D.2 Activity I Example Activity Scenario.docx

DOCX document 22 KB Posted

Attached to
Region 5 Environmental Site Investigation & Cleanup IDIQ
Solicitation number
12970223R0002
Issued by

About this file

This document provides an example activity scenario and related draft solicitation for environmental site investigation and cleanup services. The activity scenario details a former fueling station site requiring additional investigation and remediation due to soil and groundwater contamination from historic underground storage tanks and piping. Services requested include preparing investigation and remedial action workplans, implementing site characterization, and submitting assessment and cleanup reports. The related draft solicitation seeks to establish an indefinite delivery/indefinite quantity contract for environmental site work within Region 5 of the United States Forest Service. Interested parties are invited to provide feedback on the draft requirements during a November pre-solicitation conference call or in writing by November 25th. The final solicitation will support investigation and remediation of contaminated lands managed by the Forest Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment D.2 Example Activity Scenario Activity I: Non-CERCLA Site Investigation, Cleanup, And Restoration

For the scenario provided below, prepare, and submit a work plan that provides a description of how contractor would address the incident. The work plan needs to include and address the following:

· Description of the work to be performed.

· Discussion of any specific exclusions/assumptions the contractor may have regarding their response to the scenario in question.

· Anticipated contractor response time.

· Conceptual listing of personnel, including subcontractor(s) that would be utilized for the response.

· Conceptual listing of equipment and supplies to be utilized for the response.

· Safety & Health Plan and procedures the contractor will follow.

· Emergency Response Plan

· Container sampling and waste identification protocols that would be utilized.

· Hazardous material/waste management plan and protocols for material/waste handling, transport and disposal.

· Provide the estimated cost for the response. Breaking down cost items into key categories (work plan development, mobilization, performance of work, disposal cost, and final report preparation).

SCENARIO DESCRIPTION

I. Site Background:

The Small Tree National Forest operated a fueling station at the Smokey Work Center that included a gas house (approximately 40 square feet), a fuel island, a 1000 gallon gasoline underground storage tank and a 2000 gallon diesel underground storage tank. The underground storage tanks and the fuel island were removed in October of 1998. The gas house was demolished and properly disposed in 2011.

During removal of the underground storage tanks and the fuel island, product releases were determined to have occurred from the underground storage tanks, product piping and dispensers. The releases were determined to be the result of overfilling and leakage. The soil excavated during the removal of the tanks, product piping and dispensers and imported fill dirt were placed into the excavated area in December of 1998. The excavated area was repaved with asphalt.

Limited soil investigation activities were conducted at the site. Petroleum hydrocarbons and fuel volatile organic compounds were detected during these investigations. Petroleum impacted soil in the former fuel island/dispenser area was detected at 8 to12 feet below ground surface (bgs with TPHg ranging from 2.9 to 19000 ppm. in the west wall. VOCs and SVOCs were not detected.

Additional sampling was performed in the area of the former tank pit. TPHg was detected in soil samples that ranged from 6.7 to 4500 parts per million volume (ppm) from the southern and eastern sidewalls. Up to 27 ppm toluene, 31 ppm ethylbenzene, and 320 ppm xylenes was also detected. Groundwater sampling has not been conducted and the depth to groundwater is unknown.

The Regional Water Quality Control Board (RWQCB) has directed the Forest Service to conduct additional site investigation work to determine the extent of contamination and to prepare a remedial action plan for their review and apporval.

The Smokey Work Center is located at 63822 Highway 96, Happy Camp, CA 9603 II. Scope Of Work To Be Performed:

The work to be performed includes, but is not limited to:

· Prepare site investigation workplan to determine the extent of soil and groundwater contamination. Workplan is subject to RWQCB review and approval.

· Obtaining all necessary necessary permits.

· Implement site characterization, prepare and submit site assessment report, including uploading final RWQCB approved documentation into Geotracker.

· Prepare site remedial action plan for RWQCB review and approval.

· It is the responsibility of the contractor to ensure that all workplans and reports meet applicable reulatory standards and requirements. This includes coordinating and obtianing applicable site clean-up standards and thresholds.