This document is a Questions and Answers (Q&A) compilation from DARPA regarding the Unison program, dated November 23, 2026, representing the final set of clarifications for proposers. The Unison program is a two-technical-area (TA-1 and TA-2) research initiative with abstract submissions due November 23, 2026 at 5:00 p.m. ET and full proposals due December 4, 2026 at 5:00 p.m. ET. TA-1 focuses on joint autonomy and communications adaptation, while TA-2 provides simulation and testbed infrastructure. The program assumes a May 1, 2027 start date and will be awarded under 10 U.S.C. § 4022 with Phase 2 as an optional task. Multiple awards are anticipated for both technical areas, though specific budget amounts are not disclosed in the Program Summary.

Key submission requirements include: abstracts and slides must be submitted as encrypted CUI (Controlled Unclassified Information) files via email or DoD SAFE, with references not counting against the five-page abstract limit; TA-2 video submissions exceeding 50MB must use DoD SAFE; passwords for encrypted files should be transmitted separately; and CUI Guide requests must be submitted by the Addendum Request Date. Eligibility restrictions include that foreign companies cannot perform on the effort, while U.S. citizens with dual citizenship are permitted. Subcontractors can participate on multiple proposals within the same TA but cannot be awarded work on both TA-1 and TA-2 simultaneously. The program requires CMMC Level 2 certification before CUI material transmission to subcontractors and primes must handle CUI distribution and documentation. TA-1 solutions must include representative networking stacks with appropriate layers and functions; pre-launch planning compute does not count against Reasoning Paths or transmitted bits; and all bits transmitted during mission execution, including headers, acknowledgments, and retransmissions, count toward communications efficiency metrics. The program focuses exclusively on mission autonomy and communications rather than physical autonomy, with TA-2 expected to support both high-fidelity and faster-than-real-time simulation by trading off fidelity for speed. Proposers should assume platforms can be pre-configured at planning time after receiving mission objectives, and TA-1 performers are permitted to demonstrate solutions on physical robots in Phase 2 as optional tasks if desired.

View the file

Other files

File Type Posted
DARPA-PS-27-06-Amendment-02.pdf PDF
DARPA-PS-27-06-Amendment-01.pdf PDF
Unison_Q_A_20261113.pdf PDF
DARPA-PS-27-06.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unison Q&A Part 2 November 23, 2026

Programmatic

1. Can a TA-1 abstract and slides be prepared and submitted without the CUI Guide, provided they contain no CUI?

a. No, as the PS states, all proposers to either TA-1 or TA-2 must submit a request for the CUI Guide by the Addendum Request Date in order to submit an abstract.

2. The abstract content instructions for both TAs do not address reference citations.

Are reference citations or a bibliography included in the five-page limit? Can DARPA allow them to be not included in the page count?

a. References may be added to the abstracts and do not count against the page limit. The PS will be updated to reflect this.

3. What should we use as the program start date for planning/costing purposes?

a. For planning purposes, performers should assume a May 1, 2027 start date.

4. Do abstract submissions submitted via SAFE need to be less than 50MB in size? TA- 2 video submissions will probably be larger than that.

a. TA-2 videos can be larger than 50MB. If this is the case, please use DoD SAFE for transmission as noted in Section 3.7 of the PS.

5. What encryption method does DARPA accept for a TA-1 abstract submitted by email as a single zip file? Does DARPA accept a password-encrypted zip file, with the password sent in a separate email?

a. DARPA will accept encrypted filed with the password sent separately.

6. Does DARPA accept a submission sent from a Microsoft 365 GCC High email account using that environment’s message encryption?

a. If necessary, we can conduct a test prior to receiving the submission. Please send an email to Unison@darpa.mil at least 72 hours before submission so we can test it out.

7. Does the single abstract per TA requirement extend to subs, or refers only to primes? Can a sub contribute to two different abstracts with two different primes for the same TA? Also for the proposal phase, can a sub support two different proposals with two different primes, one for TA1 and one for TA2?

mailto:Unison@darpa.mil

a. Yes, a sub can be on multiple proposals but cannot be awarded work on both TA-1 and TA-2.

8. Are performers who are U.S. citizens with dual citizenship allowed to work on the Unison effort?

a. US citizens are allowed to work on the Unison program.

9. Single-TA proposals: May a proposer submit to one technical area only, or to both TAs as separate abstract submissions?

a. Proposers may submit an abstract to either TA-1 or TA-2, or may submit separate abstracts to both TAs, as seen in Section 1.2 of the PS.

10. TA-1 gate (abstracts and slides, due November 23, 2026, 5:00 p.m. ET): What are the required format and limits for the abstract and the slide deck, and what is the submission route (email to the BAA Coordinator, or a portal)?

a. Please see Section 3 of the PS for instructions.

11. TA-2 gate What are the abstract format/limits, the video length and file format, and the submission route?

a. Please see Section 3 of the PS for instructions.

12. Due time on December 4: The SAM.gov notice header shows 9:00 a.m.

PST while program summaries show 5:00 p.m. ET for TA-2. Which time controls?

a. The due date is 5:00pm ET. The time on sam.gov has been corrected.

13. CMMC Level 2 self-assessment: Is the self-assessment (and any SPRS score posting) required at the abstract gate, at full proposal, or at award?

a. See Q&A Part 1 document posted on sam.gov.

14. Full proposals, if invited: For the encrypted LaTeX zip submission, how should the decryption password be transmitted to the Government?

a. The password can be sent to the Unison@darpa.mil email inbox.

15. Is the Unison Q&A document posted with the SAM.gov notice the current version, and does DARPA anticipate issuing updated Q&A before November 23?

a. Yes, the initial set of Q&A has been posted to sam.gov. This Q&A Part 2 is the final set of questions and answers.

16. We are an academic institution. Is it possible for different groups of PIs to proceed to the full proposal stage? Or should the institution make contingencies for selecting a single team to proceed to the full proposal submission stage if more than one team is selected?

a. Refer to Question 7 above.

17. Is it possible for an academic institution to be a lead in one proposal and a subcontractor on a different proposal? Is it possible for some PI to be a member of more than one team competing at the full proposal stage?

mailto:Unison@darpa.mil

a. Yes, this is allowed but note that performers cannot be awarded work on both TA-1 and TA-2.

18. Are non-US software engineering companies eligible to participate in Unison Technical Area 2 as a prime or specialist subcontractor, subject to the solicitation's applicable eligibility and security requirements?

a. Foreign companies are not allowed to perform on the Unison effort.

19. What are the minimum font sizes for tables, figures, and footnotes/citations?

a. Per the PS, a minimum of 12-point Times New Roman font should be used for abstracts and a minimum of 16-point for slides. There is no minimum font size noted for tables or citations. Use of fonts that render text difficult to read may not be in the interest of the proposer.

20. What is the anticipated budget for this program and how many teams are anticipated to be selected? What is the expected budget per team for each of the phases?

a. As stated in the PS, multiple awards are anticipated for both TAs. The budget is not given in the PS.

21. To meet the OTA requirement, can a traditional commit to meeting the work share requirement for phase 1 only and then plan to add a nontraditional sub for the phase 2? Or would the prime need to commit to the same strategy for meeting the OTA requirement for all phases (i.e. would we be required to work share all phases or to have nontraditional subs for all phases and NOT be allowed to switch between the phases?)

a. The requirement applies to both phases of the Unison program.

22. Does an organization participating exclusively as a subcontractor need to have independently submitted the Appendix 2 CUI Addendum Request by November 12, or can it participate under a prime contractor that submitted the required request on time?

a. The CUI guide can be requested through the prime.

23. If a Prime's timely request covers its team, may the prime provide the CUI Guide (and, where applicable, the CODE/Viking software and documentation) directly to a subcontractor under the applicable distribution restrictions, or must each team member receive these materials from the Government?

a. Once the Prime receives all CUI material, it is their responsibility to handle and store all CUI material properly. Before the Prime transmits CUI material to other partners and subcontractors, they must ensure everyone meets CMMC Level 2 certification prior to transmission of CUI material. To validate that the organizations providing CUI support meets DARPA requirements, the Prime will provide DARPA the same required information as the Prime.

24. For the purpose of creating an accurate cost estimate, could you please summarize the required travel for this program? (number of trips, duration, location)

a. If selected to submit a written proposal, additional information about the required travel will be provided at that time.

25. For pre-existing, privately funded autonomy software, will DARPA accept restricted or commercial license rights, delivered as containerized binaries with documented APIs, instead of source code under GPR? Does GPR or the unlimited-rights default apply to pre-existing software that is integrated through a defined interface but not modified under the effort?

a. Where software is matured under this effort, the government will receive Government Purpose Rights (GPR) over all deliverable software source code that incorporates or is derived from pre-existing IP. For IP developed prior to the start of the agreement that will be directly utilized during program activities, proposers must certify during proposal submission, via what rights are being offered to the government. Please refer to Section 1.11 of the PS for additional detail.

26. Does the Government intend to require open-source release of Unison software, or sharing it with other performers beyond the GPR?

a. Due to the nature of the Unison program, it is not the intent of the Government to open-source the TA-1 or TA-2 Unison software. TA-2 solutions may be shared with other performers for the purpose of the program. Both TA-1 and TA-2 solutions could be shared within the Government for the purpose of the program.

27. Will TA-1 be awarded as a single OT for Prototypes under 10 U.S.C. §4022 with Phase 2 as an option?

a. Yes, as stated in the PS, a potential award will be awarded under 10 U.S.C. § 4022 with Phase 2 as an option.

28. Should the ROM include only non-recurring engineering (labor, travel, materials, compute), or also licensing costs for pre-existing commercial software?

a. A proposers’ ROM should approximate all costs associated with their proposal.

29. Is it allowable to refer to the slides in our abstract versus repeating the figure in the abstract and the text? (i.e. “the figure at <location> of slide x”)

a. Yes, this is allowed.

30. Section 3.1(c) states that all written abstracts and proposals shall be CUI. Section

3.1(k) separately provides that a proposed subawardee’s effort may be identified in the prime proposer’s proposal as fundamental research. If a proposed subawardee prepares and submits its portion of the proposal to the prime proposer describing only the scope proposed as fundamental research, is that subaward proposal material itself considered CUI and required to be handled as CUI?

a. No, if a portion of the effort is thought to be fundamental it will remain at that level. The prime should describe why they think that research should be fundamental in their proposal. DARPA will evaluate the rationale and make a determination.

31. Section 3.1(k) provides that publication or dissemination requires prior written approval from the DARPA AOR or PM, while also recognizing that certain proposed subawardee efforts may qualify as fundamental research. For an effort determined to be fundamental research, is the prior written approval requirement intended solely to allow DARPA to review the proposed publication for CUI before public release, rather than to restrict publication of the fundamental research results themselves?

a. The Performer shall submit all proposed public releases for review and approval as instructed at http://www.darpa.mil/work-with-us/contract-management/public-release.

32. Is it allowable to submit more than on TA-1 submission from the same organization if the project teams are different? Can you provide your definition of proposer as it relates to the number of submissions per TA? Is it based on the individual organization or the UEI and CAGE Code?

a. As seen in the PS, only proposers with different Unique Entity Identifier (UEI) registered in the System for Award Management (SAM.gov) and associated Commercial and Government Entity (CAGE) code are considered distinct proposers.

33. Sections 3.1.h and 3.2.d require one zip file, no larger than 50 MB, with CUI files encrypted. Please confirm (1) the file formats DARPA expects inside the zip (for example, PDF or Microsoft Word for the written abstract, and PDF or Microsoft PowerPoint for the slides), and (2) the encryption methods DARPA accepts for an emailed zip file (for example, a password-protected zip with the password sent in a separate email), or whether DoD SAFE is the only accepted method.

a. The file formats inside the zip file are up to the proposer.

b. See Question 5 above for transmission options.

34. Should the abstract ROM pricing include phase 1 and ROM option for phase 2? Or should the abstract ROM only include phase 1?

a. The abstract ROM should include pricing for all Phases.

35. The Unison CUI Guide (26 October 2026) lists Controlled Technical Information

(Distribution Statement C) and Operations Security (FEDCON) categories. For Gate 1 abstracts and slides, should proposers mark each page "CUI" with a designation http://www.darpa.mil/work-with-us/contract-management/public-release http://www.darpa.mil/work-with-us/contract-management/public-release indicator showing Controlled by: DARPA/STO, CUI Category: CTI, and Distribution Statement C, or apply a different category or dissemination control? Does DARPA prescribe a file-naming convention for the abstract and slides?

a. It is up to the performer to follow the guidelines outlined in the CUI Guide for proper marking.

b. DARPA does not prescribe a file-naming convention for the abstract and slides.

36. For the virtual Gate 2 oral presentation, is there a limit on the number of proposer participants, and may subcontractor personnel present?

a. DARPA will determine the number of participants in the Gate 2 oral presentations and the performer can select which personnel they would like to present. Subcontract personnel are allowed to present.

Overall

37. Section 3.5(f) requires an "Autonomy Safety and Assurance" section. What evidence does DARPA expect that a TA-1 solution remains within defined operational and safety constraints, and how will that evidence factor into proposal evaluation and test events?

a. Proposers should provide a summary that shows a traceable, testable argument that (1) operational and safety constraints are explicitly defined, (2) the autonomy design prevents or mitigates constraint violations, and (3) verification, validation, and independent evidence will demonstrate performance within those constraints before operational use.

38. Are there any restrictions on performers' use of AI-assisted code generation or AI-generated test cases for development and verification/validation process, provided all such tooling and data handling comply with the CUI and CMMC Level 2 requirements?

a. There are no restrictions as long as the code is explainable by the performer.

Note that documentation should not be AI-generated.

39. The PS states operator intervention during execution is not of interest. For the adaptive-adversary test cases, is a human operator permitted to participate in these test cases or must cases be fully autonomous? If any human-on-the-loop role is allowed, how is it reflected in the metrics?

a. The intent is fully autonomous but tracking by humans is allowed.

40. Is lower-level network management (e.g., packet routing, multi-hop relaying, link discovery) simulated and managed by TA-2?

a. See Table 1 in the PS for information on the desired layers of the TA-2 testbed and their expected fidelity. TA-1 should have built in networking functions, TA- 2 will provide WAN simulation to enable TA-1 solutions to network.

41. Simulation Controls: Will the simulation interface provide configurable parameters (i.e., "knobs") allowing TA-1 performers to adjust or inject errors into furnished mission variables?

a. No, only TA-2 is responsible for adjusting/injecting errors into furnished mission variables.

42. Evaluation Metrics: What is the scope and dimensionality of the parameter space over which performer systems will be evaluated during Monte Carlo simulations?

a. Performers will be evaluated across a range of missions as seen in Section 1.6 and within the confines of the TA-1 and TA-2 constraints outlined in Tables 4 and 6.

43. Is the program's intent to drive toward unknown-task architectures or flexible-task architectures?

a. Unison’s intent is to look at flexible-task architectures. Nevertheless, Unknown-unknowns are not within scope.

44. How will integration be performed? What kind of support will be provided for how to connect solutions’ provided policies to platform actions?

a. The API between TA-1 and TA-2 will be created in conjunction with the Government team. Additional integration beyond that will be discussed during the program.

45. Do we need to do image analysis or will the platform inform our agent of imaging outcome?

a. The highest fidelity sensor simulation described in the PS is synthetic imagery generated by TA-2 to be processed by TA-1. Refer to question 52 as well.

46. Has DARPA identified a DoD transition partner or Program of Record for Unison TA- 1?

a. A specific transition partner has not yet been identified but proposers are welcome to identify potential transition paths in their proposal.

47. Assuming a detection algorithm for sensors can we assume 100% fidelity in detections, or do we need to be worried about uncertainty/inaccurate information from our own agent’s sensors?

a. In the highest fidelity simulation, TA-2 will simulate sensors operating in environmental conditions which may include obscurants (e.g., fog, smoke), sensor errors (e.g., pixel errors), etc. TA-2 is also expected to simulate at much faster rates by simulating a sensor’s ability to detect an object. Near detection thresholds, the ability to detect a target may be uncertain depending on target size, contrast, noise, clutter, etc. Assume complexity will increase as the program progresses.

48. Does using sensors to capture information about other agents (e.g., cameras) count against communication or computation constraints?

a. Yes, if these sensors are available. Solutions should not base 100% or their approach on the existence of a specific sensor. For example, agent A directly observes agent B with one of its sensors. A then “knows” what can be observed about B without B using communications bandwidth to share that state. However, A expends computation to get the state information from the sensor data. Sensor configurations will vary with mission scenarios throughout the program.

49. What sort of sensors can we expect and build around interpreting as part of the TA1 effort?

a. Sensor configurations will vary with mission scenarios throughout the program.

50. Can local platforms use onboard sensors like camera/LiDAR to make observations about their teammates. Since this is all local and does not require any wireless communications does this count against the 1Kbps to 100bps bandwidth constraint?

a. Refer to question 48.

TA-1

51. In the TA-1 abstract content instructions (Section 3.2, p. 33), proposers are instructed to address "bullets (a) through (f) in Section 1.4.1." However, the referenced section is related to TA-1 Metrics (which does not include a-f bullets). Can DARPA confirm this is a typo and that proposers are to address the bullets in "Section 1.3.1 Unison Technical Area 1 - Joint Co-adaptation"?

a. Section 1.3.1 is the correct section. The PS will be updated to reflect this.

b. Additionally, the reference to (a) through (h) in Section 3.7 should say Section

1.3.2.

52. For TA1, to what extent can we anticipate that platforms can be pre-configured with mission parameters and appropriate models intended to help satisfy mission objectives? Or will we be allowed to have pre-configured templates that can be loaded onto platforms prior to launching after receiving a mission objective?

a. The performers will configure the platforms at planning time after receiving a mission objective.

53. Does pre-launch planning compute or plan size count toward Reasoning Paths (RP) or transmitted bits?

a. No, pre-launch planning does not count against RP or transmitted bits.

54. During pre-launch planning, what information does the team get (mission goals, priorities, maps), and in what format? Does every robot get the same information?

How much time and compute is allotted for planning before launch?

a. TA-2 provides the simulation and the mission configuration to each TA-1. The API between TA-1 and TA-2 will be created in conjunction with the Government team. For the abstract and proposal, TA-1 offerors may assume their own existing method and explain how they will adapt to the TA-2 format and interface.

b. Unison is interested only in mission autonomy and communications, not physical autonomy. The level of abstraction in TA-2 simulation, in TA-1 actions (sensing, planning, acting, communicating), the TA-1/2 interface, and everything else should reflect this focus.

c. Proposer’s day slides discuss the progression of “time for planning” throughout the program in an abstract manner. Compute for planning is not bounded and is up to the TA-1 performers to define and provide. Refer to question 53 regarding planning time compute.

55. Is there a path for TA-1 performers to show their solutions on their own physical robots, in Phase 2 or at transition?

a. Though not the focus of the Unison program, TA-1 performers are allowed to demonstrate their solutions on their own physical robots in Phase 2, or at any other time, if desired. If performers wish to do this, it is recommended that they provide this via an optional task.

56. Regarding the virtual sensor and detection capabilities/services provided by the TA-2 team and their virtual test environment: Is it assumed that each TA-1 performer will train their own object detection algorithms/classifiers using simulation-provided synthetic EO/IR imagery, or will all TA-1 performers be provided with standardized, pre-trained sensor detection models?

a. It is up to TA-1 to train their own detection models as needed to perform in the high-fidelity simulation mode.

b. Unison is interested only in mission autonomy and communications, not physical autonomy. The level of abstraction in TA-2 simulation, in TA-1 actions (sensing, planning, acting, communicating), the TA-1/2 interface, and everything else should reflect this focus.

57. Will the TA1 platforms include effector payloads as well as sensor payloads?

a. The exact platform configurations will be mission dependent. The hypothetical scenario in the PS does not provide for effectors and effectors are not expected to be necessary to complete the scenario. Unison is not planning to do effector payloads as of now.

58. Regarding Operational Resilience, how is UOR scored when a run under operational variability fails to complete, or when the corresponding nominal run fails? Is UOR computed for each paired nominal and variability run, or from mean completion times across runs?

a. UOR is averaged over missions that complete.

59. Section 1.3.1 of Amendment 1 permits TA-1 performers to jointly adapt autonomy and communications during mission execution, including through mission-aware information exchange. For TA-1 solutions that retain conventional communications transports but dynamically determine what information to transmit, which agents should receive it, and when transmissions should occur, will the Government-directed TA-1/TA-2 API provide sufficient control over message generation, recipient selection, and transmission timing? Additionally, will TA-1 solutions be able to observe relevant communications conditions, such as available bandwidth, connectivity, latency, and message-delivery status, to inform their joint autonomy– communications decisions? We recognize that the final API will be developed collaboratively during Phase 1 and are seeking clarification on the anticipated interface capabilities for architectural planning.

a. The API will be developed between all applicable parties to ensure the relevant information is passed between TAs, to include some of the telemetry in the question (bandwidth and latency per link).

60. Section 1.4.1 defines communications efficiency using the cumulative number of bits transmitted across the team during mission execution relative to the Government-furnished autonomy baseline. For the purposes of this metric, will transmitted-bit accounting include each individual network transmission across a multi-hop route, including relay retransmissions, or will it measure only the original application-level messages generated by autonomous agents? Additionally, will protocol headers, acknowledgments, and retransmissions associated with reliable delivery be included in the transmitted-bit total, or will the metric be limited to application-data payloads?

a. The metric will look at all bits sent over the wire by all nodes during the mission including headers, acks and retransmissions. This also applies to the benchmark.

61. Are TA1 performers expected to support T&E events in-person or can they support virtually? What is the expected duration of T&E events?

a. TA-1 performers will likely have some personnel supporting in person with the rest virtually. While the PS states that the T&E events are expected to last 4 weeks total, each TA-1 performer will not be there for all 4 weeks, only a portion of the time.

62. Will TA1 performers be expected to process and fuse raw sensor data from TA2 performers?

a. It is likely that TA-1 performers will have to process and fuse raw sensor data in the high-fidelity mode of TA-2 simulation runs.

63. Are proposed solutions that leverage a mix of both ‘explicit’ and ‘non-explicit’ communication methods in line with the Unison program vision? If so, how will non-explicit comms factor into data exchange metrics and evaluation? If so, how will TA2 performers enable non-explicit communications between TA1 agents?

a. Leveraging a mix is allowed. The nature of “implicit” communication is not dictated or defined for performers. What the PS really means is reasoning and inferring over what is known and expected as opposed to binning a specific form of implicit comms.

64. TA-1 success requires reducing each agent's Reasoning Paths to a mission-specific benchmark defined by the Government team. Will DARPA provide the benchmark value, or its order of magnitude, for the Appendix 1 scenario before abstracts are due? If not, should abstracts describe the proposed Reasoning Paths measurement mechanism without stating an expected U_CT value?

a. Because DARPA is not benchmarking the Appendix 1 scenario due to a lack of TA-2 solution as of now, performers should quantify that for their solution (comparing a non-Unison solution of choice) for the purpose of the full written proposal.

65. Table 7 lists DARPA CODE software as available upon request for TA-2 and at award for TA-1. May TA-1 proposers request CODE, or its documentation and interface description, before the Gate 2 oral presentation to characterize the communication-dependent benchmark?

a. TA-1 proposers may request the CODE software if selected to submit a written proposal.

66. Bullet (b) in Section 1.3.1 asks proposers to identify expected mission-execution compute and to design within the compute the Government and TA-2 define at test events. Until those bounds are defined, what per-agent compute class should TA-1 abstracts assume (for example, an embedded processor without a discrete accelerator, or a small edge accelerator)?

a. TA-1 proposers should describe what type of compute they expect to require for their solution to run. Once the program begins, the Government will work with the TA-2 performer(s) to define the compute resources available for TA-1 solutions during test events.

67. Section 1.3.1 defines TA-1 policies over physical actions and communication actions, and Appendix 1 anticipates multi-hop mesh routes and relay positioning.

Table 1 abstracts the physical layer (waveform-level fidelity not required) and enforces per-link bandwidth limits in the Communications Constraint Layer. Beyond deciding when to communicate, with whom, and what to send, may TA-1 communication actions also include link-level choices such as transmit power, modulation and coding, and radio resource allocation within the 100 bps to 1 kbps per-node bounds? If so, will the TA-1/TA-2 interface expose those controls?

a. If those radio parameters are exposed by the TA-2 solution for adaptation for a given mission scenario, TA-1 solutions are allowed to control them.

However, these parameters may not be exposed or exposed as read-only during certain missions, in which case, TA-1 solutions cannot control them.

TA-2

68. Is the version of CODE provided capable of discerning changes in link budget over comms link? Most production versions of CODE don't examine intermediate states of the comms link, only whether it is connected or disconnected.

a. The version of CODE that is provided is not capable of discerning changes in link budget, only whether it’s connected or disconnected. The TA-1/TA-2 interface definition activity will likely dictate where that awareness comes from.

69. Is TA2 providing strictly a simulation capability, or will TA2 also provide an emulation capability? What interfaces are anticipated between TA1 and TA2?

b. TA-2 is providing a simulation capability.

c. The API between TA-1 and TA-2 will be created in conjunction with the

Government team. A-GRA is a plausible candidate because CODE uses it.

70. What is the level of abstraction of the TA2-modeled platform control interface? Waypoint control, Control surface control, wheel steering + torque control, etc.? Is there an autopilot for each platform that handles low-level control and mobility? E.g., Blue Cube for UAVs, RACER stack for UGVs.

d. Unison is interested only in mission autonomy and communications, not physical autonomy. The level of abstraction in TA-2 simulation, in TA-1 actions (sensing, planning, acting, communicating), and the TA-1/2 interface should reflect this focus. TA-2 level-of-detail is expected to trade fidelity for speed. TA-1 is expected to adapt to varying fidelity. For the purpose of preparing an abstract, describe your proposed solution and how it can adapt.

71. For the adaptive adversary in Phase 2, what can the adversary observe and act on (physical environment, communications, or both), and does it adapt within a single mission or only across repeated runs?

e. Assume the adversary is like another TA-1 in the simulation for the purpose of preparing your proposal. Some future scenarios could involve competition between two or more TA-1 teams (e.g., capture the flag).

72. Are TA-2 adversaries subject to the same comms limitations as TA1 agents?

f. Assume the adversary is like another TA-1 in the simulation for the purpose of preparing your proposal.

73. What is the level of abstraction of sensors, detections, and data collection? Please elaborate on “representative sensor products” for each sensor. Do we need to plan for visual understanding of terrain from raw measurements, automatic object recognition in raw imagery, etc.?

g. Unison is interested only in mission autonomy and communications, not physical autonomy. The level of abstraction in TA-2 simulation, in TA-1 actions (sensing, planning, acting, communicating), the TA-1/2 interface, and everything else should reflect this focus. The highest level of fidelity in PS is synthetic sensor image generation. The simulation is expected to trade off fidelity for speed.

74. Does TA- 2 permit a scoped contribution for simulation-environment engineering, test harnesses, data/agent interfaces or evaluation infrastructure within a larger consortium, or is an end-to-end performer response required?

h. Potential proposers to TA-2 will be evaluated based on the evaluation criteria mentioned in Section 3.7 which looks at approaches in bullets (a) through (h) in Section 1.3.2.

75. What level of abstraction will the TA-2 interface provide? Will it include baseline flight software (FSW) capabilities (e.g., terrain-aware planning, collision avoidance, mapping, deconfliction, navigation error estimation, and sensor noise thresholds)?

i. Unison is interested only in mission autonomy and communications, not physical autonomy. The level of abstraction in TA-2 simulation, in TA-1 everything else should reflect this focus.

76. Section 1.3 (p. 11) references realistic scene generation and sensor-image construction, while Table 1 (p. 15) and Section 1.4.2 (p. 22) permit representative sensor products. Can TA-2 meet the sensing requirements using validated models of sensor coverage, visibility, detection performance, and measurement error that provide simulated detections and measurements directly to the autonomy software or is TA-2 required to generate synthetic EO/IR images or LADAR range images for CODE/Viking and TA-1 solutions to process in real-time or faster than real time? If image generation is required, please clarify which evaluation milestones require it:

pre-award baseline, Month 4, or later evaluations.

j. TA-2 is expected to support not only high-fidelity simulation but also much faster simulation by abstracting to lower fidelity in order to trade off fidelity of simulation against speed of simulation. TA-2 solutions will be evaluated during the TA-2 Initial Testbed Evaluation (Month 4).

77. Is it expected that each autonomous agent would operate in its own container integrated with the simulation test bed, or that all autonomous agents are orchestrated within a single container integrated with the simulation test bed?

k. The exact testbed specifications are up to TA-2. However, TA-1 performers will work in conjunction with TA-2 to define the interfaces and environment in order to make TA-1 solutions compatible with the TA-2 environment.

Scenario

78. Is a proposal for Unison that is focused within the space domain consistent with the envisioned scope of the contract? And if so, are we still required to apply against the hypothetical search and rescue mission scenario or could we use an analogous scenario for space situational awareness?

a. The space domain is not within the scope of the Unison program.

79. Are health and status state for the UxV (e.g., battery state, location estimate, etc.)

available to the TA-1 autonomy? Or do we just need to keep track of accumulated flight times?

a. State of UxV to include battery state, location, direction, speed, etc. are to be simulated by TA-2 and communicated over the provided interface.

80. Is there a way to charge/refuel UGVs?

a. The hypothetical scenario in the PS provides for UAVs to recharge at docks carried by the UGVs. It does not provide for recharging the UGVs in this scenario. Future scenarios may vary. If the mission is impossible to complete without recharging the UGVs, then explain why and articulate how your proposed technical approach addresses the challenges and where it falters and why.

81. Can multiple UAVs communicate “for free” if all charging on the same UGV at the same time?

a. No, each node can transmit up to 1 kbps instantaneously unless otherwise limited.

82. Does the data rate constraint apply to the transmission bandwidth from any one UxS? Or does it apply to the whole team in aggregate? For example, would each system be bound to a data transmission rate of X bps? Or would all systems be collectively bound to an aggregate data transmission rate of X bps?

a. Each node can transmit up to 1 kbps instantaneously unless otherwise limited.

83. How long is UAV recharge time when docked? Is there any restriction on UGV movement while launching/recovering/recharging?

a. The UAV recharge time is specified in the PS. Assume the UAVs are VTOL and can launch/recover while the UGV is stationary. Unison is interested only in mission autonomy and communications, not physical autonomy. The level of abstraction in TA-2 simulation, in TA-1 actions (sensing, planning, acting, communicating), and the TA-1/2 interface should reflect this focus.

84. Are there altitude limitations on the UAVs? Is there maximum operating altitude for UAVs?

a. Unison is interested only in mission autonomy and communications, not physical autonomy. The level of abstraction in TA-2 simulation, in TA-1 actions (sensing, planning, acting, communicating), the TA-1/2 interface, and everything else should reflect this focus.

85. Are there operational slope limitations on the UGVs? Maximum slopes that can be traversed?

a. Unison is interested only in mission autonomy and communications, not physical autonomy. The level of abstraction in TA-2 simulation, in TA-1 actions (sensing, planning, acting, communicating), the TA-1/2 interface, and everything else should reflect this focus.

86. What are detection ranges for EO/IR? I see IR camera resolution specified, but not EO

- is there a good value to assume here?

a. Unison is interested only in mission autonomy and communications, not physical autonomy. The level of abstraction in TA-2 simulation, in TA-1 everything else should reflect this focus. Assume the camera is on the order of what is available in a smart phone camera SWaP-C (Size, Weight, Power, and Cost).

87. UGV and UAV transmit ranges are specified as max values, with terrain and line-of-sight (LOS) dependence; is there a particular propagation model to use e.g. if terrain blocks LOS, the link cannot work, but if trees/etc. blocks LOS then there is some range reduction?

a. That will be determined by TA-2 solution. It is safe to assume some a low-level “comms layer” fidelity, where links can degrade from the 1 Kbps upper bound or are lost.

88. UAV recharging and UGV range

a. Does recharging docked UAVs reduce the UGV’s operating range, or should we assume the UAVs recharge from a separate power source?

i. Q&A Part 1 addresses this.

b. If recharging uses a separate power source, what charging limits should we assume?

ii. Q&A Part 1 addresses this.

c. Can all four UAVs hosted on a single UGV recharge simultaneously? If fewer can recharge at once, what is the maximum?

iii. Q&A Part 1 addresses this.

89. Does the MANET network background messaging count against autonomy (application layer) messaging?

a. Control plane messaging counts towards the 1Kbps upper bound.

90. Does the Search and Rescue scenario illustrated in the PS Figure 6 have a 1-mile grid scale?

a. Yes, Figure 6 in the PS has a 1-mile grid scale.

91. Section 8.4 notes that distant reports will generally require multi-hop mesh routes or mobile relays, Section 8.3 lists relay as a primary UAV and UGV role, and Section 8.6 expects agents to decide whether to preserve a mesh path, reposition a relay, or use store-carry-forward. For Gate 1 planning: since every UxV runs TA-1-supplied code (Q&A Scenario item 6), is it the Government's intent that TA-1 software on relay nodes handles messages in transit (e.g., forwarding, buffering, aggregating, or prioritizing them based on mission relevance)? Or will TA-2 simulate multi-hop delivery beneath the API, with TA-1 relay behavior limited to positioning nodes to create connectivity?

a. TA-1 should include a representative networking stack (which does need to be TCP/IP compliant) with all the necessary layers and functions (e.g., forwarding, queueing).

92. Can UAV units transfer data to a UGV via a physical/conductive connection (i.e., non- OTA) while charging?

a. Each node can transmit up to 1 kbps instantaneously unless otherwise limited.

93. Does the UAV recharge time scale linearly with the amount of flight time not used? i.e. 45 minutes for zero flight time not used, 22.5 minutes for 15 minutes flight time not used, etc.

b. For the scenario in Appendix 8, each docking module has sufficient power storage to charge docked UAVs enough to last for the duration of the scenario. Assume 45 minutes is stated for charging nominally from 30% to 80%. TA-2 will simulate charging. Current battery charge level is part of the UAV state. Unison is interested only in mission autonomy and communications, not physical autonomy.