Ice Core Facility Industry Day PPT.pdf

PDF 3 MB Posted

Attached to
DBB – NSF Ice Core Facility Federal contract opportunity
Solicitation number
Not on record
Issued by
General Services Administration Public Buildings Service Region 8

About this file

This presentation outlines requirements for the construction of a new Ice Core Facility in Lakewood, Colorado. The National Science Foundation and U.S. Geological Survey require increased ice core storage capacity and sustainable facility operations for at least 30 years. The General Services Administration will utilize a design-bid-build approach, with an anticipated construction value between $10-15 million. A virtual industry day was held in February 2023 to discuss project details. The solicitation is expected to publish on SAM.gov in May 2023, with proposals due in July 2023. Proposal evaluations and contract award would occur between September and December 2023. The new facility design must incorporate trans critical CO2 cooling and an underfloor glycol heating loop to meet project goals of sustainability, redundancy, and resilience.

View the file

Other files for this federal contract opportunity

Other files attached to DBB – NSF Ice Core Facility, newest first.
File Type Posted
Industry Day Announcement_Feb 03 2023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA PUBLIC BUILDINGS SERVICE

INDUSTRY DAY

ICE CORE FACILITY, BUILDING 810

DENVER FEDERAL CENTER

Disclaimer Nothing said/provided at this conference is binding.

Once released, only the solicitation and its attachments shall govern this acquisition.

February 22, 2023

WELCOME

PROJECT OVERVIEW

● Project History / Background

● Project Team

● Project Objectives

● Ice Core Facility Mission

● Project Technologies

● Project Opportunities

● Procurement Overview

● Questions

AGENDA

PROJECT HISTORY & BACKGROUND

PROJECT HISTORY & BACKGROUND

PROJECT TEAM

PROJECT GOALS/Objectives

PROJECT OBJECTIVES

● Construct new Ice Core Facility to serve NSF and USGS for 30 years

● Increase the sustainability of the Ice Core Facility operations

● Increase total ice core storage capacity

● Provide permanent, functional office space for USGS personnel

● Provide functional working space for visiting scientists

● Provide public facing space for visitors and tours

PROJECT OBJECTIVES

The National Science Foundation Ice Core Facility (NSF-ICF)

— formerly the National Ice Core Laboratory (NICL) — is a facility for storing, curating, and studying meteoric ice cores recovered from the glaciated regions of the world. NSF-ICF provides scientists with the capability to conduct examinations and measurements on ice cores, and it preserves the integrity of these ice cores in a long-term repository for future investigations.

ICE CORE FACILITY MISSION

ICE CORE FACILITY MISSION

http://www.youtube.com/watch?v=k3yPsimHe2Q

National Science Foundation Ice Core Facility https://icecores.org https://icecores.org/

BRRRR!!!!!!

Temperature of Rooms

● Exam: -26C

● Storage: -34C

Current ICF Inventory : 24,500 meters Current Capacity : 25,000 meters

ANTARCTICA

Red circles indicate locations without de-accessed cores. Green squares indicate locations with de-accessed cores. AH=Allan Hills; BMV=Beacon and Mullins Valley; BSH=Bentley Shot Holes; BY=Byrd; DR=Dominion Range;

LA5=Little America 5; NG=Newall Glacier; SD=Siple Dome; TD=Taylor Dome; TG=Taylor Glacier; UPC=Upstream C;

V=Vostok; WD=WAIS Divide; WB=Windless Bight.

See https://icecores.org/inventory for information on the cores available https://icecores.org/inventory

GREENLAND & NORTH AMERICA

Red circles indicate locations without de-accessed cores. Green squares indicate locations with de-accessed cores. BSN#=Basin; CC=Camp Century; HMB=Humboldt; SOCAS=South Cascade.

See https://icecores.org/inventory for information on the cores available https://icecores.org/inventory

Mechanical contractor troubleshooting 30+ year old analog control system in preparation of transitioning from Teltrol to a modern Honeywell system

Unloading ice core from SafeCore Container

CORE PROCESSING & ARCHIVAL

• Once ice cores arrive at the ICF, the funded science group process the cores, determine cut plans, and initial sample allocation.

• Cores are proprietary to the funded group for several years, then released.

Why Ice Cores Are Such a Great Record of Past Climate?

• Atmospheric Composition

– From snowfall

– Trapped in clathrates

• Temperature

– Isotopes

• Dating

– Visual Inspection of layers

– Volcanic layers

– ECM

A full house with 45 wood skids, 360 boxes. and 1440 m of ice core

CURRENT SCIENCE ARTICLES

● Currently there is an expedition to identify and dig up 1.5 million year old ice - Center for Oldest Ice Exploration

(COLDEX)

● Inside the Race to Find Earth's Oldest Ice - Scientific American

● KMSU - Everyday is Earthday Podcast on CODEX https://share.transistor.fm/e/14bfac76

Main storage core staging area prior to inventory assignment https://www.scientificamerican.com/article/inside-the-race-to-find-earths-oldest-ice/ https://share.transistor.fm/e/14bfac76

PROJECT TECHNOLOGIES

● Trans critical CO2 Cooling

● Underfloor Glycol Heating Loop

TRANS CRITICAL CO2

● More Sustainable Solution

● Natural Refrigerant

● Non-Toxic

● 0 Ozone Depletion Potential

● 1920 times less Global Warming Potential than R-410A

● Futureproof

○ CO2 will never not be available like other refrigerants

○ Will last for lifespan of the facility

UNDERFLOOR GLYCOL HEATING LOOP

● Freezer is so cold it is required to isolate the earth so it does not create its own frost heave condition

● Glycol system in the floor ensures a barrier between freezer and the earth

● Leverages reject heat from freezer to heat the glycol loop system

PROJECT OPPORTUNITIES

● Be on the leading edge of the largest Ice Core storage facility in the United States

○ High Profile user community; Universities, Labs

● Leverage Sustainable technologies and processes

● Work with refrigeration technologies of the future

● Create a resilient facility - Facility is designed to never lose Ice Cores

○ Redundant Systems

○ Multi-Tier Failure Analysis

○ Environmental Resilience

PROJECT OPPORTUNITIES

● Current government investment centered around sustainable technologies - This project aligns with those priorities

● Skill sets for this project are applicable to other systems and technologies for other projects

○ Clean Agent Fire

○ Sustainable cooling solutions

● Work as a partner with GSA and NSF

PROCUREMENT OVERVIEW

● Construction Magnitude: $10-15M

● Procurement Strategy: Design Bid Build

● Anticipated Contract Type: Firm Fixed Price

DESIGN BID BUILD SOLICITATION PROCESS

FY23

SOLICITATION

RELEASE

Approximately:

May 2023

Synopsis & Solicitation will be published to www.SAM.gov

TECHNICAL &

PRICE PROPOSALS

DUE

Approximately:

July 2023 or 30-45 days after solicitation released

DISCUSSIONS

IF REQUIRED

Approximately:

September 2023

Possible Factors:

1. Technical Approach

2. Past Refrigeration Experience

3. Past Refrigeration Performance

4. Management Plan

BOARD

EVALUATES

PROPOSALS

Includes technical & price proposals

FINAL SELECTION

CONTRACT

AWARD

Approximately:

November/December 2023

QUESTIONS?

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Current ICF Inventory : 24,500 meters

Current Capacity : 25,000 meters

Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16
Slide Number 17
Slide Number 18
Why Ice Cores Are Such a Great Record of Past Climate?
Slide Number 20
Slide Number 21
Slide Number 22
Slide Number 23
Slide Number 24
Slide Number 25
Slide Number 26
Slide Number 27
Slide Number 28