(CUI) Custodial Floor Plan PA017.pdf
PDF 1 MB Posted
- Solicitation number
- W15QKN22R5026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (CUI) Custodial Floor Plan PA087.pdf | ||
| (CUI) draft PWS (PA011) (PA017) and (PA087).pdf | ||
| (CUI) Custodial Floor Plan PA011.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP UP
SERVICE:
REQUIRING CUSTODIAL
BUILDING TOTAL AREA
UP
UP
CLASSROOM
SF421
UNIT STORAGE
BOILER ROOM
CORR
SF694
CORR
SF156
SF279
CLASSROOM
ASSEMBLY
KITCHEN
SF129
VEST
SF275
LOBBY
STOR
CHAIR
SF321
INSTRUCTOR
SF201
CO CMDR
SF188
CO SGT
SF314
DAY ROOM
J.C.
SF48
STAIR
SF19
CLOSET
CERAMIC
VCT
VCT
CLOSET
SF39
VCT
VCT
VCT
VCT VCT
VCT
VCT
CERAMIC
VCT
SF64
LF)57(
SF118
LATRINE
WOMEN'S
CERAMIC
LF)40(
CERAMIC
LATRINE
MEN'S
SF89
STAIRS
VCT
CONCRETE
CONCRETE
(WF)
SF71
VCT
SF214
CARPET
STORAGE
SF33
SF84
CONCRETE
16'0
GRAPHIC SCALE: 1/16" = 1'-0"
32'8'
USARC - FIRST FLOOR CUSTODIAL SERVICE PLAN
SCALE:1/16"=1'-0"
CARPET
VCT
NOT SERVICED
WOOD
CERAMIC TILECONCRETE
SLATE/ STONE
RUBBER FLOOR
CUSTODIAL SERVICE
FIXTURES REQUIRING
SHOWERS:
URINALS:
COMMODES:
WATER FOUNTAINS:
SERVICE:
REQUIRING CUSTODIAL
BUILDING TOTAL AREA
SOAP DISPENSERS:
TOILET TISSUE DISPENSERS:
PAPER TOWEL DISPENSERS: 22
2,992
N / A
N / A
N / A
FLOOR SF
FIRST
8,576 SF
FLOOR SF
FIRST
FLOOR
FIRST
TOTAL
BUILDING
FLOOR
FIRST
TOTAL
BUILDING
TOTAL SF
BUILDING
TOTAL SF
BUILDING
4 790
6,581
N / A
N / A
SINKS:
8 OCTOBER 2021DATE:
DPW - CAD DESIGN TEAM
99th READINESS DIVISION
DRAWN:NAC
FACNO:
CUSTODIAL SERVICE PLAN
CUI
CUI
CHECKED:SJS SHEET:1/3
FIELD VERIFIED:RAB
PA017 (428350)/ USARC BUILDING
PFC MELVIN L. BROWN USARC/BMA #104-1
6400 CLEARFIELD WOODLAND HWY
CLEARFIELD, PA 16830
DN
UP
CLASSROOM
SF345
CLASSROOM
SF389
CLASSROOM
SF254
UNIT STOR
SF427
CLASSROOM
SF499
SF205
ADMIN
J.C.
SF34
SF739
CORR
BELOW
OPEN TO
BELOW
ROOF
LATRINE
MEN'S
SF273
SF192
CERAMIC
VCT
SF329
SF117
STAIRS
VCT
SF829
VCT
VCT
VCT
VCT
VCT
VCT
STAIRS
SF61
LOCKERS
OFFICERS
LATRINE
OFFICER'S
LOCKERS
MEN'S
CERAMIC
LF)132(
LF)91(
CONCRETE
CONCRETE
STAGE
WOOD
SF63
WOOD
SF63
STAGE
CONCRETE
(WF)
CONCRETE
16'0
GRAPHIC SCALE: 1/16" = 1'-0"
32'8'
SCALE:1/16"=1'-0"
USARC - SECOND FLOOR CUSTODIAL SERVICE PLAN
CARPET
VCT
NOT SERVICED
WOOD
CERAMIC TILECONCRETE
SLATE/ STONE
RUBBER FLOOR
CUSTODIAL SERVICE
FIXTURES REQUIRING
SHOWERS:
URINALS:
COMMODES:
WATER FOUNTAINS:
SERVICE:
REQUIRING CUSTODIAL
BUILDING TOTAL AREA
SOAP DISPENSERS:
TOILET TISSUE DISPENSERS:
PAPER TOWEL DISPENSERS: 25
3,589
N / A
N / A
FLOOR SF
SECOND
N / A
8,576 SF
FLOOR SF
SECOND
FLOOR
SECOND
TOTAL
BUILDING
FLOOR
SECOND
TOTAL
BUILDING
TOTAL SF
BUILDING
TOTAL SF
BUILDING
4 790
6,581
N / A
N / A
SINKS:
8 OCTOBER 2021DATE:
DRAWN:NAC
FACNO:
CUSTODIAL SERVICE PLAN
CUI
CUI
CHECKED:SJS SHEET:2/3
FIELD VERIFIED:RAB
PA017 (428350)/ USARC BUILDING
PFC MELVIN L. BROWN USARC/BMA #104-1
6400 CLEARFIELD WOODLAND HWY
WORK BAY
GARAGE
STORAGE
16'0
GRAPHIC SCALE: 1/16" = 1'-0"
32'8'
SCALE:1/16"=1'-0"
BMA - MAIN FLOOR CUSTODIAL SERVICE PLAN
CARPET
VCT
NOT SERVICED
WOOD
CERAMIC TILECONCRETE
SLATE/ STONE
RUBBER FLOOR
N / A
CUSTODIAL SERVICE
FIXTURES REQUIRING
SHOWERS:
URINALS:
COMMODES:
WATER FOUNTAINS:
SERVICE:
REQUIRING CUSTODIAL
BUILDING TOTAL AREA
SOAP DISPENSERS:
TOILET TISSUE DISPENSERS:
PAPER TOWEL DISPENSERS: 00
N / A
N / A
N / A
N / A
N / A
FLOOR SF
MAIN
N / A
0 SF
FLOOR SF
MAIN
FLOOR
MAIN
TOTAL
BUILDING
FLOOR
MAIN
TOTAL
BUILDING
TOTAL SF
BUILDING
TOTAL SF
BUILDING
0 N / A
N / A
N / A
N / A
N / A
N / A
N / A
SINKS:
8 OCTOBER 2021DATE:
*DRAFT*
CUI
CUI
DRAWN:NAC SHEET:3/3
FACNO:
CUSTODIAL SERVICE PLAN
CHECKED:SJS
FIELD VERIFIED:RAB
PFC MELVIN L. BROWN USARC/BMA #104-1
6400 CLEARFIELD WOODLAND HWY
PA017 (428350)/ BMA
| PA017_CUST_JUL2021_CUI |
| PA017_CUST_JUL2021_CUI |
| PA017_CUST_JUL2021_CUI |
File details come from the government source that posted it. Updated .