D006642 Addendum 1.pdf
PDF 2 MB Posted
- Attached to
- Perimeter Security Upgrades
- Solicitation number
- 2138973
- Issued by
- Niagara County, New York
About this file
This Addendum 1, issued October 8, 2026, by the New York State Office of Parks, Recreation and Historic Preservation—Niagara Region, provides revisions and clarifications to the bid documents for the Niagara Falls State Park Perimeter Security Upgrades project (D006642). The pre-bid meeting was held on September 28, 2026, at 11:00 a.m. at Niagara Falls State Park Community Room. The project scope includes furnishing and installation of active vehicle barriers, gate operators with associated foundations and electrical work, crash-rated bollards and foundations, native quarried limestone boulders, asphalt pavement milling and paving, and associated landscape improvements. Construction work is restricted during high-volume park visitation weekends and holidays, with specific planting and clearing restrictions: no work April 15–June 15 (spring planting), no work August 15–November 15 (fall planting), no seeding outside March 16–September 30, and no tree clearing or removal April 1–October 31. Requests for Information (RFIs) were due October 2, 2026, at 4:00 p.m., and sealed bids are due October 15, 2026, at 10:30 a.m. via email to western.capital.procurement@parks.ny.gov, with public opening via WebEx at 11:00 a.m. the same day. Project completion is 365 days from contract approval by the New York State Comptroller's Office, with estimated substantial completion October 27, 2027, and estimated contract end date November 27, 2027.
The estimated contract value is $1,408,107 to $1,905,086 for a lump-sum prime contract. Bid security of $82,850 is required, with liquidated damages set at $1,750 per day of project delay. MWBE participation goals are established at 7% for Minority-Owned Business Enterprises and 18% for Women-Owned Business Enterprises; a responsible and reliable MWBE firm submitting within ten percent of the lowest bid will be deemed the apparent low bidder provided the bid does not exceed $1,737,918. This is a prevailing wage job. Contractors and subcontractors must register with the New York State Bureau of Public Work and Prevailing Wage Enforcement under Labor Law Article 8 prior to bidding; digital copies of registration certificates must be submitted with bids at opening, and failure to provide them results in automatic disqualification. Bidders must acknowledge receipt of all addenda on the bid form or face disqualification. Addendum 1 incorporates the pre-bid meeting sign-in sheet, a revised Site Details drawing sheet (L301A), and responses to three RFIs addressing asphalt mix types, gate and barrier specifications, and site coordination issues including bedrock depth variations, staging locations, and construction fencing details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D006642 NTB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kathy Hochul Kathy Moser John Honan Governor Commissioner Western Capital District Manager
New York State Office of Parks, Recreation and Historic Preservation - Niagara Region PO Box 1132, Niagara Falls, NY 14303 (716) 278-1770 www.nysparks.com
ADDENDUM 1
JOB NAME AND PROJECT NUMBER
Niagara Falls State Park Perimeter Security Upgrades General D006642
DATE: October 8, 2026
ALL BIDDERS SUBMITTING A BID FOR THE ABOVE-NAMED PROJECT SHALL TAKE NOTE OF THE
FOLLOWING CHANGES, ADDITIONS, INTERPRETATIONS, CLARIFICATIONS, ETC. IN CONNECTION WITH THE DRAWINGS AND SPECIFICATIONS AND OTHER BID DOCUMENTS. THE FOLLOWING INSTRUCTIONS HAVE PRECEDENCE OVER ANYTHING CONTRARILY SHOWN ON THE DRAWINGS OR DESCRIBED IN THE SPECIFICATION DOCUMENTS, AND ALL SUCH INFORMATION SHALL BE TAKEN INTO CONSIDERATION AND BE INCLUDED IN THE BIDDERS BID AMOUNT. ACKNOWLEDGE RECEIPT OF THIS ADDENDUM BY INSERTING ITS NUMBER AND DATE IN THE SPACE PROVIDED IN THE BID FORM. FAILURE TO DO SO
MAY SUBJECT BIDDER TO DISQUALIFICATION.
