D1 SOW UPS Contract.docx
DOCX document 40 KB Posted
- Solicitation number
- 75N95024R00120
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity issued by the Department of Health and Human Services, National Institutes of Health, National Institute on Drug Abuse.
The SOW outlines the requirement for inspection, preventative maintenance, and service coverage to maintain critical power infrastructure support, including UPS, power, and battery systems, at the NCATS 9800 facility. The period of performance is for one base year and four option years. The key requirements include performing operational inspections, maintaining critical systems, and providing emergency response services. The related federal contract opportunity, Solicitation Number 75N95024R00120, is being competed on a full and open basis. Responses are due by 4 p.m. Eastern Time on August 30, 2024, and the anticipated award date is June 30, 2024. The procurement will be evaluated on technical capability, price, and past performance, with the aim of awarding to the responsible offeror providing the best value.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SERVICES)
(SOW)
GENERAL INFORMATION
Title of Project:
UPS Power and Battery Services
Statement of Need and Purpose:
Inspection, preventative maintenance and service coverage required to maintain critical power infrastructure support to the NCATS 9800 facility for UPS/Power/Battery systems.
Background Information and Objective:
Inspection, preventative maintenance and service coverage required to maintain critical power infrastructure support to the NCATS 9800 facility for UPS/Power/Battery systems. These systems fully support all of the day to day power requirements for the labs, the robotics, the servers, and the administrative areas. Failure to any one of these systems would be devastating to the ongoing research in this facility.
Period of Performance:
The period of performance is for one (1) base year and four (4) option years.
SCOPE OF WORK
General Requirements:
Independently and not as an agent of the Government, the Contractor shall furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government as needed to perform the Statement of Work below:
Specific Requirements:
Inspection, preventative maintenance and service coverage required to maintain critical power infrastructure support to the NCATS 9800 facility for UPS/Power/Battery systems at NCATS 9800 Medical Center Dr. Rockville MD 20850
· Perform operational inspection of unit to confirm proper operation in all modes:
· Cooling
· Reheat
· Dehumidification
· Humidification
· Alarms and indicating lamps
· Econo-cool
· Hot gas bypass
· Inspect air filters and change
· Inspect fan belts and change or adjust as needed
· Lubricate motor bearings at required intervals per manufacturer's specifications
· Inspect humidifier:
· Inspect Quartz lamps
· Clean pan
· Inspect water level and adjust
· Inspect water flow and adjust
· Inspect humidifier water filter
· Inspect semi-hermetic compressor oil levels
· Inspect and confirm proper compressor operation:
· Temperatures
· Pressures
· Amperage
· Voltage (Power)
· Voltage (Control)
· Sound levels and unusual noises
· Inspect refrigerant sight glass:
· Low charge
· Moisture indication
· Inspect evaporator coil
· Inspect evaporator fans and motor for proper operation
· Check supply and return air temperatures
· Check condenser water leaving and entering temperatures
· Check all control set points and adjust as required
· Perform electrical/ microprocessor testing and diagnostics
· Inspect all electrical controls for:
· Visual damage
· Chattering
· Loose connections
· Pitting and heat damage
· Tighten all electrical connections
· Clean condensate pans and pump basins as required by visual inspection
· Clean condensate drains as needed
· Inspect air-cooled condenser/drycooler fans
· Inspect condenser/drycooler coils and clean as needed (once per year)
· Inspect pump packages and expansion tanks
· Change system sequence switches to equalize run times
· Check and adjust, as applicable, hot gas bypass
· Test glycol freeze protection and clarity (once per year)
· Inspect water/glycol cooled condenser end bells for leaks, re-torque bolts (once per year)
· Inspect water regulating valve bellows for leaks and correct
· Proide copy of work order(s) with customer and discuss any necessary follow-ups or recommendations
Additional requirements:
· Four (4) hour emergency service response
· Two (2) service technicians on twenty-four (24) hour emergency service call
· Factory trained service technicians
· Annual condenser coil cleaning
· Humidifier cleaning
· General maintenance and cleaning materials Systems:
| Make |
| Model |
| Serial |
| Tag |
| Room |
| Notes |
| Liebert |
| RXCSB24S3383 |
| M16EDK0034 |
| 1785745 |
| B1009 |
| RDC-1 |
| Liebert |
| RXCSB24S3383 |
| M16EDK0035 |
| 1785746 |
| B1009 |
| RDC-2 |
| Liebert |
| STA0100A32C870 |
| D16D890036 |
| 1785586 |
| B1009 |
| STS-1 |
| Liebert |
| STA0100A32C870 |
| D16D890037 |
| 1785587 |
| B1009 |
| STS-2 |
| Liebert |
| PPA075C234A3383 |
| M16E090375 |
| 1785748 |
| B1009 |
| PDU-2 |
| Liebert |
| PPA075C234A3383 |
| M16E090367 |
| 1785749 |
| B1009 |
| PDU-1 |
| Liebert |
| DS105DUA1EI447S |
| 1781547 |
| B1009 |
| CRAH-1 |
| Liebert |
| DS105DUA1EI447S |
| 1781550 |
| B1009 |
| CRAH-2 |
| Liebert |
| 47SA040EAC406WN |
| M21L000917 |
| 16416987 |
| B1014 |
| UPS |
| Liebert |
| 47MBE37AC3R1TDF |
| M21L000899 |
| 16351196 |
| B1014 |
| Battery Cabinet |
| Liebert |
| 47BPEHC52L101K3 |
| M21L000958 |
| 16408904 |
| B1014 |
| Battery Cabinet |
| Liebert |
| 38SA100A0A01S37 |
| M16E4B0002 |
| 1785749 |
| B1023 |
| UPS-1 |
Liebert
| 1785752 |
| B1023 |
| BATT CAB-1 |
| Liebert |
| 38SA100A0A01S37 |
| M16E4B0001 |
| 1785750 |
| B1023 |
| UPS-2 |
Liebert
| 1785751 |
| B1023 |
| BATT CAB-2 |
| Liebert |
| 38SA060A0A00 |
| M16DCI0012 |
| 1785588 |
| B1023 |
| UPS-3 |
Liebert
| 1785589 |
| B1023 |
| BATT CAB-3 |
Liebert
| 1785590 |
| B1023 |
| Maintenance Bypass |
| Liebert |
| CW038DC1A2S742 |
| N16C150044 |
| 1781546 |
| B1023 |
| CRAH-3 |
| Liebert |
| 38SA060A0A00 |
| 1012002662143050000 |
| 1697029 |
| C332 |
| UPS |
Liebert
| 1697028 |
| C332 |
| Battery Cabinet |
| Liebert |
| 47SA010A2CF0A04 |
| M15K530029 |
| 1759969 |
| C332 |
| Maintenance Bypass |
| Liebert |
| MCL110E8ADG050 |
| Y16CAZ0085 |
| Roof |
| Condensing Unit |
| Liebert |
| MCL110E8ADG050 |
| Y16CAZ0084 |
| Roof |
| Condensing Unit |
| Eaton |
| 93PM-200 SAIC-B |
| EP455UXX06 |
| NA |
| C121W |
| UPS |
| Eaton |
| 93PM IBC-LW |
| FP464VXX04 |
| NA |
| C121W |
| Battery Cabinet |
| Eaton |
| 93PM IBC-LW |
| FP464VXX04 |
| NA |
| C121W |
| Battery Cabinet |
LEVEL OF EFFORT:
NA
GOVERNMENT RESPONSIBILITIES
NCATS will provide access to the facility
DELIVERY OR DELIVERABLES
NCATS equipment will continue to operate per OEM specifications
REPORTING REQUIREMENTS
Contractor will report any unusual findings from each visit
OTHER CONSIDERATIONS
Travel:
NCATS is not responsible for travel
Key Personnel:
Information System Security Plan:
Data Rights:
Section 508—Electronic and Information Technology Standards:
Publications and Publicity:
Confidentiality of Information:
Version 11-30-2016-1 FAR Part 11—Describing Agency Needs
File details come from the government source that posted it. Updated .