CTR065872_Amendment_4_-_Adds_Key_Personnel.pdf

PDF 9 MB Posted

Attached to
Master Agreement AZ|CTR065872
Contract number
CTR065872
Issued by
Arizona

About this file

This document is a Contract Amendment issued by the Arizona Department of Environmental Quality (ADEQ) for a statewide contract with CDM Smith, Inc. The contract number is CTR065872, and this is Amendment No. 4 for Statewide Lead Service Line Identification and Inventory Services. The amendment is a unilateral acknowledgement of the contractor's approved change request, executed on June 24, 2024, in Phoenix, Arizona.

The amendment's primary purpose is to add 16 new Contractor Key Personnel to the existing contract, spanning various professional and support levels. The added personnel include environmental engineers, civil engineers, water resources engineers, and support/clerical staff with diverse backgrounds and expertise in water treatment, stormwater management, infrastructure design, environmental permitting, and related fields. The key personnel have educational backgrounds from universities across the United States, including California Polytechnic State University, University of California, Northern Arizona University, and others. Their professional experiences range from water treatment plant upgrades to lead service line inventories, stormwater compliance, and environmental planning projects.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form approved by CPO, Rev. 12-18-2018

CONTRACT

AMENDMENT

CONTRACT NO.: CTR065872

AMENDMENT NO.: 4

TITLE: Statewide Lead Service Line Identification and Inventory Services CONTRACTOR: CDM Smith, Inc.

ADEQ PROCUREMENT

1110 W. Washington Street Phoenix, AZ 85007 602-771- 4140

THE PURPOSE OF THIS AMENDMENT IS TO:

In accordance with the Special Terms and Conditions, 5.1 Contract Amendments, this contract is hereby amended as follows:

1. Add the following Contractor Key Personnel to this contract:

• Clarissa Bailey – Technical Level II

• Noel Cruz – Technical Level II

• Rayne Dann – Technical Level II

• Laura Faynor – Technical Level I

• B. Feba – Technical Level II

• Henry Gutierrez-Pena – Support/Clerical Level I

• Rose Hanson – Technical Level II

• Paula Hirsh – Support/Clerical Level I

• Jack Keenan – Technical Level II

• Sameet Master – Professional Level V

• Jasmine Quiambao – Technical Level II

• Dan Rodrigo – Professional Level V

• V. Firat Sever – Professional Level V

• Kimberly Staley – Support/Clerical

• Emily Story – Technical Level II

• Laryssa Terleckyj – Technical Level II

2. All other Terms and Conditions remain unchanged.

THE ABOVE REFERENCED AMENDMENT IS A

UNILATERAL ACKNOWLEDGEMENT OF

CONTRACTOR’S APPROVED CHANGED

REQUEST.

ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY

The above referenced Amendment is hereby executed this 24th day of June, 2024 at Phoenix, Arizona.

Ana Machiche Procurement Officer

Available online at Arizona Procurement Portal (APP) eProcurement System https://app.az.gov https://app.az.gov/

Clarissa Bailey

Environmental Engineer/Technical Level II

Ms. Bailey has experience working for engineering consulting firms as an embedded staff engineer at wastewater treatment plants (WWTP). She has developed skills in data collection and analysis, especially regarding polyfluoroalkyl substances (PFAS), effluent, and receiving water data. She is also familiar with the process for renewal of the National

Pollutant Discharge Elimination System (NPDES) permit.

Project Engineer, Repair Wastewater Treatment Plant, Beale Air Force Base (AFB), Yuba County, California. Ms. Bailey is part of a team completing the design to repair a

WWTP on the Beale AFB. Major work elements have included assignments related to the

65% design submittal. Specific activities include assisting the design project lead with primary clarifier, trickling filter, and digester designs.

Prior to CDM Smith

Jacobs Engineering

Water Resource Engineer, Phase 2C Design, City of Tracy Wastewater Treatment

Plant, Tracy, California, 2021-2022. Ms. Bailey assisted the City of Tracy WWTP with requests and concerns associated with the Phase 2C design. One of these tasks included aiding the City of Tracy WWTP in the design of aeration tanks needed to process the 9-mgd flow rates. Other responsibilities included using data to determine various requests such as chemical cost calculations, toxicity calculations via the new TST method, and

Reasonable Potential Analyses. Ms. Bailey also assisted with a sensitive species screening to determine the species susceptible to toxicity in Old River as a result of effluent discharge. Additionally, Ms. Bailey completed monitoring and analyses of PFAS and pyrethroids for the WWTP. Lastly, she was heavily involved with the renewal of the NPDES permit. She also facilitated calls between the Regional Water Quality Control Board

(RWQCB) and the City of Tracy WWTP staff regarding permit renewal topics.

Parsons Engineering

Engineering Intern, Sewer System Improvement Program (SSIP), San Francisco

Public Utilities Commission (SFPUC), San Francisco, California, 2016-2018.

Ms. Bailey worked on a collection of assignments associated with SFPUC’s Sewer System

Improvement Program. Some of these assignments included the installation of force mains, the unveiling of semi permeable pavements, and the research of odor control practices. She also participated in pipe and infrastructure checks within the city of San Francisco to minimize inflow and infiltration. Ms. Bailey also analyzed chemical data in effluent and receiving water to ensure permitted allowances weren’t exceeded.

