RLP Exhibit E - Construction Specifications Bid Proposal Worksheet.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- DACA675270004100
About this file
This is a Construction Specifications Bid Proposal Worksheet template for the Recruiting Facilities Program, version 2021-10-15 (REV 1), designed by USACE for lessor/contractor pricing submissions related to retail space leasing for an Armed Forces Career Center in Aberdeen, WA.
The worksheet requires bidders to provide unit pricing across multiple construction and tenant improvement categories organized into the following sections: HVAC/Mechanical and Plumbing systems; Electrical work including interior, exterior, and emergency lighting; Communications infrastructure including conduit and CAT-6 wiring; Safety and Fire Equipment; Architectural Finishes including ceilings, walls, soundproofing, and paint finishes specific to Army, Navy, Marines, Air Force/Space Force, Air Force Reserve, Air National Guard, and Army National Guard occupants; flooring options (porcelain tile, vinyl composition tile, luxury vinyl tile, and carpet); window treatments and hardware; signage (interior and exterior, with service-branch-specific options); security systems including video intercom entry control and CCTV; and miscellaneous items including permits, fees, architectural/design costs, overhead and profit, insurance, tax, and lessor management. The worksheet emphasizes that all entries must comply with construction specifications provided by the USACE Representative and that failure to complete the entire worksheet in its entirety may result in rejection of the offer. The template includes fields for offeror point of contact information, company name, address, phone, email, date, and signature, with a grand total line calculating the aggregate bid amount across all 116 line items.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Recruiting Facilities Program |
| Construction Specifications Bid Proposal Worksheet |
| Version: 2021-10-15 (REV 1) |
| IMPORTANT NOTES: |
| 1) All information supplied by the lessor/contractor on this bid proposal worksheet MUST include ALL appropriate requirements from the construction specifications Appendix provided by the USACE Representative. |
| 2) The entire bid proposal worksheet MUST be filled out in its entirety. Failure to fill out this bid proposal worksheet may result in the overall offer being rejected by USACE. |
| Bid Category | Quantity | $ - Each | Sub-Total | Comments |
| HVAC / Mechanical | 1 | $ 1.00 | $ 1.00 | |
| Plumbing: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Water Fountain | 1 | $ 1.00 | $ 1.00 | |
| Restroom (1) | 1 | $ 1.00 | $ 1.00 | |
| Restroom (2) | 1 | $ 1.00 | $ 1.00 | |
| Janitorial Closet | 1 | $ 1.00 | $ 1.00 | |
| Wet Pantry (if applicable) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Electrical: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Interior Lighting | 1 | $ 1.00 | $ 1.00 | |
| Exterior Lighting | 1 | $ 1.00 | $ 1.00 | |
| Exterior Signage | 1 | $ 1.00 | $ 1.00 | |
| Emergency Lighting | 1 | $ 1.00 | $ 1.00 | |
| Roller Shades | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Communications: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Conduit | 1 | $ 1.00 | $ 1.00 | |
| CAT-6 Wiring | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Safety & Fire Equipment | 1 | $ 1.00 | $ 1.00 | |
| Archetectural Finishes-Fixtures-Supplies: | ||||
| Ceilings | 1 | $ 1.00 | $ 1.00 | |
| Walls | 1 | $ 1.00 | $ 1.00 | |
| Soundproofing | 1 | $ 1.00 | $ 1.00 | |
| Paint: | ||||
| Common Area (Gov't Controlled) | 1 | $ 1.00 | $ 1.00 | |
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Porcelain Tile (wall / floor) | 1 | $ 1.00 | $ 1.00 | |
| Vinyl Composition Tile (VCT) | 1 | $ 1.00 | $ 1.00 | |
| Luxury Vinyl Tile (Air & Army Natl Guard) | 1 | $ 1.00 | $ 1.00 | |
| Carpet: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Base Cove (to include tiled areas) | 1 | $ 1.00 | $ 1.00 | |
| Fragment Retention Film | 1 | $ 1.00 | $ 1.00 | |
| Mini-Blinds | 1 | $ 1.00 | $ 1.00 | |
| Windows | 1 | $ 1.00 | $ 1.00 | |
| Doors | 1 | $ 1.00 | $ 1.00 | |
| Trim Work (chair rail, etc.) | 1 | $ 1.00 | $ 1.00 | |
| Roller Shades | 1 | $ 1.00 | $ 1.00 | |
| Fixed Panel Shade(s) | 1 | $ 1.00 | $ 1.00 | |
| Secondary Exit Door Security Hardware | 1 | $ 1.00 | $ 1.00 | |
| Restroom Fixtures | 1 | $ 1.00 | $ 1.00 | |
| Perforated Window Wrap(s): | ||||
| JRFC (Joint) Graphic | 1 | $ 1.00 | $ 1.00 | |
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Shelving | 1 | $ 1.00 | $ 1.00 | |
| Desk-Top(s) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Signage: | ||||
| Interior Signage: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Restroom(s) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Exterior Signage: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Video Intercom Entry Control System | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Marquee / Pylon Signage | 1 | $ 1.00 | $ 1.00 | |
| Security Systems: | ||||
| Video Intercom Entry Control System: | ||||
| General/System (main parts/wiring/etc.) | 1 | $ 1.00 | $ 1.00 | |
| Door Station(s) | 1 | $ 1.00 | $ 1.00 | |
| Desk Stations (master + sub-masters) | 1 | $ 1.00 | $ 1.00 | |
| CCTV System: | ||||
| General/System (NVR /Wiring / Etc.) | 1 | $ 1.00 | $ 1.00 | |
| Cameras | 1 | $ 1.00 | $ 1.00 | |
| TV Monitor(s) - (office displays) | 1 | $ 1.00 | $ 1.00 | |
| Security Closet | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Permits Fees (all necessary, including low voltage if applicable) | 1 | $ 1.00 | $ 1.00 | |
| Architectural / Design Costs | 1 | $ 1.00 | $ 1.00 | |
| Other Items (define): | ||||
| Overhead and Profit | 1 | $ 1.00 | $ 1.00 | |
| Insurance | 1 | $ 1.00 | $ 1.00 | |
| Tax | 1 | $ 1.00 | $ 1.00 | |
| Lessor Management (if applicable) | 1 | $ 1.00 | $ 1.00 | |
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| BID PROPOSAL - GRAND TOTAL | 1 | $ 1.00 | $ 116.00 |
| Offeror POC Name: |
| Offeror Company Name: |
| Address: |
| Phone: |
| Email: |
| Date: |
| Signature: |
File details come from the government source that posted it. Updated .