Data Ops CDRLS_Signed_2025.03.06.pdf
PDF 993 KB Posted
- Attached to
- AFTAC Data Operations (Data Ops) Federal contract opportunity
- Solicitation number
- FA702225R0002
About this file
This document is a Contract Data Requirements List (CDRL) for AFTAC Data Operations with multiple data deliverables. The CDRL contains 9 distinct data items (B001-B010) that contractors must submit, including Conference Minutes, Monthly Status Reports, Data Accession List, Systems Engineering Plan, Technical Reports, Software Development Plan, Risk Management Plan, Software Version Description, and Quality Program Plan. Each data item has specific submission requirements, such as frequency (monthly, yearly), distribution instructions (primarily to AFTAC/SDA, DCMA, and AMIC DET-2 OL/PKA), and formatting guidelines (MS Office-compatible softcopy).
Key submission details include consistent requirements across items: initial submittals are typically due 90 days after contract performance starts, with subsequent yearly updates by specific quarter-end dates. All documents have Distribution Statement B, authorizing distribution to US Government agencies for administrative or operational use. The documents must be submitted in softcopy format to AFTAC/SDA, with specific section references and contractor format acceptability noted. The CDRLs are part of a larger contract opportunity for Cross Domain Data Operations supporting the Air Force Technical Applications Center, with an anticipated award in November 2025 and a base ordering period of 5 years.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Initial DD Form 254_2025.03.06.pdf | ||
| NIFI Software Inventory_2025.03.04.xlsx | XLSX spreadsheet | |
| SECDEF MEMO_DIRECTING-MODERN-SOFTWARE-ACQUISITION-TO-MAXIMIZE-LETHALITY_2025.03.06.pdf | ||
| DRAFT_BASIC Data Ops SOO_2025.03.17.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER X Provisioning
D. SYSTEM/ITEM
Data Operations
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
Conference Minutes
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document)
DI-ADMIN-81250C
5. CONTRACT REFERENCE
Item 16
6. REQUIRING OFFICE
AFTAC/SDA
7. DD 250 REQ
N/A
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
Item 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Item 16 Draft
Final
Reg Repro
16. REMARKS
ITEM 5
2.3.16.3, 2.3.16.9, 2.3.17.1.3, 2.3.17.1.4, 5.14
ITEM 4
Contractor format is acceptable. Meeting slides shall be included as an attachment to meeting minutes.
ITEM 8
If Government has not returned comments to contractor within 7 calendar days of submittal, the submittal shall be considered accepted as submitted. Final submittal shall be within 4 business days of receipt of any Government comments.
ITEM 9 DISTRIBUTION STATEMENT B:
Distribution authorized to US Government agencies for administrative or operational use.
Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.
ITEMs 12 & 13
• Action items due 1 work day after meeting.
• Minutes due 7 calendar days after meeting.
ITEM 14
Submission to AFTAC/SDA shall be as follows:
• Final submittals as 1 softcopy in MS Office-compatible format.
AFTAC/SDA 1 1 1
DCMA 1
AMIC DET-2 OL/PKA 1 1 1
15. TOTAL 2 2 3
G. PREPARED BY H. DATE I. APPROVED BY
Thomas E. Sedlock, Data Ops
J. DATE
6 Mar 2025
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER X Provisioning
D. SYSTEM/ITEM
Data Operations
E. CONTRACT/PR NO.
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Monthly Status Report (MSR)
4. AUTHORITY (Data Acquisition Document
DI-MGMT-80368A
5. CONTRACT REFERENCE
Item 16
6. REQUIRING OFFICE
AFTAC/SDA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
MTHLY
12. DATE OF FIRST SUBMISSION
Item 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Item 16 Draft
Final
Reg Repro
16. REMARKS
ITEM 5
2.3.16.2, 2.3.16.4
ITEM 4
Contractor format is acceptable.
ITEM 9 DISTRIBUTION STATEMENT B:
Distribution authorized to US Government agencies for administrative or operational use.
Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.
ITEMs 12 & 13
• Monthly; due 15 calendar days following the end of each month.
ITEM 14
Submission to AFTAC/SDA shall be as follows:
• Submit 1 softcopy in MS Office-compatible format.
AFTAC/SDA 1 1
DCMA 1
AMIC DET-2 OL/PKA 1 1
15. TOTAL 0 2 3
G. PREPARED BY H. DATE I. APPROVED BY
Thomas E. Sedlock, Data Ops
J. DATE
F. CONTRACTOR
6 Mar 2025
1114549904C Cross-Out
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
Data Operations
E. CONTRACT/PR NO.
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Data Accession List (DAL)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document )
DI-MGMT-81453C
5. CONTRACT REFERENCE
Item 16
6. REQUIRING OFFICE
AFTAC/SDA
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
Item 16
12. DATE OF FIRST SUBMISSION
Item 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Item 16 Draft
Final
Reg Repro
16. REMARKS
ITEM 5
2.3.16.5, 2.3.16.9, 2.3.16.10, 5.12
ITEM 9 DISTRIBUTION STATEMENT B:
Distribution authorized to US Government agencies for administrative or operational use.
Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.
ITEMs 10, 12 & 13
• DAL due monthly; 15 calendar days following the end of each month.
• All other data deliverables under this CDRL AS REQUIRED.
ITEM 14
Submission to AFTAC/SDA shall be as follows:
• Submit 1 softcopy in MS Office-compatible format.
AFTAC/SDA 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY
Thomas E. Sedlock, Data Ops
J. DATE
F. CONTRACTOR
X
6 Mar 2025
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATE
Page of Pages
A X
Data Operations
A004
2. TITLE OF DATA ITEM
Systems Engineering Plan (SEP)
Item 16 AFTAC/SDA
LT
N/A B
Item 16
N/A
Item 16
Item 16
AFTAC/SDA 1 1
DCMA 1
AMIC DET-2 OL/PKA 1
0 1 3
16. REMARKS
ITEM 5
2.3.11, 2.3.19
ITEM 9 DISTRIBUTION STATEMENT B:
Distribution authorized to US Government agencies for administrative or operational use.
Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.
ITEMs 10, 12 & 13
• Yearly updates shall be provided by end of first quarter
• Initial submittal shall be provided 90 days after contract performance starts.
•ITEM 14
Submission to AFTAC/SDA shall be as follows:
• Submit 1 softcopy in MS Office-compatible format.
G. PREPARED BY I. APPROVED BY
Thomas E. Sedlock, Data Ops
Adobe Professional 8.0
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81785B
6 Mar 2025
1114549904C Cross-Out
1075755127C Highlight
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATE
Page of Pages
A X Provisioning
Data Operations
A005 Technical Report – Study/Services Trip Report
4. AUTHORITY (Data Acquisition Document No.)
Item 16 AFTAC/SDA
LT
N/A B
Item 16
N/A
Item 16
Item 16
AFTAC/SDA 1 1
0 1 1
ITEM 5
5.15
ITEM 4
Contractor format acceptable.
ITEM 9 DISTRIBUTION STATEMENT B:
Distribution authorized to US Government agencies for administrative or operational use.
Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.
ITEMs 10, 12 & 13
• Trip Reports shall be submitted within 7 calendar days of completion of travel.
ITEM 14
Submission to AFTAC/SDA shall be as follows:
• Submit 1 softcopy in MS Office-compatible format.
G. PREPARED BY I. APPROVED BY
Thomas E. Sedlock, Data Ops
Adobe Professional 8.0
F. CONTRACTOR
DI-MISC-80508B
6 Mar 2025
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATE
Page of Pages
B X Provisioning
Data Operations
1. DATA ITEM NO.
B006 Status of Government Furnished Equipment (GFE) Report
Item 16 AFTAC/SDA
LT
N/A B
YEARLY
N/A
Item 16
Item 16
AFTAC/SDA 1 1
AMIC DET-2 OL/PKA 1
DCMA
0 1 2
ITEM 5
4.4
ITEM 4
Contractor format acceptable.
ITEM 9 DISTRIBUTION STATEMENT B:
Distribution authorized to US Government agencies for administrative or operational use.
Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.
ITEMs 12 & 13
• A yearly report shall be provided by end of first quarter
• Initial submittal shall be provided 90 days after contract performance starts.
•ITEM 14
Submission to AFTAC/SDA shall be as follows:
• Submit 1 softcopy in MS Office-compatible format.
G. PREPARED BY I. APPROVED BY
Thomas E. Sedlock, Data Ops
Adobe Professional 8.0
F. CONTRACTOR
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80269
6 Mar 2025
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
1. DATA ITEM NO. 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATE
Page of Pages
A X
Data Operations
A007
2. TITLE OF DATA ITEM
Software Development Plan (SDP)
4. AUTHORITY (Data Acquisition Document No.)
Item 16 AFTAC/SDA
LT
N/A B
Item 16
N/A
Item 16
Item 16
AFTAC/SDA 1 1
AMIC DET-2 OL/PKA 1
DCMA 1
0 1 3
ITEM 5
2.3.11
ITEM 9 DISTRIBUTION STATEMENT B:
Distribution authorized to US Government agencies for administrative or operational use.
Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.
ITEMs 10, 12 & 13
• Yearly updates shall be provided by end of third quarter
• Initial submittal shall be provided 90 days after contract performance starts.