Education

BS – Chemical

Engineering, University of California, Davis, California, 2021

Noel Cruz, EIT, ENV SP

Civil Engineer/Technical Level II

Ms. Cruz is a civil engineer with seven years of experience in water and wastewater treatment projects. She brings expertise in treatment plant requirements, design, construction, and operation. Ms. Cruz has experience working on systems such as biological aerated filters, dissolved air flotation tanks, ozone, screw conveyors, and centrifuges.

Prior to CDM Smith

Assistant Project Manager, Santa Clara Digested Sludge Dewatering Facility Project –

Progressive Design-Build, City of San Jose, San Jose, California, 2020-2023.

The project scope consisted of a new facility to house mechanical dewatering centrifuges so the client could discontinue the use of the open-air drying beds and lagoons to repurpose the land and comply with new organic waste regulations. To support the new facility, the project also included a sludge mixing storage tank, over 12,000 feet of buried lines, an odor control system, and a cake loadout structure.

Ms. Cruz supervised, trained, and evaluated five project engineers and proactively collaborated with plant personnel to maintain operations. She served as the manager of

$25 million of the total project cost, including structural concrete, structural steel, conveyors, and live bottom bins. She coordinated and reviewed a geotechnical investigation, hazardous material sampling, and centrifuge pilot testing. Ms. Cruz was also instrumental in design development. She was part of the core team during preliminary services and led the value engineering, constructability reviews, and vendor/subcontractor outreach. Ms. Cruz also developed milestone deliverables and successfully negotiated core contracts within the project budget, all during the COVID-19 pandemic which caused major supply chain impacts.

Assistant Project Manager/Project Engineer, Mel Leong Industrial Wastewater

Treatment and Recycled Water Upgrades – Progressive-Design Build, City of San

Francisco, San Francisco International Airport, California, 2016 -2020.

Ms. Cruz served as an assistant project manager and project engineer on this $63 million project, which included construction of a 1.6-mgd plant within schedule, budget, and mandated water quality requirements. The project consisted of the design, construction, permitting, activation, commissioning, and closeout for refurbishment of an industrial wastewater treatment plant, a new Title 22 recycled water plant, new and remodeled administrative facilities, new sludge dewatering facilities, and repair of various sanitary wastewater treatment process headworks support equipment.

Ms. Cruz managed the submittal, procurement, installation, and startup of core wastewater equipment. The equipment included an ozone generation and contactor system, centrifuge, and dissolved air flotation tanks (DAFTs). She also led the contract compliance, change order management, monthly cost/schedule forecasting, and coordination/assistance with plant startup and commissioning. Other responsibilities included leading and documenting meetings with key stakeholders such as the owner, plant operators, and various permitting agencies. She built strong relations with the SFO

Building Inspection and Code Enforcement Agency (BICE) which led to timely receipt of

Education

BS - Civil Engineering, Northern Arizona

University, Flagstaff, Arizona, 2015

Certifications

Engineer in Training

(EIT)

Envision Sustainability

Professional (ENV SP), OSHA 30

CDL Type C

Noel Cruz, EIT, ENV SP building and occupancy permits. During preliminary services, she provided real-time estimating and scheduling at the 30%, 60%, and 90% design iterations.

Project Engineer, Mesa Southeast Water Reclamation Plant Grit Removal Upgrade, City of Mesa, Mesa, California, 2015-2016. Ms. Cruz served as a project engineer for this

$2 million project which addressed operation issues caused by excessive grit in the influent. The issues were addressed by installing a new Pista Grit system to the front of the

5-mgd plant. Her responsibilities included submittal, procurement, and layout of all materials, including process piping, concrete, and equipment. She also coordinated and managed subcontractors and vendors through onsite activities.

Rayne Dann

Ms. Dann’s work in both the private and public sectors has centered on source water conveyance, treatment and distribution, instrumentation, and plant design/upgrades. She also has experience with field work, operations, development reviews, and permitting.

Rayne is well-versed in Excel and ArcGIS and has programming experience in VBA, Python, and Matlab.

Environmental Engineer, Westminster Boulevard Drinking Water Facility, City of

Westminster, Westminster, Colorado. Rayne Dann assisted mid-level engineers with calculations for contact time and piping insulation by addressing reviewer’s comments, stating assumptions and updating values as needed.

Previous Work Experience

Project Engineer, Burns & McDonnell, Metro GIS Project, Metro Water Recovery, Denver, Colorado. Rayne Dann and another colleague classified 25,000 buildings across the Denver-Metro area by both use and size for use in hydraulic modelling. Rayne Dann also developed a document outlining how buildings were classified, with given specifications. She completed multiple permit applications for the Colorado Department of

Public Health and Environment (CDPHE).

Project Engineer, City of Englewood, Allen Water Treatment Plant, Englewood, Colorado. Rayne Dann collaborated with operations and maintenance (O&M) to develop an updated asset management system and manage SCADA alarms, at the same time aiding with lab procedures, plant operations, and solids handling. Rayne Dann developed process flow diagrams for plant operations and established a new naming convention for improved asset management tracking. Rayne Dann also worked to increase collaboration between Public Works and Utilities by mapping proposed water main replacements in

ArcGIS, leading to fewer recently constructed roads having to be repave for water main replacement.

