dafi62-601_ 10 Jun 2022.pdf
Department of the Air Force Instruction Jun 10, 2022 PDF 513 KB Posted
- Attached to
- KC-135 Center Console Refresh (CCR)
- Solicitation number
- RFI-06_07Nov22
View the file
Other versions and copies of DAFI 62-601
| File | Revision | Posted | Attached to |
|---|---|---|---|
| dafi62-601_ 10 Jun 2022.pdf Same revision and size as this file | Jun 10, 2022 | KC-135 Center Console Refresh (CCR) | |
| dafi62-601_ 10 Jun 2022.pdf Same revision and size as this file | Jun 10, 2022 | KC-135 Center Console Refresh (CCR) | |
| dafi62-601_ 10 Jun 2022.pdf Same revision and size as this file | Jun 10, 2022 | KC-135 Center Console Refresh (CCR) |
Who attaches DAFI 62-601
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BY ORDER OF THE
SECRETARY OF THE AIR FORCE
DEPARTMENT OF THE AIR FORCE
INSTRUCTION 62-601
10 JUNE 2022
Developmental Engineering
AIRWORTHINESS
COMPLIANCE WITH THIS PUBLICATION IS MANDATORY
ACCESSIBILITY: Publications and forms are available on the e-Publishing website at www.e-Publishing.af.mil for downloading or ordering.
RELEASABILITY: There are no releasability restrictions on this publication.
OPR: SAF/AQRE Certified by: SAF/AQR
(Ms. Kristen J. Baldwin)
Supersedes: AFI 62-601, 11 June 2010 Pages: 25
This Department of the Air Force Instruction (DAFI) implements Department of the Air Force
Policy Directive (DAFPD) 62-6, USAF Airworthiness. It applies to all air systems owned, leased, operated, used, designed, or modified by the United States Space Force, Regular Air Force, the
Air Force Reserve, and the Air National Guard. It applies to the Civil Air Patrol (see paragraph
4.10.2 for exception). Ensure all records generated as a result of processes prescribed in this publication adhere to Air Force Instruction 33-322, Records Management and Information
Governance Program, and are disposed in accordance with the Air Force Records Disposition
Schedule, which is located in the Air Force Records Information Management System. Refer recommended changes and questions about this publication to the office of the Deputy Assistant
Secretary (Science, Technology and Engineering), Engineering & Force Management Division
(SAF/AQRE) using the Air Force Form 847, Recommendation for Change of Publication; route
Air Force Forms 847 from the field through the appropriate functional chain of command. To ensure standardization, any organization supplementing this instruction must send the implementing publication to the Deputy Assistant Secretary (Science, Technology and
Engineering) (SAF/AQR) for review and coordination before publishing. In accordance with the integrated life cycle management chain of authority specified in AFI 63-101_20-101, Integrated
Life Cycle Management, mandates to the program managers and chief engineers in the acquisition execution chain are not considered Wing-level mandates. Therefore, tiering in accordance with
DAFI 90-160, Publications and Forms Management, does not apply to those mandates. When a mandate in this publication does apply to a wing/unit-level organization, the waiver authority is identified with a Tier (“T-0, T-1, T-2, T-3”) number following the compliance statement. Tiered compliance statements may be waived by the authorities identified in DAFI 90-160 with the http://www.e-publishing.af.mil/
2 DAFI62-601 10 JUNE 2022
coordination of the Air Force Technical Airworthiness Authority. Non-tiered compliance items may be waived by SAF/AQ, except items in Chapter 3, which may be waived by the Technical
Airworthiness Authority. Additional guidance on airworthiness process change approval can be found in paragraph 3.10 of this instruction. Acquisition program offices submit waiver requests via their acquisition execution chain, except for waiver requests to Chapter 3 that program offices submit directly to the Technical Airworthiness Authority. Non-program offices submit waiver requests via their command chain to the waiver authority. Compliance with attachments is mandatory.
SUMMARY OF CHANGES
This document has been substantially revised and must be completely reviewed. Major changes include updates to roles, responsibilities, and processes regarding airworthiness assessments and issuance of airworthiness approvals.
DAFI62-601 10 JUNE 2022 3
Chapter 1
AIRWORTHINESS ASSURANCE
1.1. Purpose. Department of Defense (DoD) policy requires all air systems owned, leased, operated, used, designed, or modified by DoD to have an airworthiness assessment and approval.
(T-0) Department of the Air Force (DAF) policy requires a Technical Airworthiness Authority-issued airworthiness approval of any aircraft flight activity directed by the DAF regardless of whether there is an existing approval from another airworthiness authority. The specific need for and timing of an airworthiness approval for a particular flight activity is described in the airworthiness plan for that activity. The Technical Airworthiness Authority performs an airworthiness assessment for the configuration, usage, and operating environment which supports the issuance of an airworthiness approval. If the flight activity has an existing approval from another airworthiness authority recognized as a design authority by the Technical Airworthiness
Authority (e.g., the Federal Aviation Administration or “FAA”), the Technical Airworthiness
Authority assessment is primarily focused on identifying gaps between the existing approvals and the intended configuration, usage, and operating environment. This instruction contains the processes to conduct assessments and to obtain and maintain airworthiness approvals of air systems throughout their lifecycle, enabling safe operations throughout the DAF.
