This is a Statement of Work (SOW) for fire system inspections, testing, and service at the DEA Office of Training facilities in Quantico, VA. The contractor will perform annual maintenance and preventive maintenance on fire alarm and suppression systems across four buildings: Main Academy, Clandestine Laboratory, Flexible Operations Center, and Raids Trailer.
The scope includes inspection and testing of various fire system components including control panels, NAC/expander panels, pull stations, smoke/duct detectors, fire pumps, flow valves, addressable devices, tamper devices, fire extinguishers, batteries, and system annunciation. Work will be divided into quarterly visits (two for "wet side" and two for electronics) with written reports due within 10 days after each inspection. The contractor must provide 4-hour emergency response for system issues and all replacement parts for electronic field devices. The period of performance is a base year (7/1/2025-6/30/2026) plus four one-year options through 6/30/2030. Special security requirements apply due to the location on Marine Corps Base Quantico, including DBIDS pre-registration and DEA access procedures. The current incumbent is Johnson Controls under Task Order 15DDHQ22F00000744.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Fire System Inspections, Testing, Service
Contract Solicitation Drug Enforcement Administration (DEA)
Office of Training 2500 Investigation Parkway
Quantico, Virginia 22135
1. BACKGROUND
The DEA operates multiple buildings for the purpose of training individuals in all aspects of federal drug law enforcement. There are four buildings which have installed fire alarm and suppression systems. The four buildings are: Main Academy, Clandestine Laboratory, Flexible Operations Center, and the Raids Trailer; located at the DEA Office of Training, 2500 Investigation Parkway, Quantico, VA 22135.
2. OBJECTIVES
Annual maintenance/preventive maintenance to inspect, test, certify, and respond to service requests/deficiencies for the purpose of maintaining the fire system equipment and system in a safe, operational and clean condition in compliance with all applicable standards and regulations. The contractor shall preform annual inspections and testing of all fire system control and communication devices both for the electronic and water-side of the fire system including but not limited to:
Control Panel operation NAC/Expander Panels Pull Stations Smoke and Duct Detectors Fire Pump and Jockey Pump Flow Valves Addressable and Non-Addressable Electronic Devices Tamper Devices Fire Extinguishers Batteries/Power Panels System Annunciation
3. SCOPE
The contractor shall provide all management, supervision, labor, tools, equipment, and replacement parts necessary to maintain the standby generator at its intended capacity, and performance. The Contractor shall maintain the generator equipment and system in a safe, operational and clean condition in compliance with the Applicable Standards and Regulations.
The Contractor shall establish a Monthly Inspection Schedule and conduct inspections to include safety tests and inspections in compliance with the Manufacturers O & M Manual/Maintenance requirements or the minimum maintenance listed in section 4 (the most stringent shall apply). The Contractor shall document each inspection and provide a written report of each inspection to DEA within ten (10) working days after the inspection.
4. TASKS
The Contractor shall establish a Fire System Inspection Schedule to include safety tests and inspections in compliance with the manufacturer’s recommendations.
5. SYSTEM DEVICES AND GUIDES
a. Devices
The following list are devices (some or all) that are incorporated in the 4 DEA locations with fire systems covered in this SOW. Each item is identified with a letter/number.
E-36 Transfer Switch E-43 Lead Acid Battery F-1 Alarm Check Valves and Accessories F-2 & 2A Dry-Pipe, Deluge and Preaction Valves and/or Systems F-4 Fire Control Valves F-7 Fire Pump F-13 Supervisory Signal/s F-14 Automatic Fire Detection F-15A Fire Control Panel F-17 Alarm Boxes F-20 Sprinkler Heads F-22 & 22A Fire Extinguisher F-24 Fire Extinguisher Inspections
Devices not specifically listed may be Nac Panels, Pull Stations, Speakers, Strobes, System Modules, Power Panels, Duct Detectors, and/or Secondary Display Panels
B. Device Guide Information
The Device Guides provided below are generic in nature and not intended to substitute for manufacturer's instructions or to apply uniformly across all types and configurations of equipment and systems installed in Federal Buildings. Therefore, contractor staff and sub-contractors must exercise a measure of caution in the application of these guides, abiding by the industry and manufacturers standards during the performance of procedures.
NOTE: Any reference to Maintenance in the Guides is for information only and is not relevant as there is NO requirement for System Maintenance in this scope.
C. Device Guides
E-36 Automatic Transfer Switch (Fire Pump Only)
Application.
