This Statement of Work (SOW) outlines requirements for investigating and repairing the geothermal heating system at the Rocky Mountain Arsenal National Wildlife Refuge Visitor Center in Commerce City, CO. The project involves examining 25 vertical well loop lines (400' deep) on the north side of the building that have experienced significant glycol loss over recent years, along with tracking down and identifying all interior and exterior leaks in the system that was installed in 2011.

The contractor must pressure test the exterior geothermal system including the wells and manifold lines, locate all leaks, and provide cost estimates and solutions for repairs. The project timeline spans 60 days total from award, with key milestones including an initial kickoff conference within 7 days of award, submission of investigation findings report within 45 days, and final documents executed by day 60. The SOW includes detailed site maps and technical drawings showing the geothermal loop field layout and construction details. Site visits are required before bidding, and prospective bidders will be evaluated on engineer involvement, price, ability to meet deadlines, and locality.

View the file

Other files

File Type Posted
Sol_140FC225Q0004.pdf PDF
D03_WD_CO20240015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

US FISH AND WILDLIFE SERVICE REGION 6

Geothermal Investigation for the Repair of the Geothermal Heating Systems at the

Rocky Mountain Arsenal Visitor Center, CO 24-027

December 18, 2024

I. PROJECT BACKGROUND

The Rocky Mountain Arsenal (RMA) National Wildlife Refuge is one of the largest urban refuges in the country, 14,904 acres. It is a sanctuary away from the hustle and bustle of busy urban life where time moves at nature's pace. With its expansive views, wildlife viewing opportunities, and recreation activities, it's easy to take a nature escape. RMA National Wildlife Refuge was established in 2004, in part, to protect our national symbol, the bald eagle. The land has a unique story - it has survived the test of time and transitioned from farmland, to war-time manufacturing site, to wildlife sanctuary. It may be one of the finest conservation success stories and a place where wildlife thrives.

The RMA Visitor Center built in 2011 and has a Geothermal Heat Pump system needs repair, the system often leaks throughout the interior of the Visitor Center. Staff also believes there are leaks on the exterior of the building.

The system is comprised of (25) Vertical Well Loop Lines (400’ deep) located on the North side of the building and will need to be examined for possible leaks as the staff has noted significant glycol loss in the current system over the last few years.

II. PROJECT SCOPE

The contractor shall track down and identify all leaks present in the interior of the building and propose solutions and cost estimates for the repair of those leaks. Pressure test the exterior geothermal system to include the (25) wells and line from manifold to wells to locate existing leak(s) and then provide cost estimates and solutions to repair those leaks.

Site Location:

1. Rocky Mountain Arsenal (RMA) Visitor Center: 6550 Gateway Road, Commerce City, CO 80222.

III. ADDITIONAL INFORMATION

Access to site will be arranged with the Refuge Manager. Utility locates are the responsibility of the contractor.

IV. CONFERENCES AND REVIEWS

The Initial Conference shall be held within seven (7) days of Notice to Proceed as directed by the Contracting Officer.

V. SUBMISSION OF PROPOSAL

Submit a Technical and Cost Proposal for all work required in this Statement of Work.

Provide breakout for all work required, such as field work, deliverables, incidentals, transportation, and any other costs.

The Prospective Bidders will be evaluated on engineer involvement in field work, price, ability to meet deadlines, and locality.

Prospective bidders are urged to visit the site and become familiar with existing conditions and ascertain the conditions which affect the work. Failure of the successful bidder to visit the site prior to submitting a bid or proposal on this work will not relieve the successful bidder from completing the project at the bid price. Prospective bidders must make site inspection arrangements with the Station Manager (David Lucas) at RMA Visitor Center, Phone (303) 729-2202.

https://www.bing.com/local?lid=YN873x4725486821702218223&id=YN873x4725486821702218223&q=Great+Plains+Nature+Center&name=Great+Plains+Nature+Center&cp=37.737579345703125%7e-97.26410675048828&ppois=37.737579345703125_-97.26410675048828_Great+Plains+Nature+Center https://www.bing.com/local?lid=YN873x4725486821702218223&id=YN873x4725486821702218223&q=Great+Plains+Nature+Center&name=Great+Plains+Nature+Center&cp=37.737579345703125%7e-97.26410675048828&ppois=37.737579345703125_-97.26410675048828_Great+Plains+Nature+Center

VI. SCHEDULE

Milestone Estimated Interval/ Duration in Calendar Days

Cumulative Time

Award Contract Task Order Award Date (Time 0) 0 Initial Kickoff Conference 7 days after Award Date 7 Title I: Investigation and Document Preparation Written Report with Investigation and Analysis Findings Received by USFWS

38 days after Initial Kickoff Conference

Written Report Review Conference

7 days after Written Report Received by USFWS

Final Documents Executed 8 days after Final Design Documents Completed

TOTAL 60 days

VII. DESIGNATED OFFICIALS

A. U.S. Fish and Wildlife Service, Contracting Officer Phone: TBD E-Mail: TBD

B. Project Architect

Carl Loescher Phone: 303-335-6651 E-Mail: carl_loescher@fws.gov

Alternate Project Engineer Eddie Dunn Phone: 719-225-5014 E-Mail: edward_dunn@fws.gov mailto:carl_loescher@fws.gov mailto:edward_dunn@fws.gov

C. RMA Refuge Manager

Davids Lucas Phone: 303-729-2202 E-Mail: david_c_lucas@fws.gov

VIII. ATTACHMENTS

1. RMA Visitor Center Site Map

2. Geo-Thermal Loop Field

3. Geo-Thermal Details

END OF STATEMENT OF WORK

RMA Visitor Center Site Map

RMA Visitor Center Mechanical Loop Field

RMA Visitor Center Geo-Thermal Details

RMA Visitor Center Geo-Thermal Details

The Rocky Mountain Arsenal (RMA) National Wildlife Refuge is one of the largest urban refuges in the country, 14,904 acres. It is a sanctuary away from the hustle and bustle of busy urban life where time moves at nature's pace. With its expansive view...
The RMA Visitor Center built in 2011 and has a Geothermal Heat Pump system needs repair, the system often leaks throughout the interior of the Visitor Center. Staff also believes there are leaks on the exterior of the building.
The system is comprised of (25) Vertical Well Loop Lines (400’ deep) located on the North side of the building and will need to be examined for possible leaks as the staff has noted significant glycol loss in the current system over the last few years.
The contractor shall track down and identify all leaks present in the interior of the building and propose solutions and cost estimates for the repair of those leaks. Pressure test the exterior geothermal system to include the (25) wells and line fro...