Curbing-1793059544535.pdf

PDF 249 KB Posted

Attached to
Curbing Installation, Replacement and Repair
Solicitation number
2027-06R
Issued by
Fairfield County, Connecticut

About this file

This Invitation to Bid (ITB) document is issued by the Town of Fairfield, Connecticut, on behalf of its Public Works Department and Fairfield Public Schools, soliciting competitive bids for curbing installation, replacement, repair, and rehabilitation services. The project encompasses concrete, asphalt, extruded concrete, and stone curbs of various lengths throughout the town. The solicitation opened October 15, 2026, at 2:30 PM EDT, with a questions deadline of October 22, 2026, at 4:00 PM EDT, and a bid submission deadline of October 29, 2026, at 11:00 AM EDT. The initial contract term is one year with four optional one-year renewals available at the Town's sole discretion, for a maximum contract duration of five years. No site visit or bidders' conference requirements are specified in the document.

Pricing shall be submitted on a completed Excel pricing sheet with unit prices expressed as cost per linear foot of curb, and no single job shall exceed $75,000. Item quantities are estimates only and subject to the Town's actual requirements and available appropriations. Prevailing wage rates apply if any single project site exceeds $100,000. The contractor must supply all labor, materials, equipment, mobilization, permits, and insurance; secure all required local, state, and federal permits prior to commencing work; provide traffic control when deemed necessary; handle offsite hauling and disposal of all spoils; and submit material tickets for each job. The Town reserves the right to award multiple items to different bidders or to a single bidder offering the best combination of cost, availability, and product range. Award is contingent upon funding approval by applicable Town boards and state and federal agencies. Mandatory compliance requirements include proof of insurance per a sample Certificate of Insurance, conflict of interest certification, non-collusion statements, and agreement to the Town's Terms and Conditions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2027-06R Curbing Installation, Replacement, and Repair

Oct 15th 2026, 2:30PM EDT - Oct 29th 2026, 11:00AM EDT

Table of Contents

Contents Page #

Project Details 3

1. Statement of Work 4

1.1. Project Overview 4

1.2. General Requirements 4

1.3. Detailed Specifications 4

1.4. Responsibilities 5

1.5. Items 5

2. Bid Submission 6

2.1. Contractor Information 6

2.2. Bid Pricing Form 7

2.3. References 7

2.4. Sub-Contractors 7

2.5. Exceptions (if applicable) 8

3. Mandatory Compliance Requirements 9

3.1. Insurance Requirements 9

3.2. Conflict of Interest Statements 9

3.3. Non-Collusion Statement 10

3.4. Terms and Conditions 10

Project Details

Project 2027-06R Curbing Installation, Replacement, and Repair

Ref. # 2027-06R

Type ITB

Description The Town of Fairfield (Town) on behalf of its Public Works Departments (DPW) and Fairfield Public Schools (FPS) is seeking competitive bids for qualified Contractors for the replacement, repair, rehabilitation, and installation of concrete and asphalt curbing. The curbing is various lengths and can either be full depth, extruded concrete, asphalt, or stone curbs through the Town.

Open Date Oct 15th 2026, 2:30PM EDT

Questions Due Date Oct 22nd 2026, 4:00PM EDT

Close Date Oct 29th 2026, 11:00AM EDT

Events

Event Name Duration Description

Open Date Oct 15th 2026, 2:30PM EDT Posting date for the Opportunity

Questions Due Date Oct 22nd 2026, 4:00PM EDT Deadline to submit Questions

Close Date Oct 29th 2026, 11:00AM EDT Deadline for Submissions

1. Statement of Work

1.1 Project Overview

The Town of Fairfield (Town) on behalf of its Public Works Departments (DPW) and Fairfield Public Schools (FPS) is seeking competitive bids for qualified Contractors for the replacement, repair, rehabilitation, and installation of concrete and asphalt curbing. The curbing is various lengths and can either be full depth, extruded concrete, asphalt, or stone curbs through the Town.

Contract Term/Renewals:

The initial contract term for this service shall be one (1) year with four (4) optional one-year renewals up to a maximum contract term of five (5) years. Renewal of the contract term beyond the initial one (1) year period shall be at the sole discretion of the Town.

On (60) days advance written notice, the Town may renew the 2026 contract per the same terms and conditions, including a mutually agreed upon optional cost of living allowance (COLA) adjustment reflecting the CT-DOL market:

http://www1.ctdol.state.ct.us/lmi/cpi.asp

1.2 General Requirements

Requirements

Any sizes or estimate of quantities as shown are approximate and are not guaranteed in any respect.

Prospective bidders are to visit the site to verify scope of the work, measurements, quantities, etc., prior to bidding. The Town reserves the right at all times to increase or decrease the amount of work if deemed in its best interest.

Price is to include all labor, materials, tools, equipment, plant, mobilization, permits, insurances, etc., required to properly complete the project.

The Town of Fairfield reserves the right to award the bid with multiple items:

to more than one bidder, based on meeting the item(s) specification, cost, availability, or any combination of these criteria;

to a single bidder who meets the specifications for all items, and offers the best combination of lowest cost, best availability, and broadest product range;

and may add, subtract or delete any item and/or quantity as deemed in the best interest of the Town.

The Bidder must not discriminate, nor permit discrimination, against any person on the grounds of race, color, national origin, religion, sex, handicap, or veteran status, in their employment practices, in any of their contractual arrangements, in all service and accommodations they offer to the public, and in any of their other business operations.

The successful bidder MUST secure all required permits (local, state, federal) prior to commencing work on the site.

The awarded Contractor will have access to the site immediately upon award of contract and all work must be completed in a timely manner. Time is of the essence. All work time must be coordinated with the Project Engineer.

Award of the project, either partial or in its entirety, is contingent upon funding approval by the applicable boards of the Town of Fairfield, including state and federal agencies.

If the total project at one site exceeds $100,000 prevailing wage rates shall apply.

Upon Award, all bidding documents shall constitute a legal contract including but not limited to the following; Bid Invitation, Addendum, CT DOL Prevailing Wage Documents, Award Resolution, Town Purchase Order, and AIA Contract or equivalent when applicable.

In the instance the Contactor discovers unanticipated hazardous material, whether it be in nature or capacity, the Town reserves the right to terminate the Contract and regain possession of the project site.

1.3 Detailed Specifications

The Contractor shall provide the equipment and labor to complete the work Contractor must notify DPW to conduct inspections before pouring concrete full depth curbing Contractor must submit tickets for materials used for each job

1.

2.

3.

5.

6.

7.

8.

9.

10.

11.

http://www1.ctdol.state.ct.us/lmi/cpi.asp http://www1.ctdol.state.ct.us/lmi/cpi.asp

NO SINGLE JOB SHALL EXCEED $75,000

The quantities of items are estimates only. The actual quantities contracted shall depend upon the requirements of the Town and the funds appropriated for this purpose All curbing shall be constructed in accordance with the State of Connecticut specifications All concrete curb shall be 4,500 p.s.i breaking strength at 28 days with for the six percent (4-6%) air entrainment

1.4 Responsibilities

Traffic Control shall be the responsibility of the Contractor when deemed necessary by a DPW representative Contractor shall be responsible for compliance with all safety, environmental, health and labor regulations, and with any and all local, state, and federal regulations pertaining to proposed construction Contractor shall call a DPW Representative for an inspection of the forms prior to pouring of concrete full depth curbing.

Contractor shall be responsible for the offsite hauling and disposal of all spoils. This shall include all stone, bedding, millings, etc.

Contractor shall supply all fill, top soil, aggregate, stone, seed and hay.

Contractor is responsible for all CBYD tickets and requests Contractor is responsible for supplying all concrete, asphalt, rebar (if necessary

1.5 Items

Demolition removal and site restorations: Existing curbing shall be removed and all debris, rubble, etc., removed from the site and properly disposed of by the Contractor. The works shall be performed in such a fashion as to prevent any damage to adjacent trees, shrubbery, turf, sidewalks, flowers, fences, etc.

This item shall include the backfill, topsoil, and seeding of the adjacent areas disturbed by the construction. Unite price shall be expressed in cost per linear foot of curb. The Town may accomplish this phase of the job with the DPW when it is determined to be in its own best interest. Old concrete, asphalt, or stone products must be properly disposed of by the successful contractor(s) at their own expense.

Backfilling and removal surplus material: The sides of the curbing must be backfilled with suitable material thoroughly compacted and finished flush with the top of the existing road or curbing. All surplus material must be removed and the site left in a neat and presentable condition to the sole satisfaction of the Client Agency.

Turf establishment: Turf Establishment must conform to Section 9.50 in the standards

2. Bid Submission

2.1 Contractor Information

2.1.1 Company Name: [Required] [Text]

(Vendor text input)

2.1.2 Company Address: [Required] [Text]

(Vendor text input)

2.1.3 Contact Name: [Required] [Text]

(Vendor text input)

2.1.4 Contact Email Address: [Required] [Text]

(Vendor text input)

2.1.5 Contact Phone Number: [Required] [Text]

(Vendor text input)

2.1.6 Name of the designated single point of contact for contract administration:

[Required] [Text]

(Vendor text input)

2.1.7 Number of Years in Business [Required] [Number]

(Vendor number input)

2.2 Bid Pricing Form

Attachments (Other):

2027-06R_UPDATED_Curbing_Installation,_Replacement,_and_Repair_Price_Sheet.xl s

2.2.1 Completed Pricing Sheet [Required] [Excel]

(Vendor file upload)

2.3 References

Provide reference details of most recent similar scope projects performed.

Attachments (Documentation): References_Form.pdf

2.3.1 The Contractor certifies that the references provided are accurate, complete, and pertain to services of similar scope and complexity. The Contractor understands that failure to provide accurate references may result in rejection of the proposal.” [Required] [Single Choice]

(Yes) / (No)

2.3.2 Upload completed References Form [Required] [PDF]

(Vendor file upload)

2.4 Sub-Contractors

Provide subcontractor details if any are to be employed as part of this contract, including labor rates. All sub-

Contractors are subject to approval by the Town of Fairfield and are required to provide Fed ID #.

Attachments (Documentation): Sub-Contractor_Form.pdf

2.4.1 Upload completed Sub-Contractors Form (if applicable) [Optional] [PDF]

(Vendor file upload)

2.5 Exceptions (if applicable)

The Contractor shall review all bid documents, including the draft contract, scope of services, insurance requirements, and all terms and conditions. If the Contractor takes exception to any requirement, term, condition, or provision of the solicitation or contract documents, the Contractor shall clearly identify each such exception in the space provided below. The Contractor shall also disclose any known defects, errors, inconsistencies, or omissions in the documents of which they are aware, whether identified directly by the Contractor or brought to their attention by any subcontractor or material supplier. Failure to identify such exceptions or issues may be deemed a waiver of the Contractor’s right to later assert them.

3. Mandatory Compliance Requirements

This section sets forth the mandatory requirements applicable to this solicitation. Respondents must review and comply with all requirements contained herein. Submission of a proposal shall constitute the

Respondent’s acknowledgment and agreement to satisfy each mandatory requirement, including all certifications, insurance, bonding, licensing, and other contractual obligations, as applicable. Failure to meet any mandatory requirement may result in the proposal being deemed non-responsive and removed from further consideration.

3.1 Insurance Requirements

Submission of a bid in response to this solicitation shall constitute the Respondent’s acknowledgment and agreement to provide all insurance coverage as specified in the sample Certificate of Insurance. The awarded Respondent shall, prior to contract execution, furnish a Certificate of Insurance demonstrating full compliance with all stated insurance requirements.

Attachments (Other): 2027-06R_Sample_COI.pdf

3.1.1 We acknowledge and agree to provide all insurance coverage as specified in the sample Certificate of Insurance provided. Upon award of the contract, our company will furnish a Certificate of Insurance that fully complies with the stated requirements prior to contract execution. [Required] [Single Choice]

(Yes) / (No)

3.2 Conflict of Interest Statements

The Respondent certifies and represents whether any principal, owner, or employee of the Respondent is a Town of

Fairfield employee or public official, or an immediate family member of such an individual. For this representation, “immediate family” includes: an individual’s spouse, fiancé/fiancée; the parent, sibling, or child (including adult children) of the individual or their spouse; and the spouse of any such child. ‘Yes’ = no conflict. ‘No’ = relationship exists; explanation required.

3.2.1 ‘Yes’ = no conflict. ‘No’ = relationship exists; explanation required.

[Required] [Single Choice]

(Yes) / (No)

3.2.2 Explanation of Conflict if Applicable [Optional] [Text]

(Vendor text input)

3.3 Non-Collusion Statement

3.3.1 1. The submission has been developed independently by the Respondent and submitted without any form of collusion, agreement, understanding, or coordinated action with any other vendor of the materials, supplies, equipment, or services outlined in the Scope of Services, and without the intent of restricting independent submission.

[Required] [Single Choice]

(Yes) / (No)

3.3.2 2. Neither the Respondent nor its employees or agents have communicated the contents of this RFPQ to any individual who is not an employee or agent of the Respondent or its surety on any bond furnished with the submission. Furthermore, such communications will not occur before the official opening of the submission.

[Required] [Single Choice]

(Yes) / (No)

3.4 Terms and Conditions

Attachments (Documentation): 2027-06R_Terms_&_Conditions_Document.pdf

3.4.1 I have read and agree to the Town of Fairfield's Terms and Conditions.

[Required] [Single Choice]

(Yes) / (No)

2027-06R Curbing Installation, Replacement, and Repair
Table of Contents
Project Details
Events
1. Statement of Work
1.1 Project Overview
1.2 General Requirements
1.3 Detailed Specifications
1.4 Responsibilities
1.5 Items
2. Bid Submission
2.1 Contractor Information
2.1.1 Company Name:[Required][Text]
2.1.2 Company Address:[Required][Text]
2.1.3 Contact Name:[Required][Text]
2.1.4 Contact Email Address:[Required][Text]
2.1.5 Contact Phone Number:[Required][Text]
2.1.6 Name of the designated single point of contact for contract administration:[Required][Text]
2.1.7 Number of Years in Business[Required][Number]
2.2 Bid Pricing Form
2.2.1 Completed Pricing Sheet[Required][Excel]
2.3 References
2.3.1 The Contractor certifies that the references provided are accurate, complete, and pertain to services of similar scope and complexity. The Contractor understands that failure to provide accurate references may result in rejection of the proposal.”[Required][Single Choice]
2.3.2 Upload completed References Form[Required][PDF]
2.4 Sub-Contractors
2.4.1 Upload completed Sub-Contractors Form (if applicable)[Optional][PDF]
2.5 Exceptions (if applicable)
3. Mandatory Compliance Requirements
3.1 Insurance Requirements
3.1.1 We acknowledge and agree to provide all insurance coverage as specified in the sample Certificate of Insurance provided. Upon award of the contract, our company will furnish a Certificate of Insurance that fully complies with the stated requirements prior to contract execution.[Required][Single Choice]
3.2 Conflict of Interest Statements
3.2.1 ‘Yes’ = no conflict. ‘No’ = relationship exists; explanation required.[Required][Single Choice]
3.2.2 Explanation of Conflict if Applicable[Optional][Text]
3.3 Non-Collusion Statement
3.3.1 1. The submission has been developed independently by the Respondent and submitted without any form of collusion, agreement, understanding, or coordinated action with any other vendor of the materials, supplies, equipment, or services outlined in the Scope of Services, and without the intent of restricting independent submission.[Required][Single Choice]
3.3.2 2. Neither the Respondent nor its employees or agents have communicated the contents of this RFPQ to any individual who is not an employee or agent of the Respondent or its surety on any bond furnished with the submission. Furthermore, such communications will not occur before the official opening of the submission.[Required][Single Choice]
3.4 Terms and Conditions
3.4.1 I have read and agree to the Town of Fairfield's Terms and Conditions.[Required][Single Choice]

File details come from the government source that posted it. Updated .