1.2. Applicability. Subject to the exceptions identified in paragraph 4.10, this instruction applies to all air systems that the DAF owns, leases, operates, uses, designs, or modifies. This includes, but is not limited to:
1.2.1. New air systems.
1.2.2. Modifications to air systems with previously issued DAF airworthiness approvals (any change to the form, fit, function, or interface of in-service hardware or software configuration item in accordance with AFI 63-101_20-101). This includes permanent and temporary changes such as service life extensions, carry-on equipment, portable electronic devices, test equipment, and roll-on/roll-off equipment.
1.2.3. Civil air systems, when products or services involving their operation are being procured by the DAF.
1.2.4. Air Force (AF) Security Cooperation and Security Assistance programs.
1.2.5. Foreign-owned air systems on which DAF service members, civilians, or contractors fly as aircrew or passengers.
1.3. Airworthiness Assurance. Airworthiness, as defined in Department of Defense Directive
(DoDD) 5030.61, DoD Airworthiness Policy, is the property of an air system configuration to safely attain, sustain, and complete flight in accordance with approved usage limits. DAF airworthiness provides DAF personnel (to include Service members and civilians) and contractors the appropriate level of safety of flight and risk management adapted to DoD-unique mission requirements. DAF airworthiness activities encompass the entire lifecycle management of air systems, to include design, production, operation, and maintenance.
1.3.1. Design. To ensure airworthy designs, the DAF independently assesses air systems against airworthiness criteria appropriate for the air system type and intended usage. The DAF, when appropriate, issues airworthiness approvals governing air systems and their technical
4 DAFI62-601 10 JUNE 2022
data. The DAF governs this through the Technical Airworthiness Authority and the implementation of this instruction.
1.3.2. Production. The DAF ensures manufacturers evaluate and control their production processes in order to reliably produce each individual air system in accordance with its approved design. The DAF primarily governs this by requiring manufacturers to produce air systems in accordance with industry quality standards and oversight by the program manager.
1.3.3. Operations. The DAF, primarily with 10-series and 11-series publications, ensures air systems are operated in accordance with approved design and associated technical data. The contract or agreement for civil air systems incorporates operations oversight requirements.
1.3.4. Maintenance. The DAF, primarily with 20-series and 21-series publications and the AF
Technical Order System, ensures air systems are maintained in accordance with the approved technical data and program-approved maintenance concept. The contract or agreement for civil air systems incorporates maintenance oversight requirements.
1.4. Airworthiness Authority. The AF Airworthiness Authority oversees airworthiness by relying upon DAF design, production, operations, and maintenance airworthiness assurance activities. The Secretary of the AF has designated the Commander, Air Force Materiel Command, as the AF Airworthiness Authority.
DAFI62-601 10 JUNE 2022 5
Chapter 2
ROLES AND RESPONSIBILITIES
2.1. Assistant Secretary of the Air Force for Acquisition, Technology & Logistics (SAF/AQ).
2.1.1. Is responsible for DAF-level airworthiness policy and instruction.
2.1.2. Provides air system logistics subject matter expert support to assessments of other airworthiness authorities’ assurance systems (see paragraph 4.10.6).
2.2. Air Force Airworthiness Authority, Commander, Air Force Materiel Command.
2.2.1. Develops and oversees compliance with DAF-level airworthiness policy.
2.2.2. Resolves inconsistencies in DAF airworthiness-related policies.
2.2.3. Mediates and resolves airworthiness issues when they arise between stakeholders across
DAF commands.
2.2.4. Coordinates on high airworthiness risks (defined using the matrix in Attachment 2) identified during the airworthiness process, prior to risk acceptance.
2.2.5. Advises major command commanders, field command commanders, combatant commanders, and SAF/AQ, as necessary, on air system grounding matters.
2.2.6. Provides command-level support and resource allocation to enable airworthiness policy implementation.
2.3. Air Force Technical Airworthiness Authority, Director of Engineering and Technical
Management/Services, Air Force Life Cycle Management Center (AFLCMC/EN-EZ).
2.3.1. Is the independent AF technical authority on the design of airworthy air systems.
2.3.2. Advises the AF Airworthiness Authority on airworthiness matters.
2.3.3. Serves as the AF Airworthiness Authority’s subject matter expert to develop AF-level airworthiness policy.
2.3.4. Implements, manages, and controls the design activity of airworthiness.
2.3.4.1. Updates, coordinates, publishes, and distributes Military Handbook (MIL-
HDBK)-516, Airworthiness Certification Criteria. The AF is the preparing activity for this
DoD handbook.
2.3.4.2. Ensures air system program offices incorporate airworthy design practices.
2.3.4.3. Develops and issues bulletins, advisories, circulars, and directives to provide processes and procedures and specific notifications necessary to assess and maintain the airworthiness of air systems.
2.3.4.4. Delegates to certain individuals specific authorities for executing the design activity of airworthiness on the Technical Airworthiness Authority’s behalf.
2.3.4.5. Conducts audits to verify adherence to airworthiness policies, instructions, and procedures.
6 DAFI62-601 10 JUNE 2022
2.3.5. Organizes, trains and equips the engineering workforce to provide expertise and direction to design and independently assess air systems.
2.3.5.1. Develops engineers by providing training, tools, mentoring, resources, and job experiences necessary to develop their technical expertise.
2.3.5.2. Endorses and accredits suitably qualified and experienced individuals to serve as subject matter experts and delegated technical authorities to assist in the execution of the design activity of airworthiness. Defines requirements and conditions of accreditation.