Summary of Addendum Items:
ITEM #1 - Included with Addendum 1 are the pre-bid meeting agenda and sign-in sheet held on September 28, 2026, at the Niagara Falls State Park- Community Room.
ITEM #2 - The following sheet listed below shall supersede and replace the previously issued sheet and is hereby incorporated into the bid documents. Bidders shall utilize this revised sheet in the preparation of their bids.
Sheet Number Drawing Page Title L301A Site Details
ITEM #3 – Attached with this Addendum are the RFI’s received with responses.
END OF ADDENDUM 1
Niagara Falls State Park Perimeter Security Upgrades 332 Prospect St., Niagara Falls NY 14303
Project No. D006642 - General Construction Meeting Date: Sept. 28, 2026, at 11:00am Location: Niagara Falls SP- Community Room
All information provided during this meeting is for information only and is intended to be helpful. Any information discussed or presented at this meeting does not, and cannot, alter the contract documents. The contract drawings and project manual can only be modified via addendum. Technical questions from potential bidders must be submitted in the form of an RFI prior to the RFI due date. Bidders must register with NYS Parks to ensure receipt of any project addenda. Bids which do not acknowledge receipt of addenda will be disqualified.
Pre-Bid Meeting Agenda:
1. Introductions
2. Project Narrative:
The project includes implementation of security improvements at Niagara Falls State Park. Work includes furnishing and installation of active vehicle barriers, gate operator and associated foundations and electrical work, asphalt pavement milling and paving, crash-rated bollards and foundations, native quarried limestone boulders, and associated landscape improvements.
3. Project Scope of Work:
· Temporary pedestrian and vehicular access signs.
· Tree protection. Protection shall include avoidance of disturbance to tree root zones.
· Site preparation, selective demolition and removals
· Installation of temporary facilities and controls.
· Furnishing and installation of active gate barriers and gate operator.
· Furnishing and installation of crash-rated bollards and bollard covers.
· Furnishing and installation of native quarried limestone boulders.
· Reinforced cast-in-place concrete foundations.
· Electrical work.
· Cast-in-place concrete.
· Earthwork and grading
· Milling and paving of asphalt pavement.
· Amendment of existing lawn or planted areas with approved topsoil and compost for plantings and lawn restoration.
· Landscape planting, including trees and shrubs
· Care for and maintenance of trees, shrubs and lawn until completion of contract.
· Provision of an 18-month guarantee for plantings with an additional 12-month guarantee for replacements
· Other Work indicated in the Contract Documents
4. Proposed Construction Schedule: (Project Completion is 365 days from Contract Approval by the NYS Comptroller’s Office)
· Estimated Contract Approval & Construction Start: 11/26
· Estimated Substantial Completion: 10/27
· Estimated Contract End Date: 11/27
5. Type of Contract: Lump Sum Prime Contract
6. Estimated Contract Value: $1,408,107 to $1,905,086
7. Overview of the Project Manual and Drawings:
D006642 General Construction
· Notice to Bidders
· Bid Form (Contractors to submit their Bids on the respective Bid Form as provided including the
NEW Gender-Based Violence and Workplace Certification) Effective November 5, 2025, State Finance Law § 139-m requires all vendors bidding on New York State contracts to implement and attest to a Gender-Based Violence and the Workplace policy. This policy must be in place for a bid to be considered.
· Alternates: No Alternates
· Bid Security: $82,850
· Project Allowance: $78,850
· Liquidated Damages: $1,750 for each day of project delay
· MWBE Goals (7% MBE / 18% WBE)
· Wage Rates (this is a prevailing wage rate job)
· Contractor Registry Requirement- Newly established subsection 220-i to
NYS Labor Law Article 8 requires contractors and subcontractors to register with the Bureau of Public Work and Prevailing Wage Enforcement for public work. Contractors must complete registration prior to bidding on public work projects covered under Article 8 of Labor Law. Bidders must prove they are registered at the time of bid opening by submitting a digital copy of their company’s registration certificate with their bid. Failure to provide the registration certificate at bid opening will result in automatic disqualification. The apparent low bidder will additionally be held responsible to provide copies of registration certificates for all subcontractors on their approved Utilization Plan before subcontractors commence work.
