CV Link Shade Structure and Shade Trees Project.pdf

PDF 432 KB Posted

Attached to
CV Link Shade Structure and Shade Trees Project
Solicitation number
2027-03
Issued by
Humboldt County, California

About this file

CV Link Shade Structure and Shade Trees Project – Request for Proposals

This Request for Proposals (RFP) document is issued by the Coachella Valley Association of Governments (CVAG), a California joint powers authority consisting of ten cities, one county, and four Native American tribes, for design and related professional services for the CV Link Shade Structure and Shade Trees Project (CVAG RFP No. 2027-03). The project involves designing approximately five shade structures, 26 native shade trees, and associated improvements at five existing CV Link rest-stop locations: Vista Chino (Palm Springs), Jenkins Trail (Palm Springs), Palm Desert High School (Palm Desert), Promontory Point (La Quinita), and Sierra Vista Park (Coachella). Requested services include preliminary engineering, surveying and site investigations, geotechnical analysis, civil and structural engineering, landscape architecture, irrigation and electrical design, permitting and agency coordination, preparation of Plans, Specifications, and Estimates (PS&E), and bidding and construction support. Proposals must be submitted electronically to procurement@cvag.org by December 9, 2026, at 2:00 p.m. PST. A non-mandatory pre-proposal conference will be held on November 20, 2026, at 1:00 p.m. PST via Microsoft Teams. The deadline for written questions is December 2, 2026, at 2:00 p.m. PST. CVAG anticipates selecting up to four shortlist proposers for virtual interviews on January 6, 2027, with an expected contract award date of February 22, 2027. The design phase is anticipated to run from October 2026 through May 2027, with permitting extending through October 2027 and construction occurring from October 2027 through July 2028, with final grant closeout by September 2028.

The preliminary estimated construction project cost is approximately $1.125 million. The design phase services are funded entirely by CVAG, while construction is funded primarily through the Coachella Valley Mountains Conservancy (CVMC) under Grant Agreement No. 38500000P040003 (Project ID CVMC2606) under the Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024 (Proposition 4), for which CVMC has awarded CVAG up to $1,248,586 for eligible construction costs. CVAG is also providing funding for permitting, construction management, and other non-eligible project costs. The proposal evaluation is based on a 100-point scale: Qualifications, Related Experience and References (30%); Proposed Staffing and Project Organization (20%); Work Plan (30%); and Proposed Fee (20%). Proposals are limited to 25 pages and must include a technical proposal and separate fee proposal organized by task with detailed hours, hourly rates, subtotals, and a grand total. The project is subject to California public works and prevailing wage requirements, including California Labor Code Sections 1720 et seq., and the Consultant and all subconsultants must comply with applicable prevailing wage rates established by the California Department of Industrial Relations and provide current DIR registration where required. All work products, studies, plans, reports, drawings, and data developed under the contract shall become the property of CVAG, and the Consultant must maintain complete project files and retain records for at least three years following completion.

View the file

Other files

File Type Posted
La Ladera Park Enhancements.pdf PDF
Bid Notice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 1 OF 28

Notice Inviting Proposals

The Coachella Valley Association of Governments (“CVAG”), a California joint powers authority, invites proposals from qualified professional consulting firms to provide design and related professional services for the CV Link Shade Structure and Shade Trees Project, CVAG RFP No. 2027-03 (“Project”). Proposals shall be submitted in accordance with this Request for Proposals (“RFP”) and all applicable solicitation documents issued by CVAG.

Proposals shall be submitted electronically by email to procurement@cvag.org no later than 2:00 PM Pacific Standard Time (PST) on December 9, 2026, in accordance with the submission instructions established in Section III. Submittal Requirements of the RFP. Proposals received after the stated deadline may be rejected.

The Project generally consists of designing approximately five shade structures, 26 native shade trees, and associated improvements at five existing CV Link rest-stop locations. The requested services generally include preliminary engineering, surveying and site investigations, geotechnical analysis, civil and structural engineering, landscape architecture, irrigation and electrical design, permitting and agency coordination, preparation of plans, specifications, and estimates (PS&E), and bidding and construction support.

The selected Consultant shall provide the professional services described in Section V. Scope of Work and prepare complete design documents in accordance with applicable laws, professional standards, and Project requirements.

Consultant selection will be based on demonstrated competence and professional qualifications in accordance with applicable California law and the evaluation and selection procedures established in this RFP.

The RFP and associated solicitation documents may be obtained from CVAG’s website at https://cvag.org/proposals/. Proposers are responsible for obtaining and reviewing all solicitation documents and addenda and monitoring the identified location for updates.

CVAG reserves the right to reject any or all Proposals, waive minor irregularities or informalities, and take other action in its best interest as permitted by applicable law.

The Project may include services subject to California public works and prevailing wage requirements, including, but not limited to, applicable field surveying, geotechnical investigations, testing, inspections, and other covered activities.

The Consultant and its subconsultants shall comply with all applicable provisions of the California Labor Code, including Sections 1720 et seq., and implementing regulations, to the extent applicable to the services performed under the resulting Agreement.

For work subject to prevailing wage requirements, the Consultant and its subconsultants shall pay not less than the applicable prevailing wage rates established by the California Department of Industrial Relations (DIR) and shall comply with applicable contractor registration, certified payroll reporting, recordkeeping, and labor compliance requirements.