•ITEM 14
Submission to AFTAC/SDA shall be as follows:
• Submit 1 softcopy in MS Office-compatible format.
G. PREPARED BY I. APPROVED BY
Thomas E. Sedlock, Data Ops
Adobe Professional 8.0
F. CONTRACTOR
DI-IPSC-81427B
6 Mar 2025
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATE
Page of Pages
B X Provisioning
Data Operations
1. DATA ITEM NO.
B008
2. TITLE OF DATA ITEM
RISK MANAGEMENT PLAN (RMP)
4. AUTHORITY (Data Acquisition Document No.)
Item 16 AFTAC/SDA
LT
N/A B
Item 16
N/A
Item 16
Item 16
AFTAC/SDA 1 1
AMIC DET-2 OL/PKA 1
DCMA 1
0 1 3
ITEM 5
2.3.16.5
ITEM 9 DISTRIBUTION STATEMENT B:
Distribution authorized to US Government agencies for administrative or operational use.
Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.
ITEMs 10, 12 & 13
• Initial submittal shall be provided 90 days after contract performance starts.
• Yearly updates shall be provided by end of second quarter
ITEM 14
Submission to AFTAC/SDA shall be as follows:
• Submit 1 softcopy in MS Office-compatible format.
G. PREPARED BY I. APPROVED BY
Thomas E. Sedlock, Data Ops
Adobe Professional 8.0
F. CONTRACTOR
DI-MGMT-81808
6 Mar 2025
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATE
Page of Pages
A X
Data Operations
A009 Software Version Description (SVD)
Item 16 AFTAC/SDA
LT
N/A B
Item 16
N/A
Item 16
Item 16
AFTAC/SDA 1 1
0 1 1
ITEM 5
2.3.14
ITEM 4
• Use DI-IPSC-81435A Software Design Description (SDD) and DI-IPSC-81441A Software Product Specification (SPS) as guidance documents.
ITEM 9 DISTRIBUTION STATEMENT B:
Distribution authorized to US Government agencies for administrative or operational use.
Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.
ITEMs 10 12 & 13
• A yearly update shall be provided by end of second quarter
ITEM 14
Submission to AFTAC/SDA shall be as follows:
• Submit 1 softcopy in MS Office-compatible format.
G. PREPARED BY I. APPROVED BY
Thomas E. Sedlock, Data Ops
Adobe Professional 8.0
F. CONTRACTOR
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81442A
6 Mar 2025
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO.
3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATE
Page of Pages
B X Provisioning
Data Operations
1. DATA ITEM NO.
B010
2. TITLE OF DATA ITEM
Quality Program Plan (QPP)
4. AUTHORITY (Data Acquisition Document No.)
Item 16 AFTAC/SDA
LT
N/A B
Item 16
N/A
Item 16
Item 16
AFTAC/SDA 1 1
AMIC DET-2 OL/PKA 1
DCMA 1
0 1 3
ITEM 5
2.3.16.8
ITEM 9 DISTRIBUTION STATEMENT B:
Distribution authorized to US Government agencies for administrative or operational use.
Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.
ITEMs 10, 12 & 13
• Initial submittal shall be provided 90 days after contract performance starts.
• Yearly updates shall be provided by end of first quarter
ITEM 14
Submission to AFTAC/SDA shall be as follows:
• Submit 1 softcopy in MS Office-compatible format.
G. PREPARED BY I. APPROVED BY
Thomas E. Sedlock, Data Ops
Adobe Professional 8.0
F. CONTRACTOR
DI-QCIC-81722
6 Mar 2025
| 2025-03-06T08:36:58-0500 | |
| SEDLOCK.THOMAS.1075755127 |
| 2025-03-06T08:37:24-0500 | |
| SEDLOCK.THOMAS.1075755127 |
| 2025-03-06T08:37:44-0500 | |
| SEDLOCK.THOMAS.1075755127 |
| 2025-03-06T08:38:04-0500 | |
| SEDLOCK.THOMAS.1075755127 |
| 2025-03-06T08:38:29-0500 | |
| SEDLOCK.THOMAS.1075755127 |
| 2025-03-06T08:38:50-0500 | |
| SEDLOCK.THOMAS.1075755127 |
| 2025-03-06T08:39:11-0500 | |
| SEDLOCK.THOMAS.1075755127 |
| 2025-03-06T08:39:33-0500 | |
| SEDLOCK.THOMAS.1075755127 |
| 2025-03-06T08:39:56-0500 | |
| SEDLOCK.THOMAS.1075755127 |
| 2025-03-06T08:40:19-0500 | |
| SEDLOCK.THOMAS.1075755127 |
File details come from the government source that posted it. Updated .