This document is a Memorandum for Record (MFR) justifying a limited competition contract action for C-UAS Infrastructure Construction for the U.S. Army 25th Infantry Division. The contract is with Landon Construction Inc. for a total estimated value of $86,700.00, covering a performance period from 27 June 2025 to 27 July 2025, funded through Operations & Maintenance, Army (OMA) for FY25.
The justification for sole source selection is based on Landon Construction's unique qualifications, including prior on-site surveys of the specific buildings, successful execution of similar infrastructure modifications, and the ability to mobilize quickly to meet compressed timelines. The contract was awarded under FAR 13.106-1(b)(1) for purchases not exceeding the simplified acquisition threshold, with market research indicating Landon Construction is the only source reasonably available to meet the performance schedule and technical requirements within the critical mission timeline.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For All Actions At or Below the Simplified Acquisition Threshold Use for FAR Part 8, FAR Subpart 13.1, or FAR Part 16, Including Brand Name
Remove or Replace Text Control No: (Insert #)
Landon Construction, Ltd. is the only contractor that has:
1. Conducted on-site surveys of the buildings where the work will occur. This includes access to controlled areas and detailed, firsthand knowledge of structural conditions that cannot be replicated by other vendors within the required timeline.
2. Successfully executed similar infrastructure modifications on the same types of structures, ensuring familiarity with local base construction requirements and U.S. Army operational needs.
3. Demonstrated the capability to mobilize and begin construction to meet the required start date, which is essential due to compressed timelines and mission-critical milestones.
6. Publicizing Contract Actions: For FAR Part 13 actions, the public display and synopsis requirements of FAR 5.101 and FAR 5.203 do not apply due to the $ threshold, apply and will be followed, or do not apply due to an exception at
5.202 _(2) .
Requirement to post justification in accordance with FAR 8.405-6(b)(3), FAR 13.105(c), or FAR 16.505(a)(4)(iii)(A)
Action is NOT a brand name restriction and is under $150K, no posting required Action is a brand name restriction, under $25K, no posting required
Action is a brand name restriction, over $25K. It will be redacted and posted with the solicitation.
Action is a brand name restriction over $25K but will not be posted due to exception:
FAR 6.305(f) FAR 8.405-6(b)(3)(iii)(A) FAR 8.405-6(b)(3)(iii)(B) FAR 8.405-6(b)(3)(iii)(C) FAR 16.505(a)(4)(iii(C)
7. Market Research:
IAW FAR 15.404-1(b)(2)(i), the proposed price was compared to historical pricing for similar efforts performed Landan Construction Inc in support of prior repair and construction projects in Hawaii. Those efforts had comparable scopes and complexity. Pricing was determined to be fair and reasonable
Contracts/Orders for reference:
1. W912CN24F5095
2. W912CN21F0053