DATA ITEM DESCRIPTION_First Article Qualification Test Plan and Procedures.pdf
PDF 21 KB Posted
- Attached to
- New Manufacture of Tube Assembly, Metal
- Solicitation number
- FA812124Q0010
About this file
This Data Item Description outlines test procedures and inspection criteria for first article qualification of a tube assembly. It requires the contractor to submit a test plan including the purpose of testing, applicable documents, a description of units to be tested, step-by-step test procedures with equipment details, and minimum performance requirements.
The related federal contract solicitation seeks quotes by a specified closing date for the new manufacture of a metal tube assembly. The solicitation was issued by the Department of the Air Force Materiel Command Air Force Sustainment Center. Interested vendors should submit quotes in accordance with instructions provided in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DATA ITEM DESCRIPTION_TEST INSPECTION REPORT.pdf | ||
| PKGRQMT_REPORT.pdf | ||
| TRNSPDATA_REPORT.pdf | ||
| CONTRACT DATA REQUIREMENTS LIST.pdf | ||
| FA812124Q0010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: First Article Qualification Test Plan and Procedures
Number: DI-NDTI-81307A Approval Date: 21 NOV 2006 AMSC Number: 7649 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/I522 Applicable Forms: N/A
Use/relationship:
To establish test procedures, test equipment, and the inspection criteria that will be used by the contractor for first article qualification.
This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID supercedes DI-NDTI-81307.
Requirements:
1. Reference documents. None.
2. Format:
The plan shall be in the contractor’s format.
3. Content:
This test plan shall include the following:
a. Purpose of test.
b. Applicable documents.
c. Description of units to be tested.
d. Test description to include the following:
(1) Step-by-step procedures which are to be followed by the operator when performing each test.
(2) Define readings to be taken, settings to be used, and description of the test equipment, including commercial identification.
DI-NDTI-81307A
(3) Drawings, schematics, photographs, etc, of noncommercial fixtures and testers necessary for test evaluation.
e. Inspection criteria that defines the minimum performance requirements that the unit under test must meet in order to be considered acceptable to the Government. This shall include, as a minimum, worst case prime power input, worst case signal level and timing inputs, and signal level and timing outputs.
4. END OF DI-NDTI-81307A
| DATA ITEM DESCRIPTION |
| Requirements: |