The Consultant shall ensure that all subconsultants performing covered public work possess current DIR registration where required by law and shall provide evidence of registration and compliance upon request by CVAG.

The Project is subject to applicable monitoring and enforcement by DIR. The Consultant shall cooperate with CVAG and applicable regulatory agencies in verifying compliance with public works and prevailing wage requirements.

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 2 OF 28

COACHELLA VALLEY ASSOCIATION OF

GOVERNMENTS

REQUEST FOR PROPOSALS

FOR

PROFESSIONAL SERVICES

FOR THE

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT

CVAG RFP No. 2027-03

ISSUE DATE: November 5, 2026

Coachella Valley Association of Governments 74-199 El Paseo, Suite 100

Palm Desert, CA 92260

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 3 OF 28

Table of Contents Notice Inviting Proposals

I. Background and Introduction

II. Request For Proposals

A. Scope of Services

B. Procurement Representative

C. Requests for Clarification

D. Pre-Proposal Conference

III. Submission Requirements

A. General

B. Content and Format of Technical Proposal

C. Content and Format of Fee Proposal

D. No Deviations from the RFP

E. Additional Stipulations

IV. Submission Process

A. Selection Schedule

B. Evaluation

C. Selection

D. Protests

V. Scope of Work

A. General Conditions and Requirements

B. Project Management

C. Applicable Standards

Shade Structures

Site Furnishings and Signage

Native Shade Trees and Irrigation

CVMC Acknowledgement and Signage

D. Quality Assurance

E. Project Progress

F. Materials Provided by Agency

G. Scope of Work/Project Tasks

Field Survey, Mapping, and Existing Conditions

Geotechnical Investigation and Structural Analysis

Civil and Site Design

Landscape, Irrigation, and Hardscape Design

Electrical Design

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 4 OF 28

Drainage, Water Quality, and Erosion Control

Utility Coordination

Permitting and Agency Coordination

Environmental Compliance

Cost Estimating and Scheduling

Phasing and Traffic Control

Electronic Deliverables

H. Deliverables

35% Design Submittal

95% Design Submittal

Final Bid-Ready Plans, Specifications, and Estimate

Permit Deliverables

Bid Support Deliverables

Construction Support Deliverables

Record Drawings and Final GIS Deliverables

Bidding, Construction, and Post-Design Support

I. Ownership and Use of Work Product

J. Audit and Records Requirements

K. Nondiscrimination Requirements

L. Prevailing Wage and Public Works Compliance

VI. Attachments

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 5 OF 28

I. Background and Introduction

CVAG is a joint powers authority (JPA) formed in 1973 with the purpose of coordinating and improving the planning and delivery of governmental responsibilities common to all member entities within the local region. CVAG consists of representatives of ten cities, one county, and four Native American tribes.

CVAG is seeking proposals from qualified professional consulting firms to provide design and related professional services for the CV Link Shade Structure and Shade Trees Project, CVAG RFP No. 2027-03 (“Project”).

The CV Link is an approximately 40-mile dual pathway for pedestrians, bicyclists, and low-speed neighborhood electric vehicles extending through multiple Coachella Valley communities. The corridor was developed pursuant to the CV Link Conceptual Master Plan and opened to the public in November 2025. Existing improvements along the corridor include rest stops and amenities such as shade structures, benches, bike racks, hydration stations, and signage.

Following the opening of the corridor, CVAG identified a need for additional shade at selected rest-stop locations to improve user comfort and reduce exposure to extreme heat.

The Project will provide new shade structures and native shade trees at five existing CV Link rest-stop locations: Vista Chino, Jenkins Trail, Palm Desert High School, Promontory Point, and Sierra Vista Park.

The proposed improvements generally include five shade structures with integrated benches and bike racks, approximately 26 native shade trees, and associated site improvements.

Improvements may include concrete flatwork, grading, irrigation and electrical modifications, kiosk signage relocation, litter receptacle installation, and other improvements necessary to accommodate the Project.

The proposed improvements will connect to the existing CV Link pathway at each location and may require minor pathway modifications, including signage, pavement markings, and irrigation adjustments. Irrigation modifications are anticipated at Promontory Point and Sierra Vista Park.

Wayfinding and funding-recognition signage will be incorporated at each Project location.

The shade structures will be designed to maintain compatibility with existing CV Link facilities and established design standards.

Following the completion of this Design phase, the Construction phase, including construction management services, will be solicited separately and authorized. The preliminary estimated construction project cost is approximately $1.125 million.

The Project is supported by funding from the Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024 (“Proposition 4”), administered by the Coachella Valley Mountains Conservancy (“CVMC”) under Grant Agreement No. 38500000P040003, Project ID CVMC2606, which is attached to this RFP.

CVMC has awarded CVAG up to $1,248,586 for eligible construction costs. The Design phase services are funded entirely by CVAG, while the project construction phase is funded primarily by the CVMC Proposition 4 Grant. CVAG is also providing funding for permitting, construction management, and other non-eligible Project costs identified in the grant budget.

Applicable grant-related design responsibilities and contractual requirements are addressed in the Scope of Services and resulting Professional Services Agreement.

The Project includes improvements at five existing CV Link rest-stop locations:

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 6 OF 28

• Vista Chino – Palm Springs: One shade structure and associated amenities.

• Jenkins Trail – Palm Springs: One shade structure and associated amenities.

