This Invitation for Bid (IFB) Solicitation Number 2026-ITB-029 is issued by the City of Sugar Land, Texas for water distribution rehabilitation services. The project involves the rehabilitation of approximately 7,000 linear feet of existing 6-inch, 8-inch, and 12-inch distribution water lines, raw water lines, and associated appurtenances throughout the city using both trenchless technology and open cut methods. Work includes installation of new water lines, valves, fire hydrants, water service replacements, site grading, concrete and asphalt repairs, pressure testing, disinfection, cleanup, and site restoration. A non-mandatory pre-bid meeting is scheduled for December 9, 2026 at 10:00 AM via Microsoft Teams. The questions deadline is December 18, 2026 at 3:00 PM, with answers and addenda posted by January 6, 2027. Bids are due on January 21, 2027 at 11:00 AM. The bid proposal includes 44 line items for base work and alternate unit price items covering pipe bursting, pipe installation in various sizes, valves, fire hydrants, service connections, fittings, pavement and sidewalk repairs, trench safety systems, site restoration, traffic control, and miscellaneous repairs, with quantities ranging from single installations to several thousand linear feet.
Pricing is on a unit cost basis with contractors required to enter specific unit prices for each line item to determine the total bid amount. Mobilization is capped at 5 percent of the total bid, and an allowance of $50,000 is included for miscellaneous repairs as authorized by the engineer. Insurance requirements are substantial and include Workers' Compensation at statutory Texas limits, Employers' Liability at $500,000 per employee, Commercial General Liability of $1,000,000 per occurrence with $2,000,000 aggregate, Automobile Liability at $1,000,000 combined single limits, and Pollution Liability coverage if contamination risk is present. Umbrella coverage requirements depend on contract value, ranging from $4,000,000 for contracts between $1,000,000 and $5,000,000 to $20,000,000 for contracts exceeding $15,000,000. The City of Sugar Land must be named as an additional insured with primary and non-contributory coverage, and contractors must provide certificates of insurance and required endorsements within ten business days of contract award and prior to work commencement. All mandatory documents and contractor acknowledgement of plans, specifications, terms, and conditions are required for bid submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
Solicitation Number 2026-ITB-029
CWA2606 Water Distribution Rehabilitation
1. SPECIFICATIONS
1.1. SILENCE OF SPECIFICATIONS
The apparent silence of these specifications as to any detail or to the apparent omission from it of a detailed description concerning any point, shall be regarded as meaning that only the best commercial practices are to prevail. All interpretations of these specifications shall be made on the basis of this statement.
1.2. Scope of Work
The project entails the rehabilitation of of approximately 7,000 linear feet of existing 6", 8" and 12” Distribution
Water Line, Raw Water Line, and associated appurtenances throughout the City. The improvements include rehabilitation and installation of new Water Lines via trenchless technology and open cut method that including new valves, fire hydrant, water service replacement and appurtenances , site grading, concrete repair, asphalt repair, pressure testing, disinfection, clean-up and site restoration. For additional details, Contractor should refer to the Contract Documents. Contractor is requested to provide relevant project experience and references similar to the project description outlined above.
1.3. SCHEDULE OF KEY EVENTS
ITB Advertised in local paper: November 11, 2026, 12:00am
ITB Posted to OpenGov Procurement: November 11, 2026
Pre-Bid Meeting (Non-Mandatory): December 9, 2026, 10:00am https://teams.microsoft.com/meet/25549905
7292896?p=2Px0xZZ0TgvfMiWX17
Questions Deadline: December 18, 2026, 3:00pm
Questions Answered and Addendum posted: January 6, 2027, 5:00pm https://teams.microsoft.com/meet/255499057292896?p=2Px0xZZ0TgvfMiWX17 https://teams.microsoft.com/meet/255499057292896?p=2Px0xZZ0TgvfMiWX17
CITY OF SUGAR LAND Solicitation Number 2026-ITB-029
Bids Due: January 21, 2027, 11:00am
2. BID PROPOSAL
BASE UNIT PRICE BID ITEMS + EXTRA WORK ITEMS
Line Item Description Quantity Unit of
Measure Unit Cost Total
BASE UNIT PRICE BID ITEMS
1 Mobilization including Bonds, Insurance, and Permits Not to Exceed
5% of Bid Total.
1 LS
2 Perform Pre-Chlorinated Pipe
Bursting of existing Water Line;
Replace with 8-Inch AWWA C-906
DIPS HDPE (PE 4710) DR11 Water
Line and All Fittings, Including Bore
Pits, Contractor Haul-Off of Utility
Spoils, Disposal of Waste, Thrust
Blocking, Bedding, Fittings, All
Appurtenances and All Necessary
Connections, Complete in Place.