Education

BS – Environmental

Engineering, Colorado

State University, 2024

Certifications

OSHA 10 Safety

Certification, 2023

Software Languages

VBA

Python

Matlab

Linguistic Languages

Seal of Biliteracy in

English and Spanish

Laura Faynor

Environmental Engineer/Technical Level I

Laura Faynor is an environmental engineer with experience in research, teaching, data analysis, and sampling coordination. Ms. Faynor joined the CDM Smith team in 2024. Her professional experience includes data analysis, quality assurance and quality control

(QA/QC), research and record review, and wastewater sampling.

Previous Work Experience

Engineering Intern, Morro Bay Public Works, 2023 - 2024.

Ms. Faynor assisted the City Engineer with community outreach for planned city projects.

She reviewed site plans and issued encroachment permits for various projects around the city.

Teaching Assistant, Chemistry and Biochemistry Department, California Polytechnic

State University, San Luis Obispo, California, 2022 - 2023. Ms. Faynor collaborated with professors to foster an interactive learning environment for students in the Chemistry

Department. She facilitated large scale laboratory work and discussion sessions for undergraduate students.

Project Experience

Water Quality Engineer, Hiver International Virtual Exchange Competition, 2023.

Ms. Faynor completed an extracurricular course on wastewater treatment by both a , California Polytechnic State University and Manoura Egypt University professor. Applying the skills learned, Ms. Faynor collaborated with five students to design a wastewater treatment plant using an innovative biological treatment mechanism for the city of New

Mansoura, Egypt. The design was presented through multiple rounds of competition. Ms.

Faynor’s group won the competition which provided her the opportunity to present the design to multiple judges including representatives from the US Embassy in Cairo Egypt

Undergraduate Researcher, Water and Energy Sustainability Training Team

(WESTT), 2022. Ms. Faynor aided in research funded by the California Energy

Commission. She performed bi-weekly tests to determine the nitrite levels in local wastewater samples. The tests used absorption spectroscopy with a spectrophotometer to measure the concentration of nitrite in wastewater treated by algae ponds.

Engineering, California

Polytechnic State

University, San Luis

Obispo, California, (Expected June 2025)

Skills

Auto-CAD

B. Feba

Ms. Feba is an environmental engineer with knowledge in water and wastewater engineering, transport of water and wastewater and solid waste management. Her software skills include AutoCAD Plant 3D, Civil 3D, Revit, SketchUp and AutoCAD.

Environmental Engineer, Manchester Water Works (MWW), Manchester Water

Treatment Plant Upgrade, Manchester, New Hampshire. Ms. Feba is responsible for the development of the hydraulic profile for the plant and involved in the design of influent and effluent pump stations. She used Visual Hydraulics and AFT Fathom software for designing the pump stations.

Civil Designer, Anaheim Public Utilities (APU), Anaheim Groundwater Treatment

Plants Program (Phase B), Anaheim, California. This comprehensive project is part of a multi-phase program to construct new per- and polyfluoroalkyl substances (PFAS) treatment plants and appurtenances. This phase includes treatment facilities at five separate well sites. Ms. Feba is responsible for gravity, pressure main piping modelling and drawing preparation using BIM360 and Civil 3D. She developed the construction drawing plan set for the water treatment plant using Civil 3D.

Civil Designer, Littleton Common Sewer Expansion and Water Main Replacement, Littleton, Massachusetts. Ms. Feba was responsible for modeling and developing profiles for yard piping in Civil 3D, along with rectification of any clashes that were encountered.

Ms. Feba also developed the yard piping profile sheet files and updated the record drawings per the markups following the standard quality procedures.

Drafter, Mallard Creek Water Reclamation Facility, Solids Handling Improvements, Charlotte, NC. Charlotte Water (CLTWater) retained CDM Smith to conduct a comprehensive condition assessment and optimization and reliability evaluation of the solids handling infrastructure at the MCWRF. CDM Smith developed the subsequent preliminary engineering report and design. Ms. Feba performed process mechanical drafting for this project including replacement and modifications to a polymer mixing and storage system, thickening centrifuge, thickened sludge pump, and associated piping.

Drafter, Yonkers Joint Water Resource Recovery Facility (WRRF), HVAC and Odor

Control, Yonkers, New York. CDM Smith is managing a comprehensive program for a multiyear, four phase project to replace the aging heating, ventilation, and air conditioning

(HVAC) infrastructure at a 120-mgd WRRF. The project involves evaluating existing equipment and comparing them to the requirements of NFPA 820 and the Ten States

Standards. The project also evaluated the requirements for replacing equipment to meet these standards and current building codes and preparation of the design documents so they could be implemented in four phases. The first phase addressed odor complaints from the nearby community by adding odor control systems to an offsite pump station and the Screen and Grit building. Ms. Feba was created the drawings for demolition of an existing scrubber system and replacement with a different type of system including new ductwork, fans, odor control scrubbers, recirculation pumps, and associated piping and appurtenances.

Education

Master of Technology in

Environmental Engineering, National Institute of

Technology Tiruchirappalli, Bachelor of Technology in

Civil Engineering, College of

Engineering, Kidangoor, 2017

Henry Gutierrez-Peña

Support/Clerical Level I

Henry Gutierrez-Peña is a procurement specialist in which he regularly performs the preparation, verification and distribution of client contract billings; coordinates, drafts, and reviews change orders; coordinates, drafts and reviews purchase orders; and reviews and maintains subcontractor insurance certificates, contracts, files, and records.

Mr. Gutierrez-Peña assists with CDM Smith’s file management systems, creating the file structure and managing access for projects across the firm.

Procurement Specialist, Green Cay Phase 2 Progressive Design-Build, Palm Beach

County Water Utility Department (PBCWUD), Palm Beach County, Florida.

Since 2004, wetlands at the Green Cay Nature Center have purified over 11 billion gallons of nutrient-rich water sourced from PBCWUD’s nearby Southern Region Water

Reclamation Facility. Native plants and soil filter the water, removing 75% of nitrogen and

50% of phosphorus, before replenishing the local water table. The thriving 100-acre wetland is home to various species of birds, mammals, reptiles, amphibians, insects, and fishes. In late 2021, PBCWUD initiated Green Cay Phase 2, a visionary project that is creating new opportunities for the public to connect with the local water environment.

The project will create a constructed ecosystem modeled on Florida’s world-famous natural springs. Phase 2 will extend the legacy of the original Green Cay project, transforming dozens of acres of historic farmland into a new nature park. The centerpiece of the Phase 2 construction project will be a 2-mgd AWPF that will produce water feeding a system of lakes.

Procurement Specialist, Kerr Lake Regional WTP Expansion Progressive Design-

Build, Kerr Lake Regional Water System Henderson, North Carolina.

The Cities of Henderson, Oxford, and Warren County form the Kerr Lake Regional Water

System (KLRWS) and jointly own the Kerr Lake Regional water treatment plant (WTP).

The plant is a conventional 10-mgd surface water treatment plant, treating water from the

Kerr Lake, which is in the Roanoke River watershed. CDM Smith was hired to design and construct (via a progressive design-build contract) plant improvements and an expansion to 20-mgd. CDM Smith is providing planning, design, construction administration, construction services, and funding administration for the project. This project is the first progressive design-build (PDB) WTP expansion in the state of North Carolina.

The project also includes multiple planning aspects, including developing a facility buildout plan, treatment alternatives analysis, piloting, and evaluation of long-range demand projections. KLRWS wants to change treatment processes at the plant in order to achieve greater removal of problematic contaminants, including disinfectant byproduct

(DBP) precursors, as well as repair aging facilities.

Wekiva High School, Apopoka, Florida, 2018

Languages

Spanish

Rose Hanson

Communications Specialist/Technical Level II

Rose Hanson has eight years of experience in writing and editing documents, including seven years in the engineering industry. Passionate about helping the intended audience understand a document, she focuses on contributing to communications that are clear to the reader. She has led lead service line inventories and replacement program stakeholder engagement across the United States. Rose has also led print, virtual, and visual media development for communications campaigns addressing PFAS risk.

Communications Advisor, Lead Service Line Inventory Program, Seminole County, Florida. Ms. Hanson supported the creation of documents required to gather information for the lead service line inventory. Her team created highly visual postcards and doorhangers explaining inventory collection efforts. They also wrote website content and a customer service script below a 9th grade reading level.

Public Outreach Task Lead, Accelerated Lead Service Line Replacement Program, Providence Water, Providence, Rhode Island. Ms. Hanson oversaw full-scale community outreach to help Providence Water reach its goal of replacing 25,000 lead services lines in five years. The outreach strategy plan, which includes demographic analysis and a community profile, outlined reaching customers and homeowners via mail, phone, digital resources, community meetings, and other means to help the targeted part of the community sign up for lead service line replacement. Ms. Hanson’s team also provided highly visual health and safety information for customers before, during, and after the replacement, proactively complying with the U.S. Environmental Protection Agency Lead and Copper Rule Revisions. Her team operated a call center, providing direct service and communications to customers with questions about the program. The program prioritizes replacements for low-income and otherwise disadvantaged areas of the community.

Strategic Communications Task Lead, Lead and Copper Rule Revisions Compliance

Program, City of Durham, North Carolina. Ms. Hanson led the team writing a communications outline that walks through required and best practice community outreach related to lead service line verification. The plan includes an overview of schedule and content for each communication. She also led the team compiling answers to frequently asked questions defined by the City. She engaged graphic designers and junior staff to create highly visual material informing the community of the City’s materials identification efforts. As the City moved into the replacement phase, Ms. Hanson lead the

City’s approach to creating replacement materials that would work in the short-term while waiting for federal regulations to be clarified.

Public Engagement Task Lead, Lead and Copper Rule Revisions Compliance

Program, Orange Water and Sewer Authority (OWASA), Carrboro, North Carolina.

Ms. Hanson led the team writing a high-level communications outline that walks through required and best practice community outreach related to lead service line verification.

The plan includes schedule and content for each communication. She also led the development of a materials verification flier, to be sent to customers in an effort to increase service line self-verification. She reviewed the flier for OWASA brand consistency, accessible language, and visual communication best practices.

Education

BA – History, Cornell

University, Ithaca, New

York, 2015

Communications Task Lead, Lead and Copper Rule Revisions Compliance Program, Union County Water, Union County, North Carolina. Ms. Hanson managed the initial public outreach for Union County as they begin their lead service line inventory process.

The County does not anticipate a lot of lead service lines, so Ms. Hanson’s team wrote a high-level communications outline to walk them through required and best practice community outreach. She also provided website content to explain the inventory’s purpose and expected result to Union County’s customers.

Communications Specialist, Lead and Copper Rule Revisions Compliance Services –

Phase 1 (LPIPE Grant), City of New Britain, New Britain, Connecticut. Ms. Hanson created content for a postcard explaining the Lead and Copper Rule Revisions to City of

Putnam customers. She facilitated Spanish and Polish translation and ensure the call to action to fill out an inventory survey was clear. She led a team of two junior staff to create doorhangers and website content explaining the City’s materials verification efforts.