· Pursuant to Public Buildings Law § 8(6), effective January 11, 2020, for any projects where the project design commenced on or after January 1, 2020 and for any contracts over $5,000 for the work of construction, reconstruction, alteration, repair, or improvement of any State building, a responsible and reliable NYS-certified Minority or Women-Owned Business Enterprise that submits a bid within ten percent of the lowest bid will be deemed the apparent low bidder provided that the bid is $1,737,918 or less, adjusted annually for inflation as of March 1, 2026. If more than one responsible and reliable MWBE firm meets these requirements, the MWBE firm with the lowest bid will be deemed the apparent low bidder.
8. General Information:
a) Bidders are reminded to thoroughly review the drawings and specifications to obtain a complete understanding of the entire project scope. Existing restrictions and regulations will not be considered as grounds for additional cost over bid price.
· Instructions to Bidders
· Spec. Section 011000 – Summary of Work o Project information o Work covered by Contract Documents o Contractor's use of site and premises o Work restrictions
- No work will be allowed on the following high-volume park visitation weekends and holidays (Contractor to bid the project with this in mind and account for these non-workdays within the base bid price)
- Comply with the following construction date restrictions:
Spring Planting Period April 15th – June 15th
Fall Planting Period August 15th – November 15th
Seeding March 16th – September 30th
No tree clearing and removal April 1st – October 31st o Specification and Drawing Conventions o Miscellaneous provisions
· Spec Section 020105- Maintenance and Protection of Traffic and Site Visitors
· Spec Section 028100- Off-Site Transportation and Disposal
· Others:
o Archaeology monitoring will be required for the electrical trenching work for Goat Island. Parks will hire the monitor but will require coordination with the contractor on scheduling this work.
b) RFI Schedule:
· RFI’s are due on 10/2/26 at 4pm. RFI’s received after this time and date will not be processed and bidders will have to bid the project as documented.
· Questions as they relate to the Contract documents are to be forwarded via e-mail to Eleanor Gaddi (eleanor.gaddi@parks.ny.gov) on the RFI Form provided in the project manual.
· The RFI response will be communicated by Addendum to all bidders who have obtained drawings and specifications.
c) Bid Opening:
· Bids shall be sent via email to western.capital.procurement@parks.ny.gov.
· Deadline for bid submission is 10:30 AM local time, 10/15/26 and will be publicly opened and read via Webex at 11:00 AM local time, 10/15/26.
· The Bid opening will be conducted ONLY via WebEx at the link listed below:
https://meetny-gov.webex.com/meetny-gov/j.php?MTID=mf2a5a5046a3e6550ed79c80844e844c2
· Late bids will not be eligible for consideration.
89 123467 5
A
B
D
E
F
G
H
C
123456789
Description Date
REVISIONS
Rev No
Drawn By:
Design By:
Checked By:
Date:
Approved By:
09/01/26
Project Number:
D006642
Sheet Title: Drawing Number:
Seal and Signature
Project Title:
Niagara Falls State Park Perimeter Security Upgrades
Project Location:
Key Plan
332 Prospect St Niagara Falls, NY 14303
IT IS A VIOLATION OF STATE EDUCATION LAW FOR ANY PERSON, UNLESS UNDER THE DIRECTION OF A LICENSED ARCHITECT/ENGINEER TO ALTER THIS DOCUMENT IN ANYWAY. ALTERATIONS MUST HAVE THE SEAL AFFIXED ALONG WITH A DESCRIPTION OF THE ALTERATIONS, DATE AND ARCHITECT'S/ENGINEER'S
SIGNATURE. COPYRIGHT ©
Western District - Niagara Region
Governor Kathy Hochul Commissioner Kathy Moser
DeVeaux Woods State Park | Kenan Castellani Building
3160 Deveaux Woods Drive, Niagara Falls NY 14305
Sheet:
SS
JH
EG
EG
SITE DETAILS
L301A
1 CONSTRUCTION LIMIT FENCE
SCALE: NTS 2 STABILIZED CONSTRUCTION ENTRANCE
SCALE: NTS
PLAN VIEW
PROFILE
'M
IN
'M
IN
' M
IN
50'MIN.
