CU-16-0025-3-2_REV-1PowerhouseRoofGuardRailDetails (1).pdf

PDF 399 KB Posted

Attached to
Notice of intent to solicit directly from suppliers (W9127N26QA035)
Solicitation number
W9127N26QA035
Issued by

About this file

This is a technical drawing specification document for powerhouse roof guardrail details at Green Peter Dam & Reservoir on the Middle Santiam River in Oregon, prepared by the U.S. Army Corps of Engineers, Portland District. The document provides detailed engineering drawings and specifications for the manufacture and installation of guard rail assemblies, including component parts, dimensions, materials, and assembly requirements.

The specification requires the fabrication of steel guard rail systems comprising multiple pipe and plate components that must be hot-dip galvanized after assembly. Key components include Schedule 40 steel pipes in various configurations, stanchions, mounting brackets, and plates. Total material requirements include 84 stanchions, 38-44 pipes of various types, 20 mounting bracket assemblies, 18-20 guard rail panel assemblies, and corner guard rail assemblies for both east and west locations. All steel parts must be free of varnish and surface contamination prior to welding. The galvanizing specifications mandate internal vent holes of 3/8 inch minimum (or 25 percent of pipe interior diameter) drilled at connection points before welding, with external vent holes placed as close to welds as possible. A 3/8-inch vent hole on the top rail center must be plugged after the galvanizing process. Vertical legs should be galvanized separately and attached after the galvanizing process to prevent contamination and ensure quality and cost-effectiveness. All assembly dimensions are provided at 3-inch-to-1-foot scale with specific measurements for panel lengths (5 feet to 10 feet), rail heights, and component spacing.

View the file

Other files

File Type Posted
Purchase Description for GPR Roof handrail .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

C

A

B

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S I Z

E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E P

L O

T D

A T

E

C O

N T

R A

C T

N O

IDENTIFICATION

SHEET

SHEET OF

1 2 3 4 5

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E A

P P

R

BORDER VERSION UPDATE [09-2012]

$SHEETN$SHEET NAME:$USER$BY USERNAME:DRAWING PLOT SIZE: $BORDER$ DATE AND TIME PLOTTED: $$$DATE$$$$ $TIME

G

U A

R D

R A

IL

D

E T

A

IL

S

P O

W E

R H

O U

S E

R O

O F

P O

W E

R H

O U

S E

M E

C H

A N

IC

A

L

G R

E E

N P

E T

E R

D A

M

R E

S E

R V

O

IR

M

ID

D L

E S

A N

T

IA

M R

IV

E

R

DISTRICT NAME

N

JW

N

JW

. . F G

P P

-9 -3

-1

-2

R E

V

.d g n

J W

R /R

S B

. G P

P -9

-3 -1

/2

R E

V

GPP-9-3-11/2

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

C O

R P

S O

F E

N G

IN

E

E R

S

P O

R T

L A

N D

O

R E

G O

N

E of Engineers

US Army Corps

W

IL

L A

M E

T T

E R

IV

E

R B

A S

IN

,O

R E

G O

N

10'-0"

B

A

"4

"8

1"

9"

"8

2"2

1"8

2"8

2" x 1/2" SLOT (4 PLCS)

Ø 1" (2 PLCS)

9" (REF)

3" 3"

R E

F

H S

S

H S

S

3"3" (REF)

"2

PL-02

PL-01

HSS TUBE

"L8

HSS-02 - 3" x 3" x 6

HSS TUBE

"8 HSS-01 - 7" x 3" x

PL-01

HSS-01

HSS-02

TYP

TYP

TYP

C RAILL

C STANCHIONL

SCALE: 3" = 1'-0"

A

SECTION

SCALE: 3" = 1'-0"

B

SECTION

C STANCHIONL

C STANCHION (BOTH ENDS)L

(18 PCS TOTAL REQ'D)

HOT DIP GALVANIZING.

TO BE PLUGGED AFTER

VENT HOLE"8

DRILL

PIPE 3

PIPE 4 (2 PLCS)

MOUNTING BRCKET ASSY. (2 PLCS)

GUARD RAIL PANEL 1 ASSY

0 3 6 9

SCALE: 3" = 1'-0"

(1 AS SHOWN & 1 OPPOSITE HAND REQ'D)

WEST CORNER GUARD RAIL ASSY

0 3 6 9

SCALE: 3" = 1'-0"

PIPE 4 (2 PLCS)

MOUNTING BRCKET ASSY. (2 PLCS)

PIPE 7 OPPOSITE HAND

PIPE 6

PIPE 10

ALL ASSEMBLIES WILL BE HOT DIP GALVANIZED AFTER ASSEMBLY.

ALL PIPE IS 2" SCHEDULE 40 STEEL PIPE.

2.

1.

NOTE:

PIPE 10 DETAL

0 3 6 9

SCALE: 3" = 1'-0"

PIPE 6/7 DETAL

0 3 6 9

SCALE: 3" = 1'-0"

TYP

(10mm) IN DIAMETER.

MUST BE 25% THE SIZE OF THE ID OF THE PIPE, BUT NOT LESS THAN 3/8"

EXTERNAL VENT HOLES MUST BE AS CLOSE TO THE WELDS AS POSSIBLE AND

ALTERNATIVE NOTED BELOW.

