D.1-6 Kelsey (No Arc).pdf

PDF 974 KB Posted

Attached to
127EAS23Q0048 Desert Cold Springs Mechanical Site Prep and Fuel Treatment
Solicitation number
127EAS23Q0048
Issued by

About this file

This combined synopsis/solicitation requests quotations for mechanical site preparation and fuel treatment services on the Desert Cold Springs project. The solicitation will be awarded as a small business set-aside for firms under $34 million in average annual revenue. The Forest Service seeks to reduce hazardous fuels and complete pre-commercial thinning on the Eldorado National Forest in California. Quotes are due by the date specified in Attachment 127EAS23Q0048 Desert Cold Springs Mechanical Site Prep RFQ. Services must be completed between October 15th and April 15th each year, with a 72-hour drying period required after rain events over 0.25 inches.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

114 115

LIGHT CANYON

RD

DARK

CANYO

N

RD

SP

AN

IS

H FLAT RD

ROCK

CREEK RD

TR

AVER

SE

CR

EEK

SHOO

FLY

RD

H W

Y

California State Parks, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census

Bureau, USDA, Esri, NASA, NGA, USGS, FEMA

FY23 Georgetown RD Fuels Reduction Project

Optional Item 9 - Mastication

Optional Item 10 - Mastication

Operations may not begin prior to completion of aquatic species surveys (estimated mid-spring)

Limited Operating Period - starting with the first rain event of greater than 0.25 inches (October 15th to April 15th), activities may resume after a 72-hour drying period

Controlled Area - (CA-1) no operations permitted within zones flagged in solid pink with purple and black striped flagging

Invasive Species Occurance

System Roads

Perennial Streamcourse - 50' equipment exclusion each side

Intermittent Streamcourse - 50' equipment exclusion each side

Ephemeral Streamcourse - 25' equipment exclusion each side

Canal Ditch

Pipeline

Connector

NON-USFS

USFS

0 0.25 0.5 0.750.13

Miles N

Eldorado National Forest

Items 10 & 11

File details come from the government source that posted it. Updated .