D.28 QUALITY ASSURANCE SURVEILLANCE PLAN 1 FINAL Updated 5-4-2022_01.pdf

PDF 265 KB Posted

Attached to
Q201--Kay County CBOC
Solicitation number
36C25921R0077
Issued by

View the file

Other files

File Type Posted
36C25921R0077 0002.pdf PDF
D.31 PAST PERFORMANCE QUESTIONAIRE -UPDATE.pdf PDF
36C25921R0077 0001.pdf PDF
D.10 RIGHTS AND RESPONSIBILITIES OF PATIENTS.pdf PDF
D.1 ANTICOAGULATION MANAGEMENT PROGRAM .pdf PDF
D.2 CM 11-135 MEDICATION RECONCILIATION PROCESS.pdf PDF
D.11 SUICIDE PREVENTION.pdf PDF
D.24 OUTPATIENT SCHEDULING PROCESSES AND PROCEDURES.pdf PDF
D.25 VHA CLINIC BASED TELEHEALTH OPERATIONS 1.pdf PDF
D.7 PRE-TREATMENT AND TRANSPORTATION OF SOLIED CRITICAL AND SEMI-CRITICAL.pdf PDF
D.34 IMMIGRATION CRTIFICATION.pdf PDF
D.15 USE OF UNLICENSED ASSISTIVE PERSONNEL IN ADMINISTERING MEDICATION .pdf PDF
D.22 EQM MEASURES.pdf PDF
D.16 CERVICAL CANCER SCREENING.pdf PDF
D.23 MANANAGEMENT OF BREAST CANCER SCREENING.pdf PDF
D.18 ANCILLARY TESTING POLICY.pdf PDF
D.19 DOCUMENT SCANNING POLICY.pdf PDF
D.26 VHA CLINIC BASED TELEHEALTH OPERATIONS 2.pdf PDF
D.20 LAB SUPPLIES.pdf PDF
D.29 SCA 2015-5323 WAGE DETERMINATION.pdf PDF
D.27 VHA HOME TELEHEALTH OPERATIONS.pdf PDF
D.21 EO C2021.pdf PDF
D.13 TELEPHONE SERVICE FOR CLINICAL CARE.pdf PDF
D.9 REPORTING ADVERSE DRUG EVENTS.pdf PDF
D.5 HEALTHCARE PROVIDER MEDICAL RECORD DELINQUENCIES.pdf PDF
D.8 PRE-TREATMENT AND TRANSPORTATION OF SOILED CRITICAL AND SEMI-CRITICAL.pdf PDF
36C25921R0077.pdf PDF
D.14 USE OF RADIATION GENERATING EQUIPMENT.pdf PDF
D.35 ORG CONFLICT OF INTEREST.pdf PDF
D.36 SMALL BUSINESS SUBCONTRACTING PLAN TEMPLATE.pdf PDF
D.37 SMALL BUSINESS SUBCONTRACTING PLAN CERTIFICATION.pdf PDF
D.32 DBA OK202100068 WAGE DETERMINIATION.pdf PDF
D.30 PAST PERFORMANCE REFERENCES.pdf PDF
D.6 ORDERING AND RESPORTING TEST RESULTS.pdf PDF
D.17 CONTRACTOR SECURITY REQUIREMENTS (HANDBOOK 6500.6).pdf PDF
D.38 VALIDATED PERIPHERAL LIST - PRINTERS AND SCANNERS.pdf PDF
D.4 HEALTH INFORMATION MANAGEMENT.pdf PDF
D.3 GSA SECURITY GUIDE.pdf PDF
D.12 SERVICE CONTRACT ACT OF 1965, AS AMENDED.pdf PDF
D.31 PAST PERFORMANCE QUESTIONAIRE.pdf PDF
D.33 LABORTORY MANUAL.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D.28 QUALITY ASSURANCE SURVEILLANCE PLAN 1 FINAL

36C25921R0077

Quality Assurance Surveillance Plan (QASP)

Outpatient Site of Care Service

The contractor shall be evaluated in accordance with the following:

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored.