WHERE FULL INTERNAL HOLES CANNOT BE USED, FOLLOW THE ACCEPTABLE

AFTER GALVANIZING.

VERTICAL LEGS SHOULD BE GALVANIZED SEPARATELY AND ATTACHED

ERECTION IN THE FIELD THAT PREVENTS FULL OPENINGS ON END OF

ENDS OF LEGS ARE TO BE LEFT COMPLETELY OPEN. ANY DEVICE USED FOR

AFTER THE GALVANIZING PROCESS.

CENTER OF TOP RAIL TO BE PLUGGED BY GALVANIZING COMPANY

VENT HOLE ON TOP OF THE TOP RAIL, LOCATED IN THE"8

DRILL

GALVANIZING QUALITY AND LOWEST GALVANIZING COST.

INSIDE DIAMETER, OR 2", PRIOR TO WELDING FOR THE BEST

ALL CONNECTION POINTS ON SIDES OF PIPE WILL BE DRILLED TO

CONTAMINATION.

ALL STEEL PARTS MUST BE FREE OF ALL VARNISH AND SURFACE

6.

5.

4.

3.

2.

1.

GALVANIZING SPECIFICATIONS:

PIPE 5 DETAIL

0 3 6 9

SCALE: 3" = 1'-0"

PL-02

0 3 6 9

SCALE: 3" = 1'-0"

MOUNTING BRACKET ASSY

0 3 6 9

SCALE: 3" = 1'-0"

PL-01

0 3 6 9

SCALE: 3" = 1'-0"

PIPE 3 DETAL

0 3 6 9

SCALE: 3" = 1'-0"

SEE SECTION "B" BOTH SIDES

ON JOINT C

" R.16

COVE 1

ON JOINT C

DRILL 2" HOLE

C RAILL

"16

4'-"8

2'-9

13" TYP

"32

2'-9

TEE JOINT WELDMENT

0 3 6 9

SCALE: 3" = 1'-0"

L L

SEE SECTION B (TYP)

12"

(84 TOTAL REQ'D) (84 TOTAL REQ'D)

(84 TOTAL REQ'D)

" PLATE STEEL8

TYP

C STANCHION (TYP)L

C STANCHIONL C STANCHIONL

SEE SECTION "B" (TYP)

TOP VIEW

FRONT VIEW SIDE VIEW

FRONT VIEWSIDE VIEW

TYPICAL TOP VIEW

C STANCHIONL

C STANCHIONL

(BOTH ENDS)

SEE SECTION B

R E

F

C LOWER RAILL

C TOP RAILL

PIPE 2

5'-0"

HOT DIP GALVANIZING.

TO BE PLUGGED AFTER

VENT HOLE"8

DRILL

"16

4'-

PIPE 9 OPPOSITE HAND

PIPE 8

PIPE 10

PIPE 5 (2 PLCS)

MOUNTING BRCKET ASSY. (2 PLCS)

PIPE 1

HOT DIP GALVANIZING.

TO BE PLUGGED AFTER

VENT HOLE"8

DRILL TOP VIEW

(1 AS SHOWN & 1 OPPOSITE HAND REQ'D)

EAST CORNER GUARD RAIL ASSY

0 3 6 9

SCALE: 3" = 1'-0"

FRONT VIEW SIDE VIEW

R

PIPE 4 DETAIL

0 3 6 9

SCALE: 3" = 1'-0"

C TOP RAILL

C LOWER RAILL

10'-0"

R E

F

5'-0"

HOT DIP GALVANIZING.

TO BE PLUGGED AFTER

VENT HOLE"8

DRILL

(PIPE 8 AS SHOWN & PIPE 9 OPPOSITE HAND)

PIPE 8/9 DETAL

0 3 6 9

SCALE: 3" = 1'-0"

FRONT VIEWSIDE VIEW

(38 REQ'D)

(40 REQ'D) (44 REQ'D)

PIPE 2 DETAL

0 3 6 9

SCALE: 3" = 1'-0"

PIPE 1 DETAL

0 3 6 9

SCALE: 3" = 1'-0"

" T Y P

R

" STEEL PLATE 8

(20 PCS TOTAL REQ'D)

GUARD RAIL PANEL 2 ASSY

0 3 6 9

SCALE: 3" = 1'-0"

SET SCREW

" HOLE FOR8

DRILL AND TAP

PIPE 3

TOP OF PARAPET

MOUNTING BRCKET ASSY. (2 PLCS)

PIPE 5

"8

2'-9" 3'-3"

"8

SEE SECTION "B" BOTH SIDES

"8

2'-9 "16

4'-

C STANCHION C STANCHION

SEE SECTION "B" (TYP)

LL

13" TYP

(PIPE 6 AS SHOWN & PIPE 7 OPPOSITE HAND)

" T

Y P

R

2'-6" TYP 5'-0"

2'-6" TYP 5'-0"

TYP

(20 REQ'D)

(18 REQ'D)

TOP VIEW

FRONT VIEWSIDE VIEW

(4 REQ'D)

" TYP

R

5'-0"

" T

Y P

R

4" TYP

R

TYP

File details come from the government source that posted it. Updated .