: | ASREQ | |
| 11. AS OF DATE........................................: | N/A | |
| 12. DATE OF FIRST SUBMISSION: | ASREQ | |
| 13. DATE OF SUBSEQUENT SUBM.: | ASREQ |
14. DISTRIBUTION
| A. ADDRESSEES |
| B. COPIES |
ASREQ – As Required
| DRAFT |
| FINAL |
| AFRL/RVBN |
| 0 |
| 1 |
| AFRL/RVBK |
| 0 |
| LT |
| ACO |
| 0 |
| LT |
| 15. TOTAL: |
| 0 |
| 1 |
16. REMARKS
Blk 9: All technical data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement B, and other required markings, shown below:
“Distribution authorized to U.S. Government agencies; Critical Technology, Export Controlled, [contractor fill in date of report [contractor fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to AFRL/RVBN 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF 298.)
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
DESTRUCTION NOTICE—CUI documents may be destroyed by means approved for destroying classified information or by any other means making it unreadable, indecipherable, and unrecoverable.”
Blk. 10 - 13: As directed by the Government Program Manager.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY:
I. APPROVED BY:
H. DATE:
J. DATE:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 6 of 6 Pages
File details come from the government source that posted it. Updated .