D-1_SOI.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
EN 4112 1360 Z5 Horse Trailer
Solicitation number
127EAY250003
Issued by

About this file

This is a pricing template spreadsheet for an Independent Government Cost Estimate (IGCE) with two main sections - Services and Supplies. The template is designed to capture cost estimates across a base period and four option periods of 12 months each, with fields for labor categories, hours, rates, Other Direct Costs (ODCs), and travel costs.

The supplies section specifically references a horse trailer procurement, matching the related contract opportunity from the Department of Agriculture Forest Service (Solicitation #127EAY250003). The template includes line items for a horse trailer, freight, and total setup costs, though no actual costs are filled in. The spreadsheet provides detailed instructions for completing both services and supplies sections, including guidance on loaded labor rates, travel cost calculations, and proper documentation of serial/product numbers.

View the file

Other files

File Type Posted
D-2_HorseTrailerSpecsUpdated.pdf PDF
A-6_SAM_SOL127EAY25Q0003.pdf PDF
SF-30_127EAYQ0003_0001.pdf PDF
A-6_SOL_127EAY25Q0003.pdf PDF
D-2_HorseTrailerSpecs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Services
Labor CategoriesEnter ALL proposed labor categories
Labor RatesUse loaded Labor rates which include the percentage of overhead costs that are allocable to the contract.
TravelUse an overall estimated cost (applicable air fare, per diem, and local travel) multiplied by the estimated number of trips.
Cumulative TotalDelete total from any/all unused option periods after completing chart
Period Of PerformanceIf your period of performance for the Base and/or Option Period(s) is less than 12 Months - reflect actual month total in column header
Instructions for Supplies
ColumnsComplete all columns. If there is no serial/product number enter "N/A"
Item(s)Add/delete rows as applicable (ensure item subtotal includes amounts from added rows). Identify and group items by Brand
OptionsComplete as applicable. If the option 3 and 4 page does not apply to your requirement, do not submit with your final IGCE.
Other Direct Costs (ODCs)Itemize all applicable ODCs (such as installation or special equipment) Not all requirements will have ODCs.
TravelUse an overall estimated cost for travel. Combine elements as air fare, per diem, and local travel multiplied by the # of trips.

Services

Independent Government Cost Estimate for Services
Estimator Name:Project Title:
Date:Project Manger:
Base Period: 12 MonthsOption 1: 12 MonthsOption 2: 12 MonthsOption 3: 12 MonthsOption 4: 12 Months
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotal
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Labor Total0$0.000$0.000$0.000$0.000$0.00
Other Direct Costs$0.00$0.00$0.00$0.00$0.00
(ODCs)

Travel $0.00 $0.00 $0.00 $0.00 $0.00

ODC/Travel Subtotal$0.00$0.00$0.00$0.00$0.00
Period Total$0.00$0.00$0.00$0.00$0.00
Cumulative TOTAL$0.00$0.00$0.00$0.00$0.00

Supplies

Statement of Items
Estimator Name:Project Title:
Date:Project Manger:
Base
Item(s)Serial/Product No.QuantityUnit CostAmount
Horse Trailer10.00$0.00
freight10.00$0.00
total set up10.00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Item Subtotal$0.00
ODCs$0.00
Travel$0.00
ODC/Travel Subtotal$0.00
Period Total$0.00
Cumulative TOTAL$0.00

File details come from the government source that posted it. Updated .