This document outlines hardware and software system requirements for a third-party administration of workers' compensation claims processing program. The contractor must provide an individual electronic file system for each open claim that is DOD 5015.x compliant and part of a single centralized computerized storage system, including any necessary software and hardware. The electronic system must allow sorting claims by various criteria and provide required reports and secure web-based access to DOE-Hanford. It must also meet all applicable state and federal reporting requirements. The system should include an image process for viewing documents and have capabilities for secure transmission of sensitive data. The contractor is responsible for training and providing user manuals to enable effective use of the system.

View the file

Other files

File Type Posted
D.10.1 Summary of Cost Worksheet.xlsx XLSX spreadsheet
D.10 OFFEROR INSTRUCTIONS AND EVALUATION.docx DOCX document
D.03 CONTRACTOR LEGAL_MANAGEMENT REQUIREMENTS.docx DOCX document
D.09 CONTINUITY OF OPERATIONS PLAN .docx DOCX document
New Solicitation - WC TPA Services Sections B-D.docx DOCX document
D.01 QUALITY ASSURANCE AND SURVEILLANCE PLAN.docx DOCX document
D.05 QUALITY ASSURANCE PROGRAM .docx DOCX document
D.06 MEMORANDUM OF UNDERSTANDING.docx DOCX document
D.02 REPORTING REQUIREMENTS.docx DOCX document
D.04 LEGAL MANAGEMENT PLAN.docx DOCX document
D.08 SERVICE CONTRACT ACT (SCA) WAGE DETERMINATION .docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #89303923REM000008Section D
DOE-Hanford Workers' Compensation Third-Party AdministratorAttachment D.7

ATTACHMENT

D.7 HARDWARE AND SOFTWARE SYSTEM REQUIREMENTS

a) The Contractor shall provide a DOD 5015.x compliant individual electronic file system for each open claim in addition to the paper file system. All claim files must be part of a single, orderly central computerized file storage system which includes the software and hardware. This system shall be used to receive, record, locate and sort all assigned claims and related data. Should the Contractor change the data base management system, the Contractor will be responsible for transferring all electronic and hardcopy data into the new system at no charge to DOE-Hanford and prior to the initiation of the new system.

b) The electronic system shall allow the Contractor the ability to access and sort the claims electronically by various criteria such as employer, claimant name, claim number, social security number, etc. The system shall be designed to provide the required reports (see section D) and other reports as requested by the Contracting Officer (CO) or Contracting Officer’s Representative (COR). In addition, the system shall provide direct, continuous, and secure (https on standard port 443) web-based access to any and all information entered into its system that relates to Hanford Site claims under this Contract. DOE-Hanford will use its in-house equipment and software to interface with the Contractor’s system. DOE-Hanford uses the following: Dell compatible personal computers, Microsoft Windows 7, Microsoft Windows 10, Microsoft Internet Explorer 11, Microsoft Edge, Google Chrome and Microsoft Office 2013, Microsoft Office 2016 and Microsoft Office 365. This computer access will exclude the capability for DOE-Hanford or Hanford Site Contractor’s to add, delete, and edit, in any way, Contractor’s computer files and data. NO ADDITIONAL CHARGES WILL BE ALLOWED FOR THE ABOVE ACCESS. THIS IS INCLUDED IN THE CONTRACT PRICE. NO ADDITIONAL USAGE CHARGES WILL BE PAID FOR CONNECTING TO OR TIME SPENT REVIEWING INFORMATION ON CONTRACTOR’S COMPUTER SYSTEM.

c) The electronic system must be accessible by covered Site Contractors’ designees as well as by the COR. The COR shall identify the designees and approve access. The Contractor shall ensure that individual covered Hanford Site Contractors’ designees only have access to those portions of the system containing information relevant to their specific claims.

d) The system shall meet all State and Federal Claims reporting requirements (e.g. Washington State Department of Labor and Industries, Self-Insurance Electronic Data Reporting System (SIEDRS), and the Medicare secondary payer reporting system). The Contractor’s systems shall comply with future State and Federal legislation as enacted and/or amended.

e) This system must include an image process that allows the COR to view all claim documents via the web-based access.

f) The system must be capable of securely transmitting sensitive data. Notwithstanding any other language in the Contract, E-mail attachments, and any files transmitted or received electronically containing sensitive data will be encrypted. The encryption used must be either a FIPS 140-2 certified system or the current DOE-Hanford encryption system. All parties will protect encryption keys from disclosure and misuse.

g) The Contractor shall provide required software if the software necessary to read these reports is not already used by DOE-Hanford.

h) The Contractor shall coordinate and provide training as well as supplying a User Manual sufficient to enable all parties to operate the system effectively. Additional training date(s) shall be coordinated with the COR for any change or upgrades to the on-line system.