6" M
IN
50'MIN.
12'MIN.
MOUNTABLE BERM
(OPTIONAL)
CONSTRUCTION SPECIFICATIONS
1. STONE SIZE - USE 2" STONE, OR RECLAIMED OR RECYCLED CONCRETE
EQUIVALENT.
2. LENGTH - NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE LOT
WHERE A 30 FOOT MINIMUM LENGTH WOULD APPLY).
3. THICKNESS - NOT LESS THAN SIX (6) INCHES.
4. WIDTH - TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH
AT POINTS WHERE INGRESS OR EGRESS OCCURS. TWENTY-FOUR (24)
FOOT IF SINGLE ENTRANCE TO SITE.
5. FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO
PLACING OF STONE.
6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD
CON- STRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF
PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE
PERMITTED.
7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION
WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC
RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED OR
TRACTED ONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVED
IMMEDIATELY.
8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON A AREA STABILIZED
WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT
TRAPPING DEVICE.
9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED
AFTER EACH
EXISTING PAVEMENTEXISTING GROUND
FILTER CLOTH
EXISTING GROUND
EXISTING
PAVEMENT
3 STABILIZED SOIL STOCKPILE
SCALE: NTS
NOTES:
1. AREA CHOSEN FOR STOCKPILING OPERATIONS SHALL BE DRY, STABILIZED AND LOCATED
AWAY FROM KNOWN WORK AREAS TO PREVENT RELOCATION.
2. MAXIMUM STOCKPILE HEIGHT SHALL BE 12 FEET.
3. EACH PILE SHALL BE SURROUNDED WITH SILT FENCING, INSTALLED PER SILT FENCE
DETAIL, THEN STABILIZED IN ACCORDANCE WITH THE NYSDEC STANDARD.
4. A PERIMETER DIKE/SWALE SHALL BE LOCATED UP-SLOPE OF THE TOPSOIL STOCKPILE TO
DIVERT STORMWATER AROUND THE STOCKPILE.
SILT FENCE
10' MIN. 2 MAX
4 SILT FENCE
SCALE: NTS
8" M
IN
FLO
W
FLO
W
10' MAX. C. TO C.
4"
16"M
IN.
FLOW
20"M
IN.
SECTION VIEW
PERSPECTIVE
VIEW
CONSTRUCTION SPECIFICATIONS
1. WOVEN WIRE FENCE TO BE
FASTENED SECURELY TO FENCE
POSTS WITH WIRE TIES OR
STAPLES. POSTS SHALL BE STEEL
EITHER "T" OR "U" TYPE OR
HARDWOOD.
2. FILTER CLOTH TO BE TO BE
FASTENED SECURELY TO WOVEN
WIRE FENCE WITH TIES SPACED
EVERY 24" AT TOP AND MID SECTION.
FENCE SHALL BE WOVEN WIRE, 12 1/2
GAUGE, 6" MAXIMUM MESH OPENING.
3. WHEN TWO SECTIONS OF FILTER
CLOTH ADJOIN EACH OTHER THEY
SHALL BE OVER- LAPPED BY SIX
INCHES AND FOLDED. FILTER CLOTH
SHALL BE EITHER FILTER X, MIRAFI
100X, STABILINKA T140N, OR
APPROVED EQUIVALENT.
4. PREFABRICATED UNITS SHALL BE
GEOFAB, ENVIROFENCE, OR
APPROVED EQUIVALENT.
5. MAINTENANCE SHALL BE
PERFORMED AS NEEDED AND
MATERIAL REMOVED WHEN
"BULGES" DEVELOP IN THE SILT
FENCE.
WOVEN WIRE FENCE (MIN. 14 1/2
GAUGE W/ MAX. 6" MESH SPACING)
WITH FILTER CLOTH
EMBED FILTER CLOTH A MIN. OF
6" IN GROUND.