• Palm Desert High School – Palm Desert: One shade structure and associated amenities.

• Promontory Point – La Quinta: Approximately 20 native shade trees and associated irrigation improvements.

• Sierra Vista Park – Coachella: Two shade structures and associated amenities, approximately six native shade trees, and associated irrigation improvements.

The locations are situated along the CV Link corridor in Riverside County and involve properties owned or controlled by multiple public and private entities. CVAG holds fee title to a portion of Promontory Point. Access to other locations is documented through applicable easements, rights-of-way, licenses, permits, and other access instruments. Additional construction encroachment permits and other agency approvals may be required.

CVAG requires that all firms obtain the full content of this Request for Proposals (RFP) and any addenda via CVAG’s website located at www.cvag.org/proposals.

Proposals will be evaluated and ranked in accordance with the Request for Proposals. The final ranked firms must be willing to sign an agreement with the terms and conditions required by CVAG in the Request for Proposals and attachments.

All questions must be put in writing and must be emailed to procurement@cvag.org and received by CVAG by December 2, 2026 at 2:00 p.m. Pacific Standard Time (PST). Please note that all addenda will be published on the CVAG website. Proposers are encouraged to check the CVAG website regularly since each Consultant will be responsible for downloading the RFP and any addenda. Consultants that have provided contact information will receive notification of any addenda.

CVAG reserves the right to conduct interviews to better evaluate the proposers. If interviews are conducted, CVAG may select a shortlist of vendors for tentative virtual interviews to be conducted on January 6, 2027.

The award of this contract is subject to the available budget adequate to conduct the provisions of the proposed agreement including the identified scope of work. CVAG reserves the right to reject any or all proposals determined not to be in the best interest of CVAG.

II. Request For Proposals

A. Scope of Services

The Services sought under this Request for Proposals (“RFP”) are set forth in more detail in Section V. Scope of Work/Project Tasks herein. Notwithstanding the inclusion of such Services in Section V. Scope of Work/Project Tasks herein, the final scope of Services negotiated between Coachella Valley Association of Governments (“CVAG”) and the successful Proposer shall be set forth in the Professional Services Agreement (“Agreement”) executed by and between CVAG and the successful Proposer. A copy of the draft Agreement is attached hereto as Attachment A and incorporated herein by this reference.

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 7 OF 28

B. Procurement Representative

The procurement representative for CVAG regarding this RFP will be Allen McMillen, Management Analyst II, procurement@cvag.org, or a designated representative, who will coordinate the assistance to be provided by CVAG to the Proposer.

C. Requests for Clarification

All questions, requests for interpretations or clarifications, either administrative or technical, must be requested in writing and emailed to the CVAG procurement representative for this RFP.

All written questions, if answered, will be answered in writing, conveyed to all interested Proposers, and posted to the CVAG website. Oral statements regarding this RFP by any persons should be considered unverified information unless confirmed in writing. To ensure a response, questions must be received in writing via email by 2:00 PM local time on the date identified in Section IV.A. Selection Schedule herein.

D. Pre-Proposal Conference

CVAG will conduct a non-mandatory pre-proposal conference on November 20, 2026, at 1:00 PM PST. The conference will provide prospective Proposers an opportunity to receive general Project information and seek clarification regarding the RFP requirements.

Microsoft Teams meeting

Join: https://teams.microsoft.com/meet/2928886279975832?p=rwnIL1yqxe8gX9Z2UU

Meeting ID: 292 888 627 997 583 2

Passcode: eQ2vk9Lt

Any questions requiring clarification or modification of the RFP shall be submitted in writing in accordance with Section II.C. Requests for Clarification. Only written addenda issued by CVAG shall be binding.

III. Submission Requirements

A. General

Proposals shall be submitted by email in Portable Document Format (pdf), identified in the subject line as “CV Link Shade Structure and Shade Trees Project - CVAG RFP No. 2027-03” to procurement@cvag.org. Proposals shall consist of both a technical proposal and a separate fee proposal and are to be submitted (emailed) in one email submission as two separate attachments.

The file names shall designate the contents accordingly (e.g., “Technical Proposal” or “Fee Proposal”).

It is strongly recommended that the Proposer submit proposals in the format identified in this RFP to allow CVAG to fully evaluate and compare the proposals. All requirements and questions in the RFP should be addressed and all requested data shall be supplied. CVAG reserves the right to request additional information which, in CVAG’s opinion, is necessary to assure that the Proposer’s competence, number of qualified employees, business organization, and financial resources are adequate to perform according to the Agreement.

Proposals should be prepared in such a way as to provide a straightforward, concise delineation of capabilities to satisfy the requirements of this RFP. Responses should emphasize the

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 8 OF 28

Proposer’s demonstrated capability to perform the Services. Technical literature that supports the Proposer’s approach to providing the Services and work plan may be submitted to CVAG in conjunction with the Proposal. Emphasis should be concentrated on completeness, approach to work and clarity of proposal.

Proposers are encouraged to visit the project locations, as applicable, to determine the local conditions which may in any way affect the performance of the work; familiarize themselves with all federal, state and local laws, ordinances, rules, regulations, and codes affecting the performance of the work; make such investigations, as it may deem necessary for performance of the services at its proposal price within the terms of the Agreement; and correlate its observations, investigations, and determinations with the requirements of the Agreement.

