DAF26BZ05-DV032.pdf
PDF 60 KB Posted
- Attached to
- F-35 Agnostic Rapid Weapons Integration
- Solicitation number
- DAF26BZ05-DV032
About this file
This is a Direct-to-Phase-II (D2P2) solicitation for research and development of a rapid, modular, and scalable weapons integration architecture for the F-35 aircraft. The effort, identified as DAF26BZ05-DV032, focuses on developing a solution on the Open Systems Enclave (OSE) system that reduces weapons integration timelines from three to five years to one to two months (or days in emergency situations). The primary objective addresses Air National Guard (ANG) and Air Force Reserve Command (AFRC) modernization imperatives, specifically extending long-range kill chains and enabling integration of the Extended Range Attack Munition (ERAM) on F-35 aircraft. The effort will be executed under the F-35 program office with PEO Fighters as the long-term owner. The projected Cybersecurity Maturity Model Certification (CMMC) requirement is Level 2 (Self). The technology area is Electronics, with modernization priority in Integrated Network Systems-of-Systems. No Phase I awards will be made under this topic; applicants must demonstrate technical feasibility through prior demonstrations, analogous integration efforts, past performance records, or comparable program outcomes.
The Phase II effort seeks to advance technology from Technology Readiness Level (TRL) 6-7 to TRL 8-9, with awardees required to deliver a hardware/software solution demonstrated on ANG F-35 5th generation aircraft. Key deliverables include detailed architecture and engineering documentation, integration feasibility assessments interfacing with legacy platforms and existing mission systems, extensibility documentation for additional munitions and platform variants, performance data with measured results and validation outputs, realistic development schedules with major milestones and risk registers, and documentation of potential adoption by Active Duty F-35s and other Combat Air Forces (CAF) Open System Enclaves. Phase III envisions transition to the F-35 OSE baseline funded through USAF procurement (3010) or National Guard Regional Efficiency (NGREA) (0350) funds, with scaling to support additional weapons integration across USAF, USN, and Allied strike aircraft. Potential transition partners include ANG & AFRC A5 in conjunction with the Air Force Life Cycle Management Center (AFLCMC), with sustainment through PEO Fighters and Advanced Aircraft. The solicitation is restricted under International Traffic in Arms Regulation (ITAR) and Export Administration Regulation (EAR), requiring disclosure of any proposed foreign national participation. No technical point of contact is provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DAF_SBIR_26BZ_D2P2_R5.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DAF26BZ05-DV032: F-35 Agnostic Rapid Weapons Integration
PROJECTED CMMC LEVEL REQUIREMENT:
Level 2 (Self)
TECHNOLOGY AREAS:
Electronics
MODERNIZATION PRIORITIES:
Integrated Network Systems-of-Systems
KEYWORDS:
Rapidly configurable; Interoperability Solution; Software-Enabled Integration; Open System Enclave; Modern Advanced Munitions; Rapid Weapons Integration; Extended Range Attack Munition (ERAM)
ADDITIONAL INFORMATION
N/A
OBJECTIVE:
This effort is focused on the development of a rapid, modular, and scalable weapons integration architecture, developed on the Open Systems Enclave (OSE) system, that can deploy a broader range of munitions in months (vs years) in order to solve a critical interoperability constraint, increase the capacity of 5th generation platforms;
and enable greater agility, lethality, and dominance. This topic primarily addresses the Air National Guard (ANG) & Air Force Reserve Command (AFRC) "Lethality" Modernization Imperative, specifically extending long-range kill chains to maintain offensive advantage. This effort will be run through the F-35 program office with PEO Fighters as a long-term owner.
This topic seeks modular and scalable weapons integration architecture, developed on the Open Systems Enclave (OSE) system to meet the critical F-35 modernization requirements outlined in the FY26 Air Reserve Component Modernization Book. A fielded solution will enable rapid airframe integration of new munitions, reducing the timeline from three to five years to one to two months (or days in an emergency). The speed of innovation accelerates rapidly when external capabilities are combined with an OSE.
The Air National Guard (ANG) and Air Reserve Component (AFRC) F-35 fleet must be able to integrate new weapons or weapons software updates without the need to code, test, and field entirely new aircraft operational flight programs (OFP). Additionally, ANG & AFRC requires hardware solutions to allow a larger capacity of weapons to be carried to generate the maximum effects on each mission. Both external and internal fires infrastructure must be purchased and integrated, permitting carriage of additional options for kinetic and non-kinetic fires. Successful efforts will result in the development and integration of a hardware/software solution that will be demonstrated on the Air National Guard (ANG) F-35 5th generation aircraft in order to meet the urgent requirement for the integration of an Extended Range Attack Munition (ERAM).
ITAR:
The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with section 3.5 of the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.
DESCRIPTION:
The Department of War recognizes that legacy software airworthiness processes within the Air Force are significantly limiting the ability to field software updates for aircraft on shorter timelines to integrate software updates more rapidly into its warfighting systems. The U.S. faces a critical shortfall in its ability to rapidly deploy new weapons and software. The existing munitions integration process is excessively slow and inflexible, often taking three to five years, preventing the U.S. from effectively countering rapidly specially evolving threats. This problem is especially urgent for employment of solutions from development of Family of Affordable Mass Munitions (FAMM).