36" MIN. LENGTH FENCE POSTS
DRIVEN MIN. 16" INTO GROUND.
WOVEN WIRE FENCE (MIN. 14 1/2
GAUGE W/ MAX. 6" MESH SPACING)
36" MIN. FENCE POST
UNDISTURBED GROUND
COMPACTED SOIL
5 INLET PROTECTION
SCALE: NTS
NOTE:
SEDIMENT FILTER LOGS SHALL BE
SECURED TO THE SOIL SURFACE
WITH WOODEN POSTS SPACED A
MAXIMUM OF 2' APART. WHEN
USED ON A PAVED SURFACE, THE
LOG ENDS SHALL BE FASTENED
WITH PLASTIC TIES OR IN
ACCORDANCE WITH
MANUFACTURER'S
RECOMMENDATIONS.
MEASURES SHALL BE INSPECTED
AFTER EVERY RUNOFF EVENT
AND REPAIRED AS NECESSARY.
SEDIMENT SHALL BE REMOVED
WHEN IT REACHES ONE-HALF
MEASURE HEIGHT (STORAFE
CAPACITY). SEDIMENT SHALL BE
DISPOSED OF AS UNSUITABLE
MATERIALS.
NOMINAL 2X2
WOOD POST
SEDIMENT
FILTER LOG 3"
T O
DRAINAGE
STRUCTURE
WALL
(M
AX
12" MIN.
6 TREE PROTECTION FENCE
SCALE: NTS
CROWN DRIP LINE OR OTHER LIMIT OF TREE PROTECTION AREA.
SEE SITE PREPARATION AND DEMO PLAN FOR FENCE ALIGNMENT.
MAINTAIN EXISTING
GRADE WITH THE TREE
PROTECTION FENCE
UNLESS OTHERWISE
INDICATED ON THE
PLANS.
2" X 6' STEEL POSTS
OR APPROVED EQUAL.
TREE PROTECTION
FENCE: HIGH DENSITY
POLYETHYLENE
FENCING
WITH 3.5" X 1.5"
OPENINGS; COLOR-
ORANGE. STEEL POSTS
INSTALLED AT 8' O.C.
5" THICK
LAYER OF MULCH.
NOTES:
1- SEE SPECIFICATIONS FOR ADDITIONAL TREE PROTECTION REQUIREMENTS.
2- IF THERE IS NO EXISTING IRRIGATION, SEE SPECIFICATIONS FOR WATERING REQUIREMENTS.
3- NO PRUNING SHALL BE PERFORMED EXCEPT BY APPROVED ARBORIST.
4- NO EQUIPMENT SHALL OPERATE INSIDE THE PROTECTIVE FENCING INCLUDING DURING FENCE INSTALLATION AND REMOVAL.
5- SEE SITE PREPARATION PLAN FOR ANY MODIFICATIONS WITH THE TREE PROTECTION AREA.
SECTION VIEW
4'- 0"
PLAN VIEW
7 ASPHALT TRAIL
SCALE: NTS
12"
3"
9"
NOTE: * DIMENSIONS
GIVEN ON PLAN ARE
TAKEN FROM EDGE OF
ASPHALT TOP COURSE.
CURB OR WALL AS
SHOWN
MIN. 1/4"PER FT.
CROSS SLOPETOPSOIL MIN. 6"
FINISHED GRADE, EQUAL
COMPACTED SUBGRADE, FREE
OF TOPSOIL
SOIL STABILIZATION FABRIC
6"6"
VA
RI
ES
6"
3"
TACK-COAT EDGE OF ADJACENT PAVEMENT/ CURB PRIOR TO PLACING ASPHALT
COURSES
EXISTING ASPHALT PAVEMENT
ASPHALT TOP COURSE OVERLAY
3" ASPHALT BINDER COURSE
FLUSH
CRUSHED
AGGREGATE
BACKFILL
BEDDING
MATERIAL
UTILITY LINE
PER PLAN
UNDISTURBED SUBGRADE
NOTES:
9 ASPHALT REPAIR AT UTIL. TRENCHES
SCALE: NTS
6"
"-3 2"
H
IG
H
3.5' - 4.5' LONG
QUARRY BLOCK BOULDER
NOTES:
1. NATIVE STONE TYPES: NATIVE IS DEFINED AS QUARRIED FROM THE NIAGARA ESCARPMENT; QUARRIES AND
SUPPLIERS MAY BE FOUND IN NEW YORK, ONTARIO, MICHIGAN, AND WISCONSIN.
