Drug & Alcohol Compliance Audit Program

STATEMENT OF WORK

BACKGROUND

As a part of the Congressionally-mandated substance abuse management program, within the United States (U.S.) Department of Transportation (DOT), Federal Transit Administration’s (FTA’s) Office of Transit Safety and Oversight (TSO), the Government ensures their grantee’s compliance through a drug and alcohol testing audit program. The program began in 1997. FTA seeks to complete audits on FTA grantees to achieve an optimum mitigation of risk from drug use and alcohol misuse in the transit industry. The contractor provides auditing services, and assists with audit selection, auditor training, transit grantee training, and technical assistance to support the drug and alcohol testing compliance audit program.

The normal audit requirement is for 30 on-site audit trip weeks (audit events) per year with as many as three 5307 grantees and/or larger contractor audits conducted per trip. Approximately 40-50, 5307 urban grantees (and selected contractors) and between six to nine, 5311 rural State Program (with six to nine selected sub-recipients) audits or the equivalent are anticipated in a particular audit year. In general, one State DOT with six to nine sub-recipients, two large 5307 with contractors, or three small (less than 100 safety sensitive employees) grantees are to be audited in an audit event week. The Contractor will support FTA and the USDOT Volpe Center (Volpe), in developing the audit schedule and conducting audits, an industry training conference, internal auditor training, and providing technical assistance each year.

OBJECTIVE

The objective of this requirement is to support the mission and related activities of TSO with a drug and alcohol testing audit and review program to continuously monitor grantees to ensure they and their safety-sensitive contractors, service agents, and sub-recipients meet regulatory requirements; and to provide technical assistance and outreach to the industry. In addition, the objectives are to ensure well trained auditors with consistent application of regulatory requirements and interpretations as well as effective risk management in regards to the audit selection in each contract year.

TASKS

CONTRACT LINE ITEM NUMBER (CLIN) 001 – Conduct Drug and Alcohol Testing Compliance Audits/Reviews

The contractor shall provide the personnel, materials and equipment necessary to conduct 30 audit events (primarily on-site with virtual as needed) for this tasking. The contractor shall support FTA in its planning and oversight efforts to develop a comprehensive drug and alcohol regulatory oversight audit program. This task will address the development and implementation/oversight activities of the audit process. The contractor will conduct 30- audit events (may be virtual) and the audit process will be in 3 phases (Pre-Audit, Audit, Post-Audit).

Task 1: Conduct Drug and Alcohol Testing Compliance Audits The central component of the audit process is the on-site visit by the contractor and a federal representative to the grantee, sub-recipients, safety-sensitive contractors, and service agents. The audit team typically consists of three to five staff; with a duration of typically one week on-site, depending upon size of grantee. The audit process shall be in three phases (Pre-Audit, Audit, Post-Audit). Activities include but are not limited to the following:

· Audit staff will interview grantee personnel, contractor personnel (can require review of multiple safety-sensitive contractors), and service agents for compliance with USDOT and FTA D&A testing regulations (49 CFR Parts 40 & 655).

· The audit staff shall be able to conduct mock collections at contracted and directly operated collection sites and medical facilities. The audit staff will conduct a records review of the custody and control forms and alcohol testing forms of all testing types including pre-employment, random, post-accident, reasonable suspicion, return-to-duty, and follow-up drug and alcohol tests noting any areas of non-compliance. The audit staff shall perform a certification review of service agents and review grantee training.

· The audit staff shall produce a final report (hardcopy and electronic) with FTA cover letter to be provided to the grantee on the day of the audit exit meeting. The contractor will provide hardcopies of the final report (up to a maximum of 12 copies) to each attendee present at the exit meeting, as appropriate. The electronic copy shall be distributed to the FTA Program Manager, the FTA Regional Administrator or Contact, the Drug and Alcohol Compliance Audits Program Manager at the USDOT Volpe Center, the audit’s Federal Representative, and other FTA staff as identified by COR on the evening before the presentation to the grantee or as soon as possible if that is not possible. The electronic copy must also be uploaded to the auditor travel FTA Drug and Alcohol Auditor website.

· The audit team leader is also responsible for uploading all Substance Abuse Management Oversight (SAMO) software elements and follow-up correspondence on the FTA Drug and Alcohol Auditor website. The contractor should use electronic means of storage as much as possible as well as encourage the auditees to respond to the audit findings with scanned material as opposed to hardcopy. Response materials received electronically must be uploaded to the FTA Drug and Alcohol Auditor website site. Any hardcopy materials received must be scanned and uploaded to the FTA Drug and Alcohol Auditor website.

· The audit team will develop and adhere to a process of follow-up phone calls, letters and other communications; technical assistance support with grantees; and interim compliance reports to the grantee. The compliance reports will be of two types: “continuing concerns” or “acknowledgement of compliance.” The scheduled “continuing concerns” letter will take place at FTA/Volpe staff approved successive intervals until compliance is attained. Once compliance is achieved, the “acknowledgement of compliance” letter will be issued. The Federal Representative must provide approval before either letter is issued.

· The electronic compliance reports shall be distributed to the FTA Program Manager, the FTA Regional Administrator or Contact, the Drug and Alcohol Compliance Audits Program Manager at the USDOT Volpe Center, the audit’s Federal Representative and other FTA staff as identified by COR/PM.

· The contractor must also update OTRAK on a quarterly basis with original number of deficiencies from the final audit reports and the subsequent compliance date.

· The contractor shall complete the post-audit phase of the audits currently in process.

· The audit team leader and the federal representative will work in concert to finalize deficiency/finding determinations and language used in the final audit report. The audit team leader shall defer to the federal representative in the event of any disagreement. They may also contact the COR at any time there are questions regarding the content or style of the final audit report.

· The contractor shall independently, and not as an agent of the Government furnish the necessary personnel, labor, equipment (laptops), services, materials, and supplies, except as otherwise noted specifically herein to perform the work set forth below. All work under this contract will be monitored by the Contracting Officer’s Representative (COR).

· The Contractor shall enter travel logistics 45 days prior to commencement of the audit/review into the Drug and Alcohol Program Management/Travel website hosted by the Volpe Center for FTA through the DAMIS Program. The FTA/Volpe Center will establish accounts, and furnish username/passwords for Contractor use.

· The Contractor shall in coordination with the FTA COR/PM and Volpe Center staff, develop the schedule of audits/reviews on an annual basis

CLIN 002 - Conduct Drug and Alcohol Training

· National Conference

The contractor shall provide at least 8 staff members for one national 3-day conference that covers the content of the audits with identified deficiency and compliance trends as well as new best practices, regulatory interpretations and other issues as specified by FTA. The contractor will perform tasks as directed by FTA and may include conducting presentations, monitoring presentations, registration assistance, policy review.

· One-Day Seminars

The contractor shall deliver up to eight one-day, in person, instructor-led seminars on Drug and Alcohol Testing Regulations for transportation employers, safety-sensitive transportation employees and service agents.

· Annual Auditor Team Training

The Contractor shall assist the FTA Program Manager and Volpe Center Staff to conduct an annual two-day training session to update all audit team members (FTA, USDOT Volpe Center and contractor staff) on topics to include but not limited to: new procedures (audit software and travel site), regulations, current processes, lessons learned and current industry trends/issues.

The contractor shall provide materials and topics to the COR 30-45 days prior to the two-day training for review and approval. The COR will provide written comments within 7 days that will be incorporated into the training materials.

CLIN 003 - Annual Audit Planning

The contractor shall assist FTA Program Manager and Volpe Center staff in developing an annual Drug and Alcohol (D&A) grantee recipient audit mix designed to minimize D& A-related risk(s) from the transit industry.

CLIN 004 - Provide Technical Assistance and Program Management Support

The contractor will provide technical assistance to the PM/ COR, FTA HQ, OST Office of D&A Policy & Compliance (ODAPC), FTA regional staff, USDOT Volpe Center, and/or FTA grantees as determined by the COR. This technical assistance will include training, training materials, policy review(s), and auditing support to the above parties in order to facilitate understanding and increase compliance with drug & alcohol testing requirements, regulations, program implementation, interpretations, etc. This is to help FTA and the Department in aiding grantees, their contractors and service agents in achieving compliance and reducing deficiencies outside of the normal D&A auditing process as described in CLIN 0001.

The contractor will provide up to four two-day, on-site Go-Teams for identified issues and/or program management support, as determined by FTA. The team will be comprised of one or two staff members. This shall include associated preparation and follow-up. The Go-Team shall inspect for example national third party administrators (TPA), operations contractors, and collection sites that provide service for FTA-regulated clients. The Go-Teams may also be used to inspect grantees and/or their contractor/service agents on an issues, accident or event basis as determined by the COR.

The contractor will coordinate with the FTA Program Manager and Volpe Center staff to identify and author up to six articles for FTA Regulation updates quarterly newsletter. Topics can include but are not limited to: trending industry issues, common audit findings, regulation updates, amendments and or interpretations, and current industry frequently asked questions. Articles are subject to review and approval by FTA and Volpe staff.

The contractor may also use these resources in part to provide assistance to the COR in developing and prototyping new review techniques and data analysis to more effectively target audits.

CLIN 005: Other Direct Costs (ODCs) and Travel Only

ODCs concerning associated work which are considered allowable and within scope of this requirement shall be billed against this specific CLIN. All travel must be necessary as well as within scope of this requirement. Also, the contractor must adhere to the federal travel regulations concerning per diem etc. All costs associated with this specific CLIN must be supported with documentation such as receipts etc. in order to be considered for review and payment by the Government. The contractor must ensure all materials and ODC’s are within scope of the requirement and all incurred cost are fair and reasonable prior to purchase. An example of an acceptable ODC would be printing of material as requested by FTA. Also, all ODCs must be those in which directly relate to performance of the requirement.

DELIVERABLES AND DELIVERABLE SCHEDULE

Deliverable
Deliverable Due Date
Deliver To

CLIN 0001: Drug and Alcohol Testing Compliance Audits

Phase 1: The Auditor shall develop audit agendas and schedules. The Auditor shall provide a pre-audit notification letter to the grantee.

Phase 2: The Auditor shall produce a final report (hard and electronic copy) with FTA cover letter and response software.

Phase 3: The Auditor will deliver a continuing concerns or final compliance letter to the grantee.

30-90 days prior to audit event

Exit Meeting or last day of audit event

30-90 days after completion of on-site audit event

COR or COR designee via email

Acceptance Criteria: The deliverables will be deemed acceptable for review by the Contracting Officer’s Representative (COR) as Microsoft (MS) Office Word documents.

CLIN 0002: Training

The Auditor shall provide a draft agenda and other meeting materials.

Acceptance Criteria: The deliverables will be deemed acceptable for review by the COR as MS Office Word documents.

30-60 days prior to Training

CLIN 0003: Audit Planning

The Auditor will deliver a final audit schedule no later than 7 days after the audit schedule planning meeting.

The Auditor will establish an FTA OTrak account and enter all final audits into OTrak and the FTA Auditors website.

Acceptance Criteria: The deliverable will be deemed acceptable for review by the COR as MS Office Word documents.

7 days after audit planning meeting

30 days after audit planning session

COR or COR designee via email

CLIN 0004: Technical Assistance and Program Management Support The Auditor will provide technical assistance to include training, training materials, and policy review.

Newsletter topic

Newsletter articles

Acceptance Criteria: The deliverable will be deemed acceptable for review by the COR as MS Office Word documents.

As Assigned

2 weeks after initial request

3 weeks after topics assigned COR or COR designee via email

COR or designee via email

CLIN 005 Travel/ODC

DAILY HOURS OF PERFORMANCE

None

TELEWORKING

All contractor personnel must be telework ready. All work conducted concerning the requirement must be performed within the United States and its territories. Performance sites may include but not limited to the following: the Contractor’s primary or remote offices, FTA HQ office etc.

While working off-site at their own facilities or other off-site locations, contractor personnel must, at all times, follow the identification requirements and observe all safety and security regulations of the location where work is being conducted. In the event of inclement weather, building closures, national emergencies, and/or other events impacting agency needs, the contractor is authorized to telework concerning work discussed and approved by the FTA Contracting Officer’s Representative (COR) and the FTA Contracting Officer (CO). Authorization to telework must be done in writing specifically if for work that is typically performed on-site at FTA Headquarters or periodically at their other off-site location. If some of the work is typically performed on-site periodically at FTA Headquarters or at their off-site company’s location, telework rules and restrictions are at the discretion of the FTA CO whom will consult with the respective FTA COR regarding the technical nature, scope of the work, expectations of work products submitted for review etc. schedule and work assignments must be discussed with the COR and CO prior to commencement of it.

At times, some work may be requested to be properly coordinated for re-scheduling by the contractor for a later date etc. Changes to telework rules and restrictions under special circumstances as previously mentioned such as national emergencies may also be implemented by either verbal direction and followed by an official modification to the contract.

OBSERVANCE OF LEGAL HOLIDAYS, ADMINISTRATIVE LEAVE AND EXCUSED ABSENCES

The Government hereby provides notice and Contractor hereby acknowledges receipt that Government personnel observe the listed days as holidays:

New Year's DayJanuary 1
Martin Luther King's BirthdayThird Monday in January
President’s BirthdayThird Monday in February
Memorial DayLast Monday in May
Independence DayJuly 4
Labor DayFirst Monday in September
Columbus DaySecond Monday in October
Veterans DayNovember 11
Thanksgiving DayFourth Thursday in November
Christmas DayDecember 25
Inauguration DayJanuary 20 every four years

In addition to the days designated as holidays, the Government observes the following days: Any other day designated by Federal Statute, Executive Order or by the President’s Proclamation.

It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel shall not otherwise be a reason for an additional period of performance, or entitlement of compensation. In the event the Contractor's personnel work during the holiday, they may be reimbursed by the Contractor, however, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked. This provision does not preclude reimbursement for authorized premium pay, if applicable to this requirement.

QUALITY ASSURANCE

The Government intends to do quality assurance to monitor the quality and timeliness of the contractor’s performance. The oversight concerning quality assurance from the Government in terms of monitoring will help to ensure that service levels are reached and the required levels are effectively maintained throughout the contract term. Further, the Government’s quality assurance monitoring will provide the COR with a proactive way to avoid unacceptable or deficient performance and provides verifiable input for the required past performance assessment record that will be entered into the Contractor Performance Assessment Reporting System (CPARS). Thus, the contractor must ensure that tasks performed and their deliverables meet the Government’s acceptance.

PERFORMANCE STANDARDS

· The Contractor shall use electronic means of storage. All grantee response in hardcopy shall be scanned for archiving. The audit team leader is also responsible for uploading all audit notifications, final reports, SAMO database elements, auditee follow-up SAMO responses, continuing concerns letters, and compliance letters in the FTA Drug and Alcohol Auditor website.

· The Contractor shall ensure sensitive information is not stored, processed, or transmitted on a publicly available system (via the internet) without the appropriate controls in place and specific authorization from the FTA Chief Information Officer and/or Chief Information Security Officer.

· The Contractor shall not release, publish, or disclose agency information to unauthorized personnel, and shall protect such information in accordance with the provisions of applicable laws and regulations governing the confidentiality of sensitive information.

· Section 508, Compliance of the Rehabilitation Act, requires agencies and their contractors to buy electronic and Information technology that is accessible to people with disabilities.

· The Contractor shall immediately inform the FTA Program Manager and Federal Team Lead, when a grantee is unresponsive or uncooperative to request during any phase of the audit process.

· All Contract personnel attending meetings, answering questions/inquiries, and or working in situations where their contractor status is not obvious to third parties are required to identify themselves as contractors/auditors for the Federal Transit Administration (FTA), to avoid creating an impression in the minds of the public that they are Government officials. They must also ensure all documents or reports produced by the contractor on behalf of the FTA are suitably marked as contractor and sent from the Government issued email address.

· All Contract personnel attending meetings, answering questions/inquiries when not task to do so by FTA will identify themselves as staff of their company and not as contractors/auditors for the Federal Transit Administration (FTA).

· The Contractor shall copy the FTA Program Manager and Volpe Center Drug and Alcohol Compliance Audits Program Manager on all responses to grantees questions/concerns, which occur outside of the normal audit process.

· The Contractor shall use laptops running Windows 10.

REPORTING REQUIREMENTS:

The Contractor shall upload the following documents into the FTA Drug and Alcohol Program Management Auditors Travel Website

REPORT/DOCUMENT FREQUENCY DATE DUE

Audit Notification Letterevery auditOne week after letter delivery
Final Audit Agendabefore every audit Thursday prior to entrance meeting
Audit Information Sheetbefore every audit Thursday prior to entrance meeting
Pre-Audit SAMO exportbefore every audit Thursday prior to entrance meeting

Final Audit Report after every audit prior to audit exit meeting

Continuing Concerns Report as needed per audit 60 days after audit response

Acknowledgement of Compliance after every audit 60 days after audit response

Progress Report monthly 15th of each month

The Contractor shall provide in writing, to the FTA COR, the following submittal with the required information and within the time specified for each report as follows. The reports shall contain, at a minimum, the following information

Project Name

· Description of Project Activity

· Progress of the Project, including period, cumulative and year-to-date costs

· Narrative discussion of work planned for the next month

· Documentation of significant problems encountered, if any

The contractor is expected to perform at the highest levels of professional and technical competence in performing acquisition related tasks to achieve FTA’s stated objectives.

It is expected that the Contractor shall work closely with FTA staff to ensure all assigned tasks conform to the task descriptions and work objectives stated herein. For work, the contracted personnel must be responsive daily, qualified to perform the work at hand and accountable for all work products in a timely manner.

In addition, all work must also meet the following criteria:

• Accuracy – All work shall be accurate in presentation and technical content

• Copy/Edit – All work shall be copy/edited for formatting, properly revised due to its content, style and accuracy.

• Completeness – All work shall be comprehensive and fully developed. All contents shall be well written and submitted on a timely basis 95% of the time.

• Clarity – All work shall be clear and concise free of grammatical and punctuation errors.

• Promptness – The contractor shall report for meetings on time and shall stay for the entire duration.

• Quality Assurance/Quality Control – Contractor shall employ adequate quality assurance/quality control methods to ensure all activities and deliverables meet the performance requirements.

CONTRACT TYPE

Labor Hour

PERIOD OF PERFORMANCE

The period of performance for of this requirement will be one year base period and four one (1) year option periods.

GOVERNMENT FURNISHED PROPERTY, if applicable

Government Issued ID: The contractor shall establish and implement methods of making sure all ID cards issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The contractor shall develop procedures covering ID control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued ID’s by personnel who are no longer required ID’s. The contractor shall immediately report any occurrences of lost or duplicate ID’s to the COR or the Contracting Officer.

The contractor shall prohibit the use of Government issued ID’s by any persons other than the contractor’s employees assigned under the contract.

Government Issued Federal email accounts:

The contractor may be issued a government contractor email account to communicate drug and alcohol audit activities identified herein.

Government Issued Password Protected Account for Drug and Alcohol Auditors Site: The contractor will be issued a password protected account to access the Drug and Alcohol Auditors site. The contractor shall develop procedures to secure the issued password. The contractor shall immediately notify the audit site manager, when the password is lost or forgotten, to be issued a new password.

Other Resource Concerns or Special Conditions, if applicable None

SPECIAL REQUIREMENTS/CONDITIONS

None

OTHER CONSIDERATIONS, if applicable

• The Contractor’s staff shall be required to sign non-disclosure certificate prior to commencing the start of work on this contract;

• Contractor shall be required to ensure that there are no conflicts of interests (either organizational or personal). If any conflict of interests are identified, the contractor must submit an Organizational Conflict of Interest (OCI) Mitigation Plan to the Contract Specialist with copy to the Contracting Officer for his/her review and approval.

-----------------------------------------END OF STATEMENT OF WORK-----------------------------

File details come from the government source that posted it. Updated .