D1 SOW UPS Contract.docx

DOCX document 40 KB Posted

Attached to
UPS Power and Battery Services (Brand-name or equal)
Solicitation number
75N95024R00120
Issued by

About this file

This document is a Statement of Work (SOW) for a federal contract opportunity issued by the Department of Health and Human Services, National Institutes of Health, National Institute on Drug Abuse.

The SOW outlines the requirement for inspection, preventative maintenance, and service coverage to maintain critical power infrastructure support, including UPS, power, and battery systems, at the NCATS 9800 facility. The period of performance is for one base year and four option years. The key requirements include performing operational inspections, maintaining critical systems, and providing emergency response services. The related federal contract opportunity, Solicitation Number 75N95024R00120, is being competed on a full and open basis. Responses are due by 4 p.m. Eastern Time on August 30, 2024, and the anticipated award date is June 30, 2024. The procurement will be evaluated on technical capability, price, and past performance, with the aim of awarding to the responsible offeror providing the best value.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SERVICES)

(SOW)

GENERAL INFORMATION

Title of Project:

UPS Power and Battery Services

Statement of Need and Purpose:

Inspection, preventative maintenance and service coverage required to maintain critical power infrastructure support to the NCATS 9800 facility for UPS/Power/Battery systems.

Background Information and Objective:

Inspection, preventative maintenance and service coverage required to maintain critical power infrastructure support to the NCATS 9800 facility for UPS/Power/Battery systems. These systems fully support all of the day to day power requirements for the labs, the robotics, the servers, and the administrative areas. Failure to any one of these systems would be devastating to the ongoing research in this facility.

Period of Performance:

The period of performance is for one (1) base year and four (4) option years.

SCOPE OF WORK

General Requirements:

Independently and not as an agent of the Government, the Contractor shall furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government as needed to perform the Statement of Work below:

Specific Requirements:

Inspection, preventative maintenance and service coverage required to maintain critical power infrastructure support to the NCATS 9800 facility for UPS/Power/Battery systems at NCATS 9800 Medical Center Dr. Rockville MD 20850

· Perform operational inspection of unit to confirm proper operation in all modes:

· Cooling

· Reheat

· Dehumidification

· Humidification

· Alarms and indicating lamps

· Econo-cool

· Hot gas bypass

· Inspect air filters and change

· Inspect fan belts and change or adjust as needed

· Lubricate motor bearings at required intervals per manufacturer's specifications

· Inspect humidifier:

· Inspect Quartz lamps

· Clean pan

· Inspect water level and adjust

· Inspect water flow and adjust

· Inspect humidifier water filter

· Inspect semi-hermetic compressor oil levels

· Inspect and confirm proper compressor operation:

· Temperatures

· Pressures

· Amperage

· Voltage (Power)

· Voltage (Control)

· Sound levels and unusual noises

· Inspect refrigerant sight glass:

· Low charge

· Moisture indication

· Inspect evaporator coil

· Inspect evaporator fans and motor for proper operation

· Check supply and return air temperatures

· Check condenser water leaving and entering temperatures

· Check all control set points and adjust as required

· Perform electrical/ microprocessor testing and diagnostics

· Inspect all electrical controls for:

· Visual damage

· Chattering

· Loose connections

· Pitting and heat damage

· Tighten all electrical connections

· Clean condensate pans and pump basins as required by visual inspection

· Clean condensate drains as needed

· Inspect air-cooled condenser/drycooler fans

· Inspect condenser/drycooler coils and clean as needed (once per year)

· Inspect pump packages and expansion tanks

· Change system sequence switches to equalize run times

· Check and adjust, as applicable, hot gas bypass

· Test glycol freeze protection and clarity (once per year)

· Inspect water/glycol cooled condenser end bells for leaks, re-torque bolts (once per year)

· Inspect water regulating valve bellows for leaks and correct

· Proide copy of work order(s) with customer and discuss any necessary follow-ups or recommendations

Additional requirements:

· Four (4) hour emergency service response

· Two (2) service technicians on twenty-four (24) hour emergency service call

· Factory trained service technicians

· Annual condenser coil cleaning

· Humidifier cleaning

· General maintenance and cleaning materials Systems:

Make
Model
Serial
Tag
Room
Notes
Liebert
RXCSB24S3383
M16EDK0034
1785745
B1009
RDC-1
Liebert
RXCSB24S3383
M16EDK0035
1785746
B1009
RDC-2
Liebert
STA0100A32C870
D16D890036
1785586
B1009
STS-1
Liebert
STA0100A32C870
D16D890037
1785587
B1009
STS-2
Liebert
PPA075C234A3383
M16E090375
1785748
B1009
PDU-2
Liebert
PPA075C234A3383
M16E090367
1785749
B1009
PDU-1
Liebert
DS105DUA1EI447S
1781547
B1009
CRAH-1
Liebert
DS105DUA1EI447S
1781550
B1009
CRAH-2
Liebert
47SA040EAC406WN
M21L000917
16416987
B1014
UPS
Liebert
47MBE37AC3R1TDF
M21L000899
16351196
B1014
Battery Cabinet
Liebert
47BPEHC52L101K3
M21L000958
16408904
B1014
Battery Cabinet
Liebert
38SA100A0A01S37
M16E4B0002
1785749
B1023
UPS-1

Liebert

1785752
B1023
BATT CAB-1
Liebert
38SA100A0A01S37
M16E4B0001
1785750
B1023
UPS-2

Liebert

1785751
B1023
BATT CAB-2
Liebert
38SA060A0A00
M16DCI0012
1785588
B1023
UPS-3

Liebert

1785589
B1023
BATT CAB-3

Liebert

1785590
B1023
Maintenance Bypass
Liebert
CW038DC1A2S742
N16C150044
1781546
B1023
CRAH-3
Liebert
38SA060A0A00
1012002662143050000
1697029
C332
UPS

Liebert

1697028
C332
Battery Cabinet
Liebert
47SA010A2CF0A04
M15K530029
1759969
C332
Maintenance Bypass
Liebert
MCL110E8ADG050
Y16CAZ0085
Roof
Condensing Unit
Liebert
MCL110E8ADG050
Y16CAZ0084
Roof
Condensing Unit
Eaton
93PM-200 SAIC-B
EP455UXX06
NA
C121W
UPS
Eaton
93PM IBC-LW
FP464VXX04
NA
C121W
Battery Cabinet
Eaton
93PM IBC-LW
FP464VXX04
NA
C121W
Battery Cabinet

LEVEL OF EFFORT:

NA

GOVERNMENT RESPONSIBILITIES

NCATS will provide access to the facility

DELIVERY OR DELIVERABLES

NCATS equipment will continue to operate per OEM specifications

REPORTING REQUIREMENTS

Contractor will report any unusual findings from each visit

OTHER CONSIDERATIONS

Travel:

NCATS is not responsible for travel

Key Personnel:

Information System Security Plan:

Data Rights:

Section 508—Electronic and Information Technology Standards:

Publications and Publicity:

Confidentiality of Information: