Data Ops CDRLS_Signed_2025.03.06.pdf

PDF 993 KB Posted

Attached to
AFTAC Data Operations (Data Ops) Federal contract opportunity
Solicitation number
FA702225R0002
Issued by
Department of the Air Force Air Combat Command

About this file

This document is a Contract Data Requirements List (CDRL) for AFTAC Data Operations with multiple data deliverables. The CDRL contains 9 distinct data items (B001-B010) that contractors must submit, including Conference Minutes, Monthly Status Reports, Data Accession List, Systems Engineering Plan, Technical Reports, Software Development Plan, Risk Management Plan, Software Version Description, and Quality Program Plan. Each data item has specific submission requirements, such as frequency (monthly, yearly), distribution instructions (primarily to AFTAC/SDA, DCMA, and AMIC DET-2 OL/PKA), and formatting guidelines (MS Office-compatible softcopy).

Key submission details include consistent requirements across items: initial submittals are typically due 90 days after contract performance starts, with subsequent yearly updates by specific quarter-end dates. All documents have Distribution Statement B, authorizing distribution to US Government agencies for administrative or operational use. The documents must be submitted in softcopy format to AFTAC/SDA, with specific section references and contractor format acceptability noted. The CDRLs are part of a larger contract opportunity for Cross Domain Data Operations supporting the Air Force Technical Applications Center, with an anticipated award in November 2025 and a base ordering period of 5 years.

View the file

Other files for this federal contract opportunity

Other files attached to AFTAC Data Operations (Data Ops), newest first.
File Type Posted
Initial DD Form 254_2025.03.06.pdf PDF
NIFI Software Inventory_2025.03.04.xlsx XLSX spreadsheet
SECDEF MEMO_DIRECTING-MODERN-SOFTWARE-ACQUISITION-TO-MAXIMIZE-LETHALITY_2025.03.06.pdf PDF
DRAFT_BASIC Data Ops SOO_2025.03.17.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER X Provisioning

D. SYSTEM/ITEM

Data Operations

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Conference Minutes

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document)

DI-ADMIN-81250C

5. CONTRACT REFERENCE

Item 16

6. REQUIRING OFFICE

AFTAC/SDA

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Item 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

Item 16 Draft

Final

Reg Repro

16. REMARKS

ITEM 5

2.3.16.3, 2.3.16.9, 2.3.17.1.3, 2.3.17.1.4, 5.14

ITEM 4

Contractor format is acceptable. Meeting slides shall be included as an attachment to meeting minutes.

ITEM 8

If Government has not returned comments to contractor within 7 calendar days of submittal, the submittal shall be considered accepted as submitted. Final submittal shall be within 4 business days of receipt of any Government comments.

ITEM 9 DISTRIBUTION STATEMENT B:

Distribution authorized to US Government agencies for administrative or operational use.

Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.

ITEMs 12 & 13

• Action items due 1 work day after meeting.

• Minutes due 7 calendar days after meeting.

ITEM 14

Submission to AFTAC/SDA shall be as follows:

• Final submittals as 1 softcopy in MS Office-compatible format.

AFTAC/SDA 1 1 1

DCMA 1

AMIC DET-2 OL/PKA 1 1 1

15. TOTAL 2 2 3

G. PREPARED BY H. DATE I. APPROVED BY

Thomas E. Sedlock, Data Ops

J. DATE

6 Mar 2025

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER X Provisioning

D. SYSTEM/ITEM

Data Operations

E. CONTRACT/PR NO.

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Monthly Status Report (MSR)

4. AUTHORITY (Data Acquisition Document

DI-MGMT-80368A

5. CONTRACT REFERENCE

Item 16

6. REQUIRING OFFICE

AFTAC/SDA

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

Item 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

Item 16 Draft

Final

Reg Repro

16. REMARKS

ITEM 5

2.3.16.2, 2.3.16.4

ITEM 4

Contractor format is acceptable.

ITEM 9 DISTRIBUTION STATEMENT B:

Distribution authorized to US Government agencies for administrative or operational use.

Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.

ITEMs 12 & 13

• Monthly; due 15 calendar days following the end of each month.

ITEM 14

Submission to AFTAC/SDA shall be as follows:

• Submit 1 softcopy in MS Office-compatible format.

AFTAC/SDA 1 1

DCMA 1

AMIC DET-2 OL/PKA 1 1

15. TOTAL 0 2 3

G. PREPARED BY H. DATE I. APPROVED BY

Thomas E. Sedlock, Data Ops

J. DATE

F. CONTRACTOR

6 Mar 2025

1114549904C Cross-Out

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

Data Operations

E. CONTRACT/PR NO.

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Data Accession List (DAL)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document )

DI-MGMT-81453C

5. CONTRACT REFERENCE

Item 16

6. REQUIRING OFFICE

AFTAC/SDA

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

Item 16

12. DATE OF FIRST SUBMISSION

Item 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

Item 16 Draft

Final

Reg Repro

16. REMARKS

ITEM 5

2.3.16.5, 2.3.16.9, 2.3.16.10, 5.12

ITEM 9 DISTRIBUTION STATEMENT B:

Distribution authorized to US Government agencies for administrative or operational use.

Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.

ITEMs 10, 12 & 13

• DAL due monthly; 15 calendar days following the end of each month.

• All other data deliverables under this CDRL AS REQUIRED.

ITEM 14

Submission to AFTAC/SDA shall be as follows:

• Submit 1 softcopy in MS Office-compatible format.

AFTAC/SDA 1 1

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY

Thomas E. Sedlock, Data Ops

J. DATE

F. CONTRACTOR

X

6 Mar 2025

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 3. SUBTITLE

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATE

Page of Pages

A X

Data Operations

A004

2. TITLE OF DATA ITEM

Systems Engineering Plan (SEP)

Item 16 AFTAC/SDA

LT

N/A B

Item 16

N/A

Item 16

Item 16

AFTAC/SDA 1 1

DCMA 1

AMIC DET-2 OL/PKA 1

0 1 3

16. REMARKS

ITEM 5

2.3.11, 2.3.19

ITEM 9 DISTRIBUTION STATEMENT B:

Distribution authorized to US Government agencies for administrative or operational use.

Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.

ITEMs 10, 12 & 13

• Yearly updates shall be provided by end of first quarter

• Initial submittal shall be provided 90 days after contract performance starts.

•ITEM 14

Submission to AFTAC/SDA shall be as follows:

• Submit 1 softcopy in MS Office-compatible format.

G. PREPARED BY I. APPROVED BY

Thomas E. Sedlock, Data Ops

Adobe Professional 8.0

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81785B

6 Mar 2025

1114549904C Cross-Out

1075755127C Highlight

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATE

Page of Pages

A X Provisioning

Data Operations

A005 Technical Report – Study/Services Trip Report

4. AUTHORITY (Data Acquisition Document No.)

Item 16 AFTAC/SDA

LT

N/A B

Item 16

N/A

Item 16

Item 16

AFTAC/SDA 1 1

0 1 1

ITEM 5

5.15

ITEM 4

Contractor format acceptable.

ITEM 9 DISTRIBUTION STATEMENT B:

Distribution authorized to US Government agencies for administrative or operational use.

Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.

ITEMs 10, 12 & 13

• Trip Reports shall be submitted within 7 calendar days of completion of travel.

ITEM 14

Submission to AFTAC/SDA shall be as follows:

• Submit 1 softcopy in MS Office-compatible format.

G. PREPARED BY I. APPROVED BY

Thomas E. Sedlock, Data Ops

Adobe Professional 8.0

F. CONTRACTOR

DI-MISC-80508B

6 Mar 2025

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO.

2. TITLE OF DATA ITEM 3. SUBTITLE

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATE

Page of Pages

B X Provisioning

Data Operations

1. DATA ITEM NO.

B006 Status of Government Furnished Equipment (GFE) Report

Item 16 AFTAC/SDA

LT

N/A B

YEARLY

N/A

Item 16

Item 16

AFTAC/SDA 1 1

AMIC DET-2 OL/PKA 1

DCMA

0 1 2

ITEM 5

4.4

ITEM 4

Contractor format acceptable.

ITEM 9 DISTRIBUTION STATEMENT B:

Distribution authorized to US Government agencies for administrative or operational use.

Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.

ITEMs 12 & 13

• A yearly report shall be provided by end of first quarter

• Initial submittal shall be provided 90 days after contract performance starts.

•ITEM 14

Submission to AFTAC/SDA shall be as follows:

• Submit 1 softcopy in MS Office-compatible format.

G. PREPARED BY I. APPROVED BY

Thomas E. Sedlock, Data Ops

Adobe Professional 8.0

F. CONTRACTOR

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80269

6 Mar 2025

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO.

1. DATA ITEM NO. 3. SUBTITLE

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATE

Page of Pages

A X

Data Operations

A007

2. TITLE OF DATA ITEM

Software Development Plan (SDP)

4. AUTHORITY (Data Acquisition Document No.)

Item 16 AFTAC/SDA

LT

N/A B

Item 16

N/A

Item 16

Item 16

AFTAC/SDA 1 1

AMIC DET-2 OL/PKA 1

DCMA 1

0 1 3

ITEM 5

2.3.11

ITEM 9 DISTRIBUTION STATEMENT B:

Distribution authorized to US Government agencies for administrative or operational use.

Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.