Communications Task Lead, Lead Service Line Inventory Program, City of Arlington, Arlington, Virginia. Ms. Hanson led a team creating content for the City’s web page. Her team created a highly visual self-reporting flyer and a postcard inviting the community to report their private-side service line material. She also wrote frequently asked questions and answers, which were the base of a customer service script.

Communications Specialist, Lead Service Line Inventory, Borough of Highland Park, Middlesex County, New Jersey. Ms. Hanson works with the client and CDM Smith technical and risk assessment personnel to create public-facing communications related to the program. She created content for the Borough to communicate about its inventory via the web, postcards, answers to frequently asked questions, and fact sheets. She also helped refine messaging about public health risk across the materials, using simple language and accessibility best practices.

Stakeholder Engagement Specialist, Lead Service Line Inventory and Replacement

Program, Middlesex Water Company, New Jersey. Ms. Hanson reviewed initial communications introducing the service line inventory concept to customers, including website content and inventory survey text. When the utility decided to confirm samples via potholing, she helped shape messaging for a communications campaign that included door hangars, fact sheets, and website updates. She provided communications and editorial review for the final materials before they are distributed to the public. Ms. Hanson also reviewed draft school and childcare sampling notifications to prepare for when the EPA

Lead and Copper Rule Revisions go into effect in 2024.

Communications Specialist, Lead and Copper Rule Revision Compliance, Aquarion

Water Company, Northeast United States. Ms. Hanson reviewed the existing lead-related website content and provided update recommendations for content, visuals, and language.

She lead a team of technical specialists and junior staff to create materials, including website content, postcards, flyers, and doorhangers, explaining inventory efforts and upcoming replacement opportunities. Her team facilitated the translation of materials to

Spanish. Ms. Hanson’s team also crafted disturbance and replacement materials that complied with the Lead and Copper Rule Revisions.

Public Outreach Task Lead, Lead Service Line Inventories, Municipal Clients, North

Carolina. Ms. Hanson led the creation and implementation of communication plans supporting lead service line inventories for 5 municipal clients in North Carolina. She customized plans to fit each program and community demographics. Ms. Hanson worked with a team of two junior members to understand what the inventory’s construction impacts would be. She then created materials clearly explaining those impacts and delineating how it would affect property owners. She also oversaw materials creation for website pages, press releases, FAQs, bill stuffers, postcards, and doorhangers.

Public Outreach Task Lead, Lead Service Line Inventory and Replacement Programs, Municipal Clients, Connecticut. Ms. Hanson led the creation and implementation of communication plans supporting lead service line inventory and replacement programs for 4 municipal clients in Connecticut. She customized plans to fit each program and community demographics. Ms. Hanson worked with a team of three junior members to understand what the replacement construction impacts would be. She then created materials clearly explaining those impacts and delineating how it would affect (but in the end, benefit) property owners. She also oversaw materials creation for website pages, press releases, FAQs, bill stuffers, postcards, and doorhangers.

Communications Lead, Service Line Inventory and Lead Service Line Replacement

Program Plan (Task Order No. 1), Town of Putnam, Putnam, Connecticut. Ms. Hanson reviewed and updated the Town of Putnam’s Lead and Copper Rule Revisions compliance website content and answers to frequently asked questions. She worked with the client to ensure the changes would be compatible with their website host, and consistent with all other public engagement material. She also created a postcard soliciting customer responses to the service line materials inventory. She created all content in line with plain language and accessibility best practices.

Communications Specialist, Lead Service Line Replacement Program, Passaic Valley

Water Commission, Clifton, New Jersey. Ms. Hanson reviewed website content related to the lead service line replacement program. She worked with the project team to simplify language and ensure content covered predictable community concerns were covered.

Communications Specialist, Lead Service Line Replacement Program Website

Content, City of St. Paul, St. Paul, Minnesota. Ms. Hanson reviewed the existing program website and provided recommendations for graphic and language improvements. Her suggestions brought website content down to a 9th grade reading level.

Communications Specialist, Lead in Drinking Water Public Outreach Campaign, Southeast Morris County Municipal Utilities Authority, Southeast Morris County, New Jersey. Ms. Hanson reviewed a letter to utility customers informing them of a water main replacement project, and what actions they needed to take. She read with an eye for reading level, simplifying language, and making organization suggestions to help the public understand the message. The letter was originally written by another consultant. Ms.

Hanson aso provided suggestions for improving previously written FAQs on the website to help the public better understand the answers.

Paula F. Hirsch

Support/Clerical Level I

Paula Hirsch has provided technical and administrative support in various engineering fields. She is highly skilled at supporting project technical deliverables with editing, formatting, and production; and assisting project managers with invoicing, budget tracking, and subconsultant coordination.

Ferry Terminal Conceptual Engineering and Environmental Impact Report, Port of

Redwood City, California. Ms. Hirsch supports CDM Smith’s team in the development of a conceptual design for a new ferry terminal at the Port of Redwood City. The project which is being developed by the Port in a partnership with Water Emergency Transportation

Authority (WETA), will provide new passenger ferry services between Redwood City and both Oakland and San Francisco. The project includes waterfront amenities such as an extension of the Bay Trail, new pedestrian and bicycle facilities, improved transit access, and a hotel/restaurant. The scope of work also includes an extensive public outreach effort, the preparation of an environmental impact report (EIR), and permitting for the project. Concerns of environmental groups, water recreation users, and the access/circulation needs of residents of nearby low-income communities are being addressed. The terminal design includes provisions for electric vehicle (EV) charging facilities as well as dockside charging infrastructure for future electric ferry vessels.

National Cooperative Highway Research Program (NCHRP) 19-18 Transitioning Fuel

Tax Assessments to a Road Usage Charge, Transportation Research Board.

This study is a research project focused on the history of road usage charge (RUC) programs and on the opportunity to transition to new RUC programs to supplement the diminishing value of Fuel Tax Assessments. The project is documenting research trends and current practice and presenting the findings to guide policymakers and program administrators through the process beginning with research and planning, through policymaking, and implementation. Ms. Hirsch assists with financial progress tracking and supporting the development of quarterly reports.

Regional Bus on Shoulder Assessment, Metropolitan Transportation Commission

(MTC), San Francisco Bay Area, California. Ms. Hirsch provided editorial support for technical deliverables, and supported project management activities for this project which developed regional guidelines for assessing the opportunity to use shoulder lanes for bus operation. The project included a review of Bay Area freeways for potential bus on shoulder operations. Considerations include geometric design, existing traffic, transit, and highway conditions. CDM Smith identified the top ten candidate freeway corridors for bus on shoulder implementation, MTC then selected a highly ranked corridor for development of a bus on shoulder implementation and operations plan. CDM Smith worked closely with the transit providers, the California Department of Transportation (Caltrans), and the

California Highway Patrol to develop a conceptual bus on shoulder plan for the selected I-

80 corridor.

Certification

Notary

Public, State of California

Paula F. Hirsch

SR-85 Transit Guideway Study, Santa Clara Valley Transportation Authority (VTA), Santa Clara County, California. Ms. Hirsch supported development of technical deliverables and assisted with subconsultant coordination and project financial management for this project which evaluated rail and bus transit alternatives in the SR-85 corridor in Santa Clara County in order to develop transit solutions for this congested corridor which feeds the heart of the Silicon Valley. The project was led by the VTA and included consideration of their plan to convert the existing High Occupancy Vehicle lanes to Express (High Occupancy Toll) lanes.

On-Call Railroad Business Operations and Systems Support Services, Peninsula

Corridor Joint Powers Board (Caltrain), San Francisco Bay Area, California.

Ms. Hirsch is the administrative liaison with Caltrain for this on-call services contract which serves to provide $5 million of services over a six-year term. She assists with development of work directive proposals, provides subconsultant administration, and supports overall contract management.

Transportation Planning and Program Support for Peninsula Corridor Joint

Powers Board/San Mateo County Transit District/San Mateo County

Transportation Authority, San Mateo County, California. Three agencies’ on-call contracts were jointly administered to provide $7 million of services over five years.

Paula was responsible for subconsultant administrative coordination including development of subcontracts and work directive proposals, and budget tracking. Paula supported meeting planning and documentation and editing of deliverables.

S. Linden Avenue and Scott Street Grade Separation Project, Peninsula Corridor Joint

Powers Board (Caltrain), San Bruno and South San Francisco, California.

Ms. Hirsch was responsible for reviewing comments and providing written verification that comments were addressed in addition to her project management support role and editing of reports for this study which was sponsored by a partnership of the Cities of

San Bruno and South San Francisco. The intent of the project is to improve safety and decrease expected future traffic delays due to growth in vehicle traffic, greater frequency of Caltrain service due to electrification, and future High-Speed Rail service at these at-grade crossings located at South Linden Avenue in South San Francisco and Scott Street in

San Bruno. As part of an overall planning study, CDM Smith conducted a traffic study of the grade separation alternatives which evaluated the existing traffic conditions and the forecasted future (year 2045) traffic conditions under alternative grade separation scenarios and recommended improvements.

Strategic Plan 2020-2024, San Mateo County Transportation Authority, San Mateo

County, California. The Strategic Plan for 2020-2024 is the first document to address both Measure A and Measure W, and provides guidance to the transportation authority and the other stakeholder agencies and jurisdictions in the implementation of both programs over the next five years. In addition to document review and project management support, Ms. Hirsch assisted with stakeholder outreach survey and summarization of results. The Strategic Plan annually directs nearly $180 million of transportation funds to plans and programs, for the next five years. Through an extensive stakeholder and community engagement process, where thousands of comments were received, a set of criteria was developed to reflect the wants and needs of the community to help deliver transformative transportation projects to the county.

John P. (Jack) Keenan, EIT

Mr. Keenan has experience in various engineering disciplines, mainly focused on drinking water and wastewater treatment. In school, Mr. Keenan pursued a focus area of aquatic chemistry, biology and process engineering. He learned broadly about the environmental engineering field through class projects, research, and internships in city government and at CDM Smith.

Environmental Engineer, Solids Handling Facility Improvements, Central Contra

Costa Sanitary District, Martinez, California. The Central Contra Costa Sanitary District

(CCCSD) is upgrading the solids handling facility at their wastewater treatment plant to recover resources and prevent pollution more effectively. Mr. Keenan provided quality control support on this project, checking drawings to ensure equipment tag numbers were correct and consistent throughout the set of drawings. He created and managed the valve and pipe schedules. Mr. Keenan’s attention to detail was crucial to performing these tasks accurately and ensuring high-quality results for the client.