The Air National Guard (ANG) and Air Reserve Component (AFRC) F-35 fleet requires non-recurring engineering to support kinetic and non-kinetic fires capabilities and a solution that will enable rapid airframe integration of new munitions to reduce the timeline from three to five years to one to two months (or days in an emergency). The F-35 rapidly runs out of options for fires, after which its mission capabilities are greatly limited. Magazine capacity for both kinetic and non-kinetic fires must be increased. Possibility of future operational flight programs (OFP) divergence necessitates a diversity of fires capability for different blocks of the same aircraft.
PHASE I:
As this is a Direct-to-Phase-II (D2P2) topic, no Phase I awards will be made as a result of this topic. The Air Force expects the applicant(s) to demonstrate feasibility by means of a clear technical path to prototype, integrate, validate, and transition the capability within the proposed period of performance for a modular and scalable weapons integration architecture, developed on the Open Systems Enclave (OSE) system to meet the critical F-35 modernization requirements outlined in the FY26 Air Reserve Component Modernization Book. This should include prior demonstrations, analogous integration efforts, past performance records, or comparable program outcomes that support the Applicant’s claim of technical readiness.
PHASE II:
This effort will seek to advance this technology from a current TRL of 6-7 to a target TRL of 8-9. The Air Force the awardee(s) to demonstrate a clear prototype, by means of a technical pathway to prototype, integrate, validate, and transition the capability on Air National Guard (ANG) F-35 5th generation aircraft.
Activities and tasks may include but may not be limited to:
Development and integration to deliver a hardware/software solution demonstrated on the Air National Guard (ANG) F-35 5th generation aircraft. This effort will enable the Air National Guard Air Force Reserve Component Test Center (AATC) to meet its urgent requirement for the integration of an Extended Range Attack Munition (ERAM) on the F-35 aircraft then the effort will then focus on additional weapons and aircraft.
1.
Awardee(s) will be required to provide documentation demonstrating a detailed description of the proposed architecture, engineering approach, and design methodology demonstrating how the solution enables rapid integration of a broader range of munitions through open, modular, reusable, and standards-based interfaces. - Integration feasibility. This will include a description of the manner in which the proposed solution will interface with legacy platforms, existing mission systems, and relevant test environments, including any assumptions, dependencies, and constraints affecting implementation. 3.
Documentation demonstrating how the proposed architecture may be extended to additional munitions, platform variants, and mission applications with limited redesign or rework. 4. Performance data documentation. This will include measured results, test logs, validation outputs, or benchmark data that quantify system behavior, interoperability, latency, reliability, compatibility, or other relevant performance attributes. 5. Documentation of a realistic development, integration, verification, and demonstration schedule, including major milestones, deliverables, decision points, and dependencies sufficient to support the asserted timeline. This must include development plans, milestone charts, risk registers, or earned progress evidence demonstrating that the proposed timeline is realistic.6. Documentation evidencing that the proposed solution can be potentially adopted by Active Duty F-35s and other Combat Air Forces (CAF) Open System Enclaves.
2.
PHASE III DUAL USE APPLICATIONS:
The Air National Guard & Air Force Reserve Command Test Reserve Center (AATC) has committed to conducting the operation test and evaluation, which supports a higher probability of transitioning to fielding than most other pathway.Add to the F-35 Open System Enclave (OSE) baseline which will be funded for all USAF F-35s using USAF procurement (3010) or NGREA (0350) funds.Once successfully demonstrated on the Air National Guard (ANG) & Air Force Reserve Command (AFRC) F-35, the solution will be scaled to support additional weapons for integration across the USAF, USN and Allied strike aircraft. Once a solution is achieved on the ANG & AFRC F-35, it is expected to be transitioned to Active Duty F-35s and other Combat Air Forces (CAFThe Air National Guard & Air Force Reserve Command Test Reserve Center (AATC) has committed to conducting the operation test and evaluation, which supports a higher probability of transitioning to fielding than most other pathway.
The goal is for this capability to become a component of the F-35 Open System Enclave (OSE) baseline which will be funded for all USAF F-35s using USAF procurement (3010) or NGREA (0350) funds.
Once successfully demonstrated on the Air National Guard (ANG) & Air Force Reserve Command (AFRC) F-35, the solution will be scaled to support additional weapons for integration across the USAF, USN and Allied strike aircraft. Once a solution is achieved on the ANG & AFRC F-35, it is expected to be transitioned to Active Duty F-35s and other Combat Air Forces (CAF) Open System Enclaves.
Potential transition partners include ANG & AFRC A5, in conjunction with Air Force Life Cycle Management Center (AFLCMC). Potential sustainment strategy/Program Executive Office partners include PEO Fighters and Adv Aircraft. Other key stakeholders could include HAF A5/7RAFLCMC EBZ and ARCWERX AATC. Open System Enclaves.
Potential Transition Partner: ANG & AFRC A5, in conjunction with Air Force Life Cycle Management Center (AFLCMC).Sustainment Strategy/Program Executive Office: PEO Fighters and Adv AircraftOther Key Stakeholders:HAF A5/7RAFLCMC EBZAATCARCWERX
REFERENCES:
2026 Weapons Systems Modernization Priorities Book; F-35 Critical Capability1.
2024 ARC WEPTAC Requirement2.
2026 National Defense Strategy3.
Government Accountability Office (GAO) Report GAO-23-105867, "Defense Software Acquisitions:Changes to Requirements, Oversight, and Tools Needed for Weapon Programs," July 2023
4.
United States Senate Committee on Armed Services, "Air Force, Force Structure and Modernization Programs", May 2024
5.
TECHNICAL POINT OF CONTACT (TPOC):
None
File details come from the government source that posted it. Updated .