The proposal shall be signed by an individual, partner, officer or officers authorized to execute legal documents on behalf of the Proposer.

B. Content and Format of Technical Proposal

Proposals shall be concise, well organized and demonstrate qualifications and applicable experience. Proposals shall be organized and include page numbers for all pages in the proposal.

The proposal shall be emailed (pdf file) as an attachment(s) and submitted via email to the Procurement Representative.

Proposals shall be limited to a total of twenty-five pages. The Cover Page, Cover Letter, Appendices, and page separators will not count toward the page limit. Proposals shall be presented in the following order and shall include:

1. Cover Letter. This letter, two-page maximum, shall be addressed to Jonathan Hoy, PE, Director of Transportation and shall, at a minimum, contain the following:

• Identification of Consultant that will have contractual responsibility with CVAG.

Identification shall include legal name of company, corporate address, and telephone number. Include name, title, address, email address, and telephone number of the contact person identified during period of proposal evaluation.

• Identification of all proposed Subcontractors including legal name of company, contact person(s) name and mailing address, phone number and email address. Relationship between Consultant and Subcontractors, if applicable.

• Acknowledgment of receipt of all RFP addenda – include the signed Addenda Acknowledgement(s), if any.

• A statement to the effect that the proposal shall remain valid for a period of not less than 180 days from the date of submittal.

• A statement that the Consultant does not have any personal, business, or financial relationship with the Contractors and Subcontractors that will be pursuing the work.

• Signature of a person authorized to bind Consultant to the terms of the proposal.

• Signed statement attesting that all information submitted with the proposal is true and correct.

2. Qualifications, Related Experience and References. This section of the proposal should establish the ability of Consultant to satisfactorily perform the required work by reasons of experience in performing work of the same or similar nature; strength and stability of the Consultant; staffing capability; workload; record of meeting schedules on similar projects;

and at least three supportive client references. Consultant to:

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 9 OF 28

• Provide a brief profile of the firm, including the types of services offered; the year founded; form of the organization (corporation, partnership, sole proprietorship); number, size, and location of offices; number of employees.

• Provide a general description of the firm's financial condition, identify any conditions (e.g., bankruptcy, pending litigation, planned office closures, impending merger) that may impede Consultant’s ability to complete the Project.

• Describe the firm's experience in performing work of a similar nature to that solicited in this RFP and highlight the participation in such work by the key personnel proposed for assignment to this Project.

• Describe experience in working with the various government agencies and private entities that may have jurisdiction over the approval of the work specified in this RFP.

Please include specialized experience and professional competence in areas related to this RFP.

• A minimum of three (3) references should be given with current contact information confirmed. Furnish the name, title, address, telephone number; and email address of the person(s) at the client organization who is most knowledgeable about the work performed. Consultant also may supply references from other work not cited in this section as related experience.

3. Proposed Staffing and Project Organization. This section of the proposal should establish the method that will be used by the Consultant to manage the Project as well as identify key personnel and sub-consultants assigned. Consultant to:

• Provide education, experience, and applicable professional credentials of project staff.

Include applicable professional credentials of “key” project staff.

• Summarize the resumes (one-half page each at most) for the proposed Project Manager and other key personnel in this section. More detailed resumes may be included in the Appendices for the proposal.

• Identify key personnel proposed to perform the work in the specified tasks and include major areas of subcontract work. Include the person's name, current location, proposed position for this Project, current assignment, level of commitment to that assignment, availability for this assignment and how long each person has been with the firm.

• Include a project organization chart that clearly delineates communication and reporting relationships with CVAG among the project staff and subconsultants.

• Include a statement that key personnel will be available to the extent proposed for the duration of the Project, acknowledging that no person designated as "key" to the Project shall be removed or replaced without the prior written consent of CVAG.

4. Work Plan. Consultant shall provide a narrative that addresses the Scope of Work and shows Consultant's understanding of CVAG's needs and requirements. Consultant to:

• Describe the approach and work plan for completing the tasks specified in the Scope of Work. The work plan shall be of such detail to demonstrate the Consultant’s ability to accomplish the Project objectives and overall schedule.

• Outline sequentially, the activities that would be undertaken in completing the tasks and specify who would perform them and identify all deliverables.

• Identify methods that Consultant will use to ensure quality control as well as budget and schedule control for the Project.

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 10 OF 28

• Identify any special issues or problems that are likely to be encountered during this Project and how the Consultant would propose to address them.

• Identify the approach and techniques that will be employed to ensure that the project is completed in compliance with all federal requirements.

• Provide Schedule and Deadlines. The draft schedule shall be depicted in a Gantt chart format.

5. Appendices:

• All required forms to be completed by the Proposer and certifications per Attachment B to this RFP.

• Recent and Relevant Projects: Provide an example of a similar scoped project deliverable conducted within the last three (3) years, or in process if at least in the final draft stage. If published online, the Proposer may provide a link in lieu of inserting a lengthy document into the appendices.

• Litigation: Provide litigation history for any claims filed by your firm or against your firm related to the provision of Services in the last five (5) years.

• Project Team Resumes: Submit resumes of all key personnel/support staff that will produce work products for the Services. Describe their qualifications, education, and professional licensing.

• Changes to Professional Services Contract: CVAG’s standard professional services contract is included as Attachment “A” in this Request for Proposals. The Proposer shall review with proposed subconsultants and identify from Proposer or proposed subconsultants any objections to and/or request changes to the standard contract language in this section of the proposal.

C. Content and Format of Fee Proposal

Provide separate from the Technical Proposal a Fee Proposal for required services described in Section V. Scope of Work/Project Tasks herein. The proposal shall be emailed (pdf file) as an attachment(s) and submitted via email to the Procurement Representative.

The Fee Proposal shall be presented in a table format organized by task per Section V. Scope of Work/Project Tasks herein and shall include hours and hourly rates for all personnel including subconsultants, subtotals for each task inclusive of required deliverables, and a grand total for total proposed fee. The Fee Proposal shall also include proposed direct costs and subcontractor mark-up, if any.

D. No Deviations from the RFP

In submitting a proposal in response to this RFP, Proposer is certifying that it takes no exceptions to this RFP including, but not limited to, the Agreement. If any exceptions are taken, such exceptions must be clearly noted in the proposal and may be reason for rejection of the proposal.

As such, Proposer is directed to carefully review the proposed Agreement, the insurance and indemnification provisions therein.

E. Additional Stipulations

CVAG reserves the right to accept or reject any proposal and to waive any informality, incompleteness, or error in any proposal.

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 11 OF 28

All proposals received become the property of CVAG. Once a contract has been awarded, the name(s) of the successful applicant(s) may be made available to the public upon request. All costs incurred by applicants in the preparation and presentation of their proposal will be at their own expense, and applicant materials will not be returned.

CVAG reserves the right to amend the RFP or issue to all Proposers addenda to answer questions for clarification.

Unless specifically requested by CVAG, no amendment, addendum or modification will be accepted after a proposal has been submitted to CVAG. If a change to a proposal that has been submitted is desired, the submitted proposal must be withdrawn and the replacement proposal submitted prior to the deadline stated herein for receiving proposals.

A proposal may be considered non-responsive if conditional, incomplete, or if it contains alterations of form, additions not called for, or other irregularities that may constitute a material change to the proposal.

CVAG will not compensate any Proposer for the cost of preparing any proposal, and all materials submitted with a proposal shall become the property of CVAG. CVAG will retain all proposals submitted and may use any idea in a proposal regardless of whether that proposal is selected.

CVAG reserves the right to cancel this RFP at any time prior to the contract award without obligation in any manner for proposal preparation, interview, fee negotiation or other marketing costs associated with this RFP.

Prices provided by Proposers in response to this RFP are valid for one hundred eighty calendar days from the proposal due date. CVAG intends to award the contract within this time but may request an extension from the Proposers to hold pricing, until negotiations are complete, and the contract is awarded.

Issuance of this RFP and receipt of proposals does not commit CVAG to award a contract. CVAG expressly reserves the right to postpone the proposal for its own convenience, to accept or reject any or all proposals received in response to this RFP, to negotiate with more than one Proposer concurrently, or to cancel all or part of this RFP.

CVAG reserves the right to negotiate any price or provision, task order or service; accept any part or all of any proposals; waive any irregularities; and to reject any and all, or parts of any and all proposals; whenever, in the sole opinion of CVAG, such action shall serve its best interests and those of the tax-paying public. The Agreement, if any is awarded, will go to the Proposer whose proposal best meets CVAG’s requirements.

IV. Submission Process

A. Selection Schedule

Submissions are due on December 9, 2026, no later than 2:00 p.m. PST. A Selection Committee comprised of CVAG staff may choose up to four short list proposers to be interviewed. Shortlist Finalists to be invited to an interview will be notified by 5:00 p.m. on December 18, 2026.

Interviews will be scheduled to occur on January 6, 2027, at a time and location to be provided by CVAG. Proposers are to hold the interview date until confirmed by CVAG. The tentative schedule is as follows:

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 12 OF 28

ACTION DATE

1. Release of Request for Proposals

• Post to www.cvag.org

November 5, 2026

2. Pre-Proposal Conference (Non-Mandatory, Virtual)

November 20, 2026 (1:00 p.m. PST)

3. Deadline to Email Questions

• Email to procurement@cvag.org

December 2, 2026 (2:00 p.m. PST)

4. Responses to Questions via Addendum

• Post to www.cvag.org

December 4, 2026

5. Deadline for Receipt of Proposals

• Email to procurement@cvag.org

December 9, 2026 (2:00 p.m. PST)

6. Evaluation of Proposals December 9, 2026 – December 18,

7. Finalist – Virtual Interviews (Tentative) January 6, 2027

8. Expected Contract Award February 22, 2027

The above scheduled dates are tentative and CVAG retains the sole discretion to adjust the above schedule. Proposers are to hold the date of January 6, 2027 for potential virtual interviews if selected and invited as a shortlist finalist.

B. Evaluation

The Selection Committee will score proposals based on the following scale:

1. Qualifications, Related Experience and References (30%)

This section of the proposal should establish the ability of the proposed firm, subcontractor, and team to satisfactorily perform the required work by reasons of experience in performing work of the same or similar nature; demonstrated experience working with agencies directly involved in this Project; staffing capability; workload; record of meeting schedules on similar projects; and at least three (3) supportive client references.

