A02 RAID HOUSE TILE PROJECT SCOPE.pdf
PDF 248 KB Posted
- Attached to
- Tile Repair
- Solicitation number
- D-24-TR-0083
About this file
This document is a Scope of Work (SOW) for a federal contract opportunity to replace approximately 2,000 square feet of tile flooring at the DEA's Raid House on MCB Quantico. The SOW calls for removing the existing self-stick tile, patching and sealing the floor, and installing new luxury vinyl tile flooring. The work is to be completed by September 30, 2024.
The related federal contract opportunity is a Request for Quotation (RFQ) under NAICS code 238340 - Tile and Terrazzo Contractors. The RFQ specifies that this is a Simplified Acquisition under FAR Part 13 and will be awarded to the eligible, responsible offeror with the Lowest Price Technically Acceptable quote. The requirement is set aside for Small Businesses, and a site visit is scheduled for April 22, 2024 at 11:00 AM EST. Quotes are due by April 29, 2024 at 10:00 AM EST and must include pricing and a capability statement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination.pdf | ||
| Request for Access Form.pdf | ||
| USMC Access Control (002).pdf | ||
| A28 - Request for Quote.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
Location: RAID HOUSE TILE PROJECT SCOPE - HOGANS ALLEY LOCATION
Background:
DEA HAS A TILE JOB THAT NEEDS TO BE ACCOMPLISHED IN OUR RAID HOUSE ON MCB
QUANTICO. IT IS APPROX 2000SQ FT OF TILE THAT WILL REPLACE SELF STICK TILE THAT
IS COMING UP.
Description:
WE WOULD LIKE THE FOLLOWING:
• REMOVE ALL OLD TILE.
• PATCH/SMOOTH A FEW DAMAGED AREAS OF THE EXISTING FLOOR
(THE EXISTING FLOOR IS SEALED OSB PLYWOOD)
• ENCAPSULATE AND/OR SEAL THE FLOOR WITH (OR EQUAL)
BOSTIK COTE 985 GYP
BOSTIK COTE 985 ENCAPSULATOR
• APPLY NEW MASTIC AND INSTALL NEW VINYL NON-SLIP TILE “EXPONA LUXURY
VINYL TILE” OR EQUAL
• ADD NEW MOULDING/STAIR NOSES WHERE NEEDED
Rooms Included In The Repair:
• BEDROOMS
• LIVING ROOM
• KITCHEN
• DINING ROOM
• FOYER
• HALLWAYS
• UTILITY ROOM
*NO UTILITY CLOSETS EXCEPT THRESHOLD
SEE ATTACHED FLOOR PLAN AND ACCESS FORM IF YOU ARE INTERESTED IN A WALK
THRU - ALL FLOORS ARE SELF STICK TILE THAT IS COMING UP
Completion Date By 9/30/2024