2. QUARRIED LIMESTONE BOULDERS: PROVIDE NATIVE QUARRIED LIMESTONE BOULDERS IN A RANGE OF PLEASING SHAPES AND SIZES.ALL SIDES OF NATIVE QUARRIED LIMESTONE ARE TO BE ANGULAR IN NATURAL
APPEARANCE. NO SMOOTH SURFACES.
3. APPROXIMATE BOULDER DIMENSIONS:
-- NATIVE LIMESTONE BOULDERS SHALL BE APPROXIMATELY 2 TONS MINIMUM EACH, WITH TYPICAL DIMENSIONS OF 3.5' - 4.5' LONG, 2.5'-3' WIDE X 3'-3.5' HIGH. BOULDERS SHALL HAVE BROAD IRREGULAR
BASES AND BE PARTIALLY EMBEDDED 6" BELOW FINISHED GRADE.
4. STONE PLACEMENT NOTES:
-- DIRECTOR'S REPRESENTATIVE TO DETERMINE FINAL PLACEMENT OF ALL BOULDERS IN THE FIELD AND
WILL OVERSEE INSTALLATION. ARRANGEMENTS SHOWN ON PLANS SHOW GENERAL DESIGN INTENT, BUT THE CONTRACTOR SHALL EXPECT THAT DIRECTOR'S REPRESENTATIVE WILL USE THEIR ARTISTIC LICENSE. CONTRACTOR SHALL BE FLEXIBLE AND COOPERATE IN WORKING WITH THE DIRECTOR'S
REPRESENTATIVE TO ACHIEVE A PLEASING COMPOSITION.
* TAKE CARE WHILE TRANSPORTING AND PLACING BOULDERS TO AVOID CHIPPING AND CRACKING. BOULDERS
WITH CRACKS WILL BE REJECTED AT THE SITE.
FINISHED GRADE, LAWN WITH 6" TOPSOIL
10 LIMESTONE BOULDERS
SCALE: NTS
6" BASE COURSE
(NYSDOT ITEM 304.11, TYPE 2) 2 1/2" ASPHALT BINDER COURSE
(NYSDOT ITEM 404.198901- 19 F9)
1 1/2" ASPHALT TOP COURSE
(NYSDOT ITEM 404.09101 -9.5 F1)
6 FEET HIGH BY 10 FEET
PREFABRICATED GALVANIZED
FENCE PANELS WITH WINDSCREENS
11 GAUGE GALVANIZED STEEL WIRE
WOVEN INTO TWO (2") DIAMOND MESH
1 ADDENDUM #1 10/8/26
AutoCAD SHX Text 2015015155
AutoCAD SHX Text 3'
AutoCAD SHX Text 5:1 eleanor.gaddi@parks.ny.gov
EG
06/2025 OPR 103
NYS Office of Parks, Recreation and Historic Preservation Niagara Region
REQUEST FOR INFORMATION (RFI)
OPR-103
Project: Perimeter Security Upgrades at Niagara Falls State Park Contract Number: D006642 Request From:
Reply Email Address:
Email Request to :Eleanor Gaddi, Eleanor.gaddi@parks.ny.gov Request Number: Date:
Spec Section No.: Drawing No:
Remarks:
Question:
Answer:
REQUEST FOR INFORMATION (RFI) Subject: Discrepancy Between Drawings and Specifications Mix Types & Materials
Request for Clarification:
Please confirm which mix types should govern for bidding and construction:
Type 7 & Type 3 as shown on the drawings, or 19mm and 9.5mm as stated in the specifications.
Please clarify whether poly is required, as it is not referenced in the specifications.