850 LF
3 Perform Pre-Chlorinated Pipe
Bursting of existing Water Line;
Replace with 12-Inch AWWA C-906
DIPS HDPE (PE 4710) DR11 Water
Line and All Fittings, Including Bore
Pits, Contractor Haul-Off of Utility
Spoils, Disposal of Waste, Thrust
Blocking, Bedding, Fittings, All
Appurtenances and All Necessary
Connections, Complete in Place. LF
1,030
1,030 LF
4 Furnish and Install 6-Inch AWWA C-
900 DR-18 Water Line, with standard bedding and backfill as shown in plans, All Depths, Complete in Place.
170 LF
5 Furnish and Install 8-Inch AWWA C-
900 DR-18 Water Line, with standard bedding and backfill as shown in plans, All Depths, Complete in Place.
1,650 LF
Line Item Description Quantity Unit of
Measure Unit Cost Total
6 Furnish and Install 12-Inch AWWA
C-900 DR-18 Water Line, with standard bedding and backfill as= shown in plans, All Depths, Complete in Place.
720 LF
7 Additional Cost to Bore and Jack 6-
Inch AWWA C-900 DR-18 Water
Line, with bedding and backfill as shown in plans, All Depths, Complete in Place.
70 LF
8 Additional Cost to Bore and Jack 8-
Inch AWWA C-900 DR-18 Water
Line, with bedding and backfill as shown in plans, All Depths, Complete in Place.
280 LF
9 Additional Cost to Bore and Jack 8-
Inch AWWA C-900 DR-18 Water
Line with 12-Inch Steel Casing, with bedding and backfill as shown in plans, All Depths, Complete in Place.
170 LF
10 Additional Cost to Bore and Jack 12-
Inch AWWA C-900 DR-18 Water
Line with 20-Inch Steel Casing, with bedding and backfill as shown in plans, All Depths, Complete in Place.
100 LF
11 Furnish and Install 2-inch Air/Vacuum
Release Valve per City Standard, Complete in Place.
1 EA
12 Furnish and Install All Required 6-
Inch AWWA Gate Valve with Box, Complete in Place.
5 EA
13 Furnish and Install All Required 8-
Inch AWWA Gate Valve with Box, Complete in Place.
6 EA
14 Furnish and Install All Required 12-
Inch AWWA Gate Valve with Box, Complete in Place.
12 EA
Unit Cost Total
15 Furnish and Install Fire Hydrant
Assembly including Tee and 6-Inch
AWWA Gate Valve with Box, 6- Inch
Lead and Flushing Valve, All Depths, Complete in Place.
13 EA
16 Connection of Existing Fire Hydrant and Relocated Fire Hydrant to New
Water Line, Complete in Place.
3 EA
17 Connection of Existing Water Line to
Proposed Water Line, Includes Wet
Connection and/or Necessary
Adapters and Connectors, All Sizes, Complete in Place.
11 EA
18 Furnish and Install New Single and
Double Service Connections – “Long
Side” and “Short Side”, AWWA
HDPE (PE 4710) PC 250 DR9,
Complete in Place.
27 EA
19 Furnish and Install Ductile Iron
Waterline Fittings. Weight is for Body
Casting Only. Price for all Hardware and Appurtenances Shall be incidental to the Bid Item, Complete in Place.
25 TON
20 Furnish and Provide Steel Support for the 12-inch Water Line on Bridge, Complete in Place.
1 LS
21 Sidewalk Repair, Complete in Place. 800 SY
22 Concrete Pavement Repair, Complete in Place.
300 SY
23 Asphalt Pavement Repair, Complete in Place.
500 SY
24 Replacement of Existing Brick Pavers
(Match Existing), Complete in Place.
100 SY
25 Cut and Plug Existing Water Line, All
Sizes.
4 EA
26 Cut and Plug Existing Water Line and
Backfill with Grout per City Standard.
2 EA
Unit Cost Total
27 Furnish and Install SWPPP System, Complete in Place.
1 LS
28 Contractor to Take Pre-Construction
Project Photos.
1 LS
29 Trench Safety System for All
Excavations.
2,950 LF
30 Site Restoration, Complete in Place. 1 LS
31 Traffic Control and Regulation. 1 LS
Allowance - As Authorized by Engineer (Contractor to Enter $50,000 in the Unit Cost Section) - Total
Allowance of $50,000
32 Miscellaneous Repairs (As Authorized by Engineer)
1 LS
Extra Work Items - As Authorized by Engineer
33 Contractor to Pothole the existing gas utility service line in accordance with
SUE Level A and LONO Submittal, Complete in Place.
4 EA
34 Contractor to Pothole the existing water utility line to accordance with
SUE Level A, Complete in Place.
1 EA
35 6-Inch Insertion Valve, As Authorized by Engineer, Complete in Place.