Environmental Engineer, Upper San Leandro Water Treatment Plant Upgrades, East

Bay Municipal Utility District, San Leandro, California. While upgrades to the Upper

San Leandro Water Treatment Plant were being planned, large numbers of drawings with several versions needed to be exchanged between drafters and engineers. Mr. Keenan helped facilitate these exchanges by checking comments on drawings, marking them as ready to be updated, and logging the exchange. This project required attention to detail and good organizational skills, both of which Mr. Keenan was able to provide.

Prior to CDM Smith

City of South Bend, Indiana

Engineering Intern, Rum Village Neighborhood Traffic Calming, City of South Bend, South Bend, Indiana, 2021. The City of South Bend is planning on implementing traffic calming measures in the Rum Village neighborhood to decrease traffic speeds and volumes. Mr. Keenan helped collect and analyze traffic data around the neighborhood. He communicated with the public about the project details at two public meetings and drafted a traffic calming plan for the neighborhood. His abilities to communicate complex topics clearly and work effectively in a team were essential to the successful completion of this project.

Education

MS – Civil and

Environmental

Engineering, Stanford

University, Stanford, California, 2023

BS – Environmental

Engineering, University of Notre Dame, Notre

Dame, Indiana, 2021

Certifications

Engineer-in-Training

(EIT), 2021

Languages

Programming: Python, MATLAB

Sameet Master, PE

Professional Level V

Mr. Master is a senior project manager with over 20 years of experience successfully planning and executing complex and challenging engineering, procurement and construction projects, on time and within budget, with expertise in building stakeholder relationships, effective regulatory interface and compliance, and advanced technical engineering and construction process knowledge. He is skilled at managing strategic and operational plans; regulatory, municipal, and state compliance; budget development; client relationship management; stakeholder communication sourcing; negotiation; vendor and general contracting labor bid development and selection; quality control; status reporting;

project scope; project delivery; design conception; scheduling; RFP development; and training. Mr. Master has managed all aspects of complex capital renovation and capital initiative/investment projects ranging from $500,000 to $123,000,000.

As a project engineer, Mr. Master designed and coordinated municipal water treatment projects and capital infrastructure development projects ranging from $3,000,000 to

$90,000,000.

Prior to CDM Smith

Project Manager, New Water Treatment Plant, Bloomsburg, Pennsylvania.

The project included the design, engineering, and construction of a new water treatment plant for internal business unit client under an aggressive timeline. Labor shortages in the region presented staffing challenges and regulatory issues needed to be identified and resolved. As project manager, Mr. Master led a team that conducted due diligence on a potential site to determine project suitability; recommended a land purchase that was successfully acquired and became project site; evaluated the project design and proposed alternate design to incorporate current best practices and technology; identified additional regulatory issues that increased budget from $24M to $30M while also mitigating expensive future environmental and remediation challenges; assisted in developing an on-going communication strategy with the mayor, council members, local business unit management, and state representatives; and crafted agreements, developed bid proposals and created evaluation process and team to review and select vendors and subcontractors.

Project Manager New Water Supply and Treatment Plant, Haverstraw, New York.

As project manager for this $130M project, Mr. Master led the development of an innovative and cost-effective solution to meet the projected 10-15% increase in potable water demand for this high-density area. In addition to numerous regulatory issues and multiple stakeholder group interest, the location, design, and treatment process needed to be analyzed, developed, and approved. He managed all phases of the entire project from the initial phase through to commissioning. Under his leadership, Mr. Master led a team that created a new position (Communications Director) to address information and public education needs of high-profile project with diverse and multiple stakeholder groups;

evaluated technical engineering solutions and recommended desalination of the Hudson

River as the most cost-effective and reliable water supply for the region; conducted a property search, negotiated a purchase agreement, and obtained corporate approval;

designed the first desalination plant in New York state, prepared plans, addressed

Education

MS – Chemical

Engineering, Columbia

University, 2001

BS –

Environmental

Engineering, Manhattan

College, New

York, 1997

Registration

Professional Civil

Engineer: New

Jersey and New

York

Sameet Master, PE regulatory concerns, developed the project budget, created timelines, and negotiated with vendors, subcontractors, and labor; designed labor, vendor, and subcontractor agreements and RFPs; developed an ongoing stakeholder outreach and communication strategy with mayor, council members, local business unit management, and state representatives;

provided sworn testimony to the New York State Public Service Commission; coordinated and collaborated to address legal issues and political challenges; and effectively translate technical information to ease customer and public concern.

Project Manager, Wastewater Treatment Plant Improvements, Springfield, Massachusetts. Mr. Master managed all facets of this $4.5M project. He led a team that was contracted to operate the facility and provided needed capital improvements investments in order to reduce operating costs and bring budget in line while the operation of the facility within regulatory operating and discharge permits needed to continue. The project evaluated project design and a proposed alternate design to incorporate current best practices and technologies. Mr. Master crafted labor agreements, developed RFP guidelines, and awarded contracts based upon evaluation process.

Project Manager, Delaware Aqueduct Interconnection Project.

