CT26-0173F.pdf

PDF 3 MB Posted

Attached to
On-Call Citywide Fencing Services
Solicitation number
CT26-0173F
Issued by
Pierce County, Washington

About this file

Summary

This is a Request for Bids (RFB) issued by the City of Tacoma, Washington and Tacoma Public Utilities (TPU) for on-call citywide fencing services under Specification No. CT26-0173F. The solicitation seeks to establish one or more contracts with qualified vendors to provide fencing installation, removal, service, and repair at various City and TPU locations throughout Pierce, King, Grays Harbor, Mason, and Lewis Counties. The scope of work encompasses standard fencing installation (rails, posts, gates, fabric, vinyl slats, outriggers, and wire), relocation and temporary fencing services, and additional services including materials, labor, service calls, gate controller installation and maintenance, and mobilization/demobilization to hydroelectric projects and emergency sites. Bid items include detailed line-item pricing for 72 specific tasks measured in linear feet or each unit. The solicitation deadline is 11:00 a.m. Pacific Time on Tuesday, December 8, 2026, with bid opening scheduled for 11:15 a.m. the same day. A pre-bid meeting is scheduled for Monday, November 23, 2026, from 10:00 to 11:00 a.m. via Microsoft Teams. The question deadline is November 27, 2026. Award is anticipated on or about December 15, 2026, subject to Public Utility Board and City Council approval. The contract term is not to exceed four years, structured as an initial three-year term plus one optional renewal year, with an estimated total contract value of $2,601,992.72 based on historical usage.

Bidders must submit sealed bids electronically or in person with a bid bond or certified check equal to at least five percent of the total bid amount. Payment and performance bonds in the amount of 25 percent of the contract total are required from the successful bidder. Award will be made to the lowest responsive and responsible bidder based on price, product quality, and availability, though the City reserves the right to split the award, reduce it, or make no award if in the City's best interest. All work is subject to Washington State prevailing wage requirements under Chapter 39.12 RCW, with prevailing wage rates varying by county and applicable from the submittal deadline unless the project is not awarded within six months. Bidders must meet mandatory state responsibility criteria including current contractor registration, Washington Unified Business Identifier (UBI) number, industrial insurance coverage, and compliance with prevailing wage and apprenticeship requirements. The City also imposes supplemental responsibility criteria under Tacoma Municipal Code Section 1.06.262 regarding financial resources, experience, performance history, and legal compliance. This project has Equity in Contracting (EIC) requirements, requiring bidders to utilize certified minority, women, and small business enterprises. No federal funding is identified for this project. The solicitation materials, including the complete price proposal form and all required forms, are available on the City of Tacoma Purchasing website at www.TacomaPurchasing.org.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF TACOMA

REQUEST FOR BIDS

ON-CALL CITYWIDE FENCING SERVICES

SPECIFICATION NO. CT26-0173F

Form No. SPEC-040C Revised: 06/03/2024

City of Tacoma

REQUEST FOR BIDS CT26-0173F

ON-CALL CITYWIDE FENCING SERVICES

Submittal Deadline: 11:00 a.m., Pacific Time, Tuesday, December 8, 2026 Submittals must be received by the City’s Procurement and Payables Division by 11:00 a.m. Pacific Time.

For electronic submittals, the City of Tacoma will designate the time of receipt recorded by our email server, as the official time of receipt. This clock will be used as the official time of receipt of all parts of electronic bid submittals. Include the specification number in the subject line of your email. Your submittal must be sent as an attachment, links to your electronic submittal will not be accepted.

For in person submittals, the City of Tacoma will designate the time of receipt recorded by the timestamp located at the lobby security desk, as the official time of receipt. Include the specification number on the outside of the sealed envelope. Late submittals will be returned unopened and rejected as non-responsive.

Submittal Delivery: Sealed submittals will be received as follows:

By Email:

sendbid@tacoma.gov Maximum email size including attachments: 35 MB.

Multiple emails may be sent for each submittal.

Note: Email may pass through multiple servers before arriving at its destination. Please allow sufficient time for email delivery of submittals. Timely electronic delivery is at the risk of the supplier.

In Person:

Tacoma Public Utilities Administration Building North, Main Floor, Lobby Security Desk 3628 South 35th Street Tacoma, WA 98409 Monday – Friday 8:00 am to 4:30 pm

Bid Opening: Submittals must be received by the City’s Procurement and Payables Division prior to 11:00 a.m. Pacific Time. Sealed submittals in response to a RFB will be opened Tuesday’s at 11:15 a.m. by a purchasing representative and read aloud during a public bid opening held at the Tacoma Public Utilities Administrative Building North, 3628 S. 35th Street, Tacoma, WA 98409, conference room M-1, located on the main floor. They will also be held virtually Tuesday’s at 11:15 a.m. Attend a Zoom meeting via this link or call 1

(253) 215 8782, using meeting ID # 884 0268 0573, passcode # 070737.

Submittals in response to an RFP, RFQ or RFI will be recorded as received, but not read at bid opening. As soon as possible, after 1:00 PM, on the day of submittal deadline, preliminary results will be posted to www.TacomaPurchasing.org.

If you believe your submittal was sent timely and was not read at bid opening, please contact sendbid@tacoma.gov immediately.

Solicitation Documents: An electronic copy of the complete solicitation documents may be viewed and obtained by accessing the City of Tacoma Purchasing website at www.TacomaPurchasing.org.

• Register for the Bid Holders List to receive notices of addenda, questions and answers and related updates.

• Click here to see a list of vendors registered for this solicitation.