2.3.6. Determines whether air system modifications are airworthiness-related.
2.3.7. Conducts independent airworthiness assessments.
2.3.8. Issues airworthiness approvals, when appropriate.
2.3.9. Conducts initial civil aircraft operations and public aircraft operations assessments for civil air systems, in collaboration with the contract requiring activity.
2.3.10. Determines if Technical Airworthiness Authority-issued airworthiness approvals are required for civil air systems.
2.3.11. Coordinates on risk assessments for serious and high airworthiness risks (defined using the matrix in Attachment 2) identified during the airworthiness process, prior to risk acceptance.
2.3.12. Leads, or participates in, assessments of other airworthiness authorities’ assurance systems (see paragraph 4.10.6).
2.3.13. Serves as the DAF representative to the National Airworthiness Council.
2.3.14. Interfaces with other airworthiness authorities to support formulation of agreements, documents and handbooks, promote process standardization, improve efficiency, and enhance flight safety.
2.3.15. Maintains and utilizes the AF Airworthiness Office, AFLCMC/EZZ
(USAF.Airworthiness.Office@us.af.mil). This office serves as the primary interface to the
Technical Airworthiness Authority.
2.4. Deputy Chief of Staff for Operations (AF/A3). Deputy Chief of Staff for Operations
(AF/A3) ensures any operational policy and implementing direction relating to airworthiness that
AF/A3 issues is consistent with this instruction, to include flight in foreign-owned aircraft guidance (reference paragraph 4.10.6).
2.5. Deputy Chief of Space Operations for Operations, Cyber, and Nuclear
(SF/COO). Deputy Chief of Space Operations for Operations, Cyber, and Nuclear (SF/COO) coordinates United States Space Force participation in DAF airworthiness assurance activities, primarily for air vehicles owned, leased, operated, used, or modified by the Field Commands.
2.6. Deputy Chief of Staff, Logistics, Installations Engineering and Force Protection
(AF/A4). Deputy Chief of Staff, Logistics, Installations Engineering and Force Protection
(AF/A4) designates an AF maintenance policy advisor to ensure implementing direction is consistent with this instruction.
mailto:USAF.Airworthiness.Office@us.af.mil
DAFI62-601 10 JUNE 2022 7
2.7. Chief of Safety (AF/SE).
2.7.1. Works with the Air Force Airworthiness Authority to ensure that safety and airworthiness policies and implementing direction remain consistent.
2.7.2. Collects airworthiness-related flight safety information and makes it available to organizations consistent with safety privilege guidelines.
2.7.3. Provides an annual summary of air system class A mishap reports to the Technical
Airworthiness Authority.
2.7.4. When requested by the Technical Airworthiness Authority, participates in airworthiness assessments.
2.8. Major Command Commanders, Field Command Commanders, and Director, Air
National Guard.
2.8.1. Ensure major command, field command, and Air National Guard policy and implementing direction are consistent with the DAF airworthiness assurance system.
2.8.2. Operate or use only those air systems (including leased or contracted air systems) having a valid Technical Airworthiness Authority-issued airworthiness approval.
2.8.2.1. Prior to approving DAF military, civilians, or contractors to fly on foreign-owned military air systems as aircrew or passengers, confirm the existence of a valid DoD recognition of the applicable foreign Military Airworthiness Authority or complete an operational airworthiness appraisal in accordance with the process defined in the Under
Secretary of Defense for Acquisition and Sustainment (USD(A&S)) Memorandum, Flight in Foreign-Owned Military Aircraft Implementation Guidance, December 1, 2020, available from the AF Airworthiness Office. (T-0)
2.8.2.2. When acquiring products or services using civil air systems, incorporate airworthiness requirements into the contract or agreement to support airworthiness activities.
2.8.2.3. When acquiring products or services using civil air systems, identify individuals to accomplish the activities identified in Chapter 3 (the elements applicable to the specific program) and paragraph 4.3, except for those tasks assigned to the Technical
Airworthiness Authority or subject matter experts.
2.8.3. For non-systems acquisition, interface with the Technical Airworthiness Authority to understand the technical feasibility of conducting proposed contractor operations as civil aircraft operations or public aircraft operations. Evaluate alternatives affecting operating status considering potential program impacts such as requirements, oversight responsibilities, cost, and schedule. If public aircraft operations are proposed, seek legal review from the servicing legal office as appropriate to ensure operations meet and can maintain statutory eligibility requirements for public aircraft status. Confirm with the Technical Airworthiness Authority that the elected alternative is technically feasible.
2.8.4. Only operate or use air systems (including leased or contracted air systems) with qualified aircrew and maintenance personnel in accordance with approved technical data. For civil air systems, incorporate appropriate maintenance and operations oversight requirements into the contract or agreement.
8 DAFI62-601 10 JUNE 2022
2.8.5. Ensure air system operations are consistent with the Technical Airworthiness Authority-issued airworthiness approval(s) and, when applicable, FAA airworthiness certificate(s).
2.8.6. Ensure modifications of assigned air systems are authorized by the air system program manager.
2.8.7. Define the intended operating environment and mission usage for each Mission-Design-
Series. Notify the air system program manager of proposed or planned changes.
2.9. Program Managers (as defined in AFI 63-101_20-101 and AFI 63-138, Acquisition of
Services), science and technology program managers (as referenced in AFI 61-101, Management of Science and Technology), and Test Managers (as defined in DoDI
5000.89_DAFI 99-103, Capabilities-Based Test and Evaluation).
