FEDSIM is a Client Support Center housed within GSA, FAS, AAS Page 2 Version 06/14/19
N68335-12-C-0166 Naval Air Warfare
Center
04-02-2012 to 3-
25-2013
SBIR Phase I
N121-045
$149,769.00
FA8501-13-P-0019 OPL
CONTRACTING
01-13-2013 to
10-12-2013
SBIR Phase I
AF121-224
$149,691.00
N68936-13-D0006 Naval Air Warfare
Center
06-14-2013 to
06-13-2018
SBIR III
N101-019
$9,200,000.00
N68335-13-C-0258 Naval Air Warfare
Center
06-20-2013 to
01-29-2018
SBIR Phase II
N121-045
$2,248,133.00
N66001-14-P-5101 NIWC Pacific 12-05-2013 to
06-05-2014
SBIR Phase I
N132-139
$79,864.00
N68335-14-C-0389 Naval Air Warfare
Center
09-16-2014 to
03-16-2015
SBIR Phase I
N142-105
$79,762.00
N00014-15-P-1050 Office of Naval
Research
10-27-2014 to
08-27-2015
SBIR Phase I
N142-113
$79,762.00
N68335-15-C-0221 Naval Air Warfare
Center
06-02-2015 to
11-30-2015
SBIR Phase I
N151-021
$79,998.00
H92222-17-P-0017 US SOCOM 01-31-2017 to
07-27-2017
SBIR Phase I
SOCOM163-005
$145,238.00
N68936-18-G0006 Naval Air Warfare
Center
08-02-2018 to
08-01-2023
SBIR III
N151-021
$9,800,000.00
H92401-18-D0004 Defense Contract
Management Agency
09-13-2018 to 9-
12-2023
SBIR Phase III
Multiple
$30,000,000.00
N68335-19-C-0434 Naval Air Warfare
Center
05-28-2019 to
12-4-2019
SBIR Phase I
N191-013
$139,560.00
The proposed SBIR Phase III contract will be a Cost-Plus-Fixed-Fee (CPFF) contract with an estimated period of performance of one 12-month base period and four 12-month option periods. The total estimated contract value is for $170,000,000.
3. A Description of Supplies/Services Required to Meet Agency’s Need:
The Department of Defense (DoD) has a requirement and need for the purchase of engineering services to integrate new technologies largely focused on integrated base defense and command and control projects into existing systems. It is planned that overarching requirements will be established at the contract level and more refined technical requirements for individual customer projects will be defined via technical direction letters. CTI was awarded multiple SBIR Phase I, II, and III contracts (as seen in the table above), which they created technologies related to routing of autonomous vehicles, service oriented architectures, sensors and data, warning capabilities, data
FEDSIM is a Client Support Center housed within GSA, FAS, AAS Page 3 distribution and synchronization, and cloud-based capabilities. The DoD has various programs, which require the integration of these SBIR capabilities derived from the SBIR contracts listed above into their current systems to support their missions. Each TDL will specify the project scope of work as it relates to section C of the final contract and the SBIR technologies involved.
The candidate CTI SBIR technology will be chosen from the following set of developed SBIR technologies:
� SBIR Topic Number: N101-019: Algorithms for Dynamic four dimensional (4D)
Volumetric Calculations. This technology provides a complete planning and visualization environment while improving critical technical areas such as advance protected entity and electronic attach platform auto-routing and jammer acceptability computation optimization in complex environments.
� SBIR Topic Number: N121-045: Maritime Airborne Service Oriented Architecture Integration. This technology provides a comprehensive service oriented architecture to leverage the Defense Information Systems Agency (DISA) Global Information Grid to enable interoperability between Maritime Patrol and Reconnaissance Forces airborne planforms, sensor systems, and authorized users.
� SBIR Topic Number: AF121-224: Common Global Information Grid Interface for Electronic Warfare Systems. This technology provides a comprehensive service oriented architecture to leverage the Defense Information Systems Agency Global Information Grid to enable interoperability between electronic warfare systems and authorized users.
� SBIR Topic Number: N132-139: Tripwires for Program Executive Office Command, Control, Communications, Computers and Intelligence. This technology is a system of active and passive monitors that will provide status on Program Executive Office Command, Control, Communications, Computers and Intelligence systems.
� SBIR Topic Number: N142-105: Intelligent Multi-Computing-Platform for Complex Tactical Manned and Unmanned Engagement Planning and Data Distribution. This technology provides a collaborative planning environment using emerging desktop and mobile computing devices.
� SBIR Topic Number: N151-021: Advanced Modeling and Visualization of Effects for Future Electronic Warfare Systems. This technology provides the ability to see and understand the threat and non-kinetic (for example: intelligence or cyber operations) weapon capabilities.
� SBIR Topic Number: SOCOM163-005: Cloud Data Synchronization with Limited Bandwidth Communications. This technology provides a flexible framework that allows for flexible presentation of data to consumers and resilience to intermittent and low bandwidth communications.
� SBIR Topic Number: N142-113: Expeditionary Cyber Network. This technology is a small, light-weight, rugged, tactical, embedded computer that can use wireless technology to control, capture, and disseminate signals intelligence and full-motion video.
