D.1 QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP).pdf
PDF 127 KB Posted
- Attached to
- Q999--AMENDMENT TO READJUSTMENT COUNSELING SERVCE FOR CENTRAL TEXAS VA HEALTH CARE SYSTEM.
- Solicitation number
- 36C25720Q1239
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25720Q1239 0001_1.docx | DOCX document | |
| D.3 CONTRACTOR RULES OF BEHAVIOR.pdf | ||
| D.2 CONTRACTOR CERTIFICATION.pdf | ||
| 36C25720Q1239.pdf | ||
| D.4 PAST PERFORMANCE SURVEY.pdf | ||
| 36C25720Q1239_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D.1 QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)
An abstract of the Specific Tasks (5 from the Performance Work Statement) in columnar form.
The columns are:
Column 1 is the applicable PWS paragraph number where the task is found
Column 2 is a brief description of each required task under the contract Column 3 is the standard to which the task is to be performed.
Column 4 is the Acceptable Quality Level Column 5 is the Method of Surveillance to be used
Methods of Surveillance: For example- Focused Provider Practice Evaluation (FPPE) and Ongoing Provider Practice Evaluation (OPPE).
Para Number
Required Services (Tasks)
Performance Standards
AQL Methods of Surveillance
1.4.4 Contract service providers will
report and submit for approval changes in personnel providing services under the current contract to the contracting officer through the COR.
Within ten (10) working days of personnel change.
100% 100 % Inspection
5.3 5.3.6.2 5.4 5.5 5.6
Contract service providers will provide readjustment counseling services to eligible veterans and their families referred by the COR or designee in accordance with the requirements of the contract mechanism Fees/Contract Program Handbook, and VA authorization form (VAF 10-5565b).
Within ten (10) working days upon completion of final assessment.
100% 100 % Inspection
5.3.6 Contract service providers will
schedule the initial Veteran counseling session
Within five (5) working days from the time he/she receives the authorization.
80% - 90%
Random Sampling
5.3.3 The duration of counseling
sessions for billing purposes will be in accordance with applicable contract requirements.
100% 100 % Inspection
5.7 Recordkeeping 100% 100 %
Inspection
5.9 Clients who cannot be counseled
by the contractor are referred appropriately
80% Periodic Surveillance
5.10 Clients’ presenting with homicidal
or suicidal potential are reviewed with the COR immediately and is documented in the veteran’s file.
Within ten (10) working days from the time of incident
100% 100% Inspection
5.11 Follow-up contact is made and is
documented in the client file.
Within sixty (60) days after the last contact with the client
80% Random Sampling
5.12 The contractor immediately notifies
the COR when a Veteran is no longer being seen under this program.
Within thirty (30) days after the last contact with the client
80% Random Sampling
5.13 Client files are placed in inactive
status after 90 days of inactivity unless there are clinical reasons to keep the file active.
80% Random Sampling
5.14 A closing summary is present for
inactive clients fully documenting the degree of success or lack thereof, of counseling plan or goals and prognosis.
Within thirty (30) days after the last contact with the client
100% 100% Inspection
5.17 Contractor conducts periodic
assessment of the effectiveness in providing services to clients and conducts an on-going self-assessment and evaluation of their performance.
80% Random Sampling
5.3.6.2 Contract service provider will be
required to submit initial assessments/counseling, updated counseling plans, and Veterans
DD214.
Within seven (7) days after initial contact with Veteran.
100% 100% Inspection
Section 4 Contractor Provided Facility Contractors will be located in an area that is considered safe and compatible with the veterans and their family readily keeping appointments.
Periodic Surveillance
Contractor’s facility exterior and interior must
Periodic Surveillance
1. REQUIRED REPORTS
Use a Technical Exhibit to list all required reports, drawings, maps, technical information, or other data required to be provided to the Contracting Officer by the contractor.
CONTRACT SUBMITTAL SHEET
PWS/ID No. Description Due To Who
1.4.1.1. License and Certification With Technical
Proposal Upon request
CO
COR
1.4.3. Professional Insurance Before contract
start and upon renewal
CO
Documentation verifying current certification and licenses
Before Contract Start and as it changes
COR
1.4 List of Key Personnel With Technical
Proposal
CO
1.4.4.5 & 1.4.4.7 Updated List As Amended CO/COR
5.1 Facility Description and
Location
With Technical Proposal
CO
TE 1 Signed QASP After Contract Award
COR
Legend (current individuals - subject to change):
CO Contracting Officer
Diondra.Coleman@va.gov COR Contracting Officer’s Representative, Laredo
Angelica.Garza@va.gov ISO Information Security Officer – RCS (COD4Z2)
Gregory.Jackson@va.gov PO Privacy Officer – RCS (COD4Z2)
Gregory.Jackson@va.gov
ADDD/A RCS (COD4Z2)
Gregory.Jackson@va.gov be clean, neat and presentable as well as in compliance with the policies and regulations of a VA lease property.
mailto:Diondra.Coleman@va.gov mailto:Angelica.Garza@va.gov mailto:Gregory.Jackson@va.gov mailto:Gregory.Jackson@va.gov mailto:Gregory.Jackson@va.gov
File details come from the government source that posted it. Updated .