CWA2603_Water_Well_Rehabilitation__Willow_Bank_and_Eldridge_Road.pdf

PDF 286 KB Posted

Attached to
CWA2603 Water Well Rehabilitation: Willow Bank and Eldridge Road
Solicitation number
2027-ITB-005
Issued by
Fort Bend County, Texas

About this file

Summary

This Invitation for Bid (ITB) document is issued by the City of Sugar Land, Texas for the Water Well Rehabilitation project at Willow Bank and Eldridge Road sites (Solicitation Number 2027-ITB-005). The project scope includes removing and replacing two sets of water well downhole equipment, along with miscellaneous site and electrical work at both locations, with an optional alternate bid to add a generator at the Willow Bank site. Bidders must submit one original electronic bid by 11:00 a.m. on Thursday, December 3, 2026, with a non-mandatory pre-bid site visit scheduled for 10:00 a.m. on Tuesday, November 17, 2026 via Microsoft Teams. Questions must be received by 5:00 p.m. on Monday, November 23, 2026, with answers and addenda posted by November 30, 2026 at 5:00 p.m. The City will award the contract within ninety calendar days after the bid opening date. The selected bidder must enter into the City of Sugar Land Standard Contract for Civil Engineering Construction Projects and provide minimum required insurance coverages.

The base bid pricing form includes miscellaneous items with several fixed allowances: $5,000 for SCADA programming, $5,000 for Arc Flash Hazard Analysis, and $20,000 for CenterPoint overhead power protection. Bidders must enter pricing for mobilization, bonds, and insurance, as well as for thirty-six line items covering equipment removal and replacement, piping work, blasting and recoating, electrical installation, fencing, concrete pavement, and platform construction at both well sites. The alternate bid includes two items: a natural gas generator with foundation, enclosure, and automatic transfer switch, plus a $10,000 allowance for natural gas service connection. All work must be coordinated with the City's engineer to minimize service disruption, as the facilities remain operational during construction. Contractor must comply with specified material requirements, including TNEMEC coatings and Av-Tek valves, and submit required vendor questionnaire documents and a contractor acknowledgement confirming review of plans, specifications, and insurance requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

Solicitation Number 2027-ITB-005

CWA2603 Water Well Rehabilitation: Willow Bank and Eldridge Road

1. NOTICE TO BIDDERS

The City of Sugar Land seeks bids for furnishing all labor, material, and equipment, and performing all work required for the following project in the City:

CIP PROJECT NAME: CWA2603 Water Well Rehabilitation: Willow Bank and Eldridge Road

CIP PROJECT NUMBER: 2027-ITB-005

LOCATION OF WORK: Willow Bank and Eldridge Rd Water Well Sites

Plans, specifications, and bidding documents may be obtained from OpenGov Procurement.

One (1) original bid shall be submitted electronically, on or before 11:00 am on Thursday, December 3, 2026, at which time bids will be publicly opened and read. Bids received after the opening date and time will not be considered.

A non-mandatory pre-bid / site visit for all interested parties will be held 10:00 am on Tuesday, November 17, 2026 at Microsoft Teams meeting Join:

https://teams.microsoft.com/meet/2419031023400622?p=Y3id03kdNTgdSIbhO6 Meeting ID: 241 903 102 340

062 2 Passcode: QL3UY3nS.

Questions regarding this Invitation to Bid must be received on or before 5:00 pm on Monday, November 23, 2026. Please post all questions to OpenGov Procurement.

Contact with any personnel of the City other than as authorized in this Invitation to Bid, regarding this

Invitation to Bid, may be grounds for elimination from the selection process.

The City does not assume responsibility for not receiving questions from the Bidder or the Bidders’ receipt of any answers, addenda, or amendment.

THE SELECTED BIDDER(S) WILL BE REQUIRED TO ENTER INTO THE CITY OF SUGAR

LAND STANDARD CONTRACT FOR Civil Engineering Construction PROJECTS AND PROVIDE

AND MAINTAIN THE MINIMUM INSURANCE COVERAGES REQUIRED UNDER THE

CONTRACT. THE CONTRACT IS INCLUDED AS AN ATTACHMENT TO THIS ITB.

The City Council will award the contract as provided in the Invitation to Bid. The City of Sugar Land will give notice of the contract award within ninety (90) calendar days after the opening date and time.

CITY OF SUGAR LAND Solicitation Number 2027-ITB-005

2. SCOPE OF WORK

2.1. Scope of Work

The project includes removing and replacing two sets of water well downhole equipment, miscellaneous site and electrical work at Willow Bank and Eldridge Rd water well sites. The project also includes an alternate bid to add a generator at Willow Bank Well site.

WORK COVERED BY THIS CONTRACT:

i. Willow Bank and Eldridge Road Water Wells Rehabilitation for City of Sugar Land, Fort

Bend County, Texas.

a. MEASURMENT AND PAYMENT

i. No separate payment for work. Include costs for this work in Bid Items for which this work is a component part.

b. WORK SEQUENCE

i. Phases – None.

ii. Uses of premises:

I. Work on site may not begin until the date of the Notice to Proceed.

II. This is an operating facility, and all work must be coordinated with Engineer to minimize disruption of services.

III. Do not operate valves, start/stop equipment etc. Operator will perform these functions.

iii. Stored materials and equipment

I. Assume full responsibility for the protection and safekeeping of products stored at the site.

II. Relocate any materials or equipment that prevents the Owner from using the site for its intended purposes at no additional cost to the Owner.

III. Obtain and pay for the use of off-site storage or work areas needed for operations.

iv. Utilities o Contractor may use site electricity.

d. OWNER OCCUPANCY

i. Owner may occupy the premises during the entire period of construction for the conduct of his normal operations. Cooperate with Owner's representative in all construction operations to minimize conflict, and to facilitate Owner usage.

e. BID EXPLANATION

i. Base bid includes new docking stations and manual transfer switches at both sites. The existing motor control centers (“MCC”) will remain at both sites.

ii. Base Bid electrical includes sun screens over all electrical panels at both sites.

iii. Alternate Bid is for Willow Bank site only. If the Alternate Bid is chosen, the Willow Bank docking station and manual transfer switch will NOT be built. The Alternate bid includes a generator, automatic transfer switch and new motor control center.

iv. Owner wants only TNEMEC coatings. See notes on plans.

v. Owner wants only Av-Tek valves. See notes on plans.

For additional information, please see the Invitation to Bid (ITB) and Plan set in the attached documents.

2.2. SCHEDULE OF KEY EVENTS

Advertised in local paper/Notice Posted to

OpenGov Procurement:

November 11, 2026

Pre-Bid Conference (Non-Mandatory): November 17, 2026, 10:00am

Microsoft Teams meeting Join:

https://teams.microsoft.com/meet/24190310

23400622?p=Y3id03kdNTgdSIbhO6 Meeting ID: 241 903 102 340 062 2 Passcode: QL3UY3nS

Questions Deadline: November 23, 2026, 5:00pm

Questions Answered and Addendum posted: November 30, 2026, 5:00pm

Bids Due: December 3, 2026, 11:00am

3. BID PROPOSAL

BID EXPLANATION: Base bid includes new docking stations, manual transfer switches, conduits and sunscreens over electrical equipment at both sites. For Base and Alternate Bid both existing motor control centers ("MCC") remain. Alternate Bid is for Willow Bank site only. If Alternate Bid is chosen, the Willow

Bank docking station and manual transfer switch will not be built. The Alternate bid includes a new generator and automatic transfer switch.

NOTE: If the description contains a set unit cost, you must enter the listed amount as your unit cost.

BID PRICING FORM

https://teams.microsoft.com/meet/2419031023400622?p=Y3id03kdNTgdSIbhO6 https://teams.microsoft.com/meet/2419031023400622?p=Y3id03kdNTgdSIbhO6

MISCELLANEOUS ITEMS - Base Bid

Line Item Description Quantity Unit of

Measure Unit Cost Total

Base Bid Miscellaneous Items: Enter pricing for all items included in this section, if an amount is listed in the description, you MUST enter that amount as your unit cost.

1 Mobilization, bonds and insurance 1 LS

2 ALLOWANCE for SCADA programming for both sites. (MUST

ENTER UNIT COST $5,000)

1 LS

3 ALLOWANCE for Arc Flash Hazard

Analysis per Section 16015, completed by Baird, Gilroy & Dixon, L.L.C. (MUST ENTER UNIT COST

$5,000)

1 LS

4 ALLOWANCE for CenterPoint to protect overhead power at either site if needed. (MUST ENTER UNIT COST

$20,000)

1 LS

TOTAL

WATER WELLS

WILLOW BANK AND ELDRIDGE WATER WELL - Base Bid

Line Item Site Description Quantity Unit of

Measure Unit Cost Total

Base Bid Water Well Items: Enter pricing for all items included in this section, if an amount is listed in the description, you MUST enter that amount as your unit cost.

5 Eldridge

Water Well Near-white (SSPC-SP10) blast and recoat all above ground piping with

TNEMEC three-coat zinc-rich epoxy primer/epoxy/polyurethane system with full containment if required.

1 LS

6 Eldridge

Water Well Remove and replace existing 8" Gate Valve

1 EA

Line Item Site Description Quantity Unit of

Measure Unit Cost Total

7 Eldridge

Water Well Remove and replace existing 12" Gate Valve

1 EA

8 Eldridge

Water Well Remove and replace existing 12" Check Valve

1 EA

9 Eldridge

Water Well Remove and replace 4" air/vacuum release valve

1 EA

10 Eldridge

Water Well Remove and replace existing flow meter

1 EA

11 Eldridge

Water Well Remove and replace existing 12" Restrained

Dresser Coupling

1 EA

12 Eldridge

Water Well Pull existing pump and column assembly, evaluate motor and pump equipment

1 LS

13 Eldridge

Water Well Replace pump and column assembly

1 LS

14 Eldridge

Water Well Wire brush, jet and airlift debris, preform before and after camera surveys and disinfect the well including three water samples.

1 LS

15 Eldridge

Water Well Provide and install electrical equipment including, but not limited to manual transfer switch, canopy, housekeeping pad, conduit, wire, and all ancillary devices as shown on construction drawings, complete in place.

1 LS

16 Eldridge

Water Well Partially remove existing fence and gate as shown on construction drawings.

1 LS

17 Eldridge

Water Well Provide rolling gate with track system

Unit Cost Total

18 Eldridge

Water Well Provide and install fence per plans

1 LS

19 Eldridge

Water Well Remove and haul off existing asphalt driveway and base

1 LS

20 Eldridge

Water Well 6" Concrete pavement including 6" cement stabilized sand subgrade

1 LS

21 Eldridge

Water Well Remove and replace existing sidewalk around wellhead.

1 LS

22 Eldridge

Water Well Provide aluminum access platform next to wellhead.

1 LS

23 Willow

Bank Water

Well

Near-white (SSPC-SP10) blast and recoat all above ground piping with

TNEMEC three-coat zinc-rich epoxy primer/epoxy/polyurethane system with full containment if required.

1 LS

24 Willow

Bank Water

Well

Remove and replace existing 16" butterfly valve

2 EA

25 Willow

Bank Water

Well

Remove and replace existing 16" check valve

1 EA

26 Willow

Bank Water

Well

Remove and replace 3" air/vacuum release valve

1 EA

27 Willow

Bank Water

Well

Remove and replace existing flow meter

1 EA

28 Willow

Bank Water

Well

Remove and replace existing 16" restrained dresser coupling

1 EA

Unit Cost Total

29 Willow

Bank Water

Well

Pull existing submersible pump and column pipe, evaluate motor and pump equipment.

1 LS

30 Willow

Bank Water

Well

Replace submersible pump, column pipe, and motor cable.

1 LS

31 Willow

Bank Water

Well

Wire brush, jet and airlift debris, preform before and after camera surveys and disinfect the well including three water samples.

1 LS

32 Willow

Bank Water

Well

Provide and install electrical equipment including, but not limited to manual transfer switch, canopy, housekeeping pad, conduit, wire, and all ancillary devices as shown on construction drawings, complete in place.

1 LS

33 Willow

Bank Water

Well

Remove replace main braker box and junction box at wellhead with

304SS NEMA 4X

enclosures

1 LS

34 Willow

Bank Water

Well

Miscellaneous Pipe Work 1 LS

35 Willow

Bank Water

Well

Remove and replace existing 8' tall fence w/ 8' tall cedar Fence

1 LS

36 Willow

Bank Water

Well

Provide rolling gate with track system

ADD ALTERNATE BID ITEMS

NOTE: Bid Item 32 will be deleted if the Alternate Bid Items are approved.

Line Item Description Quantity Unit of

Measure Unit Cost Total

Add Alternate Items: Enter pricing for all items included in this section, if an amount is listed in the description, you MUST enter that amount as your unit cost.

A1 In lieu of Willow Bank Bid Item 32, provide and install natural gas generator, concrete foundation, sound attenuating enclosure, ground wells, automatic transfer switch, and all required appurtenances as shown on construction drawings, complete in place.

1 LS

A2 Allowance for natural gas service.

Exact amount will be reimbursed to

Contractor upon submittal of invoice from Natural Gas Service Provider.

(MUST ENTER UNIT COST

$10,000)

4. VENDOR QUESTIONNAIRE

1. Mandatory Documents to be Submitted*

Please download the below documents, complete, and upload.

• Required_Forms_for_Willow_B...

*Response required

2. Contractor Acknowledgement*

Contractor has reviewed all of the plans, specifications, terms and conditions. I understand the Insurance

Requirements of these specifications and will comply in full if awarded this contract.

☐ Please confirm

*Response required https://government-project.s3.us-west-2.amazonaws.com/321602/ba3e433d-04e6-4364-99b9-907a322bb8ae_Required_Forms_for_Willow_Bank_and_Eldridge_Water_Wells.pdf

Attachments:

A - CWA2603 Water Well Rehab Willow Bank and Eldridge Rd ITB

B - CWA2603 Willow Bank and Eldridge Well Rehab - Final Plan Set

1. NOTICE TO BIDDERS
2. SCOPE OF WORK
2.1. Scope of Work
2.2. SCHEDULE OF KEY EVENTS
3. BID PROPOSAL
4. VENDOR QUESTIONNAIRE
1. Mandatory Documents to be Submitted*
2. Contractor Acknowledgement*

File details come from the government source that posted it. Updated .