CVAG strongly encourages proposals from qualified small local businesses. It is CVAG’s policy to encourage greater availability, capacity development, and contract participation by small local business enterprises in CVAG contracts. It is intended to further CVAG’s interest to stimulate economic development in the Coachella Valley through the support and empowerment of the local community, ensure that it is neither an active nor passive participant in marketplace discrimination, and promote equal opportunity for all segments of the contracting community. Successful applicants will demonstrate experience and success in comparable projects. References will support examples of success in comparable projects.

Refer to Section III.B.2 of the Request for Proposals for more information.

2. Proposed Staffing and Project Organization (20%)

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 13 OF 28

This section of the proposal should establish the method that will be used to manage the Project as well as identify key personnel assigned.

Refer to Section III.B.3 of the Request for Proposals for more information.

3. Work Plan (30%)

This section of the proposal shall provide a narrative that addresses the Scope of Work and shows understanding of the Project needs and requirements.

Refer to Section III.B.4 of the Request for Proposals for more information.

4. Proposed fee (20%)

Successful applicants will propose fees that are cost-effective, sufficiently detailed, and feasible. Cost-effective proposals will be able to accomplish higher levels of planning and design with the available funds.

Refer to Section III.C of the Request for Proposals for more information.

During the evaluation process, CVAG reserves the right, where it may serve CVAG's best interest, to request additional information or clarifications from Proposers, or to allow corrections of errors or omissions.

C. Selection

It is CVAG’s intent to select a Proposer best evidencing demonstrated competence and professional qualifications to perform the Services. CVAG reserves the right to reject all proposals, select by proposal review only or interview as needed. Certain Proposers may be selected to make a brief presentation and oral interview after which a final selection will be made. The successful Proposer will be selected on the basis of information provided in the RFP, in-person or virtual presentations, and the results of CVAG’s research and investigation.

Upon selection of a Proposer, CVAG will endeavor to negotiate a mutually agreeable professional services agreement with the selected Proposer. In the event that CVAG is unable to reach agreement, CVAG will proceed, at its sole discretion, to negotiate with the next Proposer selected by CVAG. CVAG reserves the right to contract for services in the manner that most benefits CVAG including awarding more than one contract if desired.

D. Protests

Protest procedures and dispute resolution process for the contract portions of the project that are federally funded will be in accordance with the CVAG policy.

Written protests must be filed with CVAG’s Executive Director within five (5) workdays after posting of the Notice of Intent to Award on CVAG’s website. No verbal protest will be accepted.

The protest must be submitted to CVAG’s Executive Director via certified mail using the following address:

Executive Director Coachella Valley Association of Governments

74-199 El Paseo, Suite 100 Palm Desert, CA 92260

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 14 OF 28

V. Scope of Work

A. General Conditions and Requirements

CVAG reserves the right to perform any portion of this scope of work with CVAG staff if resources are available. For the purposes of this proposal, the Consultant is requested to assume that no CVAG resources will be available to perform any portion of the scope of work described herein.

CVAG may have the Consultant establish direct contact with member agencies and other stakeholders for the purpose of obtaining information, expertise and assistance in developing project information. The Consultant shall maintain a record of all such contacts and shall provide copies of the contacts and records promptly to CVAG on a regular basis. CVAG will participate in and/or provide prior approval for all intra-agency meetings.

The Consultant shall be responsible for reproduction, binding, circulation, and distribution of all deliverables pursuant to CVAG requirements.

The Consultant has total responsibility for the accuracy and completeness of the deliverables for the Project and shall check all such material accordingly. Reviews by CVAG and stakeholders do not include detailed review or checking of the deliverables. The responsibility for accuracy and completeness of such items remains solely that of the Consultant. The Consultant or their sub-consultants shall not incorporate in the Project any materials or equipment of sole source origin without written approval of CVAG.

The deliverables furnished under this Scope of Work shall be of a quality acceptable to CVAG.

The criteria for acceptance shall be a product of neat appearance, well-organized, technically and grammatically correct. The minimum standard of appearance, organization and content of the drawings shall be that of similar types produced by CVAG.

The page identifying preparers of engineering reports shall bear the professional seal, certificate number, registration classification, expiration date of the certificate, and signature of the professional engineer(s) responsible for their preparation, as applicable.

The Consultant shall maintain a set of project files indexed as approved by CVAG. The Consultant shall submit all project files to CVAG at the completion of the project. All studies, plans, reports, data, manuals, electronic software developed, databases, spreadsheets and intellectual properties developed during the life of this contract shall become the property of CVAG.

The Consultant shall not suspend performance of this contract during the negotiations because of any change in scope of work except as they may be directed by CVAG. The Consultant shall perform all changes in accordance with the terms and conditions of this contract.

The Consultant shall employ risk management techniques that identify potential risks and uncertainties related to the development of the Project. If at any time during the performance of this Scope of Work, the Consultant observes, encounters, or identifies any circumstance that could pose potential risk, the Consultant shall notify CVAG.

The Consultant shall have and provide adequate office equipment and supplies, field tools, instruments, equipment, materials, supplies, and safety equipment to complete the work required by this Contract.

This will be a project-specific contract between CVAG and the selected Consultant for the performance of services with a defined scope of work. It is anticipated that the contract resulting from this solicitation, if awarded, will be a cost-plus-fixed-fee contract, with a total not-to-exceed amount based on tasks specified in the Scope of Work.

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 15 OF 28

Plans, specifications, calculations, reports, and other professional design documents prepared under this RFP shall be prepared by or under the responsible charge of appropriately licensed or registered professionals in the State of California, as applicable to the discipline and work performed. Documents requiring professional certification or sealing shall bear the appropriate signature, seal or stamp, license or registration number, and expiration date in accordance with applicable State of California requirements.

B. Project Management

CVAG will serve as the contract manager. CVAG staff will typically serve as direct liaison between the Consultant and other cities, agencies, and stakeholders, unless otherwise directed by CVAG staff.

The Consultant shall be responsible for project management activities throughout the life of the contract. The scope of activities includes, but is not limited to, coordinating and being responsible for scheduling meetings, managing the project schedule, preparing and distributing minutes, field reviews, tracking action items for CVAG and the Consultant subcontractors, and preparing all exhibits and presentations for CVAG to submit to its committees, peer agencies, stakeholders, and public meetings, as applicable.

In addition to necessary technical-focused meetings with CVAG, which may or may not need to be in person, the Consultant shall make provisions to conduct an in-person kickoff meeting; bi-weekly progress meetings with CVAG; and the various events and meetings with local agencies, users and stakeholders as proposed in this Scope of Work.

The Consultant will conduct a project kickoff meeting with CVAG to refine and clarify the project's objectives. The Consultant shall provide an anticipated project schedule at the meeting. CVAG supplied materials will be provided at this time. The Consultant will conduct bi-weekly project meetings.

C. Applicable Standards

The Consultant shall perform the work and prepare the PS&E in accordance with applicable federal, state, and local laws, regulations, codes, standards, policies, procedures, manuals, and permitting requirements; applicable CVAG standards and requirements; and the existing CV Link plans and specifications, as applicable to the proposed improvements.

Applicable standards and reference documents include, but are not limited to, the following:

• County of Riverside and Caltrans Standard Plans

• Caltrans Standard Specifications

• Caltrans Standard Special Provisions

• Standard Specifications for Public Works Construction (Greenbook)

• CV Link Master Plan

• CV Link Plans, Standard Plans, Standard Specifications, and Special Provisions

All improvements proposed under this Project shall be designed to be compatible with the existing CV Link and consistent with the objectives established by the CV Link Master Plan. The Consultant shall review and incorporate applicable elements of the CV Link Master Plan, approved CV Link plans, specifications, contract documents, and other CVAG-furnished reference materials in the development of the Project.

The Consultant shall prepare designs that maintain visual, functional, and operational consistency with existing CV Link facilities, including site furnishings, hardscape treatments, landscaping, CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 16 OF 28 signage, pavement markings, accessibility features, and other improvements. Where site-specific constraints necessitate deviations from approved CV Link standards or details, such deviations shall be identified and submitted to CVAG for review and approval.

The Consultant shall coordinate the Project design with existing and planned CV Link improvements and maintain consistency in appearance, operation, maintenance, and long-term functionality throughout the CV Link network.

Shade Structures

The shade structures proposed under this Project shall be based on the approved shade structure designs included in the approved CV Link plans, specifications, and standard details. The Consultant shall incorporate the approved shade structure design into the Project design and shall make only those modifications necessary to address site-specific conditions, permitting requirements, structural considerations, or constructability constraints, subject to CVAG review and approval. Shade structures shall be designed and located to maintain safe and unobstructed use of the CV Link facility and comply with all applicable codes and standards.

Site Furnishings and Signage

Benches, bicycle racks, trash receptacles, and similar site furnishings shall be consistent with existing CV Link facilities and applicable CVAG standards.

Wayfinding signage shall be consistent with the signage established in the CVAG-provided plans and applicable CV Link Master Plan requirements. The Consultant shall coordinate with CVAG and the Coachella Valley Mountains Conservancy (CVMC) on the content, layout, and design of the funding recognition signage and incorporate the approved signage into the final plans and specifications.

Native Shade Trees and Irrigation

To support and promote regional biodiversity, the native species shade trees proposed for Promontory Point and Sierra Vista Park will be selected from the plant palettes common to both the CV Link Master Plan and Coachella Valley Multi-Species Habitat Conservation Plan.

The Consultant shall design irrigation and associated electrical systems necessary to support all new plantings. Such systems shall conform to all applicable standards and requirements.

CVMC Acknowledgement and Signage

The Project is subject to CVMC acknowledgment and signage requirements. Project signage shall acknowledge funding through the Coachella Valley Mountains Conservancy Proposition 4 Grant Program and shall include the applicable CVMC logo and required funding acknowledgment language.

The Consultant shall incorporate required acknowledgment signage into the Project design documents as directed by CVAG and shall coordinate proposed sign location, design, and related details with CVAG. Final signage text, design, and location are subject to approval by CVMC, CVAG, and the applicable landowner, where required.

D. Quality Assurance

The Consultant has total responsibility for the accuracy and completeness of the deliverables furnished under the Project and shall meet that responsibility through quality assurance practices standard to the profession. The Consultant’s quality assurance practices shall ensure the following:

• All work is done in accordance with good engineering practice and all analysis and

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 17 OF 28

technical work meets the standards set forth herein.

• A process is established whereby all deliverables and analysis are independently checked, corrected, and backchecked in accordance with accepted practice.

• Deliverables and computations must be accompanied by supporting documentation that may include copies of appropriate lists of deliverables, tables, etc.