This guide card applies to those devices utilized to automatically switch an electrical supply from its normal source to an alternate or emergency source of power. These devices are normally associated with emergency power generators, but they can also be used to transfer from one commercial power source to another. Multiple devices may be used where Uninterruptable Power Supply (UPS) systems are installed.
Special Instructions.
1. Review manufacturer's instructions on operation and maintenance.
2. Review the switching diagram and the effected electrical systems diagrams.
3. Verify the location of the generator, transfer switches, critical load, and effected operations instructions.
4. Schedule the outage with operating personnel and occupant agency(ies).
Check Points.
1. Check with the effected occupant agency(ies) and request that they determine what equipment will be de-energized.
2. Turn the automatic transfer switch and generator controls off. Tag the control switch.
3. Open and tag out the supply breaker.
4. Open doors on automatic transfer switch and check phase to phase, and phase to ground for the presence of voltage.
5. Clean the inside of the switch cubicle.
6. Tighten all connections, checking for signs of overheated wiring.
7. If applicable, disconnect wires attached to each phase of normal supply, that supplies power to the (E-21) under voltage relays. Test the under voltage relays. After testing relays, reconnect wires.
8. Lubricate mechanism bearings, if required.
9. Locate and disconnect operating mechanism control wires and using a remote voltage source, operate the mechanism.
10. With the mechanism electrically held, use a micro-ohmmeter to check the contact resistance. Make sure the micro-ohmmeter is connected from the normal supply cable connection to the critical load cable connection. Perform the same test on the emergency source.
11. Reconnect the operating mechanism control wires.
12. Clean indicating lenses and change lamps as needed.
13. Restore the transfer switch to its normal position.
14. Check with the effected occupant agency for generator operations.
15. Remove tags and energize the normal supply breaker, picking up the critical load.
16. Remove tags and place the generator controls in the automatic position.
17. Open the normal supply breaker, the generator should start and the transfer switch should transfer the critical load.
18. Close the normal power breaker, the transfer switch should transfer the load and the generator should shut down after a cool down period.
19. Check with the effected occupant agency(ies) to see that normal services have been restored to all areas.
E-43 Lead Acid Battery
Application:
This guide is for batteries used on switch gear, control circuits, fire alarm systems, sprinkler supervisory systems, and transformer supervisory systems where the source of D.C. power must be reliable.
Special Instructions:
1. Use caution in handling the batteries and electrolyte. The electrolyte is injurious to the skin and clothing.
2. Never smoke or carry an open flame in or near the battery room or area.
3. Wear apron, face shield, and gloves.
4. Never remove any connecting cables or straps while charger is on or there is a possibility of a load being on the batteries, (this can cause a spark that may ignite ever present hydrogen gas).
5. Review manufacturer's instructions.
Check points:
1. Check as found voltage and specific gravity for each cell and record date. Check and record the temperature of two cells in each row.
2. When the electrolyte is at the lowest mark, add distilled water to bring it to the proper level.
3. Raise voltage from charger for 8 to 24 hours to give the batteries an equalizing charge.
Then, return to floating rate. 4. Check as left voltage and specific gravity for each cell and record data as above. Compare reading with manufacturer's recommendations.
5. Wipe dirt accumulation from batteries with disposable cloth taking care not to drop foreign matter into batteries.
6. Clean terminals and tighten connections checking condition of wiring.
7. Check battery cable for deterioration, paying special attention to wooden members.
F-1 Alarm Check Valves and Accessories
Special Instructions.
The work required by this procedure may cause the activation of an alarm and/or a supervisory signal (See Guide Card No. F-14). The field office manager and the control center or fire department that will receive the alarm and/or signal must be notified prior to the start of this work.
If drains are not piped to the outside of the building, take the necessary steps to prevent water damage during the full flow drain test. Rate of discharge from 2-inch drain may exceed the capacity of a floor drain. Preventive maintenance should be scheduled for the control valve (main supply) of the wet pipe sprinkler system at this time (see Guide Card Nos. F-3 and F-4). Review the manufacturer's instructions.
Check Points.
1. Record the static pressure (pressure on the supply side gauge).
2. Check for proper water flow through 2-inch drain. If water flow is weak, (considerable drop in water pressure when 2-inch is wide open), supply valves may not be fully open or there may be other piping obstructions.