FEDSIM is a Client Support Center housed within GSA, FAS, AAS Page 4
� SBIR Topic Number: N191-013: Maritime Big Data Analytics. This technology is used to provide airborne processing of terabytes of sensor data while synchronizing to afloat and ashore enclaves via a roll-on tactical cloudlet approach.
4. An Identification of the Statutory Authority Permitting Other Than Full and Open Competition:
The authority under which this J&A is made is pursuant to FAR 6.302-5, that the project is a SBIR Phase III award that is derived from, extends, or completes efforts made under prior SBIR funding agreements and is authorized under 15 U.S.C. 638(r)(4).
In accordance with the SBA SBIR/STTR Policy Directive dated May 2, 2019, the competition for SBIR Phase I and SBIR Phase II awards satisfies any competition requirement of the Armed Services Procurement Act, the Federal Property and Administrative Services Act, and the Competition in Contracting Act. Furthermore, 15 U.S.C. 638(r)(4) states:
“To the greatest extent practicable, Federal agencies and Federal prime contractors shall issue SBIR Phase III awards relating to technology, including sole source awards, to the SBIR and STTR award recipients that developed the technology.”
5. A Demonstration that the Proposed Contractor’s Unique Qualifications or the Nature of the Acquisition Requires Use of the Authority Cited:
The nature of the acquisition requires the use of the authority cited. The SBIR Program is structured in three phases.
PHASE I: The objective of Phase I is to establish the technical merit, feasibility, and commercial potential of the proposed Research/Research and Development (R/R&D) efforts and to determine the quality of performance of the small business awardee organization prior to providing further Federal support in Phase II.
PHASE II: The objective of Phase II is to continue the R/R&D efforts initiated in Phase I.
Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II. Only Phase I awardees are eligible for a Phase II award.
PHASE III: The objective of Phase III, where appropriate, is for the SBIR awardee to pursue commercialization objectives resulting from the Phase I/II R/R&D activities. The SBIR program does not fund Phase III. For some federal agencies, Phase III may involve follow-on non-SBIR funded R&D or production contracts for products, processes, or services intended for use by the U.S. Government. The Phase III work derives from, extends, or completes efforts performed under Phase I and/or Phase II, therefore the use of the authority cited is required.
Under the SBIR Program, CTI was awarded competitive Phase I and II contracts for technologies related to routing of autonomous vehicles, service oriented architectures, FEDSIM is a Client Support Center housed within GSA, FAS, AAS Page 5 sensors, warning capabilities, data distribution and synchronization, and cloud-based capabilities. The Phase I and II contracts received positive results and demonstrated that CTI is uniquely qualified as the Phase III awardee; thus this intended SBIR Phase III action is a follow-on to the initial research to continue testing the various technologies in operational settings for multiple DOD entities. CTI has also previously been awarded Phase III contracts stemming from some the successful Phase I and II contracts covered under this prospective contract, and this award will allow CTI to continue building upon their technology capability from those historical Phase III awards.
6. A Description of Efforts Made to Ensure that Offers are Solicited From as Many Potential Sources as Practicable:
The original open calls for the SBIR topic numbers N191-013, SOCOM163-005, N142-113, N151-021, N132-139, N142-105, N121-045, AF121-224, and N101-019 were posted on the SBIR.gov website portal. No other efforts were made to solicit other potential sources in accordance with the SBIR Policy Directive. Furthermore, in accordance with FAR 5.202(a)(7), proposed contract actions resulting from the acceptance of a proposal under the Small Business Innovation Development Act of 1982 are exempt from being publicized.
7. A Determination by the Contracting Officer that the Anticipated Cost to the Government will be Fair and Reasonable:
The Contracting Officer will conduct price and cost analysis in accordance with FAR Subparts 15.404-1 (Proposal Analysis Techniques) and 15.405 (Price Negotiation) to ensure that the final price is fair and reasonable and the award is in the best interest of the Government. This determination will be documented in the Award Decision Document, which will be included in the contract file.
8. A Description of the Market Research Conducted and the Results or a Statement of the Reason Market Research was not Conducted:
FAR 10.001(a)(2) states that market research appropriate to the circumstances must be conducted. SBIR Phase III procurements are such that the traditional market research to determine alternative sources is generally not applicable. The Government conducted market research to verify and determine that the proposed Phase III work derives from research, effort, and/or prototypes performed under Phase I and II efforts by obtaining copies of the Phase I and II contracts N68335-19-C-0434, H92222-17-P-0017, N00014-
15-P-1050, N68335-15-C-0221, N68335-14-C-0389, N68335-13-C-0258, FA8501-13-P-
0019, N68335-12-C-0166, N68936-11-C-0003, and N68936-10-C-0079, as well as the final report summarizing Phase I and II feasibility. In discussion with the contractor, CTI is willing and available to perform the work on this Phase III contract. The contracting officer has determined from review of the aforementioned solicitation, contracts, and research report that the requirement requested in Phase III derives from Phase I and II research. The contracting officer has reviewed CPARS and has determined CTI capable to perform the work on this Phase III contract.
FEDSIM is a Client Support Center housed within GSA, FAS, AAS Page 7
FEDSIM is a Client Support Center housed within GSA, FAS, AAS Page 8
FEDSIM is a Client Support Center housed within GSA, FAS, AAS Page 9
I have reviewed this contract action and I have determined to the best of my knowledge and belief, based on the information contained herein, that it complies with all applicable policies and regulations.