1 EA
36 8-Inch Insertion Valve, As Authorized by Engineer, Complete in Place.
1 EA
37 12-Inch Insertion Valve, As
Authorized by Engineer, Complete in
Place.
2 EA
38 Additional Cost for Pit Excavation to
Water Line Depth Greater than 8- foot including Trench Safety, As
Authorized by Engineer, Complete in
Place
50 LF
Unit Cost Total
39 Additional Cost for Hydrant
Excavation to Water Line Depth
Greater than 8-foot including Trench
Safety, As Authorized by Engineer, Complete in Place.
50 LF
40 Additional Cost for Driveway Repair with Early Strength Concrete, Complete in Place.
200 SF
41 Additional Cost for Curb Repair, As
Authorized by Engineer, Complete in
Place.
100 LF
42 Tree and Plant Protection, Complete in
Place.
5 EA
43 Tree Removal, Complete in Place. 5 EA
44 Tree Planting, Complete in Place. 5 EA
TOTAL
ALTERNATE UNIT PRICE ITEMS
As Authorized by Engineer
Line Item Description Quantity Unit of
Measure Unit Cost Total
A1 Perform Pre-Chlorinated Pipe
Bursting of existing Water Line;
Replace with 12-Inch AWWA C-906
DIPS HDPE (PE 4710) DR11 Water
Line and All Fittings, Including Bore
Pits, Contractor Haul-Off of Utility
Spoils, Disposal of Waste, Thrust
Blocking, Bedding, Fittings, All
Appurtenances and All Necessary
Connections, Complete in Place.
2,680 LF
A2 Furnish and Install 12-Inch AWWA
C-900 DR-18 Water Line, with standard bedding and backfill as shown in plans, All Depths, Complete in Place.
830 LF
Unit Cost Total
A3 Additional Cost to Bore and Jack 12-
Inch AWWA C-900 DR-18 Water
Line, with bedding and backfill as shown in plans, All Depths, Complete in Place.
540 LF
A4 Additional Cost to Bore and Jack 12-
Inch AWWA C-900 DR-18 Water
Line with 20-Inch Steel Casing, with bedding and backfill as shown in plans, All Depths, Complete in Place.
80 LF
A5 Connection of Existing Water Line to
Proposed Water Line, Includes Wet
Connection and/or Necessary
Adapters and Connectors, All Sizes, Complete in Place.
2 EA
A6 Furnish and Install Ductile Iron
Waterline Fittings. Weight is for Body
Casting Only. Price for all Hardware and Appurtenances Shall be incidental to the Bid Item, Complete in Place.
5 TON
A7 Sidewalk Repair, Complete in Place. 250 SY
A8 Concrete Pavement Repair, Complete in Place.
100 SY
A9 Trench Safety System for All
Excavations.
1,520 LF
A10 Site Restoration, Complete in Place. 1 LS
TOTAL
3. VENDOR RESPONSES
1. Mandatory Documents to be Submitted*
The forms must be completed and submitted electronically with the bid in order for submitting contractor to be considered responsive. Failure to include the required forms, signed and dated, will result in the bid being rejected.
• Required_Documents_-_CWA260...
*Response required https://government-project.s3.us-west-2.amazonaws.com/320307/f2584e6c-b958-47f6-8b39-4989e025d517_Required_Documents_-_CWA2606_Water_Distribution_Rehabilitation.pdf
2. Contractor Acknowledgement*
Contractor has reviewed all of the plans, specifications, terms and conditions. I understand the Insurance
Requirements of these specifications and will comply in full if awarded this contract.
☐ Please confirm
*Response required
4. INSURANCE REQUIREMENTS
REQUIREMENTS FOR GENERAL SERVICES CONTRACT
The Contractor shall comply with each and every condition contained herein. The Contractor shall provide and maintain the minimum insurance coverage set forth below during the term of its agreement with the City. Any
Subcontractor(s) hired by the Contractor shall maintain insurance coverage equal to that required of the
Contractor. It is the responsibility of the Contractor to assure compliance with this provision. The City of
Sugar Land accepts no responsibility arising from the conduct, or lack of conduct, of the Subcontractor.
NOTE: The nature/size of a contract/agreement may necessitate higher limits than shown above. These requirements are only meant as a guide, but in any event, should cover most situations. Check with Purchasing
& Risk Management if you need assistance or need additional information.
4.1. INSTRUCTIONS FOR COMPLETION OF INSURANCE DOCUMENT
With reference to the foregoing insurance requirements, Contractor shall specifically endorse applicable insurance policies as follows:
A. The City of Sugar Land shall be named as an additional insured with respect to General Liability and
Automobile Liability on a separate endorsement
B. A waiver of subrogation in favor of The City of Sugar Land shall be contained in the Workers
Compensation and all liability policies and must be provided on a separate endorsement.