3. Record the flow full drain residual pressure (lowest pressure on supply side gauge).
4. Close 2-inch drain.
5. Close main supply valve for the sprinkler system, then open 2-inch drain valve.
6. Immediately close drain valve when water pressure on incoming side of alarm check valve has dropped to 10 to 20 psi. If pressure rises within one minute, main supply valve is not seating properly. In such case, open drain valve and alternately open and close supply valve several times in an attempt to flush the valve seat. If not successful, supply valve needs to be repaired.
7. With supply valve open, check operation of alarm check valve, water motor gong and its drain, and all other alarm or supervisory signals, such as water flow paddle alarms, pressure switches, etc. by flowing water through inspector's test both at valve and at remote connection.
8. When applicable, check that excess pressure, booster, jockey, and fire pumps equipped with automatic start feature are operating.
9. Perform any other steps required in manufacturer's instructions.
10. Check that water-flow through water motor gong is stopped to ensure that clapper of alarm check valve is properly seated.
11. Record static pressure (pressure on supply side gauge).
12. Perform internal inspections of alarm check valve when normal testing procedures indicate the need. Examine valve body for tuberculation and check freedom of clapper operation.
Replace clapper facings or resurface seat rings, if necessary.
F-2 Dry-Pipe, Deluge and Preaction Valves and/or Systems
Special Instructions.
In general, it is recommended that the servicing of these valves be entrusted only to personnel experienced in this type of system or qualified representatives of a sprinkler company. The work required by this procedure may cause the activation of an alarm and/or a supervisory signal. All precautions shall be taken to ensure that the building evacuation system is not activated during the testing of these systems or their peripheral devices. The field office manager and the control center or fire department that will receive the alarm and/or signal must be notified prior to the start of this work. The testing of the supervisory features associated with dry-pipe and preaction systems should be coordinated with the device testing.
Check Points.
1. Determine that legible manufacturer's maintenance instructions are posted in a convenient location near the valve.
2. The air pressure on each dry-pipe or preaction valve should be checked and the air replenished when necessary.
NOTE: It is necessary to watch the maintenance of air pressure on these systems carefully. If pressure is lost rapidly, requiring frequent pumping, the piping system should be inspected and made tight.
3. In cold weather, check the valve enclosure to ascertain that it is properly heated and the heating equipment is kept safe and in order.
F-2A Dry-Pipe, Deluge and Preaction Valves and/or Systems
Special Instructions.
In general, it is recommended that the servicing of these valves be entrusted only to personnel experienced in this type of system or qualified representatives of a sprinkler company. The work required by this procedure may cause the activation of an alarm and/or a supervisory signal. All precautions shall be taken to ensure that the building evacuation system is not activated during the testing of these systems or their peripheral devices. The field office manager and the control center or fire department that will receive the alarm and/or signal must be notified prior to the start of this work. The testing of the supervisory features associated with dry-pipe and preaction systems should be coordinated with the F-13 Guide Card. If drains are not piped to the outside of the building, take the necessary steps to prevent water damage during full flow drain test. The rate of discharge may exceed the capacity of floor drain. On preaction and deluge valves, the associated fire detection system must also be serviced (see Guide Card Nos. F-14 and F-15-A).
Whenever possible, the operation of the preaction or deluge valves should be tested by the initiation of the fire detection system using the appropriate simulated fire condition, i.e., heat or smoke. Preventive maintenance should be performed on the control valve (main supply) at this time since its functional purpose can be tested (stop water flow). (See Guide Card Nos. F-3 and F-4). Review the manufacturer's instructions.
Check Points.
1. Determine that legible manufacturer's maintenance instructions are posted in a convenient location near the valve.
2. The air pressure on each dry-pipe or preaction valve should be checked and the air replenished when necessary.
NOTE: It is necessary to watch the maintenance of air pressure on these systems carefully. If pressure is lost rapidly, requiring frequent pumping, the piping system should be inspected and made tight.
3. In cold weather, check the valve enclosure to ascertain that it is properly heated and the heating equipment is kept safe and in order.
4. Before and during freezing weather, all low point drains of dry-pipe systems should be checked and kept free of water.
5. Perform the 2-inch drain test quarterly by opening the 2-inch drain valve fully and recording pressure at the lowest point.
Special Note: Close the 2-inch drain valve and record the pressure at the stabilization point.
Notice whether pressure returns quickly or slowly. Maintain continuous record of drain tests. If recorded pressure when valve is wide open is similar to previous recordings and pressure returns quickly, it is normal. If the recorded pressure when valve is wide open is significantly lower or the pressure is slow to return when the valve is closed, there may be an obstruction in the waterway.
