DCNR DSA Attachment A.pdf
PDF 285 KB Posted
- Attached to
- FD7 - Spruce Run DSA
- Solicitation number
- 6100060932
- Issued by
- Union County, Pennsylvania
About this file
This document is an attachment for a state and local contract opportunity issued by the Commonwealth of Pennsylvania, Department of Conservation and Natural Resources (DCNR), Forest District 7. The contract requires the delivery, paver-placement, and compaction of approximately 5,000 tons of limestone Driving Surface Aggregate (DSA) to Spruce Run Road in Union County. The attachment provides detailed DSA product specifications, including passive sieve requirements, pH, LA Abrasion, and Plasticity Index. Contractors or quarries must complete and submit the appropriate acknowledgement form, either the DSA Contractor Acknowledgement or the DSA Quarry Letter of Intent, as part of their bid response.
The contract opportunity has an estimated quantity of 5,000 tons of DSA, which may increase or decrease based on the department's needs. Pricing terms, set-asides, funding sources, and other financial details are not provided in the attachment. However, the attachment emphasizes the importance of complying with the acknowledgement form requirement, as failure to do so could result in the contractor being deemed non-responsive and disqualified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 06. BOP-2201 EO 2021-06 Worker Protection Form BOP FINAL.docx | DOCX document | |
| Spruce Run Map.pdf | ||
| Terms & Conditions.pdf | ||
| 05. GSPUR-89 Reciprocal_Limitations_Act_Reqirements.docx | DOCX document | |
| 07. DCNR Small Business Procurement Initiative.pdf | ||
| DSA SOW Spruce Run.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
04/12/2024
ATTACHMENT A
Signed Acknowledgement of DCNR DSA Specifications
1. The Contractor must choose the appropriate acknowledgement letter:
a. DSA Contractor Acknowledgement of DSA Specifications (A.1) This form is used when the Contractor will be creating and supplying the DSA.
b. DSA Quarry Letter of Intent (A.2) This form is used when the DSA will be created and supplied by a quarry not owned by the Contractor.
2. The appropriate form must be printed, completed in its entirety, signed, and dated.
a. Both A.1 and A.2 must be signed only by approved representatives of the Contractor and Quarry respectively.
b. The authorized representative must include their title with their signature.
c. Representatives must be knowledgeable of DSA and be prepared to answer all questions on the product.
3. The Contractor must then include the appropriate fully executed form with their bid response (either A.1 or A.2.).
DO NOT attach both acknowledgements.
4. Failure to comply with this requirement could result in a non-responsive determination and subsequent disqualification for the Contractor.
BUREAU OF ADMINISTRATIVE SERVICES
A.1
CONTRACTOR ACKNOWLEDGEMENT OF DSA PRODUCT
(FORM MUST BE COMPLETED BY BIDDING CONTRACTOR)
Solicitation # 6100060932 FD07 - Bald Eagle Spruce Run Approximate Tonnage – 5,000 (Tonnage is estimated and can increase or decrease based on the needs of the Department.)
By signing this acknowledgement I, _______________________________________ (Print Name), an authorized representative of ____________________________________________ (Name of Contractor), confirms that ___________________________________________ (Name of Contractor) has the ability to competently create and supply certified Driving Surface Aggregate (DSA) for the Solicitation listed above that meets the following specifications.
Passive Sieve
Low Percentage
High Percentage
1 ½ inch 100% -- ¾ inch 65% 97%
#4 30% 65% #16 15% 30%
#200* 11% 15%
The fines passing the #200 sieve must be rock material. No clay or silt soil may be added. Limestone material passing the #200 sieve may be used to make up a deficit in the distribution of sandstone aggregate rock, and vice versa. All added material passing the #200 sieve must be derived from rock material that conforms to program specifications. The amount of particles passing the #200 sieve will be determined using the washing procedures specified in PTM No. 100.
*If the Plasticity Index for the Material is 2 or below, then the #200 sieve is permitted to be 11-17%.
pH: 6 – 12.45 as measured by EPA 9045C
LA Abrasion: < 45% loss based on Los Angeles Abrasion test, AASHTO T-96 [ASTM C 131] Plasticity Index: ≤ 4 based on ASTM D4318 – Standard Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.
Optimum Moisture: Material will be delivered and placed at optimum moisture content, or up to 2% below that value, as determined for that particular source. The optimum percentage moisture will be determined using Proctor Test ASTM D698, procedure C, Standard.
Signature of Authorized Representative Date
Division of Procurement & Supply Rachel Carson State Office Building | P.O. Box 8769 | Harrisburg, PA 17105-8769 | 717.783.3332 | F 717.787.8624 | www.dcnr.pa.gov
BUREAU OF ADMINISTRATIVE SERVICES
A.2
QUARRY ACKNOWLEDGEMENT OF DSA PRODUCT - LETTER OF INTENT
(FORM MUST BE COMPLETED BY SUPPLYING QUARRY)
Solicitation # 6100060932 FD07 - Bald Eagle Spruce Run Approximate Tonnage – 5,000 (Tonnage is estimated and can increase or decrease based on the needs of the Department.)
By signing this Letter of Intent I, _______________________________________ (Print Name), an authorized representative of ____________________________________________ (Name of Company), confirms that ___________________________________________ (Location or Name of Quarry) has the ability to competently create and supply to ____________________________________ (Name of
Contractor) certified Driving Surface Aggregate (DSA) for the Solicitation listed above that meets the following specifications.
The fines passing the #200 sieve must be rock material. No clay or silt soil may be added. Limestone material passing the #200 sieve may be used to make up a deficit in the distribution of sandstone aggregate rock, and vice versa. All added material passing the #200 sieve must be derived from rock material that conforms to program specifications. The amount of particles passing the #200 sieve will be determined using the washing procedures specified in PTM No. 100.
*If the Plasticity Index for the Material is 2 or below, then the #200 sieve is permitted to be 11-17%.
pH: 6 – 12.45 as measured by EPA 9045C LA Abrasion: < 45% loss based on Los Angeles Abrasion test, AASHTO T-96 [ASTM C 131]
Plasticity Index: ≤ 4 based on ASTM D4318 – Standard Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.
Optimum Moisture: Material will be delivered and placed at optimum moisture content, or up to 2% below that value, as determined for that particular source. The optimum percentage moisture will be determined using Proctor Test ASTM D698, procedure C, Standard.
Signature of Authorized Representative Date
Division of Procurement & Supply Rachel Carson State Office Building | P.O. Box 8769 | Harrisburg, PA 17105-8769 | 717.783.3332 | F 717.787.8624 | www.dcnr.pa.gov
Passive Sieve
Low Percentage
High Percentage
1 ½ inch 100% -- ¾ inch 65% 97%
#4 30% 65% #16 15% 30%
#200* 11% 15%
File details come from the government source that posted it. Updated .