E. Project Progress

The Consultant shall establish internal accounting methods and procedures acceptable to CVAG for documenting and monitoring contract costs.

The Consultant shall report in a timely manner, through correspondence or progress reports, whenever it appears that approved schedules will not be met, and whether the reasons are within the Consultant’s control. In the event the Scope of Work is modified, and the modified Schedule is approved by CVAG, the Consultant shall submit a revised schedule.

On a monthly basis, the Consultant shall prepare and submit to CVAG a monthly status report that indicates the work progress achieved during the period. The report shall summarize the actual work progress compared with estimated progress and will identify problem areas, provide evaluations, recommendations, and an outline of the process which the Consultant and CVAG will follow to rectify the problem(s). The progress report shall be submitted with the monthly invoice. Progress reports shall include the total number of hours worked by the Consultant’s and sub-consultant’s personnel. As a minimum, the monthly report should address the following specific areas:

• Time related project status via a bar chart schedule

• Physical progress

• Amendment summary history

• Narrative status report

• Graphical comparisons for actual progress vs. earned and planned progress for physical

(%complete), performance (hours complete) and cash flow

Progress meetings between the Consultant and CVAG shall be held to discuss progress, potential problems, plans for the next period, and other progress issues. CVAG will establish with the Consultant the dates and times of these meetings. The Consultant shall provide CVAG with a written agenda for the meeting and prepare written meeting minutes and submit them to CVAG after the meeting. The minutes shall indicate issues discussed and the resolution or action required to resolve any issues. The Consultant shall submit at each Progress Meeting a four-week horizon schedule to be used in monitoring the progress of the work.

F. Materials Provided by Agency

Unless otherwise specified in this RFP, the Consultant shall provide all materials to complete the required work in accordance with the delivery schedule and cost estimate. To assist the Consultant in fulfilling the terms of this RFP, CVAG agrees to furnish the following:

• CV Link Approved Contract Submittals o PS&E o CAD Files o As-Builts o Bid Documents

• CV Link Master Plan

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 18 OF 28

G. Scope of Work/Project Tasks

The Project is subject to the schedule established under the CVMC Grant Agreement. The following milestones represent the anticipated overall Project schedule and are subject to adjustment by CVAG consistent with applicable grant requirements.

Project Activity Anticipated Timeframe

Design October 2026–May 2027

Permitting May 2027–October 2027

Construction October 2027–July 2028

Final Reporting/Grant Closeout July 2028–September 2028

The Project Completion Date established by the Grant Agreement is no later than July 31, 2028.

Detailed requirements for the Consultant's design schedule, deliverables, and progress reporting are provided in Section V. Scope of Work/Project Tasks. Any changes affecting the Consultant's contractual schedule will be addressed in accordance with the resulting Professional Services Agreement.

The selected Consultant shall provide professional services to complete preliminary engineering, design, permitting, and Plans, Specifications, and Estimates (PS&E) for the Project, including right-of-way services if necessary.

Services shall include the following:

• Preliminary Engineering – Perform investigations, analyses, coordination, preliminary design, and surveys, including site boundary surveys to confirm existing easements, to establish design criteria, identify site constraints, and develop the proposed improvements at each Project location. Preliminary engineering shall form the basis of the 35% design submittal and subsequent design development.

• Design and PS&E – Develop the Project design and complete PS&E in accordance with applicable standards and requirements. Submit PS&E to CVAG at the 35%, 95%, and Final Design milestones. Evaluate design alternatives as necessary to address site constraints, constructability, and the construction budget.

• Permitting and Agency Coordination – Coordinate with applicable agencies and prepare applications, supporting documents, and design revisions necessary to obtain required permits and approvals.

• Bidding and Construction Support – Provide bidding, construction, and post-construction support specified herein, including preparation of record drawings and final GIS deliverables.

The Consultant shall perform all services in a manner consistent with the approved Project scope established by Grant Agreement and the related Work Plan. The Consultant shall not make material changes to the Project improvements, locations, design approach, or other grant-funded elements without prior written authorization from CVAG.

If the Consultant identifies a proposed design modification that could affect the approved Project scope, budget, schedule, environmental compliance, permitting, or grant requirements, the Consultant shall promptly notify CVAG before proceeding with the affected work. The Grant Agreement requires Project activities and expenditures to remain consistent with the approved Project and budget.

CV LINK SHADE STRUCTURE AND SHADE TREES PROJECT PAGE 19 OF 28

The Consultant shall perform the services in accordance with applicable requirements of the Coachella Valley Mountains Conservancy (CVMC) Proposition 4 Grant Agreement, to the extent such requirements apply to the Consultant's services under this Project.

CVAG is responsible for submitting required progress reports, reimbursement documentation, and final grant reporting to CVMC. The Consultant shall provide CVAG with information and documentation reasonably necessary to support these requirements.

Such information may include, as applicable, design progress, schedules, cost estimates, permit status, completed deliverables, project photographs, technical documentation, and other project-related information requested by CVAG. The Grant Agreement requires quarterly progress reports and timely submittal of completed deliverables during the Project term.

Field Survey, Mapping, and Existing Conditions

The Consultant shall perform field surveys and prepare base mapping sufficient to support the design and preparation of the Project plans. Survey limits shall encompass the proposed improvements and adjacent areas necessary to establish existing conditions and complete the design.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .