CW cabinet washer specification.pdf
PDF 174 KB Posted
- Solicitation number
- 12905B20Q1012784
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Frm 2/09/20
Qu Customer
Contact USDA Agricultural Research Service
Address Foodbourne Toxin Detection and Prevention 800 Buchanan Street Albany, CA 94710
Phone
Qty Part Number Description Unit Price Ext. Price
CW-185 Cabinet Washer
1 CW185ET2DUL CW-185-E-T-2D-UL Cabinet washer, electric heat, touch screen & PLC controls, 2 access doors, UL compliant, 3-level oscillating wash/rinse arms and removable middle level. Includes wash and rinse pumps, detergent dosing pump & neutralizer in-line injection pump, canister level alarm, upper level shelf and USB port.
1 CW185ET3UL CW-185-E-T3-UL Third tank option for final rinse including tank, plumbing connections, UL compliant. Compatible with all UL compliant CW-185-E cabinet washers.
1 CW185ETH CW-185-ETH Ethernet connection option. Includes PLC ethernet module & machine software for downloading operation data to a customer-supplied PC as well as providing the capability for remote factory troubleshooting of the machine. Compatible with all CW-185 washers.
1 CW13-18EX25UL CW-13x/15x/18x-EX.25-UL Exhaust kit including 0.25Kw fan, UL compliant. Compatible with all CW-13x, CW-15x and CW-18x UL compliant cabinet washers.
1 CW185DPUL CW-185-DP-UL Additional Dosing pump kit for use with detergent in tank 1 or tank 2. Includes dosing pump, plumbing connections and software, UL compliant. Compatible with all UL compliant CW-185 cabinet washers.
1 CW185PHTUL CW-185-PHT-UL Tank system for controlling the pH and temperature of washer discharge water located adjacent to the cabinet washer, including drain pump and software, UL compliant.
Compatible with all UL compliant CW-185-E and CW-185-S washers.
1 CW18xUSCON CW-18x-US-CON Service connection kit for CW-18x cabinet washers to provide standard USA connections (threads, flanges, etc.) for building services/utilities.
1 CW13-18CF CW-13-18-CF Crating & packaging for air/ocean shipment of a CW-135 or a CW-185.
Shipment information
Transp ort Mode Ocean Container and Commercial Carrier
Incote rms DDP Albany, CA
Lead-T ime 18 Weeks After Receipt of Purchase Order and Required Payment
Total see last page
Terms & Conditions
Prepared By: E. Bijou
Allentown, LLC
165 Route 526
Allentown, NJ 08501 www.AllentownInc.com
T: 609-259-7951 F: 609-259-0449 http://www.allentowninc.com/
Frm 2/09/20
Qu Customer
Contact USDA Agricultural Research Service
Address Foodbourne Toxin Detection and Prevention 800 Buchanan Street Albany, CA 94710
Phone
Qty Part Number Description Unit Price Ext. Price
Factory Acceptance Test (FAT)
1 FAT-WC FAT for equipment on this quote performed by ACO Personnel at no charge.
Expenses for Attendance Paid by Customer.
Installation, Site Acceptance Test (SAT) and Training
1 INSTALL-WC Placement, assembly & startup for all equipment on this quote, performed by
Allentown representatives.
1 SAT-WC SAT & Training for all equipment on this quote, performed by
Warranty Support
Allentown representatives.
2 yr WARRANTY-WC Warranty Support, Parts and Labor, for quoted equipment
Comments and Notes
• Services and utility drops, disconnects, shut-offs and other associated items are to be installed and tested by others prior to the arrival of the Allentown representatives.
• The customer's receiving facilities must be capable of accepting large truck deliveries.
• The equipment required for truck unloading and equipment movement through the facility will be provided by others.
• All doorways and hallways along the equipment path from the dock to its installation location must be a minimum of 48" wide.
• Allentown personnel will unpack, locate and level the equipment using the customer supplied material handling apparatus.
• Final utility and services connections to the equipment will be performed by others.
• Installation, Commissioning and Training for the quoted equipment will be performed by Allentown and support personnel.
• Please note the following items are not included in this quoted pricing:
- Temporary barrier fabrication and installation
- Removal and disposal of existing equipment
- Pit and other wash area repairs
- Barrier wall and other building modifications
- Disposal of packaging and shipment materials
Subtotal Freight Shipment information Discount
Transport Mode Ocean Container and Commercial Carrier
Incoterms DDP Albany, CA
Lead-Time 18 Weeks After Receipt of Purchase Order and Required Payment
Total
Terms & Conditions
Allentown, LLC
165 Route 526
Allentown, NJ 08501 www.AllentownInc.com
T: 609-259-7951 F: 609-259-0449
Prepared By: E. Bijou mailto:jackie.miller@ars.usda.gov http://www.allentowninc.com/
File details come from the government source that posted it. Updated .