Quality Assurance Surveillance Plan (QASP) Contract: Heritage Health
Page 1 of 5 Revised 10/25/2012
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored.
• How monitoring will take place.
• Who will conduct the monitoring.
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
Organization or Agency: Department of Veterans Affairs
b. Contracting Officer’s Technical Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Kristin Nakasato
Organization or Agency: VA Pacific Islands Health Care System
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary:
Alternate:
Page 2 of 5 Revised 10/25/2012
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined.
Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. INCENTIVES/DEDUCTS
The Government shall use past performance as incentives. Incentives shall be based on ratings received on the performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. 100% surveillance: Reports from Pharmacy service of received invoices.
b.VALIDATED USER/CUSTOMER COMPLAINTS. Complaints/suggestions/compliments shall be recorded and reported to the VA COR ona quarterly basis (or more frequently if a significant problem occurs).
c. Verification and/or documentation provided by Contractor. All medication errors and medication related incidents will be recorded and investigated and reported to the VA COR on a quarterly basis. Medication errors or events that result in required hospitalization, clinical intervention or significant negative events will be reported to the VA COR immediately.
PERFORMANCE MEASURES
Measures SOW
Reference
Performance
Requirement
Standard Acceptable Quality Level
Surveillance
Method
Incentive Disincentive/Deduct
1 - Patient Safety
6.c.i. Medication errors and medication related incidents will be recorded and investigated and reported to the VA
COR.
All incidents reported quarterly. More critical incidents are reported immediately (within 24 hours.)
100% Contractor to provide documentation
Favorable contactor performance evaluation.
Unfavorable contractor performance evaluation
Page 3 of 5 Revised 10/25/2012
2 - Customer Satisfaction
6.c.ii. Customer feedback is provided to VA as applicable
Customer complaints/sug gestions/compl iments shall be recorded and reported to the VA COR on a quarterly basis (or more frequently if a significat problem occurs)
100%
Contractor to provide documentation
Favorable contactor performance evaluation.
Immediate removal from contract
3 - Timely Invoicing
6.b. Within 30 days of the end of each month services were provided, as described above, the vendor shall provide itemized invoicing
All itemized invoices provided within 30 days of end of each month services delivered
100% Direct Observation
Favorable contactor performance evaluation.
Unfavorable contractor performance evaluation
4- Communica tin
6.a. Contractor shall provide a monthly summary (for each contracted Pharmacy or CBOC) to the VA Pharmacy Service detailing specific information for services provided.
Summary of information provided monthly to VA Pharmacy Service.
100% Contractor to provide documentation
Favorable contactor performance evaluation.
Unfavorable contractor performance evaluation
7. RATINGS
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT.
However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
VERY GOOD: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.
Page 4 of 5 Revised 10/25/2012
SATISFACTORY: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.
MARGINAL: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g,. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and perparing annual past performance using
CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor.
This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the CO determines formal written communication is required, the CO shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable
Page 5 of 5 Revised 10/25/2012 performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Reporting.
The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.
10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
| Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP. |
| a. DIRECT OBSERVATION. 100% surveillance: Reports from Pharmacy service of received invoices. |
| a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and perparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR). |
| a. Frequency of Measurement. |
| b. Frequency of Performance Reporting. |
| Assigned CO: | |
| Primary Contractor POC: | |
| Alternate Contractor POC: | |
| 2020-11-13T09:43:35-1000 | |
| Kristin L. Nakasato 217396 |