ITEMs 10, 12 & 13

• Yearly updates shall be provided by end of third quarter

• Initial submittal shall be provided 90 days after contract performance starts.

•ITEM 14

Submission to AFTAC/SDA shall be as follows:

• Submit 1 softcopy in MS Office-compatible format.

G. PREPARED BY I. APPROVED BY

Thomas E. Sedlock, Data Ops

Adobe Professional 8.0

F. CONTRACTOR

DI-IPSC-81427B

6 Mar 2025

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO.

3. SUBTITLE

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATE

Page of Pages

B X Provisioning

Data Operations

1. DATA ITEM NO.

B008

2. TITLE OF DATA ITEM

RISK MANAGEMENT PLAN (RMP)

4. AUTHORITY (Data Acquisition Document No.)

Item 16 AFTAC/SDA

LT

N/A B

Item 16

N/A

Item 16

Item 16

AFTAC/SDA 1 1

AMIC DET-2 OL/PKA 1

DCMA 1

0 1 3

ITEM 5

2.3.16.5

ITEM 9 DISTRIBUTION STATEMENT B:

Distribution authorized to US Government agencies for administrative or operational use.

Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.

ITEMs 10, 12 & 13

• Initial submittal shall be provided 90 days after contract performance starts.

• Yearly updates shall be provided by end of second quarter

ITEM 14

Submission to AFTAC/SDA shall be as follows:

• Submit 1 softcopy in MS Office-compatible format.

G. PREPARED BY I. APPROVED BY

Thomas E. Sedlock, Data Ops

Adobe Professional 8.0

F. CONTRACTOR

DI-MGMT-81808

6 Mar 2025

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATE

Page of Pages

A X

Data Operations

A009 Software Version Description (SVD)

Item 16 AFTAC/SDA

LT

N/A B

Item 16

N/A

Item 16

Item 16

AFTAC/SDA 1 1

0 1 1

ITEM 5

2.3.14

ITEM 4

• Use DI-IPSC-81435A Software Design Description (SDD) and DI-IPSC-81441A Software Product Specification (SPS) as guidance documents.

ITEM 9 DISTRIBUTION STATEMENT B:

Distribution authorized to US Government agencies for administrative or operational use.

Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.

ITEMs 10 12 & 13

• A yearly update shall be provided by end of second quarter

ITEM 14

Submission to AFTAC/SDA shall be as follows:

• Submit 1 softcopy in MS Office-compatible format.

G. PREPARED BY I. APPROVED BY

Thomas E. Sedlock, Data Ops

Adobe Professional 8.0

F. CONTRACTOR

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81442A

6 Mar 2025

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO.

3. SUBTITLE

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATE

Page of Pages

B X Provisioning

Data Operations

1. DATA ITEM NO.

B010

2. TITLE OF DATA ITEM

Quality Program Plan (QPP)

4. AUTHORITY (Data Acquisition Document No.)

Item 16 AFTAC/SDA

LT

N/A B

Item 16

N/A

Item 16

Item 16

AFTAC/SDA 1 1

AMIC DET-2 OL/PKA 1

DCMA 1

0 1 3

ITEM 5

2.3.16.8

ITEM 9 DISTRIBUTION STATEMENT B:

Distribution authorized to US Government agencies for administrative or operational use.

Other requests for this document shall be referred to AFTAC/SDA, Building 10989, 1020 South Patrick Dr., Patrick AFB FL 32925-3516.

ITEMs 10, 12 & 13

• Initial submittal shall be provided 90 days after contract performance starts.

• Yearly updates shall be provided by end of first quarter

ITEM 14

Submission to AFTAC/SDA shall be as follows:

• Submit 1 softcopy in MS Office-compatible format.

G. PREPARED BY I. APPROVED BY

Thomas E. Sedlock, Data Ops

Adobe Professional 8.0

F. CONTRACTOR

DI-QCIC-81722

6 Mar 2025

2025-03-06T08:36:58-0500
SEDLOCK.THOMAS.1075755127
2025-03-06T08:37:24-0500
SEDLOCK.THOMAS.1075755127
2025-03-06T08:37:44-0500
SEDLOCK.THOMAS.1075755127
2025-03-06T08:38:04-0500
SEDLOCK.THOMAS.1075755127
2025-03-06T08:38:29-0500
SEDLOCK.THOMAS.1075755127
2025-03-06T08:38:50-0500
SEDLOCK.THOMAS.1075755127
2025-03-06T08:39:11-0500
SEDLOCK.THOMAS.1075755127
2025-03-06T08:39:33-0500
SEDLOCK.THOMAS.1075755127
2025-03-06T08:39:56-0500
SEDLOCK.THOMAS.1075755127
2025-03-06T08:40:19-0500
SEDLOCK.THOMAS.1075755127

File details come from the government source that posted it. Updated .