Check for partially closed valves to the sprinkler system. Check:
a. Water pressure
b. Local water flow alarm through bypass connection.
6. Check air pressure, latching mechanisms, automatic drip connections and general condition of the valve, and valve area. Observe operation of drains, valves, valve releases, pressure switches (supervisory air and control valve).
7. Observe operation of water motor gong, and other alarms or supervisory signals such as water-flow paddle alarms.
8. Perform internal inspections of alarm valves when normal testing or resetting procedures indicate the need. At such times:
a. Examine the valve body for tuberculation.
b. Check freedom of clapper operation.
c. Replace clapper facings, as required.
d. Resurface seat rings, as required.
F-4 Fire Control Valves for Interior Water Distribution Systems
The work required by this procedure may cause the activation of an alarm and/or a supervisory signal. Tamper switches may be provided (see guide card number F-13). The office and the control center or fire department that will receive the alarm and/or signal must be notified prior to the start of this work. Most fire system control valves are normally in the open position. If a valve is found to be closed at the time of the inspection, confirmation must be obtained through the buildings manager's office on the proper normal valve position. This work should be done when other scheduled maintenance is being performed that involves water flow through valves (see guide cards number F-1, F-2, and F-3). Review manufacturer's instructions.
Check Points.
1. Remove any obstructions for easy accessibility to the valve.
2. Determine that safe ladders or access ways are in place where needed.
3. Inspect for damage to valve or accessories, including tamper devices.
4. Determine that valve is properly identified.
5. Check that non-rising stem and underground valves are marked with direction in which to open. If not, permanently mark valve with proper direction to open.
6. Lubricate outside stems, and other friction points used for operating valves.
7. Remove any tamper locking devices and completely close (or open) valve. Check that water flow has ceased when valve is closed.
8. Inspect for leaks.
9. Reopen (or close) valve and check for leaks at stem and joints.
10. Replace tamper seals or locks.
F-7 Fire Pumps (Motor or Engine Driven)
Special Instructions.
The work required by this procedure may cause the activation of an alarm and/or a supervisory signal. The office and the control center or fire department that will receive the alarm and/or signal must be notified prior to the start of this work. It is recommended that a yearly test shall be made at full pump capacity and over to make sure that neither the pump nor suction pipe is obstructed.
Check Points.
Electric Motor
This guide is for squirrel-cage, wound rotor and synchronous motors that are 1 horsepower or greater, in size. The maintenance specified by this guide card is not intended to require disassembly of the motor. This guide does not normally apply to motors rated less than 1 horsepower. Maintenance for these motors is normally limited to cleaning and lubrication which is accomplished with the maintenance of the driven machine.
1. Review manufacturer's instructions.
2. De-energize, lock-out, and tag electrical circuits.
3. The maintenance outlined by this guide card should be scheduled to coincide with the maintenance of the driven unit.
Check Points.
1. Check ventilation ports for soil accumulation and clean if necessary.
2. Clean exterior of motor surfaces of soil accumulations.
3. Check motor windings for accumulation of soil. Blow out with air if required.
4. If applicable, lubricate motor bearings in accordance with manufacturer's instructions.
5. Check motor mounts and grounding straps for tightness.
6. Check all electrical connections for tightness, including starters, relays, etc.
7. Remove tags and return to service.
Pump/Jockey Pump
Special Instructions.
1. Review manufacturer's instructions.
2. De-energize, lock-out, and tag electrical circuits.
3. The maintenance outlined by this guide card should be scheduled to coincide with the drive motor maintenance per Guide Card No. M-3.
Check Points.
1. Check that base bolts are securely fastened.
2. After shut down, drain pump housing, check suction and discharge valves for holding.
3. Remove cover, gland, and packing.
4. Inspect impeller vanes and other pump components for corrosion and/or excessive wear.
5. Remove corrosion from impeller, shaft, and housing cover.
6. On pumps with oil ring lubrication, drain oil, flush, and fill to proper oil level with new oil.
7. Clean strainers.
8. Replace packing, "O" rings and gaskets, and reassemble the pump.
9. Start and stop pump, noting vibration, pressure and action of check valve.
10. If applicable, adjust packing.
11. Lubricate impeller shaft bearings, do not over-lubricate.
12. Check drive shaft coupling.
13. Check motor and pump alignment.
F-13 Fire Supervisory Signals - Testing
The work required by this procedure may cause the activation of an alarm and/or a supervisory signal. The office and the control center or fire department that will receive the alarm and/or signal must be notified prior to the start of this work. When feasible the position of valves, air pressure, temperature, or water level being monitored should be altered to actuate the signals.
Check Points.
1. Examine device for corrosion, paint, physical damage and exposure to deteriorating atmospheres.
2. Inspect exposed conduit, EMT, flexible metal conduit, fittings, and all boxes for looseness, loose supports, and/or clamps.
3. Inspect external and internal tamper devices.
4. Check terminals for proper connections (25 percent per quarter).
5. Before testing devices which are connected to auxiliary functions, disconnect or bypass the auxiliary function.
(Note: Testing of supervisory signals shall be coordinated with testing required by the F- 15 series guide cards.)
6. Check for proper contact closure and signal transmission to the fire alarm control panel.
7. Check unit for return to normal after signal transmission.
8. Valve Supervision - the supervisory signal shall be initiated upon a maximum of three complete turns of the valve wheel or closure of ten percent, whichever is less.
9. Air Pressure Supervision-
a. Inspect pressure gauges for any damage.
b. Tap gauge to see if needle is jammed or immovable.
c. Check for proper air pressure.
d. Gradually release air pressure and note pressure at which pressure switch activates signal. When necessary, adjust switch. Re-pressurize the system.
10. Temperature Supervision - mechanically activate temperature switches and check for signal. Adjust if necessary.
11. Water Level Supervision - check float mechanism for corrosion and freedom of movement.
Move float until a signal is received. Adjust if necessary.
F-14 Automatic Fire Detection (Contact Closure, Non-Coded)
Special Instructions.
The work required by this procedure may cause the activation of an alarm and/or a supervisory signal. The office and the control center or fire department that will receive the alarm and/or signal must be notified prior to the start of this work. When it is both feasible and safe, the environmental conditions being monitored should be altered to actuate the device. Check all detection devices for drainage and proper anchorage.
Check Points.
1. Examine device for corrosion, paint, physical damage and exposure to grease or other deposits and/or corrosive atmospheres.
2. Inspect exposed conduit and all back boxes for looseness, and loose hangers and/or clamps.
3. Check all lamps and LEDS including remote annunciators.
4. Check terminals for loose screws, and/or signs of excessive heat.
5. Before testing devices which are connected to auxiliary functions, disconnect or bypass the auxiliary function.
6. Check for proper contact closure and signal transmission to the fire alarm control panel.
7. Check unit for return to normal after alarm/trouble.
8. Check area layout for changes which may affect the operation of the protective device.
9. Photo electric smoke detectors - test by methods recommended by the manufacturer or by blowing smoke into the detector.
10. Ionization type smoke detectors - test by using test equipment available from the manufacturer or aerosol synthetic smoke (containing no coating agents).
11. Duct smoke detectors - test by following manufacturer's recommendations as stated in line items 9 and 10 above. Visually check and clean air sampling devices.
12. Self-restoring temperature detectors - (snap action of bi-metallic strips) test by increasing temperature or mechanically complete the circuit and check for proper signal.
Make adjustments as necessary.
13. Non-restorable temperature detectors - check tension on termostatic cable. Check continuity of circuits by use of test buttons or by mechanically completing circuits. Check for proper signal.
14. Water-flow alarm - wet system - test by opening the inspector's test valve fully to allow full flow until an alarm is indicated at the fire alarm control valve. Allow for retard action -adjust as necessary.
15. Water-flow alarm - dry system - test by opening the alarm test valve adjacent to the alarm valve or tripping the dry-pipe system during an annual test.7/10/92
16. Check indicating alarm devices for physical damage, muffling and proper tone.
17. Check flashing units for flash frequency and/or intermittent operation.
18. Visually check solenoid on electic gongs.
19. General - check other features for activation by the devices through the fire alarm control panel. These features include elevator capture, releasing of fire doors held open, notification of fire department, smoke control, etc.
F-15A Fire Alarm Control Panel - Special Systems
The work required by this procedure may cause the activation of the building fire alarm system and/or central station transmitter. The office and the control center or fire department that will receive the alarm and/or signal must be notified prior to the start of this work. When work requires the actuation of building evacuation systems, the work must be performed after hours and must be coordinated through the area managers’ office to prevent the unnecessary evacuation for the building's occupants. If a test to include actual discharge of the system is desired, special precautions must be taken with the tenant agency to prevent shutdown and discharge during routine work performance and subsequent equipment or software damage. If an actual discharge test is not desired, be sure to prevent gas discharge and ventilation system or computer power shutdown. All necessary arrangements for the above should be coordinated through the Area Manager's Office.