This $63M project developed a new water supply source for United Water’s Westchester

County service area by connecting to New York City’s Delaware Aqueduct. Due to prior extensive litigation, Mr. Master managed delay’s impact on the project while also proactively addressing community and stakeholder concerns for this design, build, and operate facility within a residential neighborhood with minimum disruption, lifestyle impact, and enhanced aesthetic appeal. He managed all facets of the entire project that included a modified project design to address residents’ objections, municipal safety concerns, community aesthetic requirements, and construction impact concerns;

identified a win-win solution that utilized open space and minimized disruption of traffic and commerce; coordinated and collaborated with legal departments to proactively address issues; translated technical information for the community to ease public concern;

provided project updates to elected officials to address all concerns; and developed an ongoing stakeholder outreach and communication strategy to multiple community sectors including municipal officials, residents, state officials, local business unit management team, and environmental organizations.

Jasmine Quiambao

While Ms. Quiambao was at the University of New Mexico (UNM), her research project investigated the co-occurrence of microplastics, uranium, and arsenic in heavy metal-contaminated freshwater systems and their potential interfacial reaction. Ms. Quiambao has experience in the area of surface chemistry with the integration of field and controlled laboratory experiments with aqueous chemistry, microscopy, and spectroscopy analyses.

Work Experience

Environmental Engineer, Stormwater Compliance, Albuquerque Aviation Department

Environmental Services, City of Albuquerque, Albuquerque, New Mexico. Ms.

Quiambao conducted site visits at the Albuquerque International Sunport and Double Eagle

II Airport (DEII). She investigated the facilities related to Spill Prevention, Control, and

Countermeasure (SPCC) at the DEII airport. Ms. Quiambao assisted with updating the DEII

SPCC Plan. Ms. Quiambao’s work includes quarterly indicator monitoring, visual stormwater monitoring, quarterly inspections, stormwater sampler installation, deicing inspections, qualitative monitoring reports (QMR), stormwater pollution prevention plan (SWPPP) updates and training presentations.

Environmental Engineer, Stormwater Master Plan, San Patricio County, San Patricio, Texas. Ms. Quiambao contributed to the PC storm water management model (SWMM) modeling in Odem City, Texas. She identified and input attributes for culverts, weirs, and transects within the Odem city limits.

Environmental Engineer, Volcano Cliffs Arsenic Treatment Facility and Pumping

Station Upgrades, Albuquerque Bernalillo County Water Utility Authority, Albuquerque, New Mexico. Ms. Quiambao contributed to engineering calculations. She performed pipe length restraint calculations for the buried ductile iron pipe in the Arsenic

Treatment Facility. She also performed hydraulics and WaterPro! Calculations. Ms.

Quiambao reviewed record drawings and updated civil drawing sheets, permits and specifications.

Environmental Engineer, Cloudcroft PURe Water, Cloudcroft, New Mexico.

Ms. Quiambao contributed to the preliminary cost estimates and vendor coordination.

Ms. Quiambao provided water treatment plant process and treatment equipment assessments, concentrate management plan updates, and water quality data compilation and summarization.

Prior to CDM Smith

Graduate Research Assistant, Civil, Construction, and Environmental Engineering

Department, University of New Mexico, Albuquerque, New Mexico, 2022.

Ms. Quiambao identified the occurrence and the type of microplastics in freshwater bodies of New Mexico located nearby mining sites. She also evaluated the interaction of arsenic and uranium with commercial microplastics in laboratory-controlled conditions.

Ms. Quiambao conducted literature searches, extensive laboratory experiments, collected and analyzed data, presented at various organizations/events, prepared proposals, a master’s thesis document, and published two journal articles.

Education

MS – Environmental

Engineering, University of New Mexico, Albuquerque, New

Mexico, 2022

BS – Chemical

Engineering, University of New Mexico, Albuquerque, New

Mexico, 2020

Languages

English

Tagalog

Dan Rodrigo

Professional Level V

Mr. Rodrigo is a senior technical specialist and CDM Smith’s global One Water Practice

Leader. He has over 30 years of experience in integrated water resources management, water supply planning, water demand forecasting, scenario planning, climate resiliency, resource economics, financial planning, and stakeholder process design. Mr. Rodrigo is an expert in decision science using tools such as system integration models, multi-criteria decision analysis software, and triple bottom line approaches. These tools have been successfully used by Mr. Rodrigo to garner consensus on alternatives and develop adaptive management plans that phase in water resources investments over time based on risk triggers. Plans managed by Mr. Rodrigo have successfully resulted in the implementation of over $20 billion in capital improvements.

Project Manager, Integrated Master Plan, City of San Diego Public Utilities

Department, San Diego, California. San Diego Public Utilities is one of the largest, most complex water, wastewater, and recycled water utilities in the country. In the past, these utility components were planned separately. But with the advancement of the City’s Pure

Water Program that will purify reclaimed wastewater for potable water supply, along with pressures of climate change and future regulations, the City wanted to develop an

“integrated” master plan to examine water, wastewater, and recycled water in a more holistic manner. This effort will include a comprehensive risk assessment of all existing utility assets, analyses of impacts of climate change, and reassessment of new projects.

Project Manager, Integrated Resources Plan (IRP), Elsinore Valley Municipal Water

District, Lake Elsinore, California. CDM Smith is currently updating the IRP for Elsinore

Municipal Water District, focusing on incorporating climate change and other uncertainties in imported and local water supplies in Riverside County. Water supply gaps have been estimated under a five-planning-scenarios order to identify resiliency strategies that can be implemented in the near, medium, and long-term future. Alternatives have been ranked based on triple-bottom-line criteria. These alternatives include potable reuse, water banking, seawater desalination, and stormwater capture.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .