This Statement of Objectives (SOO) outlines requirements for a cellular Distributed Antenna System (DAS) to provide coverage inside two buildings on Wright-Patterson Air Force Base. The scope is to install a DAS to cover approximately 55,000 square feet in buildings 837 and 851, as personnel currently must exit the buildings to access cellular services. The period of performance is up to 120 days from order receipt. Offerors must obtain base access and coordinate work to minimize research and operations impacts. The performance objectives are to provide a Statement of Work, evaluate spaces, design the DAS, install the system, test functionality, and train staff. This pre-solicitation opportunity posted by the Air Force Research Laboratory Materiel Command seeks solutions to meet the SOO requirements through solicitation SS_N4181723MP00040 for project NAMIRU-D.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DAS

STATEMENT OF OBJECTIVES (SOO)

I. Purpose:

The purpose of this procurement is to provide cellular service inside Buildings 837 and 851 on WPAFB.

II. Scope or Mission:

The Scope is to provide Cellular coverage to approximately 55,000 sq/ft of space inside of buildings 837 and 851.

III. Period and Place of Performance;

The period of performance should extend up to 120 days after the vendor’s receipt of an order or contract.

IV. Background:

Personnel perform research within buildings 837 and 851 but are frequently required to exit the buildings to access cellular services. Emergencies within the buildings suffer the same problem. The purpose is to remedy that situation.

V. Performance Objectives:

1. Provide a Performance Based Statement of Work

2. Evaluate working spaces in both buildings.

3. Design a DAS system

4. Install the system

5. Test and evaluate function of the system

6. Provide any needed training of staff

VI. Operating Constraints:

Offerors need to obtain access to WPAFB. Work needs to be coordinated with staff to reduce impact to ongoing research and operations.