Pre-Bid Meeting: A pre-bid meeting will be held via Microsoft Teams on Monday, November 23, 2026, from 10:00 AM to 11:00 AM. Meeting link is below:

Join: https://teams.microsoft.com/meet/2998381568004509?p=YVCZY4dqBeDDb59WqT Meeting ID: 299 838 156 800 450 9 Passcode: Rn3hB3Gj mailto:sendbid@sendbid@tacoma.gov https://us06web.zoom.us/j/88402680573?pwd=eThSaXZxNER0TWRhUGx6U0F2cURMZz09 https://www.cityoftacoma.org/cms/One.aspx?portalId=169&pageId=22848 mailto:sendbid@tacoma.gov http://www.tacomapurchasing.org/ http://www.ci.tacoma.wa.us/45bidsapps/PlanholderRegister.aspx http://www.ci.tacoma.wa.us/45bidsapps/PlanholderList.aspx https://teams.microsoft.com/meet/2998381568004509?p=YVCZY4dqBeDDb59WqT

Form No. SPEC-040C Revised: 06/03/2024

Dial in by phone +1 253-666-4424,,733320594# United States, Tacoma Find a local number Phone conference ID: 733 320 594#

Project Scope: The City of Tacoma (City) / Tacoma Public Utilities (TPU) is soliciting bids to establish one or more contracts with qualified vendors to fulfill the City’s needs for on-call fencing installation, removal, service and repair.

Estimate: $2,601,992.72 Paid Sick Leave: The City of Tacoma requires all employers to provide paid sick leave in accordance with State of Washington law.

Americans with Disabilities Act (ADA Information: The City of Tacoma, in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. Specification materials can be made available in an alternate format by emailing the contact listed below in the Additional Information section.

Title VI Information:

“The City of Tacoma” in accordance with provisions of Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.S.C. sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin in consideration of award.

Additional Information: Requests for information regarding the specifications may be obtained by contacting Brandon Marquett-Snow by email to bsnow@tacoma.gov.

Protest Policy: City of Tacoma protest policy, located at www.tacomapurchasing.org, specifies procedures for protests submitted prior to and after submittal deadline.

Meeting sites are accessible to persons with disabilities. Reasonable accommodations for persons with disabilities can be arranged with 48 hours advance notice by calling 253-502-8468.

tel:+12536664424,,733320594 https://dialin.teams.cloud.microsoft/5349761c-1f7c-49ce-8138-c91754a307ae?id=733320594 http://cms.cityoftacoma.org/Purchasing/CandA/ProtestPolicy052711.pdf http://www.tacomapurchasing.org/

Request for Bids Specification No. CT26-0173F Template Revised: 08/01/2025

TABLE OF CONTENTS

TABLE OF CONTENTS

SUBMITTAL CHECK LIST

SPECIAL NOTICE TO BIDDERS

1. DESCRIPTION OF WORK

2. MINIMUM REQUIREMENTS

3. STANDARD TERMS AND CONDITIONS / GENERAL PROVISIONS

4. INSURANCE REQUIREMENTS

5. ANTICIPATED CONTRACT TERM

6. CALENDAR OF EVENTS

7. INQUIRIES

8. PRE-BID MEETING

9. DISCLAIMER

10. RESPONSIVENESS

11. AWARD

12. PREVAILING WAGE INFORMATION

13. BID BOND

14. PAYMENT AND PERFORMANCE BONDS

15. DELIVERY

16. WARRANTY – If Applicable

17. INSPECTION

18. MATERIALS AND WORKMANSHIP

19. ENVIRONMENTALLY PREFERABLE PROCUREMENT

20. LEAP REQUIREMENTS

21. EQUITY IN CONTRACTING

APPENDIX A

APPENDIX B

APPENDIX C

APPENDIX D

SUBMITTAL CHECK LIST

This checklist identifies items to be included with your submittal. Any submittal received without these required items may be deemed non-responsive and not be considered for award.

Submittals must be received by the City of Tacoma Purchasing Division by the date and time specified in the Request for Bids page.

The following items make up your complete electronic submittal package. Please submit only the items listed below:

Signature Page (See Appendix B) To be filled in and executed by a duly authorized officer or representative of the bidding entity.

If the bidder is a subsidiary or doing business on behalf of another entity, so state, and provide the firm name under which business is hereby transacted.

Bid Bond (See Appendix B)

Price Proposal Form (See Appendix B) The unit prices bid must be shown in the space provided. Check your computations for omissions and errors.

State Responsibility and Reciprocal Bid Preference Information Bidder shall complete this form in its entirety to ensure compliance with state legislation.

(See Appendix B)

Record of Prior Contracts (See Appendix B)

List of Subcontractor Categories of Work (See Appendix B)

EIC Utilization Form. (See Appendix B)

Note:

Only the seven (7) documents listed above are desired in a responsive bid.

Please do not include the full solicitation document in your response.

After award, the following documents will be executed:

City of Tacoma Contract (See sample in Appendix C) Must be executed by the successful bidder.

Certificate of Insurance and related endorsements (See Appendix D) Shall be submitted with all required endorsements

Payment and Performance Bonds (See samples in Appendix C) Payment Bond and Performance Bond: Must be executed by the successful bidder and his/her surety company

General Release (See sample in Appendix C)

SPECIAL NOTICE TO BIDDERS

Public works and improvement projects for the City of Tacoma are subject to Washington state law and Tacoma Municipal Code, including, but not limited to the following:

I. STATE OF WASHINGTON

A. RESPONSIBILITY CRITERIA – STATE OF WASHINGTON

In order to be considered a responsible bidder the bidder must meet the following mandatory state responsibility criteria contained in RCW 39.04.350:

1. Have a current certificate of registration as a contractor in compliance with chapters

18.27 RCW,18.106 RCW, 70.87 RCW, 19.28 RCW, which must have been in effect at the time of bid submittal;

2. Have a current Washington Unified Business Identifier (UBI) number;

3. If applicable:

a. Have Industrial Insurance (workers' compensation) coverage for the bidder’s employees working in Washington, as required in Title 51 RCW;

b. Have a Washington Employment Security Department number, as required in Title 50 RCW;

c. Have a Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW and;

4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 (unlicensed or unregistered contractors) or 39.12.065(3) (prevailing wage).

5. Have received training on the requirements related to public works and prevailing wage under this chapter and chapter 39.12 RCW and must designate a person or persons to be trained on these requirements. The training must be provided by the department of labor and industries or by a training provider whose curriculum is approved by the department. Bidders that have completed three or more public works projects and have had a valid business license in Washington for three or more years are exempt from this subsection.

B. RECIPROCAL PREFERENCE FOR RESIDENT CONTRACTORS:

Effective March 30, 2012, RCW 39.04.380 imposes a reciprocal preference for resident contractors. Any bid received from a non-resident contractor from a state that provides an in-state percentage bidding preference is subject application of a comparable percentage disadvantage.

A non-resident contractor from a state that provides an in-state percentage bidding preference means a contractor that:

1. Is from a state that provides a percentage bid preference to its resident contractors bidding on public works projects, and

2. Does not have a physical office located in Washington at the time of bidding on the City of Tacoma public works project.

The state of residence for a non-resident contractor is the state in which the contractor was incorporated, or if not a corporation, the state in which the contractor’s business entity was formed.

The City of Tacoma will evaluate all non-resident contractors for an out-of-state bidder preference. If the state of the non-resident contractor provides an in-state contractor preference, a comparable percentage disadvantage will be applied to the non-resident contractor’s bid prior to contract award. The responsive and lowest and best responsible bidder after application of any non-resident disadvantage will be awarded the contract.

The reciprocal preference evaluation does not apply to public works procured pursuant to RCW 39.04.155, RCW 39.04.280, federally funded competitive solicitations where such agencies prohibit the application of bid preferences, or any other procurement exempt from competitive bidding.

Bidders must provide the City of Tacoma with their state of incorporation or the state in which the business entity was formed and include whether the bidder has a physical office located in Washington.

The bidder shall submit documentation demonstrating compliance with above criteria on the enclosed State Responsibility and Reciprocal Bidder Information form.

C. SUBCONTRACTOR RESPONSIBILITY

1. The Contractor shall include the language of this subcontractor responsibility section in each of its first-tier subcontracts and shall require each of its subcontractors to include the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. The requirements of this section apply to all subcontractors regardless of tier.

2. At the time of subcontract execution, the Contractor shall verify that each of its first-tier subcontractors meets the following bidder responsibility criteria:

a. Have a current certificate of registration as a contractor in compliance with chapter 18.27 RCW, which must have been in effect at the time of subcontract bid submittal;

b. Have a current Washington Unified Business Identifier (UBI) number;

c. If applicable, have:

i. Industrial Insurance (workers' compensation) coverage for the bidder’s employees working in Washington, as required in Title 51 RCW;

ii. A Washington Employment Security Department number, as required in Title 50 RCW;

iii. A Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW;

iv. An electrical contractor license, if required by Chapter 19.28 RCW;

v. An elevator contractor license, if required by Chapter 70.87 RCW and;

3. Not be disqualified from bidding on any public works contract under RCW 39.06.010 (unlicensed or unregistered contractors) or 39.12.065(3) (prevailing wage).

II. CITY OF TACOMA

A. SUPPLEMENTAL RESPONSIBILITY CRITERIA – CITY OF TACOMA:

In order to be considered a responsible bidder, the prospective bidder shall have all of the following qualifications set forth in Tacoma Municipal Code 1.06.262:

1. Adequate financial resources or the ability to secure such resources;

2. The necessary experience, stability, organization and technical qualifications to perform the proposed contract;

3. The ability to comply with the required performance schedule, taking into consideration all existing business commitments;

4. A satisfactory record of performance, integrity, judgment and skills; and

5. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

a. Bidder Responsibility. Bidders shall not be in violation of 39.04.350 RCW Bidder

Responsibility Criteria - Supplemental Criteria.

In addition to the mandatory bidder responsibility criteria listed immediately above, the City may, in addition to price, consider any or all of the following criteria contained in Tacoma Municipal Code Chapter 1.06.262 in determining bidder responsibility:

1. The ability, capacity, experience, stability, technical qualifications and skill of the respondent to perform the contract;

2. Whether the respondent can perform the contract within the time specified, without delay or interference;

3. Integrity, reputation, character, judgment, experience, and efficiency of the respondents, including past compliance with the City’s Ethics Code;

4. Quality of performance of previous contracts;

5. Previous and existing compliance with laws and ordinances relating to contracts or services;

6. Sufficiency of the respondent’s financial resources;

7. Quality, availability, and adaptability of the supplies, purchased services or public works to the particular use required;

8. Ability of the respondent to provide future maintenance and service on a timely basis;

9. Payment terms and prompt pay discounts;

10. The number and scope of conditions attached to the submittal;

11. Compliance with all applicable City requirements, including but not limited to the City's

Ethics Code and its Small Business Enterprise and Local Employment and Apprenticeship programs;

12. Other qualification criteria set forth in the specification or advertisement that the appropriate department or division head determines to be in the best interests of the City.

The City may require bidders to furnish information, sworn or certified to be true, to demonstrate compliance with the City responsibility criteria set forth above. If the city manager or director of utilities is not satisfied with the sufficiency of the information provided, or if the prospective respondent does not substantially meet all responsibility requirements, any submittal from such respondent must be disregarded.

B. ADDITIONAL SUPPLEMENTAL CRITERIA

No supplemental Criteria. See Minimum Requirements section

C. MODIFICATIONS TO SUPPLEMENTAL CRITERIA

Potential bidders may request modifications to the City’s supplemental criteria by submitting a written request to the Purchasing Division via email to bids@tacoma.gov no later than 5:00 p.m. Pacific Time, three days prior to the submittal deadline. Please include the Specification No. and Title when submitting such requests. Requests must include justification for why certain criteria should be modified. Requests received after this date and time will not be considered.

The City will respond to a timely submitted request prior to the bid opening date. Changes to the supplemental criteria, if warranted, will be issued by addendum to the solicitation documents and posted to the City’s website for the attention of all prospective bidders.

D. DETERMINATION OF BIDDER RESPONSIBILITY

If the City determines the bidder does not meet the criteria above and is therefore not a responsible bidder, the City shall notify the bidder in writing with the reasons for its determination. If the bidder disagrees, the bidder may appeal the determination in a manner consistent with the City’s Protest Policy. Appeals are coordinated by the Purchasing Division heard by the Procurement and Payables Division manager for contracts less than or equal to

$500,000 and by Contracts and Awards Board for contracts greater than $500,000.

1. DESCRIPTION OF WORK

The City of Tacoma (City) / Tacoma Public Utilities (TPU) is soliciting bids to establish one or more contracts with qualified vendors to fulfill the City’s ongoing need for on-call installation, repair, removal and relocation of fences of various kinds at various City locations. Some of this work will be planned and specified prior to contacting the vendor while other work will be unexpected; sometimes needing to be completed with little notice and on a short timeframe.

Contract(s) will be awarded to the lowest responsive and responsible bidder(s) based on price, product quality and availability. The preference is to award a single contract, however, the City reserves the right to split the award, reduce the award, or make no award, if it is in the City’s best interest.

The anticipated contract value for this project is $2,601,992.72 over the total possible four-year term. This value is not a guarantee of spend but an estimate derived from historical usage.

Actual spend will be determined based on the projects completed under the agreement.

2. MINIMUM REQUIREMENTS

Bidders seeking award of the subject work must meet all requirements as outlined within this solicitation and all other applicable federal, state, and local requirements for conducting the work as outlined.

3. GENERAL PROVISIONS

City of Tacoma General Provisions apply. (See Appendix D)

4. CITYWIDE CONTRACT REQUIREMENTS

City of Tacoma Citywide Contract Requirements apply. (See Appendix D)

5. INSURANCE REQUIREMENTS

Successful proposer will provide proof of and maintain the insurance coverage in the amounts and in the manner specified in the City of Tacoma Insurance Requirements contained in this solicitation. (See Appendix D)

6. ANTICIPATED CONTRACT TERM

The awarded contract(s) will not exceed four years of total performance. Per Washington State statute the period of performance will be awarded as not more than an initial three-year term plus one, optional, renewal year.

The City reserves the right to shorten the initial award period as deemed fit to meet the City’s business requirements.

7. CALENDAR OF EVENTS

This is a tentative schedule only and may be altered at the sole discretion of the City.

Any contract(s) will be issued after Public Utility Board and City Council approval.

The anticipated schedule of events concerning this RFB is as follows:

Solicitation Released 11/17/2026 Pre-Bid Meeting: 11/23/2026 Question Deadline: 11/27/2026 City response to Questions: 12/2/2026 Submittal Due Date: 12/8/2026 Anticipated Award Date, on or about: 12/15/2026 Public Utility Board/City Council Approval, on or about: TBD 2027 Governing Body

8. INQUIRIES

8.1 Questions can be submitted to Brandon Marquett-Snow Senior Contract and Procurement Specialist, via email to bsnow@tacoma.gov. Subject line to read:

“CT26-0173 – On-Call Citywide Fencing Services – Vendor Name

8.2 Questions are due by 3 pm on the date included in the Calendar of Events section.

8.3 Questions marked confidential will not be answered or included.

8.4 The City reserves the discretion to group similar questions to provide a single answer or not to respond when the requested information is confidential.

8.5 The answers are not typically considered an addendum.

8.6 The City will not be responsible for unsuccessful submittal of questions.

8.7 Written answers to questions will be posted alongside these specifications at www.tacomapurchasing.org.

9. PRE-BID MEETING

A pre-bid meeting will be held via Microsoft Teams on Monday, November 23, 2026, from 10:00 AM to 11:00 AM. Meeting link is below:

Join: https://teams.microsoft.com/meet/2998381568004509?p=YVCZY4dqBeDDb59WqT

Meeting ID: 299 838 156 800 450 9

Passcode: Rn3hB3Gj https://teams.microsoft.com/meet/2998381568004509?p=YVCZY4dqBeDDb59WqT

Dial in by phone

+1 253-666-4424,,733320594# United States, Tacoma

Find a local number

Phone conference ID: 733 320 594#

10. DISCLAIMER

The City is not liable for any costs incurred by the Respondent for the preparation of materials, or a proposal submitted in response to this RFB, for conducting any presentations to the City, or any other activities related to responding to this RFB, or to any subsequent requirements of the contract negotiation process.

11. RESPONSIVENESS

Bid submittals must provide ninety (90) days for acceptance by City from the due date for receipt of submittals. All submittals will be reviewed by the City to determine compliance with the requirements and instructions specified in this RFB. The Respondent is specifically notified that failure to comply with any part of this RFB may result in rejection of the submittal as non-responsive. The City reserves the right, in its sole discretion, to waive irregularities deemed immaterial. The City also reserves the right to not award a contract or to issue subsequent RFB’s.

12. AWARD

Awardee shall be required to comply with 2 CFR part 25 and obtain a unique entity identifier and/or be registered in the federal System for Award Management as appropriate.

Award will be made to the lowest responsive, responsible bidder. All bidders shall provide unit or lump sum pricing for each line item. Each line item will be added up for a subtotal price. The subtotal price will be compared amongst each bidder, including any payment discount terms offered twenty (20) days or more. The City may also take into consideration all other criteria for determining award, including evaluation factors set forth in Municipal Code Section 1.06.262.

All other elements or factors, whether or not specifically provided for in this specification, which would affect the final cost to and the benefits to be derived by the City will be considered in determining the award of the contract. The final award decision will be based on the best interests of the City.

The City reserves the right to let the contract to the lowest responsible bidder whose bid will be the most advantageous to the City, price and any other factors considered. In evaluating the proposals, the City may also consider any or all of the following:

1. Compliance with specification.

2. Proposal prices, listed separately if requested, as well as a lump sum total

3. Time of completion/delivery.

tel:+12536664424,,733320594 https://dialin.teams.cloud.microsoft/5349761c-1f7c-49ce-8138-c91754a307ae?id=733320594

4. Warranty terms.

5. Bidder's responsibility based on, but not limited to:

a) Ability, capacity, organization, technical qualifications and skill to perform the contract or provide the services required.

b) References, judgment, experience, efficiency and stability.

c) Whether the contract can be performed within the time specified.

d) Quality of performance of previous contracts or services

13. PREVAILING WAGE INFORMATION

If this project requires prevailing wages under chapter 39.12 RCW, any worker, laborer, or mechanic employed in the performance of any part of the work shall be paid not less than the applicable prevailing rate of wage.

Project sites will be located in Pierce, King, Grays Harbor, Mason, and Lewis Counties.

The effective date for prevailing wages on this project will be the submittal deadline with these exceptions:

1. If the project is not awarded within six months of the submittal deadline, the award date is the effective date.

2. If the project is not awarded pursuant to a competitive solicitation, the date the contract is executed is the effective date.

3. Janitorial contracts follow WAC 296-127-023.

Except for janitorial contracts, these rates shall apply for the duration of the contract unless otherwise noted in the solicitation.

Look up prevailing rates of pay, benefits, and overtime codes from this link:

https://secure.lni.wa.gov/wagelookup/

REQUIRED FILINGS

The contractor and all subcontractors covered under 39.12 RCW shall submit to the Department of Labor and Industries (L&I) for work provided under this contract:

1. A Statement of Intent to Pay Prevailing Wages must be filed with and approved by L&I upon award of contract.

2. An Affidavit of Wages Paid must be filed with and approved by L&I upon job completion.

3. For on-call contracts, retainage can be release annually. Please see the Intent-Affidavit Info for On-Call Contracts in Appendix D

Payments cannot be released by the City until verification of these filings are received by the engineer. Additional information regarding these filings can be obtained by calling the Department of Labor & Industries, Prevailing Wage at 360-902-5335, https://secure.lni.wa.gov/ or by visiting their MY L&I account.

https://secure.lni.wa.gov/wagelookup/ http://apps.leg.wa.gov/RCW/default.aspx?cite=39.12 https://secure.lni.wa.gov/

14. BID BOND

The attached Bid Bond (Appendix B) must be executed by the person legally authorized to sign the bid and must be properly signed by representatives of the surety company unless the bid is accompanied by a certified check or cashier’s check.

14.1 If a Bid Bond is used, the form furnished by the City must be followed; no variation from the language thereof will be accepted. The amount of the Bid Bond must be not less than five percent (5%) of the total amount bid; and, if shown in dollars and cents, the amount of said Bid Bond must be not less than the required five percent; or in lieu of dollars and cents, the bond may be completed by inserting therein, “five percent of the amount of the accompanying proposal”. Bid Bonds will not be returned. Bid Bond should be submitted electronically with bid submittal. Hard copies should be postmarked no later than the submittal date.

14.2 If a certified or cashier’s check is provided by the successful Respondent(s), the amount of their check will be refunded after award of the Contract, City’s receipt of the signed Contract, and acceptance of the Performance Bond, if applicable. Unsuccessful Respondents providing certified checks will be refunded the amount of their check upon award of the Contract.

14.3 Failure to furnish a Bid deposit of a minimum of 5 percent shall make the bid nonresponsive and shall cause the bid to be rejected by the City.

A deposit of at least 5 percent of the total Bid shall accompany each Bid. This deposit may be cash, certified check, cashier’s check, or a proposal bond (Surety bond). Any proposal bond shall be on the Contracting Agency’s form and shall be signed by the Bidder and the Surety. A proposal bond shall not be conditioned in any way to modify the minimum 5 percent required.

The Surety shall: (1) be registered with the Washington State Insurance Commissioner, and

(2) appear on the current Authorized Insurance List in the State of Washington published by the Office of the Insurance Commissioner.

The failure to furnish a Bid deposit of a minimum of 5 percent shall make the Bid nonresponsive and shall cause the Bid to be rejected by the Contracting Agency.

If submitting your bid electronically, A scanned version of the original bid bond or cashier’s check shall accompany your electronic bid submittal. The original bid bond or cashier’s check shall be sent to the Contracting Agency and received by the Contracting Agency within 7 calendar days of the bid opening, or the bidder may be deemed non-responsive.

Original bid bond or cashier’s check will be delivered to:

City of Tacoma Procurement & Payables Division Tacoma Public Utilities 3628 South 35th Street Tacoma, WA 98409

If so, stated in the Contract Provisions, cash will not be accepted for a bid deposit.

15. PAYMENT AND PERFORMANCE BONDS

Payment and performance bonds, including power of attorney, for this project is required in the amount of 25 percent of the Contract total.

15.1 The City’s payment and performance bond forms must be used.

15.2 The payment and performance bonds must be executed by a surety company licensed to do business in the state of Washington.

15.3 The cost of a payment and performance bonds must be included in submittal prices.

Bonds will not be paid as a separate line item.

15.4 For a supply-type contract, a certified cashier’s check or cash may be substituted for the bonds; however, this cash or check must remain with the City through the guarantee period and any interest on said amount shall accrue to the City.

The same bonds can remain in place over the life of the contract and annual status inquiries can be directed to Brandon Marquett-Snow via email to bsnow@tacoma.gov. Subject line to read:

16. DELIVERY

16.1 Delivery shall be to various City of Tacoma and Tacoma Public Utility facilities as identified by City/TPU staff for each project.

16.2 All work shall be delivered in the timeframe as mutually agreed between the vendor and ordering City staff for each project. Given the remote nature of some TPU facilities, increased delivery timelines are understood but at all times the vendor(s) shall exercise all due haste in mobilizing and engaging in ordered work.

16.3 Time frames for delivery of services to Pierce and King County facilities should be of a “regular” nature and projects should not experience undue delays.

16.4 Hours of operation will generally be Monday through Friday, during regular business hours, excluding legal holidays, as referred to in the General Provisions or as otherwise approved by the City. City staff and vendor(s) shall work together to ensure most delivery of services happens without incurring overtime for City or vendor staff. However, all parties will recognize the need to occasionally accommodate special circumstances and/or avoid interruption of critical facility operations.

17. WARRANTY

Labor: Minimum one (1) year warranty.

Parts: Manufacturer’s warranty or minimum one-year warranty whichever is greater.

mailto:bsnow@tacoma

Contractor shall arrive on-site at the location of an identified defect with all due has but not more than 48 hours of notification for all warranty repairs during normal work hours of 8:00 a.m. to 5:00 p.m. Monday through Friday.

Contractor agrees to allow City to make minor warranty repairs where that is most cost effective and, if requested, contractor will credit City for cost of parts, but not labor.

Vendor will warranty goods according to the manufacturer’s warranty guidelines. The start of the warranty commences once all goods and services are installed and accepted by the City.

18. INSPECTION

All goods are subject to final inspection and acceptance by the City. If any inspection fails, the vendor shall be required to make arrangements to exchange the goods at their own expense and replace it in a timely manner acceptable to the City.

Material failing to meet the requirements of this contract will be held at Vendor’s risk and may be returned to Vendor. If so returned, the cost of transportation, unpacking, inspection, repackaging, reshipping, or other like expenses are the responsibility of the Vendor.

19. MATERIALS AND WORKMANSHIP

The successful bidder shall be required to furnish all materials necessary to perform contractual requirements. Materials and workmanship for this contract shall conform to all codes, regulations and requirements for such specifications contained herein and the normal uses for which intended. Material shall be manufactured in accordance with the best commercial practices and standards for this type of goods. All literature and products must be packaged and labeled to sell in the United States.

20. ENVIRONMENTALLY PREFERABLE PROCUREMENT

In accordance with the City’s Sustainable Procurement Policy and Climate Action Plan, it is the policy of the City of Tacoma to encourage the use of products or services that help to minimize the environmental and human health impacts of City Operations. Respondents are encouraged to incorporate environmentally preferable products or services that have a lesser or reduced effect on human health and the environment when compared with competing products or services that serve the same purpose. This comparison may consider raw materials acquisition, products, manufacturing, packaging, distribution reuse, operation, maintenance or disposal of the product or service.

The City of Tacoma encourages the use of sustainability practices and desires any awarded contractor(s) to assist in efforts to address such factors when feasible for:

• Durability, reusability, or refillable

• Pollutant releases, especially persistent bioaccumulative toxins (PBTs), low volatile organic compounds (VOCs), and air quality and stormwater impacts

• Toxicity of products used https://cms.tacoma.gov/sustainability/resolution38248-PurchasingPolicy.pdf https://cms.tacoma.gov/enviro/Sustain/CAP%20Final/Tacoma%20CAP.pdf

• Greenhouse gas emissions, including transportation of products and services, and embodied carbon

• Recycled content

• Energy and water resource efficiency

21. LEAP REQUIREMENTS

This project has no LEAP requirements; however, the City of Tacoma is committed to equality in employment for WA-State approved Apprentices, City of Tacoma residents, residents of local economically distressed areas, youth, veterans, minorities, and women. Please contact the LEAP Office for assistance in locating qualified employees. Visit the LEAP website for more information.

22. EQUITY IN CONTRACTING

This project has EIC requirements. See Appendix D for complete EIC documentation.

**Please contact the EIC office for any assistance with submitting a compliant bid.** mailto:LEAP@tacoma.gov https://tacoma.gov/government/departments/community-and-economic-development/local-employment-and-apprenticeship-training-program/

APPENDIX A

Statement of Work

CT26-0173F - Statement of Work

Specification No. CT26-0173F

Schedule A: Standard Fencing Install Bid Items 1-3: Rails

Furnish and Install. Rails shall be measured and priced by lineal foot (LF) and will include all labor, materials, and equipment required to furnish and install rails on new fence or as a repair on existing fence, including miscellaneous hardware and all other items required, but not listed herein as a bid item.

Bid Items 4-6: Line Posts

Furnish and Install, Posts shall be measured per each (EA) and will include all labor, materials, and equipment required to furnish and install line posts for fence fabric. Work includes excavation and concrete placement, miscellaneous hardware and all other items required, but not listed herein as a bid item.

Bid Items 7-11: Terminal or Corner Posts

Furnish and Install. Terminal and Corner Posts, shall be measured per each (EA) and will include all labor, materials, and equipment required to furnish and install terminal or corner posts including horizontal bracing, excavation, concrete placement, miscellaneous hardware, and all other items required, but not listed herein as a bid item.

Bid Items: 12-22: Chain Link Gates

Man Gates - Furnish and Install. Man Gates shall be measured and priced per each (EA) and will include all labor, materials, and equipment required to furnish and install complete man gate.

Gate may be ordered hung on an existing fence, new fence, or modified/repaired fence, including gate frame, chain link fabric and barbed wire. Work includes gate posts, hardware, and all items required, but not listed herein as a bid item.

Vehicle Gates - Furnish and install. Vehicle Gate shall be measured per each (EA) and will include all labor, materials, and equipment required to furnish and install vehicle gates, sized as listed, including gate frame, posts, chain link fabric, and barbed wire. Gate may be ordered hung on existing fence, new fence, or on a modified/repaired fence. Work includes gate posts, hardware, and all items required, but not listed herein as a bid item.

Bid Items 23-33: Fence Fabric

Furnish and Install. Fence Fabric shall be measured by the lineal foot (LF) and will include all labor, materials, and equipment required to install fence fabric. This bid item may be ordered installed on existing posts or may be installed as a new fence, using other bid items. Work includes tie wire, bottom tension wire, and miscellaneous hardware and all other items required, but not listed herein as a bid item.

Note: Not to be used for Gate pricing.

Bid Items 34-36 – Addition of Vinyl and Powder Coating for Complete Fence

Addition of Vinyl and Powder Coating for Complete Fence shall be measured and priced by lineal foot (LF) and consists of adding vinyl and powder coating to bid items to furnish complete vinyl and powder coated fence. Vinyl coating shall be applied to fence fabric. Powder coating shall be applied to posts, outriggers, barbed wire, and all required hardware. The fence items will be ordered under other bid items.

Bid Items 37-39 – Vinyl Slats

Furnish and Install Vinyl Slats for Chain Link Fence Fabric shall be measured and priced by lineal foot (LF) and will include all labor, materials and equipment required to install vinyl slats for chain link fencing at any location. Color of slats shall be determined by the City representative.

Bid Items 39-42 – Outriggers

Furnish and Install. Outriggers shall be measured and priced per each (EA) and will include all labor, materials, and equipment required to furnish and install outriggers on new fence or as repair on an existing fence. This bid item includes all miscellaneous hardware and all other items required but not listed herein as a bid item.

Note: Not to be used for gates.

Bid Items 43-45 – Wire Install

Furnish and Install wire as ordered. Shall be measured by lineal foot (LF) and will include all labor, materials, and equipment required to furnish and install single strand wire on extension arms or mounted on steel or wood fence posts, including miscellaneous hardware and all other items required, but not listed herein as a bid item. Mounting may be on new or existing extension arms or fence posts. Types of wire included in this specification are Barbed, Tension, and Coiled Razor Wire.

Note: Not to be used for gates.

Bid Items 45-49 – Fence Isolation Panels

Furnish and Install. Fence Isolation Panel shall be measured per each (EA) and will include all labor, materials, and equipment required to furnish and install fence isolation panel including barbed wire.

Fence isolation panel may be ordered hung on existing fence, new fence, or on a modified/repaired fence. Work includes gate frame, chain link fabric, barbed wire, porcelain insulators, hardware and all items required, but not listed herein as a bid item.

Schedule B: Relocation and Temporary Fencing

Bid Items 50-51 - Temporary Fencing

Furnish, Install, and Uninstall Temporary Fencing as ordered. Temporary Panels or Temporary Fence and Posts shall be measured and priced by lineal foot (LF) and will include all labor, materials and equipment required to install and later remove temporary fence panels or fence and posts at any location.

Temporary fence panels include panels, concrete blocks for mounting and all fasteners.

Temporary fence and posts include chain link fabric, posts, all fasteners and excavation / backfill necessary for temporary post embedment.

Temporary fence and posts may remain in place for up to 12 months as determined by the City.

Bid Items 52-59 – Relocate Existing Fence Fabric

Relocate existing fence fabric as ordered. Shall be measured by the lineal foot (LF) and will include all labor, materials, and equipment required to relocate an existing fence, transport and install at a new location. Relocation of fence fabric includes all miscellaneous hardware required for installation. Fence posts, top, middle or bottom rails, outriggers, barbed wire, tension wire and coiled razor wire will be ordered under other bid items.

Schedule C: Additional Services

Bid Item 60 – Materials at Cost Plus Percentage

Furnish Materials at cost plus shall be measured by the cost of material plus a fixed percentage of mark-up as bid.

Note: This bid item only applies to the purchase of materials not currently specified in the bid items but required to complete work orders.

Bid Items 61-63 – Miscellaneous Fence Labor

Furnish labor, measured on an hourly (HR) basis, for the completion of tasks not already inclusive of labor costs. Overtime labor hours shall be paid in accordance with Federal law, State law, Prevailing Wage statues, City statues, Union Contracts, and vendor policy. City and vendor shall make all reasonable efforts to reduce the use of overtime hours.

Note: Miscellaneous labor is only applicable to tasks not already inclusive of labor and shall not be priced to augment those items. Line-item use should be limited to work ordered that is not already contemplated with a direct line-item, or to accommodate exceptional site conditions and preparations.

Bid Item 64 – Service Calls for Repairs with Stocked Parts

Furnish service vehicle and technician(s) for the execution of minor repairs with in-stock parts.

Parts shall be priced in accordance with Bid Item 60 and labor shall be priced in accordance with Bid Items 61-63.

Labor hours shall not be incurred for travel time associated with call-outs to locations not associated with a mobilization/demobilization fee as outlined in Schedule D. Mobilization fees shall cover the travel time to and from Schedule D locations and Bid Items 61-63 shall only be used once on-site.

Bid Item 65 - Gate Controller Installation

Gate Controller install shall be measured per each (EA) and will include all labor, materials, and equipment required to furnish and install gate controllers as ordered by City staff.

Bid Item 60 shall be utilized to price gate controllers as ordered by City staff. City staff are authorized to approve the use of Bid-Items 61-63 to accommodate installation of gate controllers with site conditions that reasonably exceed a “standard” installation.

Authorization of additional labor hours shall be accepted on a mutual basis and must be authorized by City staff before extra installation labor is incurred.

Bid Item 66 – Gate Controller Maintenance and Repair

Measurement will be made on a per hour (HR) basis starting when the Contractor arrives at the site to troubleshoot and repair the gate controls. The gate controls shall be repaired and the gate controls tested to be fully functional when repair is complete.

Schedule D fees will apply to call-out locations as outlined.

Schedule D: Mobilization, Demobilization

Bid Items 67-72 – Hydro Project and Emergency Mobilization/Demobilization

Mobilization/Demobilization to the hydroelectric projects and emergencies shall be measured and priced per each (EA) occurrence. The work under this bid item will include all labor, materials, and equipment required to mobilize/demobilize for one (1) each fencing work order at a listed site.

This bid item includes all transportation costs of materials and equipment to and from the job, all travel for laborers, management, and inspection, mobilization to the job site, preparation of work areas, and demobilization to include clean-up and site restoration.

Vendor and City shall make all reasonable efforts to group work orders/call-outs to reduce the number of mobilization/demobilization fees.

Additional Notes:

Force Accounts – No force account will be available on this contract. Work not contemplated with a direct line-item should utilize Bid Items 60-63 to price materials and labor needed to complete work orders.

APPENDIX B

Signature Page

Bid Bond

Price Proposal Form

Record of Prior Contracts

List of Subcontractors Category of Work

EIC Utilization Form

Form No. SPEC-080A Revised: 08/24/2026

SIGNATURE PAGE

CITY OF TACOMA

All submittals must be in ink or typewritten, executed by a duly authorized officer or representative of the bidding/proposing entity, and received and time stamped as directed in the Request for Bids page near the beginning of the specification. If the bidder/proposer is a subsidiary or doing business on behalf of another entity, so state, and provide the firm name under which business is hereby transacted.

REQUEST FOR BIDS SPECIFICATION NO. CT26-0173F

ON-CALL CITYWIDE FENCING SERVICES

The undersigned bidder/proposer hereby agrees to execute the proposed contract and furnish all materials, labor, tools, equipment and all other facilities and services in accordance with these specifications.

The bidder/proposer agrees, by submitting a bid/proposal under these specifications, that in the event any litigation should arise concerning the submission of bids/proposals or the award of contract under this specification, Request for Bids, Request for Proposals or Request for Qualifications, the venue of such action or litigation shall be in the Superior Court of the State of Washington, in and for the County of Pierce.

Declaration

The undersigned bidder/proposer hereby certifies under penalty of perjury that this bid/proposal and all required documents are genuine, accurate and not a sham or collusive bid/proposal, or made in the interests or on behalf of any person or entity not herein named; and that said bidder/proposer has not directly or indirectly induced or solicited any contractor or supplier on the above work to put in a sham bid/proposal or any person or entity to refrain from submitting a bid/proposal; and that said bidder/proposer has not, in any manner, sought by collusion to secure to itself an advantage over any other contractor(s) or person(s).

Bidder/Proposer’s Registered Name

Address

City, State, Zip

Authorized Signatory E-Mail Address

E.I.No. / Federal Social Security Number Used on Quarterly Federal Tax Return, U.S. Treasury Dept. Form 941

E-Mail Address for Communications

Signature of Person Authorized to Enter Date into Contracts for Bidder/Proposer

Printed Name and Title

(Area Code) Telephone Number / Fax Number

State Business License Number in WA, also known as UBI (Unified Business Identifier) Number

State Contractor’s License Number (See Ch. 18.27, R.C.W.)

Addendum acknowledgement #1_____ #2_____ #3_____ #4_____ #5_____

THIS PAGE MUST BE SIGNED AND RETURNED WITH SUBMITTAL.

Form No. SPEC-090A Revised: 08/2004

Herewith find deposit in the form of a cashier’s check in the amount of $__________________ which amount is not less than 5-percent of the total bid.

SIGN HERE__________________________________

BID BOND

KNOW ALL MEN BY THESE PRESENTS:

That we, ______________________________________________________________, as Principal, and

______________________________________________________________________, as Surety, are held and firmly bound unto the City of Tacoma, as Obligee, in the penal sum of __________________

_________________________________________________ dollars, for the payment of which the Principal and the Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents.

The condition of this obligation is such that if the Obligee shall make any award to the Principal for according to the terms of the proposal or bid made by the Principal therefor, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for faithful performance thereof, with Surety or Sureties approved by the Obligee; or if the

Principal shall, in case of failure to do so, pay and forfeit to the Obligee the penal amount of the deposit specified in the call for bids, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damages, the amount of this bond.

SIGNED, SEALED AND DATED THIS _______________ DAY OF __________________, 20______.

PRINCIPAL: SURETY:

__________________, 20______

Received return of deposit in the sum of $ _______________________________________________

CT26-0173F Price Propal Sheet

Bid Item Description Unit Quantity Unit Cost Total

Furnish and Install 1-5/8-Inch Rails, Bottom

LF 6,288

Furnish and Install 1-5/8-Inch Rails, Middle

LF 795

Furnish and Install 1-5/8-Inch Rails, Top

LF 8,386

Furnish and Install 2-3/8 Inch Line Posts, 48-Inches High (for 2-Inch fabric)

EA 66

Furnish and Install 2-3/8 Inch Line Posts, 84-Inches High (for 2-Inch fabric)

EA 437

Furnish and Install 3-1/2-Inch Line Posts, 84-Inches High (for 5/8-Inch fabric)

EA 489

Furnish and Install 2-7/8-Inch Terminal or Corner Posts, 48-Inches High (for 2-Inch fabric)

EA 10

Furnish and Install 2-7/8-Inch Terminal or Corner Posts, 84-Inches High…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .