Darft_SOW - Radon Mitigation System (251 UN).pdf
PDF 617 KB Posted
- Attached to
- RADON MITIGATION SYSTEM (251UN)
- Solicitation number
- FA5270FY24RADON
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to upgrade or install reliable and functional radon mitigation systems in 251 housing units across various military installations in Okinawa, Japan.
The work includes pre-installation inspection, gathering of site data, and review of existing drawings and radon sampling data to determine the size, location, and configuration of the new radon mitigation systems. The contractor shall furnish all labor, materials, equipment, transportation, supervision, quality control, and other items necessary to design, manage, and accomplish the repair/upgrade or installation of the new radon mitigation systems. The contract includes a basic award of 180 units and four option CLINs for an additional 71 units. The contractor shall complete the basic award within 272 calendar days, which includes material submittals, government review, procurement, construction, and post-installation radon testing. The contract requires the use of certified radon mitigation professionals and adherence to applicable federal, state, and local safety requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8-May-24
STATEMENT OF WORK
PROJECT #: LXEZ244572
PROJECT DESCRIPTION: RADON MITIGATION SYSTEM, ISLAND WIDE
PROJECT LOCATION: ISLAND WIDE, OKINAWA, JP
PROJECT MANAGER: JON HAYASHI, AFIMSC DET 2 OL-B, KADENA, 632-7067
1. GENERAL:
1.1 SCOPE: The Contractor shall furnish all labor, materials, equipment, tools, testing, plan, design, and management to upgrade or install reliable and functional radon mitigation system for. The Contractor shall provide all labor, materials, equipment, transportation, supervision, quality control, and other items necessary to design, manage and accomplish repair /upgrade or install new radon mitigation systems (sub-slab suction or depressurization or positive pressure ventilation) 251 housing units. Work will be comprised of Military Family
Housing (MFH) located in Kadena Air Base and US Marine Corps Camps on Okinawa, Japan.
1.2 Radon Mitigation Award Breakdown for 251 units:
a) Basic Award: 180 units
b) Option CLIN #1 ~ 3: 20 units per option
c) Option CLIN #4: 11 units
1.3 Work includes but is not limited to pre-installation inspection, gathering of relevant site data, and review of existing drawings and radon sampling data. Determine size, location, and configuration of radon mitigation systems to continuously maintain radon levels under 0.8 Working Level Months per year (WLM/yr) or 4 pico-
Curies per liter (pCi/L) for the housing unit.
1.3.1 Housing Unit without a radon system:
a) The Contractor shall select the best efficient, feasible and effective location for the new system.
b) The Contractor shall install Complete Usable Radon Mitigation
1.3.2 Existing Non-Operating Radon System in the housing unit, contractor shall do the following:
a) The Contractor shall analyze and determine the best effective location.
b) The Contractor shall upgrade the existing system to conform with the new UFC,
c) The Contractor may utilize the existing infrastructure (vent pipes, electrical line and other).
1. If the existing is the best effective location.
2. If not select a new location for the new system. Remove and disposed of all the expose old system.
1.4 Place of performance: Kadena Air Base (to include Chibana Housing), Camp Shields (O’Donnell Garden
Housing, Camp Lester (New and Old Lester Housing), Camp Foster (Futenma, Chatan, Sada, and Kishaba
Terrace and Plaza) Camp Kinser, and Camp Courtney (to include Camp McTureous)
1.5 INSTALLATION: New system shall be completed using active soil depressurization (ASD) techniques and employ sub-slab depressurization (SSD) methods. All installed exterior hardware and components shall be corrosion resistant suitable for coastal marine environments. Provide electrical wire from new suction fan to existing circuit breaker panel board. New interior conduit shall run above ceiling as much as possible.
1.6 ASBESTOS AND LEAD BASED PAINT (LBP) SAMPLING RESULTS: Applying 40 CFR § 763.83
Homogeneous methodology (similar construction year, unit type/model, surface material, thermal system or miscellaneous material that is uniform in color and texture). All LBP samples are less than 0.5% lead by weight and Asbestos detected on 107 of 251 unit, see para 1.9 and attachment test/sample results from current and past data’s.
1.7 RESTORATION: The Contractor shall restore all excavated and damaged areas to same as existing adjacent surface.
1.8 POST TESTING: Following the installation of radon mitigation systems, perform radon tests in each unit in accordance with EPA Guidance (EPA 402-R-93-003). The radon test shall be a continuous monitoring system which will measure the radon levels over a minimum period of 91 days.
1.9 NO POST MITIGATION: Additional mitigation work following the Post Testing is not required on this contract.
1.10 Preparation of Final Report: Upon completion of the installation work, the Contractor shall provide a final report summarizing all field activities including conclusions and recommendations. In addition, the
Contractor shall provide (either as an appendix to the final report or a separate report) operations, maintenance, and warranty information on installed systems. Include detailed photos of pre-existing conditions, work performed, and final conditions. Photos shall include unit numbers and written descriptions, as necessary.
1.11 This project covers the following Unit and floorplan type.
MFH NAME Bldg.
Unit No.
Residen t
Present /Install ed? Y/N
Device Tracking #
Device Pick-up
Date Unit Type
Results pCi/L
WLM/
yr
Unit
Floors
ACM LBP
Beeson Avenue
9464 A Y 929078-4 3-Feb-20 JA4-78p2 4.4 0.907 4 2 ND NEG
Beeson Avenue
9464 D Y 905997-3 3-Feb-20 JA4-78p2 4.4 0.907 4 2 ND NEG
Beeson Avenue
9467 C Y 945035-4 3-Feb-20 JA4-78p2 4.3 0.886 4 2 ND NEG
Beeson Avenue
9469 D Y 370694-2 3-Feb-20 JA4-78p2 3.9 0.804 4 2 ND NEG
Courtney Towers
4531 101 Y 254483-1 30-May-20
TJ3-
86p8p9
4.8 0.989 68 9 ND NEG
Courtney Towers
4531 104 Y 963209-2 8-May-20
TJ3-
86p8p9
4.2 0.866 68 9 ND NEG
Chatan (New)
1350 A N 960748-2 13-Mar-21
HT3-02
CH
3.9 0.804 4 2 POS NEG
Chatan (New)
1352 D Y 950725-2 13-Mar-21
HT3-02
CH
3.9 0.804 4 2 POS NEG
Chatan (New)
1357 B Y 161821-4 30-May-20
HT3-02
CH
3.9 0.804 4 2 POS NEG
Chatan (New)
1365 D Y 944947-1 13-Mar-21
HT3-02
CH
4.2 0.866 6 2 POS NEG
Chatan (New)
1366 F Y 944746-7 13-Mar-21
HT3-02
CH
4.2 0.866 6 2 POS NEG
Chatan (New)
1367 A Y 951193-2 13-Mar-21
HT3-02
CH
3.9 0.804 4 2 POS NEG
Chatan (New)
1375 E Y 545860-9 9-Dec-20
HT3-02
CH
3.9 0.804 6 2 POS NEG
Chibana 50113 D Y 613514-3 23-Feb-21 JB4-85p8 4.1 0.845 4 2 ND NEG
Chibana 50119 D Y 169202-9 13-Feb-21 JB4-85p8 4.4 0.907 4 2 ND NEG
Chibana 50121 D Y 301286-1 26-Feb-21 JB4-85p8 4.1 0.845 4 2 ND NEG
Chibana 50210 B Y 927473-9 26-Feb-21 JB2-84p9
KAB
4.1 0.845 4 2 POS NEG
Chibana 50212 A Y 504988-7 26-Jun-20 JB2-84p9
KAB
4.1 0.845 4 2 POS NEG
Chibana 50212 E Y 170113-5 23-Feb-21 JB2-84p9
KAB
4.1 0.845 6 2 POS NEG
Chibana 50214 A Y 913920-5 26-Jun-20 JB2-84p9
KAB
4.1 0.845 4 2 POS NEG
Chibana 50217 A y 909689-2 23-Jan-21 JB4-85p8 4.1 0.845 4 2 ND NEG
Chibana 50227 A Y 962350-5 23-Jan-21 JB4-85p8 4.1 0.845 6 2 POS NEG
Chibana 50230 A Y 614726-8 26-Jun-20 JB4-85p8 4.1 0.845 4 2 ND NEG
Chibana 50118 C Y 913152-5 12-Feb-20 JC3-85p9
A CB
3.9 0.804 4 2 ND NEG
Chibana 50215 D Y 958003-6 14-Feb-20 JC3-85p9
A CB
3.9 0.804 4 2 ND NEG
Chibana 50227 E Y 939762-1 16-Feb-21 JB4-85p8 3.9 0.804 6 2 POS NEG
Courtney 4468 D Y 249906-9 3/16/201 JB4-85p8
CC
5.3 1.092 6 2 POS NEG
Courtney 4542 A Y 907238-0 3/17/201 JC3-85p9
A CC
4.1 0.845 4 2 POS NEG
Courtney 4543 C Y 906121-9 17-Apr-21 JC3-85p9
A CC
3.9 0.804 4 2 POS NEG
Courtney 4546 D Y 963373-6 23-Feb-21
JC3-
85p9t1
3.9 0.804 4 2 ND NEG
Courtney 4552 B Y 906134-2 17-Mar-21 JB2-84p9
CC
4.1 0.845 4 2 POS NEG
Courtney 4560 C Y 616444-6 17-Mar-21 JB2-84p9
CC
4.0 0.824 4 2 POS NEG
Courtney 4568 D Y 927469-7 30-May-20 JB4-85p8
CC
4.0 0.824 4 2 POS NEG
Jennings 9278 D Y 172227-1 14-Feb-20 JB3-82p6 3.9 0.804 4 2 ND NEG
Jennings 9285 D Y 908513-5 26-Jun-20 JB3-82p6 3.9 0.804 4 2 ND NEG
Jennings 9288 A Y 158375-6 26-Jun-20 JB3-82p6 4.1 0.845 4 2 ND NEG
Jennings 9296 B Y 261955-9 23-Jan-21 JB3-82p6 4.4 0.907 4 2 ND NEG
Jennings 9313 A Y 951153-6 5-Feb-20 JB3-82p3 4.1 0.845 4 2 POS NEG
Jennings 9314 D Y 302559-0 5-Feb-20 JB3-82p3 3.9 0.804 4 2 POS NEG
Jennings 9323 B Y 943945-6 23-Feb-21 JB3-82p3 4.1 0.845 4 2 POS NEG
Jennings 9324 B Y 961020-5 23-Feb-21 JB3-82p3 4.4 0.907 4 2 POS NEG
Jennings 9332 A Y 908410-4 23-Feb-21 JB3-82p3 4.1 0.845 4 2 POS NEG
Jennings 9333 C Y 908267-8 23-Jan-21 JB3-82p3 3.9 0.804 4 2 POS NEG
Jennings 9336 D Y 963237-3 26-Feb-21 JB3-82p3 4.1 0.845 4 2 POS NEG
Jennings 9337 C Y 553631-3 26-Jun-20 JB3-82p3 4.4 0.907 4 2 POS NEG
Jennings 9340 D Y 303229-9 23-Jan-21 JB3-82p4 4.1 0.845 4 2 ND NEG
Jennings 9356 C Y 958359-2 13-Feb-20 JB3-82p4 3.9 0.804 4 2 ND NEG
Jennings 9358 D Y 162307-3 26-Jun-20 JB3-82p4 3.9 0.804 4 2 ND NEG
Jennings 9361 A Y 957620-8 26-Jun-20 JB3-82p4 4.1 0.845 4 2 ND NEG
Jennings 9363 B Y 620671-8 23-Jan-21 JB3-82p4 4.4 0.907 4 2 ND NEG
Jennings 9380 C Y 907527-6 23-Jan-21 JB3-82p6 4.1 0.845 4 2 ND NEG
Jennings 9394 A Y 962287-9 26-Jun-20 JB3-82p6 3.9 0.804 4 2 ND NEG
Kadena Heights
2428 D Y 303734-8 23-Jan-21 JB2-84p7 4.1 0.845 4 2 ND NEG
Kadena Heights
2430 D Y 614934-8 26-Jun-20 JB2-84p7 4.4 0.907 2 2 ND NEG
Kadena Heights
5401 A Y 949914-6 23-Jan-21 JB2-84p7 3.9 0.804 2 2 ND NEG
Kadena Heights
5442 C Y 171270-2 26-Jun-20 JB2-84p7 4.1 0.845 4 2 ND NEG
Kadena Heights
5444 B Y 957487-2 23-Jan-21 JB2-84p7 4.4 0.907 4 2 ND NEG
Kadena Heights
5447 A Y 962670-6 3-Mar-20 JB2-84p7 3.9 0.804 4 2 ND NEG
Kadena Heights
5456 D Y 487971-4 23-Jan-21 JB2-84p7 4.1 0.845 2 2 ND NEG
Kinser 1401 F Y 962664-9 21-Jan-21 JB4-90 KI 3.9 0.804 6 2 POS NEG
Kinser 1404 F Y 908136-5 21-Jan-21 JB4-90 KI 3.9 0.804 6 2 POS NEG
Kinser 1418 A Y 371382-3 23-Jan-21 JB4-90 KI 3.9 0.804 6 2 POS NEG
Kinser 1426 B Y 959364-1 23-Jan-21 JB4-90 KI 4.1 0.845 6 2 POS NEG
Kinser 1441 E Y 962300-0 23-Jan-21 JB4-90 KI 4.4 0.907 6 2 POS NEG
Kishaba Terrace
1411 C Y 487742-9 23-Jan-21 JB4-90p10
KT
4.1 0.845 6 2 POS NEG
Kishaba Terrace
1411 D Y 303117-6 23-Jan-21 JB4-90p10
KT
3.9 0.804 6 2 POS NEG
Kishaba Terrace
1411 F Y 949979-9 23-Apr-20 JB4-90p10
KT
4.1 0.845 6 2 POS NEG
Kishaba Terrace
1414 B Y 950768-2 23-Jan-21 JB4-90p10
KT
4.4 0.907 6 2 POS NEG
Kishaba Terrace
1416 E Y 216839-1 23-Apr-20 JB4-90p10
KT
3.9 0.804 6 2 POS NEG
Kishaba Terrace
1418 F Y 302609-3 23-Jan-21 JB4-90p10
KT
4.1 0.845 6 2 POS NEG
Kishaba Terrace
1807 NA Y 614481-0 30-May-20 C3-52p10 5.5 1.134 1 ND NEG
Kishaba Terrace
2312 NA Y 903494-3 13-May-20 K3-53p10
ADA
3.9 0.804 1 1 POS NEG
Lester - New
6168 D Y 170371-9 20-Jan-21 JB3-82 3.9 0.804 4 2 ND NEG
Lester - New
6172 A Y 928362-3 12-May-20 JB3-82 3.9 0.804 4 2 ND NEG
Lester - New
6179 D Y 905873-6 23-Feb-21 JB3-82 4.4 0.907 4 2 ND NEG
Lester - New
6183 C Y 927651-0 23-Dec-20 JB3-82 4.1 0.845 4 2 ND NEG
Lester - New
6183 B Y 906486-6 9-Mar-20 JB3-82 3.9 0.804 4 2 ND NEG
Lester - New
6185 B Y 927346-7 23-Dec-20 JB3-82 3.9 0.804 4 2 ND NEG
Lester - New
6185 D Y 912575-8 23-Dec-20 JB3-82 4.1 0.845 4 2 ND NEG
Lester - New
6187 A Y 959196-7 9-Mar-20 JB3-82 3.9 0.804 4 2 ND NEG
Lester - New
6190 B Y 500067-4 20-Jan-21 JB3-82 3.9 0.804 4 2 ND NEG
Lester - New
6225 A Y 958746-0 23-Jan-21 JB3-82 4.4 0.907 4 2 ND NEG
Lester - New
6235 C Y 165314-6 23-Jan-21 JB3-82 4.1 0.845 4 2 ND NEG
Marek Park 10201 D Y 940549-9 23-Jun-20 JB2-84p7 3.9 0.804 4 2 ND NEG
Marek Park 10203 D Y 302311-6 23-Jul-20 JB2-84p7 4.1 0.845 4 2 ND NEG
Marek Park 10220 A Y 906950-1 23-Jan-20 JB2-84p7 4.4 0.907 4 2 ND NEG
Marek Park 10238 B Y 957603-4 23-Jan-20 JB2-84p7 3.9 0.804 4 2 ND NEG
Marek Park 10243 C Y 906276-1 23-Jan-20 JB2-84p7 4.1 0.845 4 2 ND NEG
Marek Park 10264 B Y 371091-0 23-Jan-20 JB2-84p7 4.4 0.907 4 2 ND NEG
Marek Park 10283 B Y 904816-6 23-Feb-21 JB2-84p7 3.9 0.804 4 2 ND NEG
Marek Park 10283 C Y 907993-0 10-Aug-20 JB2-84p7 4.1 0.845 4 2 ND NEG
Marek Park 10304 A Y 901200-6 6-Jan-21 JB2-84p7 3.9 0.804 4 2 ND NEG
Marek Park 10305 B Y 370937-5 28-Dec-20 JB2-84p7 4.4 0.907 4 2 ND NEG
Marek Park 10305 D Y 172786-6 28-Dec-20 JB2-84p7 4.1 0.845 4 2 ND NEG
Marek Park 10322 B Y 907325-5 28-Jan-20 JB2-84p7 3.9 0.804 4 2 ND NEG
Marek Park 10333 C Y 171696-8 23-Feb-21
JB3-
82p6M
3.9 0.804 4 2 POS NEG
Marek Park 10335 A Y 907143-2 23-Feb-21
JB3-
82p6M
4.1 0.845 4 2 POS NEG
Marek Park 10337 A Y 907708-2 23-Feb-21
JB3-
82p6M
4.4 0.907 4 2 POS NEG
Marek Park 10347 C Y 415169-2 23-Dec-20 JB2-84p8 3.9 0.804 4 2 POS NEG
Marek Park 10353 B Y 961967-7 23-Jul-20 JB2-84p8 4.1 0.845 4 2 POS NEG
Marek Park 10356 A Y 904732-5 30-Jan-20 JB2-84p8 3.9 0.804 4 2 POS NEG
Marek Park 10362 B Y 930917-0 23-Feb-21 JB2-84p8 4.4 0.907 4 2 POS NEG
McTureous 5016 D Y 945221-0 18-Feb-21 JC3-90p11 4.1 0.845 4 2 POS NEG
McTureous 5017 F Y 907422-0 18-Feb-21 JC3-90p11 3.9 0.804 6 2 POS NEG
McTureous 5029 B Y 909983-9 18-Feb-21 JC3-90p11 4.1 0.845 6 2 POS NEG
McTureous 5031 A Y 900920-0 18-Feb-21 JC3-90p11 4.4 0.907 4 2 POS NEG
McTureous 5032 C Y 918315-3 18-Feb-21 JC3-90p11 4.1 0.845 6 2 POS NEG
McTureous 5032 F Y 904838-0 18-Feb-21 JC3-90p11 3.9 0.804 6 2 POS NEG
McTureous 5035 A Y 906394-2 18-Feb-21 JB4-90p10 4.1 0.845 4 2 POS NEG
McTureous 5035 B Y 248993-8 18-Feb-21 JB4-90p10 4.4 0.907 4 2 POS NEG
McTureous 5038 C Y 904272-2 18-Feb-21 JC3-90p11
A
4.1 0.845 3 2 POS NEG
McTureous 5038 E Y 936763-2 18-Feb-21 JC3-90p11
A
4.4 0.907 6 2 POS NEG
McTureous 5038 F Y 907502-9 18-Feb-21 JC3-90p11
A
3.9 0.804 6 2 POS NEG
McTureous 5042 A Y 958669-4 18-Feb-21 JB4-90p10 4.1 0.845 6 2 POS NEG
McTureous 5042 C Y 908032-6 18-Feb-21 JB4-90p10 4.4 0.907 6 2 POS NEG
McTureous 5044 C Y 961866-1 18-Feb-21 JB4-90p10 4.1 0.845 6 2 POS NEG
McTureous 5045 D Y 950839-1 18-Feb-21 JB4-90p10 3.9 0.804 6 2 POS NEG
McTureous 5045 E Y 951148-6 18-Feb-21 JB4-90p10 4.1 0.845 6 2 POS NEG
McTureous 5047 E Y 904649-1 18-Feb-21 JB4-90p10 5.7 1.175 6 2 POS NEG
McTureous 5049 A Y 249705-5 18-Feb-21 JB4-90p10 3.9 0.804 4 2 POS NEG
McTureous 5049 C Y 904218-5 18-Feb-21 JB4-90p10 4.1 0.845 4 2 POS NEG
McTureous 5054 C Y 906637-4 18-Feb-21 JC3-90p11 4.4 0.907 6 2 POS NEG
McTureous 5057 B Y 944313-6 18-Feb-21 JB4-90p10 4.1 0.845 6 2 POS NEG
McTureous 5057 C Y 951003-3 18-Feb-21 JB4-90p10 4.1 0.845 6 2 POS NEG
McTureous 5062 B Y 960797-9 30-May-20 JB4-90p10
A
3.9 0.804 3 2 POS NEG
McTureous 5062 E Y 929110-5 18-Feb-21 JB4-90p10
A
4.1 0.845 3 2 POS NEG
McTureous 5064 D Y 307254-3 18-Feb-21 JB4-90p10
A
4.4 0.907 3 2 POS NEG
North Terrace
2559 B Y 248953-2 23-Feb-21 K2-56 4.4 0.907 2 2 ND NEG
North Terrace
2563 F Y 171360-1 23-Jun-20 JC3-90 NT 4.1 0.845 6 2 POS NEG
North Terrace
2564 A Y 616885-0 23-Jun-20 JC3-90 NT 4.1 0.845 4 2 POS NEG
North
2570 F Y 493546-2 23-Feb-21 JC3-90 NT 3.9 0.804 6 2 POS NEG
North Terrace
2625 NA Y 936917-4 23-Feb-21 H4-56 4.1 0.845 1 1 POS NEG
North Terrace
2632 NA Y 906104-5 23-Feb-21 F2-56R 4.4 0.907 1 1 POS NEG
North Terrace
2636 NA Y 383102-1 23-Jun-20 F2-56R 4.1 0.845 1 1 POS NEG
North Terrace
2637 NA Y 908286-8 4-Dec-20 G3-56R 3.9 0.804 1 1 ND NEG
North Terrace
2647 NA Y 918256-9 23-Feb-21 F2-56 4.4 0.907 1 1 ND NEG
North Terrace
2652 NA Y 908558-0 23-Jun-20 F2-56R 4.1 0.845 1 1 POS NEG
North Terrace
2653 NA N 301189-7 23-Feb-21 H4-56 3.9 0.804 1 1 POS NEG
North Terrace
2661 NA Y 904787-9 28-Jan-20 F2-56R 3.9 0.804 1 1 POS NEG
North Terrace
2702 NA Y 950969-6 23-Jun-20 H4-56 4.1 0.845 1 1 POS NEG
North Terrace
2708 NA Y 940105-0 23-Jun-20 F2-56R 4.4 0.907 1 1 POS NEG
North Terrace
2712 NA Y 169207-8 23-Feb-21 F2-56R 3.9 0.804 1 1 POS NEG
North Terrace
2722 NA Y 371217-1 23-Feb-21 H4-56 4.8 0.989 1 1 POS NEG
North
2728 NA Y 170154-9 23-Feb-21 F2-56 4.4 0.907 1 1 ND NEG
North
2734 NA Y 22-Nov-19 G3-56 15.4 3.174 1 1 ND NEG
North Terrace
2744 NA Y 173102-5 23-Jun-20 F2-56 4.1 0.845 1 1 ND NEG
North Terrace
2748 NA Y 940085-4 23-Jun-20 F2-56 4.1 0.845 1 1 ND NEG
North Terrace
2754 NA Y 406332-7 23-Jun-20 F2-56 4.1 0.845 1 1 ND NEG
North Terrace
2802 B Y 960200-4 13-Jan-21 K2-56 4.1 0.845 2 2 ND NEG
North Terrace
2810 A Y 169082-5 4-Dec-20 K2-56 3.9 0.804 2 2 ND NEG
North Terrace
2826 NA Y 303688-6 23-Feb-21 G3-56 4.5 0.928 1 1 ND NEG
North Terrace
2906 B Y 970513-8 23-Jun-20 K2-56 4.1 0.845 2 2 ND NEG
North Terrace
2911 NA Y 940034-2 28-Jan-20 H4-56 3.9 0.804 1 1 POS NEG
North Terrace
2913 NA Y 904238-3 28-Jan-20 G3-56 3.9 0.804 1 1 ND NEG
O'Donnell Gardens
1002 D Y 959059-7 30-May-20 JC3-85p8
OG
4.1 0.845 4 2 ND NEG
O'Donnell Gardens
1008 B Y 906142-5 30-May-20 JC3-85p8
OG
4.4 0.907 4 2 ND NEG
O'Donnell Gardens
1015 A Y 908072-2 30-May-20 JB2-84p9
KAB
4.1 0.845 4 2 ND NEG
O'Donnell Gardens
1022 B Y 936836-6 30-May-20 JC3-85p8
OG
3.9 0.804 4 2 ND NEG
O'Donnell Gardens
1025 C Y 249703-0 30-May-20 JB2-84p9
KAB
4.1 0.845 4 2 ND NEG
O'Donnell Gardens
1026 A Y 371337-7 23-Jan-21 JC3-85p8
A OG
4.4 0.907 4 2 ND NEG
O'Donnell Gardens
1027 A Y 906924-6 23-Jan-21 JB2-84p9
KAB
3.9 0.804 4 2 ND NEG
O'Donnell Gardens
1027 C Y 910500-8 23-Jan-21 JB2-84p9
KAB
4.1 0.845 4 2 ND NEG
O'Donnell Gardens
1029 B Y 936813-5 23-Jan-21 JB2-84p9
KAB
4.4 0.907 4 2 ND NEG
O'Donnell Gardens
1030 B Y 917867-4 23-Jan-21 JC3-85p8
OG
4.1 0.845 4 2 ND NEG
O'Donnell Gardens
1032 C Y 913033-7 23-Jan-21 JC3-85p8
OG
4.1 0.845 4 2 ND NEG
O'Donnell Gardens
1035 C Y 942069-6 30-May-20 JB2-84p9
KAB
3.9 0.804 4 2 ND NEG
O'Donnell Gardens
1064 C Y 936709-5 30-May-20 JC3-85p8
A OG
4.1 0.845 4 2 ND NEG
O'Donnell Gardens
1071 A Y 913212-7 23-Feb-21 JC3-85p8
OG
4.4 0.907 4 2 ND NEG
O'Donnell Gardens
1075 A Y 919984-5 23-Feb-21 JC3-85p8
OG
3.9 0.804 4 2 ND NEG
O'Donnell Gardens
1078 B Y 901583-5 23-Jan-21 JC3-85p8
OG
4.1 0.845 4 2 ND NEG
O'Donnell Gardens
1079 D Y 962240-8 23-Feb-21 JC3-85p8
OG
4.4 0.907 4 2 ND NEG
O'Donnell Gardens
1080 B Y 939464-4 23-Feb-21 JC3-85p8
OG
4.1 0.845 4 2 ND NEG
O'Donnell Gardens
1080 D Y 962576-5 23-Feb-21 JC3-85p8
OG
4.4 0.907 4 2 ND NEG
O'Donnell Gardens
2002 B Y 960908-2 23-Mar-21 JB2-84p9
KAB
3.9 0.804 4 2 ND NEG
O'Donnell Gardens
2017 B Y 930564-0 30-May-20 JB2-84p9
KAB
4.1 0.845 4 2 ND NEG
O'Donnell Gardens
2020 D Y 306575-2 23-Jan-21 JB2-84p9
KAB
4.4 0.907 4 2 ND NEG
O'Donnell Gardens
2023 A Y 950542-1 23-Mar-21 JB2-84p9
KAB
4.1 0.845 4 2 ND NEG
Sada (New) 1632 E Y 907887-4 23-Feb-21 HT2-02 SA 4.1 0.845 6 2 POS NEG
Sada (New) 1633 D Y 170697-7 12-Mar-20 HT3-02 SA 8.1 1.670 4 2 POS NEG
Sada (New) 1634 A Y 909768-4 12-Mar-20 HT2-02 SA 4.7 0.969 4 2 POS NEG
Sada (New) 1634 B Y 171325-4 23-Mar-20 HT2-02 SA 4.4 0.907 4 2 POS NEG
Sada (New) 1635 C Y 171852-7 12-Mar-20 HT2-02 SA 4.9 1.010 4 2 POS NEG
Sada (New) 1636 C Y 167416-7 23-Mar-20 HT2-02 SA 4.1 0.845 4 2 POS NEG
Sada (New) 1644 F Y 951100-7 10-Mar-20 HT2-02 SA 4.5 0.928 6 2 POS NEG
Sada (New) 1645 C Y 172903-7 23-Mar-20 HT2-02 SA 3.9 0.804 4 2 POS NEG
Sada (New) 1646 D Y 907923-7 12-Mar-20 HT2-02 SA 5.7 1.175 4 2 POS NEG
Sada (New) 1650 F Y 621852-3 23-Mar-20 HT2-02 SA 4.1 0.845 6 2 POS NEG
Sada (New) 1653 A Y 943459-8 30-May-20 HT2-02 SA 4.4 0.907 4 2 POS NEG
Sada (New) 1657 D Y 169153-4 8-Jun-20 HT2-02 SA 4.2 0.866 4 2 POS NEG
Sada (New) 1658 F Y 941687-6 23-Feb-21 HT2-02 SA 3.9 0.804 6 2 POS NEG
Sada (New) 1662 B Y 928486-0 30-May-20 HT2-02 SA 4.1 0.845 4 2 POS NEG
Sada (New) 1663 A Y 165147-0 11-May-20 HT2-02 SA 4.4 0.907 4 2 POS NEG
Sada (New) 1664 D Y 908263-7 23-Mar-21 HT2-02 SA 4.4 0.907 4 2 POS NEG
Sada (New) 1665 B Y 370640-5 10-Mar-20 HT2-02 SA 4.4 0.907 4 2 POS NEG
Sada (New) 1665 C Y 936602-2 10-Mar-20 HT2-02 SA 7.2 1.484 4 2 POS NEG
Sada (New) 1667 B Y 912934-7 12-May-20 HT2-02 SA 3.9 0.804 4 2 POS NEG
Sada (New) 1667 D Y 173192-6 10-Mar-20 HT2-02 SA 7.8 1.608 4 2 POS NEG
Sada (New) 1668 D Y 908034-2 10-Mar-20 HT2-02 SA 4.3 0.886 4 2 POS NEG
Sebille Manor
2398 C Y 960198-0 8-Feb-21 IV4-70 3.9 0.804 3 2 ND NEG
Sebille Manor
2399 E Y 962466-9 8-Feb-21 III3-70 3.9 0.804 6 2 ND NEG
Sebille Manor
5414 D Y 936736-8 10-Feb-21 III3-70 3.9 0.804 4 2 ND NEG
Stearley Heights
2323 NA Y 936627-9 2-Dec-20 G3-53 3.9 0.804 1 1 ND NEG
Stillwell Park
1634 B Y 171325-4 23-Mar-20 JSP3-07 3.9 0.804 4 2 ND NEG
Stillwell Park
1635 D Y 957688-5 23-Feb-21 JSP3-07 4.1 0.845 4 2 ND NEG
Stillwell Park
1635 F Y 943360-8 23-Feb-21 JSP3-07 4.4 0.907 6 2 ND NEG
Stillwell Park
1636 C Y 167416-7 30-Mar-20 JSP3-07 3.9 0.804 6 2 ND NEG
Stillwell Park
1636 D Y 370898-9 23-Feb-21 JSP3-07 4.1 0.845 6 2 ND NEG
Stillwell Park
1637 F Y 907994-8 30-May-20 JSP3-07 4.4 0.907 6 2 ND NEG
Stillwell Park
1638 D Y 907469-1 30-May-20 JSP3-07 6.7 1.381 6 2 ND NEG
Stillwell Park
1642 D Y 621889-5 13-Jan-21 JSP4-07 4.2 0.866 4 2 ND NEG
Stillwell Park
1644 A Y 171640-6 23-Jan-20 JSP3-07 3.9 0.804 4 2 ND NEG
Stillwell Park
1645 C Y 172903-7 23-Mar-20 JSP3-07 4.4 0.907 4 2 ND NEG
Stillwell Park
1647 F Y 306564-6 23-Mar-21 JSP3-07 4.1 0.845 6 2 ND NEG
Stillwell Park
1650 F Y 621852-3 23-Mar-20 JSP3-07 4.1 0.845 6 2 ND NEG
Stillwell Park
1653 A Y 943459-8 30-May-20 JSP3-07 4.1 0.845 6 2 ND NEG
Stillwell Park
1864 A Y 908526-7 30-May-20 JSP4-08 4.4 0.907 6 2 ND NEG
Stillwell Park
1864 E Y 961319-1 30-May-20 JSP4-08 4.1 0.845 6 2 ND NEG
Stillwell Park
1865 C Y 908202-5 23-Mar-21 JSP3-08 4.4 0.907 6 2 ND NEG
Stillwell Park
1865 E Y 943595-9 23-Jan-21 JSP3-08 4.1 0.845 6 2 ND NEG
Stillwell Park
1870 A Y 616469-3 23-Mar-21 JSP3-08 3.9 0.804 6 2 ND NEG
Stillwell Park
1919 A Y 616118-6 23-Jan-20
JC3-
80(C)p6
4.1 0.845 4 2 ND NEG
Stillwell Park
2069 B Y 912882-8 23-Mar-21
JC3-
80(C)p6
4.4 0.907 4 2 ND NEG
Stillwell Park
2072 C Y 950528-0 23-Mar-21
JC3-
80(C)p6
3.9 0.804 4 2 ND NEG
Stillwell Park
2076 B Y 306676-8 23-Mar-21
JC3-
80(C)p6
4.1 0.845 4 2 ND NEG
Stillwell Park
2078 B Y 172136-4 23-Mar-21
JC3-
80(C)p6
4.4 0.907 4 2 ND NEG
Terrace Heights
2955 D Y 371145-4 30-May-20 JC3-80p7 3.9 0.804 4 2 ND NEG
Terrace Heights
2958 B Y 951762-4 23-Jan-21
JC3-
80(B)p6
4.1 0.845 4 2 ND NEG
Terrace Heights
2960 C Y 165142-1 19-Jan-21
JC3-
80(B)p6
3.9 0.804 4 2 ND NEG
Heights
2961 C Y 962854-6 23-Jan-21
JC3-
80(B)p6
4.4 0.907 4 2 ND NEG
Terrace Heights
2966 A Y 240872-2 30-May-20 JC3-80p7 4.1 0.845 4 2 ND NEG
Terrace Heights
2968 C Y 371171-0 30-May-20 JC3-80p7 3.9 0.804 4 2 ND NEG
Terrace Heights
2969 C Y 913649-0 23-Jan-21 JC3-80p7 4.1 0.845 4 2 ND NEG
Terrace Heights
2970 A Y 172631-4 30-May-20 JC3-80p7
A
4.4 0.907 4 2 ND NEG
Terrace Heights
2971 D Y 962888-4 23-Jan-21 JC3-80p7 3.9 0.804 4 2 ND NEG
Washington Heights
8117 A Y 958121-6 30-May-20 JA2-77p9 4.1 0.845 4 2 ND NEG
Washington Heights
8126 B Y 936675-8 14-Feb-20 JA2-77p9 3.9 0.804 4 2 ND NEG
Washington Heights
8134 A Y 940954-1 30-May-20 JA2-77p5 4.4 0.907 4 2 ND NEG
Washington Heights
8135 C Y 950848-2 23-Mar-21 JA2-76p5 4.1 0.845 4 2 ND NEG
Washington Heights
8144 D Y 906010-4 30-May-20 JA2-77p5 4.1 0.845 4 2 ND NEG
Washington Heights
8148 A Y 172723-9 23-Mar-21 JA2-77p5 3.9 0.804 4 2 ND NEG
Washington Heights
8151 D Y 250191-4 23-Mar-21 JA2-76p5 4.1 0.845 4 2 ND NEG
Washington
8153 A Y 906058-3 30-May-20 JA2-76p5 4.4 0.907 4 2 ND NEG
Washington
8156 C Y 908135-7 12-Feb-21 JA2-76p5 3.9 0.804 4 2 ND NEG
Washington Heights
8163 B Y 941612-4 23-Jan-21 JA2-76p5 3.9 0.804 4 2 ND NEG
Washington Heights
8180 B Y 960012-3 23-Mar-21 JA2-76p6 4.1 0.845 4 2 ND NEG
Washington Heights
8184 B Y 959010-0 23-Mar-21 JA2-76p6 4.4 0.907 4 2 ND NEG
Washington Heights
8191 A Y 960811-8 30-May-20 JA2-76p6 4.1 0.845 4 2 ND NEG
Washington Heights
8193 B Y 957837-8 23-Mar-21 JA2-76p6 4.1 0.845 4 2 ND NEG
Washington Heights
8194 D Y 908423-7 23-Mar-21 JA2-76p6 3.9 0.804 4 2 ND NEG
Washington Heights
8201 C Y 908148-0 23-Mar-21 JA3-83p8 4.1 0.845 4 2 ND NEG
Washington
8300 C Y 962451-1 13-Jan-21 OB3-98 4.8 0.989 4 2 POS NEG
2.0 DESCRIPTION OF WORK: The work consists of the following elements. All replacement work is in kind.
2.1 General:
a. Install radon mitigation system, housing units (single story).
b. Install radon mitigation system, housing units (two story).
c. Install radon mitigation system, housing tower (first or 2nd floor).
d. Unit with crawl space – mitigation technique shall be sub-slab suction, depressurization, or positive pressure ventilation.
e. Unit without crawl space, slab-on-grade or foundation shall use sub-slab suction or depressurization method.
f. New mitigation system should be installed and operational within 6 months.
h. Contractor shall use the best management practice to successful reduce radon
2.2 Architectural:
a. Remove and replace patio floor tile and/or ceiling, as necessary.
b. Repair and patchwork to match existing adjacent finishes.
c. Paint the 4” Ø PVC radon exhaust pipe, cover and other accessories with the matching exterior paint color (fans are 4”, 6” and 8”, they will be connected to coupling to reduce to 4”).
2.3 Civil:
a. Excavation, removal, disposal, and back fill of soil.
b. Provide aggregate.
c. Remove and replace sodding including topsoil for damaged surface.
d. Drilling the core at exterior concrete wall under floor slab to provide 4” Ø PVC radon exhaust pipe and seal around the PVC pipe.
e. Restore the site.
2.4 Electrical:
a. Provide electrical power for exhaust fan. The interior conduit shall run above ceiling as much as possible.
b. Interior exposed conduit shall be metal wire mold and exterior exposed conduit shall be rigid steel galvanize (thick wall).
c. Provide a circuit breaker 1P, 125V, 20A with enclosure by the existing circuit breaker panel for power supply of new exhaust fan. Install additional circuit breaker as required.
d. Assume approximate distance from new exhaust fan to existing circuit breaker panel for 2 Story unit: 32m (Assume 29m of conduits run above ceiling).
e. Conduct insulation resistance test for all new electrical wires and submit test result.
f. Minimum resistance shall be 250,000 ohms.
g. Install a radon monitor system such as Mano-tube.
h. Weatherproof cover from inclement weather.
i. Cooper pipe to connect the U-tube manometer.
2.5 Mechanical:
a. Install radon fans sufficient to support the unit square footage as required:
1. Small (RP-145) or equivalent size
2. Medium (RP-265) or equivalent size
3. Large (GP-510) or equivalent size
b. Provide 4” Ø PVC radon exhaust pipe, fittings, and pipe support from the radon suction pit under the floor slab to above the roof.
c. Install/drill brackets for radon exhaust/vent pipe:
d. Single Story - drill four 2 holes bracket each
e. Two story - drill six 2 holes bracket each
f. Tower drill six 2 holes bracket each (the vent on towers must be separated at least 3 meters from any opening of the building)
g. Provide weatherproof type radon exhaust fan with radon system monitor and all associated accessories. Provide corrosion-proof protective cover for fan with paint to match existing exterior wall.
h. Provide rain cap with bird screen for radon exhaust outlet pipe.
i. Install 4” Ø PVC inlet and outlet vent lines into the crawl space (underneath the house).
j. When building concrete manholes are present/available. Contractor shall cut a 4” Ø hole from each end, (2/building).
k. The height of inlet & outlet vent line is 18” connect to 180-degree elbow with steel net.
l. The depth is 12” to 18” deep with 90-degree elbow connected to 3’ to 4’ foot line into crawl space.
m. Bracket for vents - drill four 2 holes bracket each.
2.6 Fire Protection System: N/A
2.7 Asbestos & LBP
a. Government will provide ACM & LBP sampling test result when available.
b. Contractor may request to sample and test as required and requested by government.
c. Asbestos & LBP Abatement: As required to include disposal of the hazardous waste.
2.8 Post-Installation Radon Testing Requirement:
a. Test radon levels in each dwelling unit after each new installation or repair/upgrade of existing mitigation system and record time and date for each unit.
b. Post-installation testing should begin no sooner than 24 hours and no later than 30 days after installation.
c. Radon tests shall follow EPA guidelines and shall be continuously monitoring utilizing Alpha Track devices (long term detectors) and are set out for a minimum of 91 days. One detector shall be installed per 186 square meters or 2,000 square feet.
d. Detectors should be placed in the lowest level of the facility which contains a room that is used regularly (used at least 4 hours or more) (e.g., living room).
e. Detectors should not be placed in a room or wall that has any type of exhaust or ventilation nearby
(e.g., kitchen, bathroom).
f. Detectors should be placed where it will not be disturbed during the measurement period and where there is adequate room/space for the detector.
g. Detectors should not be placed near drafts caused by heating, ventilating, and air conditioning vents, doors, fans, and windows. Locations near heat such as appliances or direct sunlight, and high humidity areas should be avoided.
h. Because some detectors are sensitive to increased air motion, fans should not be operated in the test area.
i. Measurement location should not be within 3 ft (90 cm) of the doors and windows or other potential openings to the outdoors.
j. The detector should be placed at least 20 in (50 cm) from the floor, and at least 4 in (10 cm) from other objects. On walls, place at the breathing zone height which is approximately 5 to 6 feet (1.6 m to 1.8 m).
k. Ensure date and time of install and retrieval are recorded for each detector.
l. Ensure detectors are re-sealed using a re-sealable bag inside the home.
m. Provide & install additional 10% (round off to lowest number) for missing or lost or designate radon test device (Alpha Track).
n. Submit results of radon tests to the government within 7 calendar days of receipt from the testing facility.
2.9 Lightning Protection System: N/A
3.0 PROJECT SCHEDULE AND TIME CONSTRAINTS:
3.1 Once the contractor received award documents from 18 CONS/PKC. Contractor shall schedule a pre-construction conference with the government within fourteen (14) calendar days. Notice To Proceed (NTP) will be issue after the completion of the pre-construction meeting and only once.
3.2 The contractor shall prepare meeting minutes summarizing all parties’ comments and submit to
Contracting Office within three business days after each meeting.
3.3 Contract Completion: Contractor shall complete Basic CLIN within the 360 calendar days (88 Survey
& DSGN and 272 CNST) this includes procurement of material, material submittals, government materials submittal review, construction time, radon test results and unfavorable weather, see section 5.0 for details on options.
4.0 DESIGN REQUIREMENTS:
4.1 Designer certification requirement for design engineers: The Government minimum requirement of
Design Engineers is indicated in the Qualification Matrix below. All design professionals shall have current registration to practice in the United States or Japan. Approval shall be indicated on all documents by having the professional signature or stamp/seal of the architect or engineer with personal signature over same appearing on all sheets as applicable to their specialties.
Experience Matrix
Area Qualifications
Architectural Graduate Architect with professional licensure/registration or 1st
Class Kenchikushi and 5 years’ experience
Electrical
Graduate Electrical Engineer with professional licensure/registration or 1st
Class Denkishi or Registered Electrical Engineering Consulting Manager and 5 years’ experience
Mechanical
Graduate Mechanical Engineer with professional licensure/registration or 1st
Class Doboku Sekou Kanrigishi or Mechanical engineering Consulting Manager and 5 years’ experience.
Radon Technician
Individual certified from the National Radon Proficiency Program (NRPP), a
Radon Mitigation Installer (RMI) certification, or a National Radon Safety
Board (NRSB) Radon Mitigation Specialist (RRS) certification. Contractor shall provide proof of certification at the time of bidding. with minimum of 2 years’ experience.
4.2 Design Schedule: 8 8 c a l e n d a r d a y s i s c o n s t a n t a n d w i l l s t a y t h e s a m e r e g a r d l e s s 1 8 0 u n i t s o r 2 5 1 u n i t s .
SCHEDULE
SHALL BE COMPLETED WITHIN
Survey & 95% Design 60 Calendar days after the NTP
Government Review 7
Submit Revised 95% Design Documents 14 Calendar days after 95% design approval
Government Review 7
DESIGN SUBTOTAL: 88 CALENDAR DAYS
4.3 Pre-Design Meeting: A pre-design meeting is required to assure that all requirements and procedures are understood.
4.4 Project design will be coordinated with the 18CONS/PKC, Using Agency, DET 2 OL-B and other agencies involved in project reviews.
4.5 The design for this project shall provide for the completion of the work identified on this Statement of Work
(SOW). All design work shall be in accordance with the most current applicable criteria. Any review by the
Government of technical items shall not be construed to relieve the Contractor of responsibility for technically correct and complete documents in compliance with applicable codes, industry standards, and the intent of this
SOW. Government shall not be responsible for any additional costs which could have been avoided through an appropriate contractor’s design.
4.6 Actual Field Investigation: Actual investigation by the Contractor must be conducted for 95% design. A joint site visit with Government Agencies (DET 2 OL-B and the Using Agency) prior to submittal of approved scheme for confirmation of work tasks required shall be accomplished. The Contractor shall determine how the project can best be accomplished. The Contractor shall perform environmental archaeological monitoring in accordance with 718 CES Environmental requirements.
4.7 Every effort shall be exerted to develop a 95% design within the project criteria and instructions so that the project may be executed within the target cost. The design of this project shall be the most economical with necessary consideration being given to the most efficient utilization of all materials consistent with the design criteria.
4.8 Documents Required at 95%: The documents that shall be submitted are as follow:
(1) Specifications
(2) Project Drawings
(3) Environmental Analysis – If required
(4) Project documents.
(4.1) Schedule of Material Submittals (AF Form 66)
(4.2) Progress Schedule and Phasing Plan
4.9 Detailed design analysis/calculations shall be included with the 95% design submittal. Project documents and drawings to be submitted for each design stage are as follows:
Submittal Design Stage
35% 35%
Rev
65% 65%
Rev
95% 95%
Rev
Set
1 B1 Drawings (full size)
2 B2 Drawings (half size) 1 1 2
3 Specifications 1 1 2
Annotated Design Review
Comments
Design
Analysis/Calculations
CD-R (all contract documents)
7 Draft DD Form 1354 2
AF Form 3064 Progress
Schedule
9 ACM/LBP Reports
Environmental Protection
Plan 1 1
• Note: Submit one set (hard copy and CD) submittals to 18 CONS/PKC and the remainder to 718
CES/CENMA directly at each design stage.
• Submittal shall be Windows compatible CD-ROM with drawings in US version of AutoCAD and PDF, the complete specifications in Microsoft Word, and AF Form 66 in Microsoft Excel.
4.10 All equipment and materials installed or utilized for this project shall be in strict compliance with the Air Force’s policy concerning Ozone Depleting Chemicals.
4.11 As-built drawings will be provided to the Contractor for reference in their present form. The Government bears no responsibility for the accuracy of these drawings. Actual field investigation and survey of the facility must be conducted by the Contractor to ascertain existing conditions before start of design.
4.12 Civil, Architectural and Structural will be stamped, certified, dated and signed by appropriately licensed
Architects and Engineers. Proper credentials shall be included prior, for approval. Construction documents shall be stamped, signed, and dated (in ink) prior to construction and upon completion of the project.
4.13 Drawing Units and Scale: All drawings shall be in English unit with a Metric System (SI) conversion or vice versa. A generic graphic scale shall be provided at the bottom right of the drawing sheet and separately for each drawing sections that requires different scale.
4.14 As-built drawings will be provided to the contractor for reference in their present form when available.
The government bears no responsibility for the accuracy of these drawings.
4.15 The Contractor shall attend joint review meetings of the project upon notification. The contractor shall submit minutes of any meetings held related to this project to the Contracting Officer and DET 2 OL-B not later than seven (7) working days after the event.
5.0 CONSTRUCTION REQUIREMENTS:
5.1 Construction Schedule: The Contractor can begin on-site work with approval from the Government upon satisfactory response actions at the Notice to Proceed (NTP) conference. The Contractor shall be allowed to work 0730 to 1630 hours, Monday through Friday excluding U.S. Federal Holidays.
5.2 When U.S. Government legal holidays occur on Saturday or Sunday, the preceding Friday or following
Monday shall not be considered workdays until changes in work schedules are approved by the Contracting
Officer. No work will be allowed on Friday if the preceding Thursday is a U.S. Government legal holiday. The
Contractor is to account for this in his construction schedule and offer. Any deviations from the above shall be submitted in writing to the Contracting Officer for approval on a case-by-case basis.
5.3 Performance Time: The contract shall be completed within 272 calendar days. This includes material submittals, government material submittal review, procurement of materials, 7 days for unfavorable weather and construction time.
Schedule Shall Be Completed Within
A) Material/Shop Drawings Submittal – One Time 21 Calendar days
B) Government Review – One Time 7 Calendar days
C) Procurement of materials – One Time 45 Calendar days
D) Unfavorable Weather (7 days) for Basic – Will change/Increase Depending Option’s
Calendar days
E) Construction Site Work (69 days) for Basic – Will change/Increase Depending Option’s
Calendar days
F) Post Testing Over 91 days & Lab Result – see sec
5.5.d 130 Calendar days
Total Performance Time: 272 Calendar days
5.4 Performance Break down: Basic and Options awards.
A B C D E F DAYS
Basic 14 7 45 7 69 130 272
Option 1 0 0 0 7 1 0 8
Option 2 0 0 0 7 1 0 8
Option 3 0 0 0 7 1 0 8
Option 4 0 0 0 4 0 0 4
Total 14 7 45 32 72 130 300
5.5 Option or Options Award, refer to SOW section 1.2 for breakdown.
a. Option CLIN #1 ~ 3: per option contractor (ktr) will be awarded addition 7 days for construction and one day for unfavorable weather (assumption 3 Options are exercise ktr will be awarded 21 days and 3 days unfavorable, total 24 days).
b. Option CLIN 4: Contractor (ktr) will be awarded addition 4 days for construction with no unfavorable weather day.
c. If all options are exercise additional total days 28 days (construction 25 days and 3 days unfavorable weather) will be added to the original performance time.
d. The Post Testing Over 91 days & Lab Result (130 days) will apply separately if the construction is completed plus 14 days after, then additional 130 days shall be awarded.
5.6 During project activities the Contractor will be responsible for ensuring Work Plan compliance, and construction quality, complying with Base procedures regarding security, Base Access, and Safety; and ensuring safe work practices are employed.
5.7 Construction Project Signs: N/A
5.8 Storage of Material, Latrines and Field Office: N/A
5.9 Cleanup: The Contractor shall always keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government.
Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer.
5.10 AF Form 66 and AF Form 3000—Contractor shall be responsible to edit these submittal forms in accordance with actual requirements and schedule of the project and shall be submitted for government approval.
6.0 ENVIRONMENTAL REQUIREMENTS:
6.1 Conformance with Environmental, Safety and Occupational Health Management System
(ESOHMS): Contractor shall perform all work under this contract consistent with the relevant policy and objectives identified within Kadena AB. Refer to Environmental Section 01 57 19.01 30, Temporary Env Controls (2022-07 or Latest Edition).
a. Section 01 57 19.01 30, Temporary Env Controls (2022-07)
b. Section 02 82 00, ACM (2019-08)
c. Section 02 82 00.00 30 ACM Supp (2020-03)
d. Section 02 82 00.00 30 Attachments
e. Section 02 83 00, LBP (2019-08)
f. Section 02 83 00.00 30 Lead Supp (2020-02)
6.2 Waste Disposal:
1. All other items for landfill disposal not addressed, shall be encapsulated according to the contractor’s agreement with the landfill management.
2. All work and waste disposal preparations shall conform to applicable OSHA and EPA Regulations, JEGS C15, the Japan Waste Management and Cleaning Act, and Okinawa Prefecture Administrative
Regulations.
7.0 SAFETY:
7.1 The contractor shall comply with all applicable federal, state, and local safety requirements. The contractor is also required to comply with the American General Contractors' Safety Manual and the Occupational Safety and Health Act (OSHA), see reference sheet.
7.2 Confined Space: The contractors and sub-contractors entering confined spaces on Kadena AB, Japan is responsible for the safety of their personnel and for their space program as outlined in AFI 91- 203 (see reference sheet). The primary contractor is responsible for all sub-contractor confined space operations.
8.0 CLOSE-OUT REQUIREMENTS:
8.1 PRE-FINAL INSPECTION:
a. The Contractor shall conduct a pre-final walk-through inspection in the presence of COR, and PM in coordination with R&O SMEs and publish the pre-final inspection findings in a pre-final inspection report. The pre-final inspection shall be conducted a minimum of 30 calendar days before the final inspection date. A Beneficial Occupancy Determination (BOD) may be required for certain areas in the event it is in the best interest of the government to utilize the designated BOD areas.
b. Contractor shall submit an intermediate DD Form 1354 for Real Property review, to make sure all line items are correct except for block 16 and 18. If there are exterior new/removed construction features in the project, provide preliminary civil as-built drawings to 718 CES/CENME (GeoBase office), and see attached DD Form 1354 workflow.
8.2 FINAL INSPECTION: The Contractor shall conduct a final inspection in the presence of CO, PM, COR in coordination with R&O SMEs and publish the findings in a final inspection report in accordance with the format specified at the pre-construction conference and the RFP. The inspection shall concentrate on the items identified at the pre-final inspection and recorded in the pre-final report. The final inspection report shall certify that all items of the work plan have been implemented and that the construction is complete.
8.3 FINAL PAYMENT:
a. As-Built Documents: The Contractor shall provide the corrected contract drawings in white paper and
2 copies of CD containing all drawings in electronic CADD and PDF (stamp As- built/date) and all documents in WORD or EXCEL and PDF. All as-built files shall meet latest 718 CES Electronic As-built
Naming Standard (PDF and CADD) see attached. Contractor shall provide all the approved material catalog cuts and maintenance manuals in binders to 718 CES/CENH. The final as-built digital copies of the documents and drawings shall be in the following format:
(1) Drawings AutoCAD and PDF
(2) Specifications Microsoft Word and PDF
(3) Environmental Analysis Microsoft Power Point and PDF
(4) Final Report Microsoft Word and PDF
b. The Contractor shall submit final (DD Form 1354) Transfer and Acceptance of Real Property to Base
Civil Engineer (BCE) or other appropriate organization for signature and acceptance.
c. The Contractor shall not receive final payment until all approved material submittals, As-Built
Drawings, O&M manuals, DD Form 1354 are turned into the US Government and final inspection punched list items are accomplished.
8.4 DELIVERY/WARRANTY:
a. The Contractor shall provide a one-year warranty or manufacturer’s standard commercial warranty, whichever is longer. This warranty shall include a one-year workmanship warranty. The warranty period shall start from the date of system and/or project acceptance. The Contractor shall provide written procedures and required information for warranty services at or prior to site acceptance.
b. The Contractor shall complete all inspection and commissioning requirements prior to final inspection. The warranty shall be issued in accordance with FAR 52.246.21. Extended warranties offered by the Contractor and its subcontractors or suppliers may be accepted at the Government’s discretion. Post
Acceptance Inspection will be conducted with the user and if required with the contractor at the 9-month period of the warranty to discuss any repair items needed. The Contractor will provide throughout the warranty period a point of contact in the event any repairs are needed.
9.0 OTHER REQUIREMENTS:
9.1 Progress Schedules: The contractor shall provide a Contract Progress Schedule (AF Form 3064) in accordance with the basic contract specification, General Requirements for projects with performance period over
60 calendar days. Contract Progress Schedule shall be submitted to the Contracting Officer within 14 calendar days prior to start of on-site work.
9.2 Submittals: The contractor shall provide the Government with Material Approval Submittals (AF Form
3000) in accordance with basic contract specification, General Requirements and as stated in Schedule of Material
Submittals (AF Form 66).
REFERENCE: Use the most current Code, Regulations and Guidance as it applies:
➢ SPECS – General, Elec, Earthwork (sect 1 2 3), exclude Division 31 – Earthwork, section 3.2.2 para. 14, page
36 from this SOW, all other applies
➢ EPP Submittal Register Guideline
➢ Unified Master Reference List https://www.wbdg.org/ccb/DOD/UMRL/UMRL.pdf
➢ Unified Facilities Guide Specifications (UFGS): http://wbdg.org/ccb/browse_org.php?o=70
➢ Unified Facilities Criteria (UFC): http://wbdg.org/ccb/browse_cat.php?o=29&c=4
➢ Air Force Engineering Technical Letters (ETL’s):
http://www.wbdg.org/ccb/browse_cat.php?o=33&c=125
➢ International Building Code (IBC)
➢ National Fire Protection Association (NFPA)
➢ The National Environmental Health Association (NEHA) National Radon Proficiency Program
➢ The National Radon Safety Board (NRSB)
➢ AFI 48-148, Ionizing Radiation Protection
➢ IOH-SD-BR-SR-2005-0004, Bioenvironmental Engineer’s Guide to Ionizing Radiation
➢ USAF OEF OEHL-87-132RZ0111KRD, The Bioenvironmental Engineer’s Primer to the Air Force Radon
Assessment and Mitigation Program (RAMP)
➢ EPA 402-R-93-003, Protocols for Radon Measurement in Homes
➢ EPA 402-R-92-004, Indoor Radon and Radon Decay Product Measurement Device Protocols
➢ EPA 402-R-93-078, Radon Mitigation Standards
➢ EPA 625-R-93-011, Radon Reduction Techniques for Existing Detached Houses
➢ ASTM E 2121-12, Standard Practice for Installing Radon Mitigation Systems in Existing Low-Rise
Residential Buildings, current version.
➢ UFC 3-800-10N, Environmental Engineering for Facility Construction Final
➢ UFC 3-101-01, Architecture,
➢ UFGS 31 21 13 Radon Mitigation
➢ UFGS 02 82 13 Asbestos (JEGS)
➢ National Electrical Code (NEC) Handbook
➢ UFC 3-501-01 Electrical Engineering
➢ UFC 3-520-01 Interior Electrical Systems
➢ UFC 4-711-01 Family Housing
➢ Air Force Housing Guide
➢ Air Force Instructions (AFI)
➢ Japan Environmental Governing Standards (JEGS)
➢ Kadena Design Guide
➢ Bioenvironmental Engineering Guidebook for Radon Management 3rd Edition or most current
ATTACHMENTS
5a. Housing Units for RADON Mitigation System Map
5b. EPP Submittal Register Guideline
6a. Bioenvironmental Engineering Guidebook for Radon Management 3rd Edition (1)
7a. As-Built Drawing, FA5270-22-C-0003, INST RADON 300UN, 03-20-23
7b. As-Built Drawing, FA5270-23-C-0006, Radon (222), 03-20-24
8a. SECTION 01 57 19.01 30 EPP Spec (2022-06) V1.29
8b. SECTION 02 82 00, ACM (2019-08)
8c. SECTION 02 82 00.00 30 ACM Supp (2020-03)
8d. SECTION 02 82 00.00 30 Attachments
8e. SECTION 02 82 00.00 30 Attachments.exe
8f. SECTION 02 83 00, LBP (2019-08)
8g. SECTION 02 83 00.00 30 Lead Supp (2020-02)
9a. LXEZ164313, Radon (91), ACM & LBP Test Result, 01-11-17
9b. LXEZ184647, Radon (144), ACM & LBP Test Result, 12-21-18
9c. ACM & LBP Test Results, (59UN), MECCS, 05-19-21
9d. ACM & LBP Test Results, (38UN) MECCS, 03-19-22
File details come from the government source that posted it. Updated .