Proposed Action: Pending clarification, we intend to prepare the quote according to the specifications.
Response Requested: Please advise on the correct materials and mix types so we can proceed accordingly.
eleanor.gaddi@parks.ny.gov Text Box Please use mix as stated in specifications. Detail on the drawings has been updated to match the specifications and is included in this Addendum. No poly is required.
NYS Office of Parks, Recreation and Historic Preservation Niagara Region
REQUEST FOR INFORMATION (RFI)
OPR-103
Project: Perimeter Security Upgrades at Niagara Falls State Park
Contract Number: D006642
Request From: Evan Veness
Reply Email Address: e.veness@ontarioparking.com
Email Request to :Eleanor Gaddi, Eleanor.gaddi@parks.ny.gov
Request Number: Date:10/2/26
Spec Section No.: Gates and Barriers Drawing No: All
Remarks:
Question:
1.
The barrier arm gates come with 1 set of traffic lights that face one direction. Is a second set needed to face the opposite direction for bidirectional traffic flow?
2. Are the vehicle detection loops to be saw cut into the new asphalt base layer or be directly buried in the sub granular?
3. The drawing shows two conduits for loops which is correct for one loop on either side of the barrier arm but are the barrier arms going to be used for exit as well? Would this require a third loop for free exit?
4. What type of emergency access is required: Fire box, SOS sensor, Click to Enter, or Strobe sensor? Or is this being provided by the security access contractor?
5. Access controls are managed by others. Regarding the access control pedestal, what size hood is needed for the attachment of all the access controls? At the crash barriers just a standard card reader then a 7"x7" would work, except for the swing gate which a 14"x14" should suffice? Or should we make them all the same size?
6. We recommend bollards on either side of the access control pedestal; would you like this added to the bid?
7. A 2" conduit is too large for the base of the access control pedestal. We advise using 3/4" in this location.
8. For the crash rated bollards, I advise having one extra in stock in case one gets hit, to avoid replacement delays. This would bring the total number to 40. Please confirm if this is preferred?
9. Is a subcontractor required to submit a NY DOL# mailto:Eleanor.gaddi@parks.ny.gov
Answer:
06/2025 OPR 103
Text Box
1. The intent is for no traffic lights as these are limited access roadways.
2. Vehicle detection loops shall be saw-cut into finished asphalt pavement and installed in accordance with the manufacturer's requirements and applicable NYSDOT standard details and specifications
3. Please refer to detail 1/C101. The intent is for free exit. If additional material is needed, the contractor is required to provide.
4. Contractor to provide a fire box at each gate.
5. Access controls contractor is providing 12"x12" hoods at all pedestals.
6. Bollards on either side of the access control pedestal are not included in this contract.
7. 3/4" conduit to the access control pedestals is acceptable.
8. Please use the total quantity (39) as specified.
9. Yes, a subcontractor must be registered with NYSDOL before they begin work on the project.
Text Box
1. The depth of bedrock greatly varies in the park.
2. Staging will be allowed at the Old Stone Lot. Stockpiling for topsoil, rock and stone fill will be allowed in certain closed roads located in Goat Island and the closed section of the parkway near Whirlpool. Final locations shall be coordinated with the Director's Representative.
3. The construction fencing detail has been updated on the drawings and is included in this Addendum.
| D006642 Addendum 1 |
| ADDENDUM 1 |
| JOB NAME AND PROJECT NUMBER |
| DATE: October 8, 2026 |
| D006642 Pre-Bid Mtg Agenda |
| Niagara Falls State Park |
| Perimeter Security Upgrades |
| Pre-Bid Meeting Agenda: |
| April 15th – June 15th |
| Spring Planting Period |
| August 15th – November 15th |
| Fall Planting Period |
| March 16th – September 30th |
| Seeding |
| April 1st – October 31st |
| No tree clearing and removal |
| D006642 Pre-Bid Meeting Sign-In Sheet 092826 |
| L301A |
| Sheets and Views |
| L301 |
D006642 RFI Responses
File details come from the government source that posted it. Updated .