CTE and TPE 2020 solicitation.docx

DOCX document 52 KB Posted

Attached to
Alaska CST CTE TPE 2020 July August
Solicitation number
W91ZRU-20-R-0016
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91ZRU20R0016

Section SF 1449 - CONTINUATION SHEET

2020 CST CTE / TPE PWS

Performance Work Statement For

103RD WMD-CST

Collective Training Event (CTE) and Training Proficiency Evaluation (TPE)

1.0 Objective: The objective of this task is to facilitate and execute a 24 hour, full scale, multi-agency, all-hazards collective training exercise in Anchorage, Alaska from 2 July-7 August 2020. This exercise will create an environment to exercise the mission essential tasks outlined in the current Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks dated 5 June 2019, the Local and Federal Emergency Response Plans, and Emergency Response Plans from each agency participating in the exercise. This exercise involves members from the Chemical Biological Radiological and Nuclear Response Enterprise, Federal, State and Local First Responders.

2.0 Specific Tasks: The contractor will provide the necessary personnel, labor, materials, supplies, and equipment as indicated below to perform the tasks outlined:

2.1 Scenario Development: The series of exercises will not only measure the training and readiness level of the team in accordance with DTMS Combined Armed Training Strategy (CATS) Objective-T Civil Support Team Mission Essential Tasks, but will also reinforce interoperability, communications, and aid in the development of standard operating guidelines (SOGs). The scenarios must include two (2) Chemical, two (2) Biological, two (2) Radiological, and two (2) Home-Made Explosives ELABORATE clandestine laboratories or processes for each day of exercise. Contractors must utilize controlled Isotopes that will test radiological detection equipment beyond training check/button sources. Contractor will facilitate and coordinate US approved radiological hazards IAW NRC Regulation, Title 10 Code of Federal Regulations requirements. All scenarios must be designed to aid in the identification of possible team shortcomings and weak areas, and to re-train those areas as necessary. They must also provide an environment ready for on-the-fly injects as necessary to ensure conditions are available for all of the DTMS Combined Armed Training Strategy (CATS) Objective T Civil Support Team Mission Essential Tasks to be assess to standard. Should any weak CST METL areas be found, the scenarios should provide for immediate re-training in those areas. The scenarios must provide the complexity and technical detail to represent a realistic mission. Training facilitation must incorporate training aids, devices, and intelligence that accurately simulate current CST operational requirements and elicit employment of CST unique detection and analytical equipment. Conditions must be provided that enable the CST to exercise and be evaluated against METL tasks requiring assessments. Realism and technical exactitude are crucial for all training aids, devices, simulators, and locations. The contractor must also incorporate current emerging threats CSTs face domestically and/or from overseas into scenario design. The full scenarios should each provide for complete, continuous and demanding training and evaluation not to exceed 24 hours.

Chemical and Biological threat agent production will incorporate realistic laboratory process consistent with applicable US Patent, Current substantiated intelligence or verifiable production methods. Process must include all equipment, reactants and steps to achieve the target CWA/BWA (WMD). Simulation of equipment, precursors and steps to achieve the end product must be annotated in response to SOW.

Radiation sources producing alpha, beta, and gamma will be incorporated into the scenario. Gamma sources will be of sufficient activity so as to produce 2mR/hr unshielded field. Simulation of equipment, precursors and steps to achieve the end product must be annotated in response to SOW.

Home-Made Explosives (HME) threat agent production will incorporate realistic laboratory process consistent with applicable US Patent, Current substantiated intelligence or verifiable production methods. Process must include all equipment, reactants and steps to achieve the target HME. Simulation of equipment, precursors and steps to achieve the end product must be annotated in response to SOW.

2.2 Scenario Staffing: The contractor will provide experienced and certified staff to create target sites that replicate elaborate chemical and biological laboratory production, radiological and explosives manufacturing labs, and act as role players in the scenario. The minimal roles include Incident Commander (IC), FBI or local law enforcement, Explosives Ordnance Disposal (EOD), Safety Officer, Staging Officer, Medical reach-back, and a planner to attend the mid-planning IPR and final evaluation out brief. All staff must have a full understanding of the Incident Command System (ICS) and their role in WMD events. Since staff will be playing the roles of trained Hazardous Materials (HAZMAT) professionals and reacting to the decisions of the CST, they must be fully trained and possess at least 10 years of experience in HAZMAT operations to the minimum level of “Technician” in accordance with National Fire Protection Association (NFPA) 472. As these exercises are in part to assist with SOG construction and implementation, as well as reinforce Training and Evaluation Tasks enforced at a national certification level the contractor must show evidence of sufficient proficiency, as well as, reinforce Training and Evaluation Tasks (OBJ-T T&EO) enforced at NGB J39. The contractor must demonstrate successful prior contactor exercise in a lead capacity in the execution in at least (5) national level CST training exercises; of which three (3) must be CST Task Proficiency Evaluations (TPE). Sufficient CST unique support experience is vital to plenary understanding of the training requirements. The contractor will provide their latest three (3) CST exercises facilitated and CST Commanders as reference to determine recent past performance to allow for accurate vetting. All staff must be well versed in CST Operations and all governing regulations to supplement the training and reinforcement of standard CST operating principals during the exercise. The contractor will provide and maintain at least three certified Emergency Medical Technicians (EMT) on site. Contractor will establish a “Simulation Cell” of technical/subject matter experts to facilitate/adjudicate the synchronization and facilitation of all exercise intelligence support as required. Contractor staff will also possess basic skills in electrical, plumbing, and carpentry for target site adjustments (see 3.1 and 3.2 below).

3.0 Place of Performance: The contractor locates and identifies target venues in the Anchorage community, to meet the requirements for target locations, vehicle footprint, communications equipment, egress, and functioning utilities (electricity, water supply) in accordance with the DTMS Combined Armed Training Strategy (CATS) Objective T Civil Support Team Mission Essential Tasks dated 5 June 2019, FM 3-11.22, NGB-J39 Procedural Guidance Weapons of Mass Destruction Civil Support Team Management and unit Standard Operating Guidelines (SOG).

3.1 Target Site: The contractor will acquire and prepare all target venues as necessary to provide realism of the scenarios that supports METL execution. Role players with the proper casualty simulation makeup may be necessary in some or all exercises. Contractor must possess the ability to acquire appropriate permits to transport hazardous materials which require warning placards, or contract for said service. The contractor will possess the skill set required to perform basic plumbing, carpentry, paint and finish, and electrical work (not requiring permit) to adequately prepare target buildings or, must be able to obtain such services as necessary to insure a realistic training environment. All furniture, decorations, props and chemical toilets/porta-potties (with servicing to support contract personnel and evaluated team) will also be provided by the contractor.

3.2 Site Adjustments: Any necessary adjustments to the site (to include building construction, inoperable vehicle placement, demolition, fabrications) will be made by the contractor. This may include the use of heavy and or specialized equipment that the contractor may sub-contract if unable to perform this function with onsite staff. Contractor will be required to acquire and improve/modify a minimum of (2) abandoned structures, to include multiple rooms, for each exercise consisting of two each Radiological, Biological, Chemical and Explosives. The buildings should range from approximately 500 – 2000 sq ft in size and are generally at 25%-100% disrepair. Moderate to elaborate construction within the buildings may be required such as: secret room construction, false walls, doors and windows installation, repair or removal of walls. All modifications required will be driven based on the scenario. Minor site adjustment changes not requiring monetary adjustment to the contract may be negotiated by the Contracting Officer Representative (COR). The Contracting Officer (KO) must negotiate any changes requiring increased expense to the contractor. At the conclusion of the exercise, the contractor will return the site to its previous state. All clean-up will be done by the contractor. All hazardous waste resulting from hazardous materials provided by the contractor will be removed and disposed of by the contractor at contractor expense.

4.0 Period of Performance: On average, it is estimated that eleven (11) working days will be needed to complete the tasks. This includes seven (7) days for site preparation of suitable chemical, biological, radiological, and explosives labs, two (2) days for execution, and two (2) days for clean-up.

5.0 Reporting Requirements and Deliverables: Contractor will provide the following deliverables:

5.1 Refined Scenario Summary: The contractor will provide copies of refined scenario summaries for each exercise to 196TH IN BDE CST/CERFP Training and Readiness Division no later than 10 days prior to each exercise site preparation (NLT 2 July 2020 for CTE and 24 July 2020 for TPE).

5.2 Master Scenario Events List (MSEL): The contractor will provide the 196TH IN BDE CST/CERFP Training and Readiness Division a draft of the MSEL no later than 3 days prior to exercises execution (NLT 8 July 2020 for CTE and 29 July 2020 for TPE). As revisions are made, updated copies will be provided to the 196TH IN BDE CST/CERFP Training and Readiness Division.

5.3 After Actions Review (AAR). The contractor will provide a detailed after actions review of the exercise to include any deficiencies noted as they pertain to the DTMS CATS Objective T WMD-CST Mission Essential Tasks and/or SOG within 7 days after execution. Any major deficiencies from execution day will be noted and provided immediately to the Exercise Director/ 196TH IN BDE representative the day after execution.

5.4 Task Deliverable Schedule Table:

Deliverable
Req. Ref.
Due Date
Exercise Scenario Summary
5.1
10 days prior to exercise execution
MSEL
5.2
3 days prior to exercise execution
AAR
5.3
1 day for major deficiencies, 7 days for detailed AAR presentation

6.0 Government Furnished Information/Equipment:

6.1 The Government will provide all training facilities/classrooms required outside of the scenario at no cost to the contractor.

7.0 Contractor Manpower Reporting Statement

The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following address: https://contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including sub-contractor); (7) Total payments (including subcontractor); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different; (9) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (10) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest City, Country when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language, and; (13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year.

8.0 Special Provisions

8.1 Quality Control. A representative from the 196TH IN BDE CST/CERFP Training and Readiness Division will oversee conduct of training and skills test to ensure effective and appropriate training is being conducted.

8.2 Performance Assessment. The WMD-CST teams participating must be accurately assessed based on the twelve National Guard Mission Essential Tasks outlined in the DTMS Combined Armed Training Strategy (CATS) Objective T Civil Support Team Mission Essential Tasks dated Sep 18, requiring the contractor to assemble a realistic and appropriate environment as well as an effective scenario development and facilitation method.

8.3 Hours of Operation: Normal Duty Hours. It is estimated that the average preparation will take no less than the equivalent of seven (7) eight (8) hour workdays using 5-6 staff. Depending on the exercise script and the venue, up to 12-hour days may be necessary. The contractors will accomplish the preparation in a timely fashion and facilitate each exercise for 24-36 continuous hours.

8.4 Contractor Employees. The contractor will determine the suitable number of staff needed to prepare all target sites and facilitate continuous training not to exceed 36-hours.

8.5 Special Qualifications. The contractors must have qualifications that enable them to construct plausible, realistic WMD target site(s) and assess teams in accordance with DTMS CATS Objective-T CST Tasks. (see 2.0, 2.1, and 2.2 above)

8.6 Security Requirements. Contractor personnel will not be required to obtain security clearances. However, all personnel involved must have a valid driver’s license in order to obtain a military installation pass or to be signed on by a Government employee member.

8.7 Identification of Employees. Identification of employees will be at the discretion of the contractor.

8.8 Utilities. N/A.

9.0 Applicable Documents. N/A.

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

2020 CST CTE-TPE (Training Event)

FFP

103rd WMD-CST Collective Training Event (CTE) and Training Proficiency Evaluation (TPE) 02 July 2020 - 07 August 2020. See PWS FOB: Destination ADDITIONAL MARKINGS: Major Browning @ 907-433-5610

PSC CD: U014

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
N/A
N/A
N/A
N/A

CLAUSES INCORPORATED BY REFERENCE

52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-6
Brand Name or Equal
AUG 1999
52.222-1
Notice To The Government Of Labor Disputes
FEB 1997
52.222-21
Prohibition Of Segregated Facilities
APR 2015
52.222-26
Equal Opportunity
SEP 2016
52.222-35
Equal Opportunity for Veterans
OCT 2015
52.222-36
Equal Opportunity for Workers with Disabilities
JUL 2014
52.222-37
Employment Reports on Veterans
FEB 2016
52.222-40
Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-41
Service Contract Labor Standards
AUG 2018
52.222-43
Fair Labor Standards Act And Service Contract Labor Standards - Price Adjustment (Multiple Year And Option Contracts)
AUG 2018
52.222-44
Fair Labor Standards And Service Contract Labor Standards- Price Adjustment
MAY 2014
52.222-50
Combating Trafficking in Persons
JAN 2019
52.222-54
Employment Eligibility Verification
OCT 2015
52.222-55
Minimum Wages Under Executive Order 13658
DEC 2015
52.223-18
Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.232-2
Payments Under Fixed-Price Research And Development Contracts
APR 1984
52.232-33
Payment by Electronic Funds Transfer--System for Award Management
OCT 2018
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40
Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
252.201-7000
Contracting Officer's Representative
DEC 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
SEP 2013
252.203-7005
Representation Relating to Compensation of Former DoD Officials
NOV 2011
252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7014
Limitations on the Use or Disclosure of Information by Litigation Support Contractors
MAY 2016
252.225-7001
Buy American And Balance Of Payments Program-- Basic
DEC 2017
252.225-7002
Qualifying Country Sources As Subcontractors
DEC 2017
252.225-7012
Preference For Certain Domestic Commodities
DEC 2017
252.225-7031
Secondary Arab Boycott Of Israel
JUN 2005
252.225-7050
Disclosure of Ownership or Control by the Government of a Country that is a State Sponsor of Terrorism
DEC 2018
252.226-7001
Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns
APR 2019
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7006
Wide Area WorkFlow Payment Instructions
DEC 2018
252.237-7010
Prohibition on Interrogation of Detainees by Contractor Personnel
JUN 2013
252.243-7002
Requests for Equitable Adjustment
DEC 2012

CLAUSES INCORPORATED BY FULL TEXT

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Michael Conner, P.O. Box B, Fort Richardson, AK 99505.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

(End of clause) image1.wmf image2.wmf

File details come from the government source that posted it. Updated .