C. All insurance policies shall be endorsed to the effect that The City of Sugar Land will receive at least thirty (30) days' written notice prior to cancellation or non-renewal of the insurance.
D. All insurance policies, which name The City of Sugar Land as an additional insured, must be endorsed to read as primary and non-contributory coverage regardless of the application of other insurance.
E. Chapter 1811 of the Texas Insurance Code, Senate Bill 425 82(R) of 2011, states that the above endorsements cannot be on the certificate of insurance. Separate endorsements must be provided for each of the above.
F. All insurance policies shall be endorsed to require the insurer to immediately notify The City of Sugar
Land of any material change in the insurance coverage.
G. All liability policies shall contain no cross liability exclusions or insured versus insured restrictions.
H. Required limits may be satisfied by any combination of primary and umbrella liability insurances.
I. Contractor may maintain reasonable and customary deductibles, subject to approval by The City of
Sugar Land.
J. Insurance must be purchased from insurers having a minimum AmBest rating of B+.
K. All insurance must be written on forms filed with and approved by the Texas Department of Insurance.
(ACORD 25 2016/03) Coverage must be written on an occurrence form.
L. Contractual Liability must be maintained covering the Contractors obligations contained in the contract. Certificates of Insurance shall be prepared and executed by the insurance company or its authorized agent and shall contain provisions representing and warranting all endorsements and insurance coverages according to requirements and instructions contained herein.
M. Upon request, Contractor shall furnish The City of Sugar Land with certified copies of all insurance policies.
N. A valid certificate of insurance verifying each of the coverages required above shall be issued directly to the City of Sugar Land within ten (10) business days after contract award and prior to starting any work by the successful contractor’s insurance agent of record or insurance company. Also, prior to the start of any work and at the same time that the Certificate of Insurance is issued and sent to the City of Sugar
Land, all required endorsements identified in sections A, B, C and D, above shall be sent to the City of
Sugar Land. The certificate of insurance and endorsements shall be sent to:
City of Sugar Land Emailed to: purchasing@sugarlandtx.gov Purchasing Office Faxed to: 281 275-2741 P. O. Box 110 Sugar Land, TX 77487-0110
4.2. Worker's Compensation
Statutory limits, State of TX.
4.3. Employers' Liability
$500,000 per employee per disease / $500,000 per employee per accident / $500,000 by disease aggregate
4.4. Commercial General Liability
Very High/High Risk
Each Occurrence $1,000,000
Fire Damage $300,000
Personal & ADV Injury $1,000,000
General Aggregate $2,000,000 mailto:purchasing@sugarlandtx.gov
Products/Compl Op $2,000,000
XCU $2,000,000
4.5. Automobile Liability: (Owned, Non-Owned, Hired and Injury & Property coverage for all)
Very High/ High Risk
Combined Single Limits
$1,000,000 Bodily
4.6. Umbrella each-occurrence with respect to primary Commercial General Liability, Automobile
Liability, and Employers Liability policies at minimum limits as follows:
Contract value less than $1,000,000: not required
Contract value between $1,000,000 and $5,000,000: $4,000,000 is required
Contract value between $5,000,000 and $10,000,000: $9,000,000 is required
Contract value between $10,000,000 and $15,000,000: $15,000,000 is required
Contract value above $15,000,000: $20,000,000 is required
Excess coverage over $10,000,000 can be provided on “following form” type to the underlying coverages to the extent of liability coverage as determined by the City.
4.7. Pollution Liability
For property damage, bodily injury and clean up (if project entails possible contamination of air, soil or ground or as determined by the City of Sugar Land)
Attachments:
A - CWA2606_Water_Distribution_Rehabilitation_Project_Manual_(with_specs)
B - CWA2606 Water Distribution Rehabilitation (Plans)
| 1. SPECIFICATIONS |
| 1.1. SILENCE OF SPECIFICATIONS |
| 1.2. Scope of Work |
| 1.3. SCHEDULE OF KEY EVENTS |
| 2. BID PROPOSAL |
| 3. VENDOR RESPONSES |
| 1. Mandatory Documents to be Submitted* |
| 2. Contractor Acknowledgement* |
| 4. INSURANCE REQUIREMENTS |
| 4.1. INSTRUCTIONS FOR COMPLETION OF INSURANCE DOCUMENT |
| 4.2. Worker's Compensation |
| 4.3. Employers' Liability |
| 4.4. Commercial General Liability |
| 4.5. Automobile Liability: (Owned, Non-Owned, Hired and Injury & Property coverage for all) |
| 4.6. Umbrella each-occurrence with respect to primary Commercial General Liability, Automobile Liability, and Employers Liability policies at minimum limits as follows: |
| 4.7. Pollution Liability |