Check Points.
1. Inspect the cabinet for damage (exterior and interior) including locks, door hinges and plastic covers.
2. Check all lamps and LEDS including remote annunciators.
3. Check all fuses.
4. Check power supply output voltage in normal and under load conditions.
5. Check standby battery voltage under load for a minimum of 5 minutes (if applicable).
6. Check battery charge current, to ensure that it is within manufacturer's limits.
7. Check trouble signals by opening all supervised circuits one at a time. (Class A circuits -open two return wires; Class B circuits - open end of-the-line device).
8. Check for proper alarm on all input circuits.
9. Check for return to normal operation after each alarm circuit input.
10. Check for proper reset (either automatic or manual) of the trouble signal when the circuits are closed.
11. Check for proper contact closure and signal transmission for all panel modes of operation
(trouble, alarm, ground, etc.).
12. Check for proper ground fault annunciation where panels have such a feature.
13. Check all meters in the panel for proper operation and deflection.
14. Check modules in panel for signs of heat and deterioration.
15. Check standby batteries (if applicable) for signs of overcharging, heat, or leakage.
16. Clean interior of cabinet.
17. Leave panel in normal operating condition with the door locked. Inform appropriate personnel that testing is complete.
18. Test electrically operated release devices (control heads). Note: Combine release test with detector test.
19. Test manual overrides electrically to cause direct actuation of release devices.
20. Test cross-zoned systems by actuating detectors on alternate circuits to actuate release devices and auxiliary functions. Observe functions as each zone is actuated.
21. Test abort feature by operating the abort approximately in the middle of the time interval.
At the end of the time interval confirm that the aborted functions did not occur.
22. Test the manual override device over the abort feature.
23. Return all circuits and sub-systems to normal. Leave the panel in normal operating condition with the door locked. Inform appropriate personnel that the testing is complete.
F-17 Fire Alarm Boxes, Expander Panels, and Signal Transmitter
Special Instructions.
The work required by this procedure may cause the activation of an alarm and/or supervisory signal. The office and the control center or fire department that will receive the alarm and/or signal must be notified prior to the start of this work. When alarm systems are connected to municipal systems, test signals to be transmitted to them will be limited to those acceptable to that authority.
All results should be recorded.
Check Points.
1. Examine box for corrosion, paint, physical damage, exposure to deteriorating atmospheres and legible box number.
2. Check external tamper devices.
3. Inspect exposed conduit and all back boxes for looseness, loose hangers and/or clamps.
4. Check terminals for proper connections.
5. Before testing boxes which are connected to auxiliary functions, disconnect or bypass such functions.
6. When practical, follow instructions recommended by the manufacturer for actuating the alarm.
7. Check for proper contact closure and signal transmission to the fire alarm control panel.
8. Check and restore unit for return to normal after signal transmission.
9. Check for changes in the area layout which may affect the visibility and accessibility of the box.
10. On systems with shunt non-interfering or positive non-interfering circuits, operate one box and then operate another box on each box loop prior to the completion of the first cycle.
Check for interference at the receiving station or the recording register.
11. On boxes with code wheels, check code wheels for alignment and proper rate of travel as well as drive mechanism (electric or clock type motor).
12. Clean interior of panel and transmitter.
13. Check indicating alarm devices for physical damage, muffling and proper tone.
F-20 Sprinkler Heads - Sprinklered Areas
Special Instructions.
The work should be scheduled immediately prior to the scheduled maintenance on dry pipe valves or alarm check valves (wet pipe). Needed replacement of sprinkler heads should be performed at this time.
Check Points.
1. Inspect and identify damaged, bent, corroded, painted, or weeping sprinkler heads, all of which will need replacement.
2. Remove any insect nests attached to sprinkler heads.
3. Place a light coat of oil on sprinkler heads located in areas conducive to insect nests.
4. For sprinkler heads which are subject to above normal temperature (adjacent to steam pipes, furnaces, ovens, hot gas, vents, exhaust, etc.), check color coding of sprinkler heads for the proper temperature range. Identify the sprinkler heads with improper temperature ranges, all of which will need replacement.
5. Check that a minimum distance of 18 to 36 inches is maintained between sprinkler heads and racks, palletized stock, or other stacked materials.
6. Remove any ladders, stock or material which is being supported by the sprinkler piping.
7. Replace broken pipe hangers and refasten any that have come loose.
8. Check that all water is drained from low points on dry piping systems.
F-22 Fire Extinguisher - Stored Pressure with Gauge
Special Instructions.
Do not pressurize any extinguisher that shows signs of mechanical damage, corrosion, or which has reduced pressure without being discharged. In such cases, release pressure and perform hydrostatic test. (See Guide Card No. F-25).
Check Points.
1. Remove any obstructions to visibility and easy accessibility.
2. Inspect shell for dents, broken hanger attachments or hangers, corrosion at seams, damaged threads, and legible operating instructions.
3. Check for broken seals, bent, damaged, or missing pins, or any other signs that extinguisher has been used or tampered with. Regardless of gauge readings, if seal or tamper device is broken, release pressure (without discharging extinguishing agent) and check for proper level of extinguishing agent. Re-pressurize extinguisher and check for leaks.
4. Tap gauge to see if it is jammed or immovable. Read gauge. If not in operating range, check for leaks and re-pressurize. Inspect gauge casing and crystal for damage.
5. Replace cracked, cut, or brittle hose, and damaged couplings. Remove any obstructions in nozzle or hose.
6. Replace broken seal or tamper indicator. Tag extinguisher and replace on hanger.
F-22A Fire Extinguisher – Hydrostatic Testing
Application.
The purpose of this guide card is to provide for a 6-year internal inspection of stored pressure fire extinguishers constructed with non-stainless-steel shells, in accordance with the requirements of the NFPA Standard Volume 1, Chapter 10.
The work outlined by this guide card in in addition to the annual maintenance (guide card no. F- 22), the monthly inspection
Check Points.
1. Release pressure on extinguisher without discharging extinguishing agent, and dismantle extinguisher.
2. Remove extinguishing agent from inside of shell and hose or nozzle assembly.
3. Examine physical characteristics of extinguishing agent.
4. Inspect inner and outer shell for corrosion, dents, broken hanger attachment, damaged threads, and legible operating instructions.
5. Inspect valve assembly for damaged gauge and handles; corroded, cracked, or blocked siphon tube; corroded or damaged stem and spring; damaged, cut, or brittle "O" rings and seals.
6. Replace cracked, cut, or brittle hose and damaged couplings and nozzles.
7. Reassemble and refill shell to proper level with extinguishing agent and pressurize.
Replace seal or tamper indicator. Tag extinguisher and replace on designated hanger.
F-24 Fire Extinguisher - Inspection
Application.
This guide is for monthly inspection of all fire extinguishers listed in Guide Nos. F-21, F- 22, and F-23, and is in addition to the annual maintenance. The quantity for this guide is the sum of the quantities for Guide Nos. F-21, F-22, and F-23. The work outlined by this guide card is in accordance with the NFPA Standard Volume 1, Check Points.
1. Check that the extinguisher is in its designated place.
2. Check that the extinguisher has not obstruction to access or visibility.
3. Check that the extinguisher operating instructions on nameplate are legible and facing outward.
4. Check that seals and tamper indicators are not broken or missing.
5. Check that extinguisher is full by weighing or "hefting".
6. Examine the extinguisher for obvious physical damage, corrosion, leakage, or clogged nozzle.
7. If applicable, check to see that pressure gauge reading or indicator is in the operable range or position.
6. DELIVERY
The Contractor shall break down the inspection/testing/contract requirements into “wet side” and “Electronics” devices and controls. The two categories shall be divided into 4 quarterly visits , (two for wet side and two for the electronics) and each visit on a different quarter. If needed, the quarterly visits may be scheduled for multiple consecutive business days. The contractor shall provide a copy of the Fire System Inspections schedule to DEA for review and approval. The Contractor shall document each inspection and provide a written report of each inspection to DEA within ten (10) working days after the inspection. The contractor shall be responsible to repair/replace all electronic field devices that compromise the fire systems at the 4 DEA locations. The Contractor shall provide DEA a labor cost per hour for any repairs outside the requirements of this scope including any parts of the fire system that they will charge DEA to repair/replace.
5.1 Deficiencies
Deficiencies shall be reported immediately before leaving the location for the day. The contractor will, on returning to their office, communicate the deficiency and begin the process of providing a timely resolution to DEA. If the correction of the deficiency is covered by this scope then a proposed return date shall be provided as soon as can be scheduled. If the deficiency is not covered by this scope then a quote for the corrective action shall be provided as soon as possible to the DEA Facilities unit and/or POC.
5.2 Service Calls
If a problem/trouble arises that prevents the Fire System from its required coverage or operation then the contractor shall be available to respond within 4 hours after being informed of the condition and be prepared to correct the deficiency unless there are parts/materials that are not immediately available
5.3 Repairs Not Covered by the Scope
The contractor shall provide a timely quote for any upgrade and or addition to the existing fire system as well as the earlier addressed “outside the scope” items. The contractor will provide an estimated time of completion once the quote is approved. The contractor will only provide work, materials, labor or any other resources after being directed in writing by DEA.
7. SECURITY
As the DEA Office of Training is located on the MCB Quantico (MCBQ), there are two separate requirements for access (MCBQ Access and DEA Access) addressed below:
MCBQ Access
• Must pre-register via DBIDS link https://dbids-global.dmdc.mil/enroll#!/
• Must have proper form(s) of identification (see Attachment A - Acceptable forms of identification to gain access to the USMC Base Quantico)
• Must have in their possession valid identification per above, valid vehicle state inspection, valid vehicle registration, and valid proof of insurance
• DEA may provide a temporary DBIDS pass to each contractor employee working on this contract.
DEA Access
• The Contractor must at least three (3) business days prior to arrival on-site, submit a Request for Access form (see Attachment B – Request for Access) for the individual that will be performing the tasks on this SOW.
• The access form(s) must be emailed to the designated DEA Contact by the prime contractor. Sub-contractors may not submit the forms directly to DEA.
• Failure to comply may result in person/s being refused access to the buildings and will not be the Governments responsibility for any costs or delays.
• Contractor may not bill DEA for any missed appointments due to refusal of access at either gate location.
• It is the contractor’s responsibility to provide personnel suitable for access and it will not be the responsibility of the government for any additional costs or delays incurred from the submittal of unsuitable individuals by the contractor or sub-contractor.
• Note: All commercial vehicles needing access to the MCBQ/DEA sites are subject to search at either and/or both locations.
8. SPECIAL MATERIAL REQUIREMENTS
Contractors and vendors are required to strictly adhere to the Occupational Safety and Health Administration (OSHA) 29 CFR 1910.1200 & 1910.106 and Environmental Protection Agency (EPA) 40 CFR 260, 261, 262, 273, and 279 regulations. To ensure the proper storage and management of hazardous materials, solid waste, non-hazardous waste, and hazardous waste brought on-site for use, contractors and vendors must use only the necessary amount of hazardous materials and solid waste materials required on-site for that work day. The contractor shall ensure no excess hazardous materials or solid waste are left onsite after conducting preventive maintenance operations on any DEA property. Once all onsite work is completed, the contractors and vendors shall take all hazardous materials, solid waste, non-hazardous waste, and hazardous waste off-site for disposal. Contractors and vendors are responsible for ensuring their employees are properly trained in hazardous materials and hazardous waste management https://dbids-global.dmdc.mil/enroll#!/ by OSHA 29 CFR 1910.1200, 1910.120, and EPA 40 CFR 262 per state and federal regulations as required at the work site.
9. OTHER UNIQUE REQUIREMENTS
The hours of contractor access will be Monday through Friday, 7:30 am to 4:00 pm. Any special access on weekends and holidays must be coordinated in advance with the appropriate DEA point of contact. All access to the DEA Training Academy will be via the FBI/DEA Training Academy’s West Gate for deliveries and commercial vehicles. Daily personnel, not in a commercial vehicle, will enter through the FBI East Gate. In the event the USMC Base Quantico, the FBI Academy, or DEA closes for any reason, the DEA will not be the responsible for any costs or delays.
10. PLACE OF PERFORMANCE
Drug Enforcement Administration Office of Training located at 2500 Investigation Pkwy, Quantico, VA 22135 and includes:
Main Academy Building Clandestine Laboratory Training & Research Center Flexible Operations Center DEA Raid Trailer
11. PERIOD OF PERFORMANCE
Base year plus four-year option for the following periods:
Base Year 7/1/2025-6/30/2026 1st year 7/1/2026-6/30/2027 2nd year 7/1/2027-6/30/2028 3rd year 7/1/2028-6/30/2029 4th year 7/1/2029-6/30/2030
| STATEMENT OF WORK |
| Fire System Inspections, Testing, Service |
| Contract Solicitation |
| Drug Enforcement Administration (DEA) |
| Quantico, Virginia 22135 |
| F-20 Sprinkler Heads |
File details come from the government source that posted it. Updated .