2.9.1. Ensure airworthiness and substantiating data requirements are incorporated into program contractual documents.
2.9.2. Ensure air systems are designed or modified in compliance with airworthiness criteria appropriate for the air system type and intended use.
2.9.3. Obtain and maintain FAA type certification for commercial derivative aircraft acquired or modified by the DAF if the primary mission for the air system is the transport of passengers.
For all other commercial derivative aircraft acquired or modified by the DAF, obtain and maintain FAA type certification to the maximum extent practical.
2.9.4. Obtain Technical Airworthiness Authority coordination on serious and high risk assessments, and AF Airworthiness Authority coordination on high risk assessments, identified during the airworthiness process, prior to seeking risk acceptance. (T-1) Obtain documented acceptance of all risks by the appropriate authority, in accordance with paragraph 3.8, prior to exposing people, equipment, or the environment to known hazards. (T-1) Provide proof of risk acceptance to the Technical Airworthiness Authority. (T-1)
2.9.5. Notify the Technical Airworthiness Authority and the lead and using commands when reasonably confident that a hazard has become a serious or high risk. Notify the AF
Airworthiness Office within 24 hours of a class A mishap.
2.9.6. Obtain Technical Airworthiness Authority-issued airworthiness approvals prior to flight.
2.9.7. Ensure manufacturers evaluate and control production processes to reliably produce each individual air system in accordance with its approved design.
2.9.8. Issue Military Certificates of Airworthiness for individual DAF air systems conforming to the configuration identified in the airworthiness approval and in a condition for safe operation.
2.9.8.1. Establish and execute monitoring and surveillance processes for fielded systems to identify when fielded air systems do not conform to a Technical Airworthiness
Authority-approved configuration or are no longer in a condition for safe operation.
2.9.8.2. Immediately implement risk mitigation activities or revoke the Military
Certificate of Airworthiness of any air system found not to be in a condition for safe operation. Notify the Technical Airworthiness Authority of any revocation of a Military
Certificate of Airworthiness.
DAFI62-601 10 JUNE 2022 9
2.9.9. Interface with the Technical Airworthiness Authority to understand the technical feasibility of conducting planned operations using civil air systems as civil aircraft operations or public aircraft operations. Evaluate alternatives affecting operating status considering potential program impacts such as requirements, oversight responsibilities, cost, and schedule.
Confirm with the Technical Airworthiness Authority and, when appropriate, obtain a legal review from the servicing legal office, that the elected alternative is technically feasible.
2.9.10. Incorporate hazards identified during the airworthiness process into system safety programs.
2.9.11. Maintain and manage air system data and configurations in support of life cycle airworthiness.
2.9.12. Ensure that air systems maintain airworthiness upon removal of temporary modifications and are returned to an approved configuration.
2.10. Chief Engineers (as defined in AFI 63-101_20-101).
2.10.1. Develop and obtain Technical Airworthiness Authority approval of airworthiness plans, certification basis documents, and compliance reports.
2.10.2. When leveraging approvals from other airworthiness authorities (see paragraph
4.1.1.1), manage the integration of subject approvals with the intended DAF unique configuration, usage, and operating environment to ensure a comprehensive airworthiness assessment.
2.10.3. Provide flight test airworthiness hazards, associated risks, and proof of risk acceptance to the lead developmental test organization. Coordinate with the chief developmental tester or test manager to identify and document conditions and operating limitations appropriate for the test environment.
10 DAFI62-601 10 JUNE 2022
Chapter 3
AIRWORTHINESS APPROVAL PROCESS
3.1. Overview. It is DAF policy for program managers to design or modify air systems to comply with appropriate airworthiness criteria, and for the Technical Airworthiness Authority to conduct independent airworthiness assessments which, when successfully completed, result in a Technical
Airworthiness Authority-issued airworthiness approval as identified in the airworthiness plan, prior to flight. (T-1) This chapter describes the process to obtain a Technical Airworthiness
Authority-issued airworthiness approval for all air systems and for modifications that are airworthiness-related.
3.1.1. The Technical Airworthiness Authority may approve changes to this process on a case-by-case basis to address unique program needs (see paragraph 3.10).
3.1.2. DAF organizations that are not program offices (in accordance with AFI 63-101_20-
101) shall assign an individual(s) to accomplish the tasks identified below, except for those tasks assigned to the Technical Airworthiness Authority or subject matter experts. (T-1) Note:
Contact the AF Airworthiness Office for assistance.
3.2. Modification Airworthiness. Modifications typically require execution of the airworthiness process. For this reason, all configuration, usage, operating envelope, and service life changes require an assessment of whether the modification is airworthiness-related. The chief engineer shall document this assessment and obtain Technical Airworthiness Authority approval. This approval should be obtained prior to contract award or contract modification. If a modification is not airworthiness-related, no further airworthiness assessment activity is required.
3.3. Airworthiness Planning.
3.3.1. The chief engineer shall develop an airworthiness plan for the air system or modification, to include:
3.3.1.1. The overall approach to establish and maintain an airworthy air system throughout its service life.
3.3.1.2. The approach to obtain the substantiating data for the airworthiness assessment.
3.3.1.3. A detailed system description and its intended usage.
3.3.1.4. An explanation of how previous AF and non-AF airworthiness approvals and certifications will be leveraged.
3.3.1.5. Identification of required airworthiness assessments and Technical Airworthiness
Authority-issued airworthiness approvals. Typically, programs require incremental airworthiness approvals for conducting flight test, followed by an airworthiness approval for releasing full operational capability. Separate assessments may be required when revising, extending, or incrementally updating airworthiness approvals.
3.3.1.6. A description of the program schedule with respect to airworthiness activities, other airworthiness-related certifications, and interactions with the Technical
Airworthiness Authority and other airworthiness authorities (see paragraph 4.1.1.1).
DAFI62-601 10 JUNE 2022 11
3.3.2. To support program airworthiness planning, the program manager should request airworthiness plans from bidders in the request for proposals.
3.3.3. The chief engineer shall obtain Technical Airworthiness Authority approval of the program’s airworthiness plan prior to contract award.
3.3.4. The program manager shall ensure airworthiness and substantiating data requirements are incorporated into program contractual documents. For Security Cooperation and Security
Assistance programs, the program manager shall coordinate Letters of Offer and Acceptance airworthiness requirements with the Technical Airworthiness Authority.
3.4. Certification Basis Development.
3.4.1. The chief engineer shall develop a certification basis, which includes:
3.4.1.1. A current detailed system description and its intended usage.
3.4.1.2. Identification of portions of air system configuration and operations covered by non-AF airworthiness approvals or certifications.
3.4.1.3. Identification of portions of air system configuration and operations covered by
AF airworthiness approvals.
3.4.1.4. The applicable criteria, standards, and methods of compliance from MIL-HDBK-
516.
3.4.2. The Technical Airworthiness Authority, through the use of subject matter experts, reviews the certification basis. The chief engineer shall obtain Technical Airworthiness
Authority approval of the certification basis. This approval should be obtained prior to System
Requirements Review. The certification basis is revised as necessary over the course of system development; chief engineers must obtain approval of revisions in accordance with this instruction.
3.5. Design Activity. The program manager and chief engineer rely on the expertise of competent engineers to perform design activities and establish compliance to the certification basis to the maximum extent practical. The program manager and chief engineer shall obtain data to provide a substantiation of the design’s compliance to the certification basis, including technical data which enables the continued safe operation and maintenance of the air system.
3.6. Compliance Report Development. The chief engineer shall develop a compliance report, which includes:
3.6.1. The certification basis.
3.6.2. Evidence of leveraged non-AF airworthiness approvals or certifications.
3.6.3. Mapping of substantiating data to each criterion in the certification basis. This includes the technical data which enables the continued safe operation and maintenance.
3.6.4. Assertion from competent engineers that the data shows compliance or non-compliance to each applicable criterion.
3.6.5. Identification of hazards associated with non-compliant criteria and risk levels for those hazards.
12 DAFI62-601 10 JUNE 2022
3.6.5.1. A non-compliant criterion is an indication of a potential safety of flight hazard.
Program managers must eliminate such hazards or obtain acceptance of their event risk by the appropriate authority, prior to airworthiness approval.
3.6.5.2. The chief engineer shall assess airworthiness risks using the methodology defined in MIL-STD-882, DoD Standard Practice – System Safety, and the AF airworthiness risk assessment matrix in Attachment 2. (T-1)
3.6.6. Proposed operating limitations and other mitigating factors, and recommended target risk levels if mitigations are adopted.
3.7. Compliance Assessment. The chief engineer shall request a Technical Airworthiness
Authority assessment of the proposed compliance report.
3.7.1. The Technical Airworthiness Authority, through the use of subject matter experts, assesses and documents findings of compliance or non-compliance.
3.7.2. Subject matter experts identify airworthiness hazards associated with non-compliance, recommend initial risk levels for those hazards, propose possible operating limitations and other mitigating factors, and recommend target risk levels if mitigations are adopted.
3.7.3. The chief engineer shall incorporate any changes resulting from the compliance assessment in the compliance report in order to obtain Technical Airworthiness Authority approval of the compliance report. The Technical Airworthiness Authority approves the compliance report considering the recommendation of the Airworthiness Board.
3.8. Risk Coordination and Decisions. The program manager coordinates with the user representative to determine if proposed mitigating actions to address airworthiness hazards will result in unacceptable impacts to the planned operations and missions. Upon determination of acceptable mitigating actions, the program manager is responsible for documenting the risk assessment and obtaining documented acceptance of event risks by the appropriate risk acceptance authority. The program manager shall obtain Technical Airworthiness Authority coordination on serious and high risk assessments, and AF Airworthiness Authority coordination on high risk assessments, prior to seeking risk acceptance.
3.9. Airworthiness Approval.
3.9.1. The program manager shall provide final operating limitations to the operator by including them in the operational and maintenance technical data or by other standard means.
3.9.2. The program manager shall provide proof of risk acceptance to the Technical
Airworthiness Authority.
3.9.3. The Technical Airworthiness Authority issues the airworthiness approval based on the airworthiness assessment, operational and maintenance technical data, and risk acceptance.
The airworthiness approval may identify operating limitations which mitigate risk.
3.9.3.1. A Military Type Certificate may be issued for an air system design found to be substantially in compliance with a certification basis. Existence of serious or high level risks is evidence the air system is not substantially in compliance. Issuing or retaining a
Military Type Certificate in this circumstance is at the discretion of the Technical
Airworthiness Authority. The Military Type Certificate identifies the air system service life limit.