• How monitoring will take place.

• Who will conduct the monitoring?

• How monitoring efforts and results will be documented.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United

States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: John Pratt/ Patricia Toliver Contract Specialist

Organization or Agency: Department of Veterans Affairs Oklahoma City, OK 73104 (635)

b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Karli Bacon

3. CONTRACTOR REPRESENTATIVES

The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.

Primary: Karli Bacon

4. PERFORMANCE STANDARDS

The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined.

To be paid the full capitated rate on the schedule, the contractor must provide services as required in the entire contract and to meet or exceed the acceptable quality level outlined in this section/sub-sections. If any portion of the requirement is not met and/or the acceptable quality level in any of the elements in this section/subsection are not maintained, the contractor will be notified by the contracting officer for response outlining the contractor’s proposed remedy. The Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming services per FAR 52.212-4.

Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.

The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.

5. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP

a. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed by note reviews by Chief, Ambulatory Care Service on a daily, weekly, or quarterly basis.

Inspection through various reporting avenues for data (PACT Compass, CBOC Report, Performance

Measure Report, etc.).

b. VALIDATED USER/CUSTOMER COMPLAINTS. SHEP/PCMH Reports and PATS

6. Measures

VHA Contracted Outpatient Clinics Quality Assurance Surveillance Plan (QASP) Template

As of: February 1, 2021

METRIC PWS

Para

Performance

Requirement

Standard Acceptable

Quality

Level

(tailor to meet your requiremen ts)

Method of

Surveillance and frequency

Met

AQL/Did

Not Meet

AQL

(Add comment)

DOMAIN: ACCESS

New PC

Appointment s Completed within 20

Calendar

Days of

Create Date

Appointments for new patients completed less than or equal to 20 days from create date

(See the

Cube in

Pyramid

Analytics for more information)

PWS

para.

4.13.1

Contractor shall provide completed appointments for new patients <=20 calendar days from the create date

Contractor shall provide completed appointment s for new patients <=20 calendar days from the create date no less than 71% of the time

Contractor shall provide completed appointment s for new patients <=20 calendar days from the create date no less than 85% of the time.

VA will monitor progress quarterly by

COR

monitoring progress using data from the

Cube.

Established

PC Patient

Average Wait

Time in Days

PWS

para.

4.13.2

Contractor shall provide completed appointments for established patients <=20 days

Contractor shall provide completed appointment s for established patients <=20 days

Contractor shall provide completed appointment s for established patients

VA will monitor progress by

COR

monitoring progress quarterly using data from the for established patients completed less than or equal to

20 days from

Patient

Indicated Date

Cube in

Pyramid

Analytics for more information) from the patient indicated date from the patient indicated date no less than 92% of the time

<=20 days from the patient indicated date no less than 95% of the time

PCMHI

Penetration

(PACT21)

The percent of all Primary

Care patients engaged in

Primary Care-

Mental Health

Integration

(PCMHI)

(See PACT Compass for more information)

PWS

para.

4.13.3

Contractor shall involve

PCMHI staff in the care of patients with mental health needs

Contractor’s

PCMHI

penetration rate shall meet or exceed 8%

Contractor’s

PCMHI

penetration rate meets or exceeds

8%

VA will monitor progress quarterly by

COR

monitoring progress using data from the

PACT

Compass.

PCMH SHEP

Access

Composite

Composite % based on 3 questions from the

SHEP/PCMH

report: 1) Get an urgent care appointment as soon as needed, 2) Get a routine care appointment as soon as needed, and 3)

Get same day answer to your medical question.

(See

SHEP/PCMH

Report for more information)

PWS

para.4

.13.4

Contractor shall provide:

1) urgent care appointments as soon as needed, 2) routine care appointments as soon as needed, and

3) same day answers to patients’ medical questions

Contractor’s

SHEP access composite score shall meet or exceed 51%

Contractor’s

SHEP

access composite score shall meet or exceed 55%

VA will monitor progress quarterly by

COR

monitoring progress using data from the

Report.

SHEP

Question 7

In the last 6 months, how many days did you usually have to wait for an appointment when you needed care right away?

(Less is better)

Report for more information)

PWS

para.

4.13.5

Contractor shall provide timely appointments when patients need care right away

Contractor’s

SHEP

question 7 score shall meet or exceed 34%

Contractor’s

SHEP

question 7 score shall meet or exceed

50%.

VA will monitor progress quarterly by

COR

monitoring progress using data from the

Same-Day

Appts w/

PCP

Measures the percent of requested same day appointments with PCP more information)

PWS

para.

4.13.6

Contractor shall provide same day appointments with primary care provider

Contractor’s same day appointment s with PCP rate shall meet or exceed 54%

Contractor’s same day appointment s with PCP rate shall meet or exceed 70%

VA will monitor progress quarterly by

COR

monitoring progress using data from the

Appointment

Cancellations

Cancelled by clinic rate for all active clinic stop codes

(mop13)

(Lower is better)

Performance

Measure

Report for more information)

PWS

para.

4.13.7

Contractor shall not unnecessarily cancel patient appointments

Contractor’s rate of appointment s cancelled by clinic shall not exceed 9%

Contractor’s rate of appointment s cancelled by clinic shall not exceed 6%

VA will monitor progress quarterly by

COR

monitoring progress using data from the

Performance

Measure

DOMAIN:

QUALITY OF CARE

Composite -

Behavioral

Health

Screening

Composite of mdd40 -- Vets screened annually for major depression dx.

ptsd51 --

PTSD

screening

PWS

para.

4.13.8

Contractor shall complete all behavioral health screenings and follow-up evaluations

Contractor shall maintain a behavioral health composite score of at least 92%

Contractor shall maintain a behavioral health composite score of at least 96%

VA will monitor progress quarterly by

COR

monitoring progress using

CBOC Report.

using the PC-

PTSD at required times sa17 -- Vets screened for alcohol misuse w/ score GE 5 w/ timely brief counselling sa7 -- Vets screened annually for alcohol misuse

CBOC Report for more information)

Composite –

Cardiovascu lar Risk

Managemen t (EQM)

Composite measure monitors cardiovascular and diabetes patients for blood pressure management and statin prescribing.

The eQM performance measures ihd53h, dmg27h_ec, statn1_ec, and statn7_ec are included in the composite with data collected and

PWS

para.

4.13.9

Contractor shall manage patients with diabetes and cardiovascul ar disease in accordance with VA standards

Contractor shall maintain a cardiovasc ular risk manageme nt composite score of at least 70%

Contractor shall maintain a cardiovasc ular risk manageme nt composite score of at least 82%

VA will monitor progress quarterly by

COR

monitoring progress using scored using electronic extraction from the

CDW.

for more

Prevention dmg31h DM:

Retinal exam, timely by disease (OP) p61h

Colorectal

Cancer

Screening

Ages 50-75 p42 Cervical

Cancer

Screening

Women age

21-29y p43h Cervical

Cancer

Screening

Women age

30-64 pvc11h

Pneumococcal

Immunization s (OP) EPRP sample p32h Breast

Cancer

Screening including tomography for Women

50-74y (OP)

HEDIS

for more information)

PWS

para.

4.13.1

Contractor shall provide preventive health care in accordance with VA standards

Contractor shall maintain a prevention composite score of at least 80%

Contractor shall maintain a prevention composite score of at least 83%

VA will monitor progress quarterly by

COR

monitoring progress using

Tobacco smg8 Pts using tobacco provided w/counsel

(OP)

smg9 Pts using tobacco offered referral (OP) smg10 Pts using tobacco offered meds

(OP)

for more information)

PWS

para.

4.13.1

Contractor shall provide tobacco counseling and care in accordance with VA standards

Contractor shall maintain a tobacco composite score of at least 94%

Contractor shall maintain a tobacco composite score of at least 95%

VA will monitor progress quarterly by

COR

monitoring progress using

Clinical

Reminders

PWS

para.

4.13.1

Contractor shall complete all clinical reminders as indicated in the VA EHR.

Contractor shall complete no less than

90% of all clinical reminders as indicated in the VA EHR

Contractor shall complete no less than

95% of all clinical reminders as indicated in the VA

EHR and clinical reminders due within

60 days.

VA will monitor progress quarterly by

COR

monitoring progress using data from the

External Peer

Review. VA will also monitor progress periodically through note reviews.

Progress

Notes and

Patient Care

Encounter

(PCE)

Module

Documentati on

PWS

para.

4.13.1

Contractor shall complete workload and encounter documentatio n as defined in the PWS within 2 business days.

Progress notes must be connected to the correct visit/encounte r and location, entered into the VA EHR on the same day as the visit/encounte r, meet CMS guidelines, and include content as defined in

PWS.

Contractor shall properly complete documentati on for each patient encounter

100% of the time

Contractor shall properly complete documentati on for each patient encounter

100% of the time

VA will monitor progress weekly by using VSSC reports for

Encounters.

PANEL MANAGEMENT

Percent of

Teams with

Core Teamlet

Staffing

Ratio >=3

The total Core

Primary Care

Support Staff

(clerical/admi nistrative associate, RN care manager, and clinical

PWS

para.

4.13.1

Contractor shall provide core teamlet staffing at a ratio of >=3

FTE core teamlet members (RN care manager, clinical associate, administrative associate) for

100% of

Contractor’s primary care teams shall have a core teamlet staffing ratio of >=3

100% of

Contractor’s primary care teams shall have a core teamlet staffing ratio of >=3

VA will monitor progress quarterly by

COR

monitoring progress using data from the

PACT

Compass associate)

FTE divided by the total

Primary Care

Provider FTE entered in the

PCMM Web

Application.

Compass

Cube for more information) each PCP

FTE

Percent of

Women

Assigned to

Women’s

Health PACT or Designated

Women’s

Health

Provider

(WH1)

The total number of female patients assigned to a

Women’s

Health PACT

(identified by having *WH* in the team name or a primary or secondary team focus of

Women’s

Health) OR to a provider with a team role of

DESIGNATE

D WH

PROVIDER

(WH-PCP)

divided by the total number of unique female

PWS

para.

4.13.1

Contractor shall ensure that an appropriate number of

WH-PACTs or WH-PCPs are available at site of care to ensure that all VHA access goals are met for women

Veterans who choose to be seen by a designated women’s health provider.

Contractor’s percent of women assigned to

Women’s

Health

PACT or

Designated

Women’s

Health

Provider shall meet or exceed 83%

Contractor’s percent of women assigned to

Women’s

Health

PACT or

Designated

Women’s

Health

Provider shall meet or exceed

100%

VA will monitor progress quarterly by

COR

monitoring progress using data from the patients assigned to

Primary Care

Teams more

Percent

Primary

Care Patients

Enrolled in

Home

Telehealth

Reflects the total number of unique PC patients enrolled in home telehealth

(numerator) divided by the total number of unique patients assigned to primary care teams

(denominator) more information)

PWS

para.

4.13.1

Contractor shall offer and refer patients to home telehealth

Contractor shall exceed

1.1% of PC patients enrolled in Home

Telehealth

(HT)

Contractor shall exceed

1.3% of patients enrolled in Home

Telehealth

(HT)

VA will monitor progress quarterly by

COR

monitoring progress using data from the

Ratio of Non-

Traditional

Encounters

This is the sum of all PC telephone encounters added to the sum of all PC group

PWS

para.

4.13.1

Contractor shall provide telephone encounters, group encounters, and secure messaging

Contractor shall exceed

46% ratio of non-traditional encounters

Contractor shall exceed

46% ratio of non-traditional encounters

VA will monitor progress quarterly by

COR

monitoring progress using data from the encounters added to the sum of all incoming and outgoing secure messages as the numerator.

The denominator is the total team assignments for the reporting period.

VETERAN SATISFACTION

Veteran

Satisfaction

Overall rating of Primary

Care Provider on question 32 of the survey

Report for more information)

PWS

para.

4.13.1

The

Contractor’s

PCPs shall provide care that Veterans rate as a 9 or

10 on question 32 of the

SHEP/PCMH

survey

Contractor’s

SHEP

question 32 score shall meet or exceed

73%

Contractor’s

SHEP

question 32 score shall meet or exceed 80%

VA will monitor progress quarterly by

COR

monitoring progress using data from the

SHEP/PCM

H

COORDINATION OF CARE

Post

Discharge

Contact by

Teamlet

The percent of assigned primary care patients discharged from any VA facility who have been contacted by

PACT teamlet within two business days more information)

PWS

para.

4.13.2

The

Contractor’s

PACT

teamlets shall contact their assigned patients within 2 business days of discharge from any VA facility

Contractor’s rate of post discharge contact by

PACT

teamlet shall meet or exceed 62%

Contractor’s rate of post discharge contact by

PACT

teamlet shall meet or exceed

75%

VA will monitor progress quarterly by

COR

monitoring progress using data from the

ENVIRONMENT OF CARE (EOC)

Percentage of

Deficiencies

Identified

During EOC

Rounds that are Closed

Timely

(e5eoc1)

Percentage of deficiencies identified during EOC rounds that are closed within

14-business days or have a documented

Plan for

Action (PFA)

Performance

PWS

para

4.13.2

Contractor shall address deficiencies identified in

EOC rounds within 14 business days or have a documented

Plan for

Action

Contractor’s rate of EOC deficiencies that are closed within 14 business days or have a PFA shall meet or exceed 92%

Contractor’s rate of EOC deficiencies that are closed within 14 days or have a PFA shall meet or exceed 92%

VA will monitor progress quarterly by

COR

monitoring progress using data from the

Performance

Report for

DOMAIN: PHARMACY

Medication

Storage Area

Inspections

PWS

para.

4.13.2

Contractor shall inspect medication storage areas monthly

The

Contractor shall ensure that 100% of medication storage areas are inspected monthly and documented on VA Form

10-0053 (or local VA medical center form).

Inspection documentati on will be sent to the

COR within

10 days of the end of each month.

Any issues discovered shall be resolved by the

Contractor and reported to the COR within 15 days of the inspection date.

The

Contractor shall ensure that 100% of medication storage areas are inspected monthly and documented on VA

Form 10-

0053 (or local VA medical center form).

Inspection documentati on will be sent to the

COR within

10 days of the end of each month.

Any issues discovered are resolved by the

Contractor and reported to the COR within 15 days of the

COR will monitor performance via receipt of

VA Form 10-

0053 (or local medical center form) and documented resolution of any issues discovered during inspections.

COR will send reports to the

Contractor and

CO quarterly to notify them of current performance.

inspection date.

7. Ratings:

Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:

EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the

Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

VERY GOOD:

Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.

SATISFACTORY:

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.

MARGINAL:

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the

GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., Management, Quality, Safety or Environmental Deficiency Report or letter).

UNSATISFACTORY:

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental

Deficiency Reports, or letters).

8. DOCUMENTING PERFORMANCE

a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).

b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the

CO determines, formal written communication is required, the COR shall prepare a Contract Discrepancy

Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor must present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

The frequency of measurement is defined in the contract or otherwise in this document. The government

(COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Reporting.

The COR shall communicate with the Contractor and will provide written reports to the Contracting

Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.

10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP

SIGNED:

COR NAME/TITLE DATE

SIGNED:

CONTRACTOR NAME/TITLE DATE

File details come from the government source that posted it. Updated .