DAFI62-601 10 JUNE 2022 13
3.9.3.2. A Military Flight Release may be issued for an air system design found to possess more risk than is expected for mature air systems. Military Flight Releases are intended to be issued for air systems engaged in temporary activities (e.g., flight test) and have a finite duration appropriate for the intended activity and validity of risk acceptance. The Military
Flight Release identifies the air system service life limit when appropriate.
3.9.4. The chief engineer shall consult with the Technical Airworthiness Authority to determine the airworthiness plan for revising, updating, or extending airworthiness approvals.
3.10. Process Changes. The Technical Airworthiness Authority may approve specific changes of the process herein on a “by exception” basis to suit a special need or purpose. This may occur, for instance, when a standard airworthiness assessment cannot reasonably be accomplished and a compelling military need to operate the air system exists. Chief engineers shall document requests to change the airworthiness process for their air system, including justification, in the airworthiness plan. Process changes that involve accelerated timelines, limited data, or limited subject matter expertise result in a less than comprehensive assessment, and may also result in:
3.10.1. A higher level of risk requiring acceptance by the appropriate authority.
3.10.2. An airworthiness approval which imposes special operating limits and other mitigating factors and procedures, permitting air system operations for a finite duration under specific circumstances in fulfillment of specific missions at specified locations.
14 DAFI62-601 10 JUNE 2022
Chapter 4
OTHER ACTIVITIES RELATED TO AIRWORTHINESS ASSURANCE
4.1. Leveraging Approvals Issued by Other Airworthiness Authorities.
4.1.1. An AF airworthiness approval may leverage approvals issued by other airworthiness authorities. Regardless of leveraging, a Technical Airworthiness Authority-issued airworthiness approval is required.
4.1.1.1. Air systems approved by the FAA or other DoD airworthiness authorities may be accepted as airworthy when the planned DAF usage is consistent with the existing approved configuration, usage, and operating environment. Use of non-FAA and non-DoD airworthiness approvals require prior Technical Airworthiness Authority approval.
4.1.1.2. It is imperative that the chief engineer manage the integration of leveraged approvals with the intended DAF unique configuration, usage, and operating environment to ensure a comprehensive airworthiness assessment. For example, some military mission equipment may not be fully certifiable under civil regulations; it is incumbent upon the chief engineer to understand the scope of a civil approval and ensure the AF airworthiness approval evaluates the installation, compatibility, and operation of such equipment completely.
4.1.1.3. When leveraging other approvals, the certification basis contains the applicable criteria, standards, and methods of compliance from MIL-HDBK-516 only for the DAF unique configuration, usage and operating environment.
4.1.2. FAA airworthiness certificates (standard or special) are not, by themselves, sufficient to support issuance of an AF airworthiness approval.
4.2. FAA Certification. Civil air systems acquired or modified by the military are commonly referred to as “commercial derivative aircraft.” The DAF has historically preferred the benefits of
FAA type certification for passenger-carrying and commercial derivative aircraft. Program managers shall obtain and maintain FAA type certification for commercial derivative aircraft acquired or modified by the DAF if the primary mission for the air system is the transport of passengers. (T-1) For all other commercial derivative aircraft acquired or modified by the DAF, program managers shall obtain and maintain FAA type certification to the maximum extent practical. (T-1) For more information on the services and type certification processes the FAA provides in support of DAF commercial derivative aircraft, refer to FAA Order 8110.101, Type
Certification Procedures for Military Commercial Derivative Aircraft.
4.3. Civil Air Systems. DAF organizations acquiring products or services involving civil air systems via DAF contract, agreement, or other means (herein referred to as the contract requiring activity) shall obtain Technical Airworthiness Authority-issued airworthiness approval(s) in accordance with the Technical Airworthiness Authority-approved airworthiness plan. (T-0) When acquiring these products or services, the DAF should maximize the use of air systems with proven airworthiness pedigrees. In addition to the airworthiness approval process in Chapter 3 of this instruction, the following are required:
4.3.1. Responsibility. Contract requiring activities that are not program offices (in accordance with AFI 63-101_20-101) will identify an individual(s) to accomplish the tasks identified
DAFI62-601 10 JUNE 2022 15
throughout Chapter 3 (the elements applicable to the specific program) and paragraph 4.3, except for those tasks assigned to the Technical Airworthiness Authority or subject matter experts. (T-1) Note: Contact the AF Airworthiness Office for assistance.
4.3.2. Funding. When the AF Airworthiness Office is involved in the execution of the airworthiness assessment, the AF Airworthiness Office may request the necessary funding to meet program schedules. Contact the AF Airworthiness Office to obtain a cost estimate for required support.
4.3.3. Planning. The contract requiring activity must engage with the AF Airworthiness Office early and continuously through all phases of the acquisition. (T-1) The Technical
Airworthiness Authority will provide technical subject matter expertise. (T-1)
4.3.3.1. The contract requiring activities should contact the Technical Airworthiness
Authority early during market research or solicitation activities to incorporate airworthiness planning into the prospective solicitation (e.g., request for proposals) and contract or agreement.
4.3.3.2. In addition to the content contained in paragraph 3.3, the contract requiring activity shall include in the airworthiness plan:
4.3.3.2.1. A description of how the contract requiring activity intends to use the air system, as required by the contract, including intended modifications, configuration changes, and differences in operational environment that deviate from the existing certificates. (T-1)
4.3.3.2.2. The overall approach to ensuring operations and maintenance oversight for the duration of the contract. (T-1)
4.3.4. Initial Identification of Air System Status Considerations. When planning for a contract, the DAF must identify and evaluate considerations that will impact the feasibility of operating in civil aircraft status.
4.3.4.1. During market research or in the pre-solicitation phase, the contract requiring activity requests from the Technical Airworthiness Authority an initial identification of technical considerations that may impact air system operating status. The contract requiring activity provides necessary information to enable the Technical Airworthiness Authority to identify these considerations. (T-1)
4.3.4.2. The Technical Airworthiness Authority provides an initial evaluation of the technical feasibility of conducting proposed operations using civil air systems in civil aircraft status. This evaluation is accomplished in collaboration with the contract requiring activity, and documents any technical conflicts which may limit or preclude civil aircraft operations under a civil airworthiness approval.
4.3.4.3. Taking into account this initial identification of considerations, the contract requiring activity should evaluate alternatives affecting civil aircraft status or public aircraft status considering potential program impacts such as requirements, oversight responsibilities, cost, and schedule. These alternatives may include exploring deviations or exceptions from the FAA. After evaluation, the contract requiring activity selects a desired alternative.
16 DAFI62-601 10 JUNE 2022
4.3.4.4. Public aircraft status is only available in narrowly defined circumstances. If the contract requiring activity selects an alternative which would involve operations in public aircraft status, the contract requiring activity seeks legal review that the operation meets the statutory eligibility requirements (see Title 49 United States Code § 40102(a)(41) and
40125). (T-1) Note: If public aircraft status is not legally available and operations cannot be conducted as planned in compliant civil aircraft status, the contract requiring activity must re-evaluate alternatives.
4.3.4.5. Following the legal review, the contract requiring activity notifies the Technical
Airworthiness Authority of the outcome of the decisions in paragraphs 4.3.4.3 and 4.3.4.4.
4.3.5. Initial Airworthiness Quick-Look. The Technical Airworthiness Authority, when requested by the contract requiring activity, provides an initial airworthiness quick-look to provide insight into potential risks associated with specific baseline air system designs that may be proposed to fulfill contract requirements.
4.3.5.1. During market research or in the solicitation phase, the contract requiring activity works with the Technical Airworthiness Authority to determine the data required to support an initial airworthiness quick-look. These data may include, but are not limited to, type certification pedigree, current airworthiness certificate(s), known modification history, and mishap history.
4.3.5.2. During source selection, the contract requiring activity should work with the
Technical Airworthiness Authority to understand the potential airworthiness risks associated with the potential air systems. The contract requiring activity, including its safety office, should evaluate the viability of selecting existing air system designs with potential elevated risk level for contract performance. Note: The fidelity of this non-binding initial airworthiness quick-look is contingent upon the information available. The assessment (reference paragraph 4.3.7.1) may identify additional risk(s).
4.3.6. Contracting. The contract requiring activity, working with the contracting officer, incorporates airworthiness requirements and accommodations for public aircraft status, when necessary, into the contract or agreement to support airworthiness activities. (T-1)
4.3.7. Airworthiness Assessment.
4.3.7.1. Technical Airworthiness. The Technical Airworthiness Authority conducts a technical airworthiness assessment with support from the contract requiring activity. The scope of the technical airworthiness assessment is first against the baseline air system and second against the configuration, usage, and environment required by the contract. The assessment of baseline air systems used by the AF may necessitate a tailored airworthiness assessment process in accordance with paragraph 3.10 as approved by the Technical
Airworthiness Authority. Note: It may be prudent to conduct this baseline assessment prior to contract award to support informed decision-making regarding the potential serious or high risks associated with offered air systems (reference paragraph 4.3.5.2).
Modifications and missions required by the DAF contract (agreement or other means) that are conducted beyond the approved technical data shall be assessed in accordance with
Chapter 3. (T-1)
4.3.7.2. Maintenance and Operations. The contract requiring activity shall ensure an initial maintenance and operations airworthiness assessment is conducted to verify the air system
DAFI62-601 10 JUNE 2022 17
is in a condition for safe operation and procedures are established for operations. (T-1)
This assessment may be satisfied by the completion of a pre-award or post-award flight and ground operations/flight safety survey described in AFI 10-220, Contractor’s Flight and Ground Operations, or a suitably equivalent assessment as determined by the
Technical Airworthiness Authority. The contract requiring activity works with the AF
Airworthiness Office to produce an adequate assessment approach. The contract requiring activity shall provide the results of the assessment to the Technical Airworthiness
Authority. (T-1) Note: Contact the AF Airworthiness Office for assistance.
4.3.8. Air System Status Confirmation. The Technical Airworthiness Authority, in collaboration with the contract requiring activity, considers information gathered during the initial identification of air system status considerations (reference paragraph 4.3.4), specific air systems conducting operations required under the awarded contract, and the airworthiness assessments (reference paragraph 4.3.7) to confirm whether the air system status remains valid or should be re-evaluated.
4.3.9. Risk Decisions. Risks associated with hazards identified during the airworthiness assessments are dispositioned in accordance with paragraph 3.8 to support issuance of an airworthiness approval. For high risk assessments, the Technical Airworthiness Authority in collaboration with the contract requiring activity will obtain AF Airworthiness Authority coordination prior to seeking risk acceptance.
4.3.10. Airworthiness Approval. The Technical Airworthiness Authority issues the airworthiness approval in accordance with paragraph 3.9.
4.3.11. Public Aircraft Operations Notification. Flights in public aircraft status shall not occur prior to issuance of an airworthiness approval issued by the Technical Airworthiness Authority and a public aircraft operations declaration letter issued by the contracting officer. Consult
FAA guidance (currently FAA Advisory Circular 00-1.1B, Public Aircraft Operation-Manned and Unmanned) for information about public aircraft operations declaration. Normally, the
Technical Airworthiness Authority-issued airworthiness approval accompanies the public aircraft operations declaration letter when issued by the contracting officer. Note: The contractor is responsible for providing the declaration to its FAA Flight Standards Office. For contracted operations conducted in public aircraft status within the National Airspace System, the contractor carries the declaration letter and the airworthiness approval onboard the aircraft
(or ground control stations for unmanned aircraft systems).
4.3.12. Public aircraft status is only valid for operations conducted within the National
Airspace System. Aircraft status in foreign or international airspace is outside the scope of this
AFI.
4.3.13. Maintenance and Operations Oversight. For public aircraft operations, the contract requiring activity has the responsibility to oversee and enforce contractor compliance with contracted requirements including maintenance and oversight. For civil aircraft operations, the
FAA has the responsibility to oversee and enforce contractor compliance with all FAA regulations.
18 DAFI62-601 10 JUNE 2022
4.4. Risk Management.
4.4.1. Program managers shall incorporate hazards identified during the airworthiness process into the systems engineering system safety hazard tracking process in accordance with AFI 63-
101_20-101, and AFI 91-202, The US Air Force Mishap Prevention Program. (T-1)
4.4.2. For fielded air systems, when the program manager and chief engineer are reasonably confident that an airworthiness hazard has become a serious or high risk, the program manager shall notify the lead and using commands, the risk acceptance authority, and the Technical
Airworthiness Authority. Discovery of an elevated risk may require an airworthiness approval to be revised or updated (reference paragraph 3.9.4) or rescinded (reference paragraph 4.12).
4.4.3. The program manager shall notify the AF Airworthiness Office within 24 hours of a class A mishap.
4.5. Flight Test.
4.5.1. During developmental test and evaluation, non-compliances with MIL-HDBK-516 criteria are expected. The chief engineer shall provide airworthiness hazards and risks to the lead developmental test organization, and coordinate with the chief developmental tester or test manager to identify and document conditions and operating limitations appropriate for the test environment that provide sufficient risk mitigation.
4.5.2. During developmental test and evaluation and operational test and evaluation, when the program manager, chief engineer, and chief developmental tester or test manager are reasonably confident that an airworthiness hazard has become a serious or high risk, the program manager shall notify the Technical Airworthiness Authority.
4.5.3. For science and technology activities, the project manager or cognizant engineer shall provide airworthiness hazards and risks to the lead developmental test organization and coordinate with the test manager to identify and document conditions and operating limitations appropriate for the test environment that provide sufficient risk mitigation.
4.5.4. During science and technology tests, when project managers or cognizant engineers are reasonably confident that an airworthiness hazard has become a serious or high risk, the project manager shall notify the Technical Airworthiness Authority.
4.5.5. Discovery of an elevated risk may require an airworthiness approval to be revised or updated (reference paragraph 3.9.4) or rescinded (reference paragraph 4.12).
4.6. Temporary Modifications. The program manager shall ensure that air systems maintain airworthiness upon removal of temporary modifications and are returned to an approved configuration.
4.7. One Time Flight. In cases when an air system sustains damage which compromises its airworthiness, the Technical Airworthiness Authority may issue a “one time” flight Military Flight
Release for operation of the air system under defined and controlled limitations. The Technical
Airworthiness Authority shall conduct an airworthiness risk assessment, and the program manager shall obtain risk acceptance, prior to issuance of the Military Flight Release. (T-1)
4.8. Grounding. In addition to the air system grounding process and authorities delineated in
AFI 63-101_20-101, the Technical Airworthiness Authority shall notify the Airworthiness
DAFI62-601 10 JUNE 2022 19
Authority following program manager notification of potential high risks leading to a grounding concern. (T-1)
4.9. Production Airworthiness.
4.9.1. The program manager shall require manufacturers to maintain a quality system that ensures that each air system produced conforms to its approved design and is in a condition for safe operation. The program manager shall review the manufacturer’s quality system to ensure it meets contract requirements.
4.9.2. The program manager shall issue a Military Certificate of Airworthiness to individual
DAF air systems conforming to the configuration identified in the airworthiness approval and in a condition for safe operation. The program manager shall identify the service life limit, as defined on the airworthiness approval, on the Military Certificate of Airworthiness. The program manager retains the original Military Certificate of Airworthiness in the program office files.
4.9.3. A copy of the Military Certificate of Airworthiness should be included in the aerospace vehicle’s Air Force Technical Order Form 781-series forms binder.
4.9.4. The Military Certificate of Airworthiness remains in effect for the approved service life as long as the air system conforms to the Technical Airworthiness Authority-approved configuration and is in a condition for safe operation (i.e., properly maintained in accordance with approved maintenance documentation, and the system is operated in accordance with the approved flight manual and within the approved mission usage).
4.10. Special Situations for Operational Airworthiness. The following are unique circumstances where a Technical Airworthiness Authority-issued airworthiness approval is not required:
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .