CSX1003321_Exhibit_A.pdf

PDF 3 MB Posted

Attached to
Oakfield Palafox Bore and Jack
Solicitation number
25-26.013
Issued by
Escambia County, Florida

About this file

This document is Exhibit A, a technical specification and design exhibit for the Oakfield Palafox Bore and Jack drainage infrastructure project being procured by Escambia County, Florida, in coordination with CSX Transportation (CSXT). The project involves the installation of 100 linear feet of 72-inch steel casing pipe and 117 linear feet of 54-inch reinforced concrete pipe (RCP) with two Type D drainage structures exceeding 12 feet in depth, located on Majors Road approximately 1,400 linear feet east of its intersection with Palafox Street. The project includes grading and excavation to daylight the 54-inch pipe into an existing borrow pit and requires strict compliance with CSX Railroad and Northwest Florida Water Management District permits. Construction must be completed within 365 consecutive calendar days from the Notice to Proceed, with final completion within 395 days. The pre-bid meeting was scheduled for November 12, 2025, at 1:00 pm, and bid responses were due by December 4, 2025, at 10:00 am.

The technical specifications outline comprehensive requirements for bore and jack operations under active CSX railroad right-of-way, including mandatory CSXT Construction Representative approvals, daily safety briefings with CSXT flagging personnel, track monitoring with baseline surveys, and continuous 24-hour operation requirements for the jack and bore procedure. All excavation must comply with slope ratios of 1.5 horizontal to 1 vertical for depths of 5 feet or greater, with all backfill compacted to 95 percent maximum dry density per ASTM D1557 in six-inch lifts. The contractor must submit detailed construction submittals including work plans, equipment layouts, dewatering plans, and as-built documentation showing final alignment and pipe specifications. Strict prohibitions include no blasting under or adjacent to CSXT property, no placement of equipment on track structure or ballast, and no temporary at-grade crossings on CSXT property. Upon project completion, the right-of-way must be restored to a condition equal to or better than its pre-construction state, and all soils generated from CSXT property must be either reused on-site or disposed of at CSXT-approved facilities.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised January 31, 2023

CSX Transportation (CSXT) General Notes (Bore and Jack):

1) CSXT owns its right-of-way for the primary purpose of operating a railroad, and shall maintain unrestricted use of its property for current and future operations.

2) Agency or its contractor shall arrange and conduct its work so that there will be no interference with CSXT operations, including train, signal, telephone and telegraphic services, or damages to CSXT’s property, or to poles, wires, and other facilities of tenants of CSXT’s property or right-of-way.

3) Refer to the CSXT’s “Design & Construction Standard Specifications Pipeline Occupancies” revised June 5, 2018 (4.1.2).

4) Work schedule is subject to the approval of all required construction submittals by the CSXT Construction Representative, verification that proposed work will not conflict with any CSXT U.G. Facilities, and the availability of CSXT Flagging and Protection Services. Construction submittals will be based upon the proposed scope of work and may include, but are not limited to; proposed work plan, project schedule, means and methods, site access, dewatering, temporary excavation/shoring, soil disposition/management, track monitoring, concrete placement work, structural lifting/rigging plans for hoisting operations, substructure construction plans, steel erection plans, roadwork plans, etc. No work may begin on, over, or adjacent to CSXT property, or that could potentially impact CSXT property, operations or safety without the prior completion and approval of the required aforementioned information and approvals.

5) Prior to construction, all signal facilities and/or warning devices at proposed facility crossing, i.e. cantilevers, flashers, and gates must be located and marked/flagged by CSXT. The traditional “One Call” utility locate services are not responsible for locating any CSXT under-grade utilities or facilities Contractor shall be held liable for any damages to CSXT communication & signal facilities.

6) Contractor also has the sole responsibility of ascertaining that all other utilities have been properly located by complying with the local “call before you dig” regulation(s). Contractor shall solely be responsible for notifying owners of adjacent properties and of underground facilities and utility owners when prosecution of the work may affect them, and shall cooperate with them in the protection, removal, relocation and replacement of their property.

7) The use of construction safety fencing is required when a CSXT Flagman is not present. Distance of fencing from nearest rail to be determined by the CSXT Track Supervisor and shall be removed upon completion of the project.

8) Contractor access will be limited to the immediate project area only. The CSXT property outside the project area may not be used for contractor access to the project site and no temporary at-grade crossings will be allowed.

9) All material and equipment will be staged to not block any CSXT access or maintenance roads. No hoisting or auxiliary equipment necessary for the procedure shall be placed on CSXT track structure and / or ballast section. Clear working locations for equipment used will be laid out and approved by CSXT’s representative prior to equipment set-up. Agency and contractor shall not store their materials or equipment on CSXT’s property or where they may potentially interfere with CSXT’s operations.

10) CSXT does not grant or convey an easement for this installation.

11) CSXT requires contractors, subcontractors, and vendors to participate in job safety briefings daily and as necessary with the CSXT flagger. The scope of work may require that various protection against train movements be discussed, understood, and utilized. Work shall only be undertaken with the presence and permission of the CSXT flagger. If at any time the CSXT flagger perceives that the hoisting procedure is causing or has the potential to cause a hazard or delay to CSXT operations through the project site, work will cease until such time as satisfactory modifications have been reviewed and approved.

12) The right of way shall be restored to a condition equal to or better than the condition prior to beginning the project before final acceptance will be provided. Punch lists shall be responded to prior to issuance of an acceptance memorandum signed by the CSXT representative.

13) No construction or entry upon the CSXT corridor is permitted until the document transaction is completed, you are in receipt of a fully executed document, and you have obtained authority from CSXT’s.

14) The front of the pipe shall be provided with mechanical arrangements or devices that will positively prevent the auger from leading the pipe so that no unsupported excavation is ahead of the pipe. The bore head / auger set-up (sketch or photos) shall be submitted by contractor and accepted by assigned CSXT representative prior to start of the jack & bore.

15) The operation shall be progressed on a 24-hour basis without stoppage (except for adding lengths of pipe) until the leading edge of the pipe has reached the receiving pit.

16) The auger and cutting head arrangement shall be removable from within the pipe in the event an obstruction is encountered.

17) Pipeline shall be prominently marked at both sides of the CSXT property lines by durable, weatherproof signs located over the centerline of the pipe in accordance with CSXT specifications.

18) If required, a dewatering plan in accordance with CSXT specifications will be submitted to the CSXT representative for review and approval prior to any dewatering operations. Dewatering drawdown level at tracks shall be field verified that it meets the approved dewatering design prior to commencement of jack and bore operations.

19) Blasting is not permitted under, on, or adjacent to CSXT property.

CSX1003321 Exhibit A 08/19/2024 c8735 Text Box Pensacola, Florida Engineering Region (Division): SOUTHWEST (SW) / Sub Division: P AND A (P5) / Nearest DOT: 339703T Mile Post: 00K 645.5583 / Lat_Long: 30.48248,-87.24355

Revised January 31, 2023

20) Jacking pit: identify hazards and put controls in place prior to start of excavation. Contractor shall erect a barrier and construction fence along the face of jacking pit construction limits and not encroach past it when preparing the pit. Stake or mark pit as needed for digging. Erosion control devices shall be placed at the jacking and receiving pits protecting CSXT property and ditches to the satisfaction of the CSXT representative.

21) Excavation: If the excavation is 5 feet or greater in depth, the walls may be sloped at 1.5 horizontal to 1 vertical to reduce the risk of cave-ins or slides. A safe manner in which to enter and exit the excavation must be established. The toe of slopes in excavation shall in no case be undercut by power shovels, bulldozers, graders, blasting, or in any manner. Excavation shall not be made in excess of the authorized cross-section.

22) Backfill, cover or fence all excavations when unattended. The CSXT representative will approve the protection method and the type of fencing material. Set fencing back at least 3 feet (91 centimeters) from the edges of the excavation. Set fence posts securely in the ground and insure the fencing is securely tied to posts with zip ties or some other tie wrap product.

23) For any excavations permitted on CSXT property, all backfill in excavations and trenches shall be compacted to 95% maximum dry density as defined in ASTM standard d1557 and installed in six-inch lifts. In-situ soil shall be used for backfill material. Should additional offsite backfill material be needed, offsite material sources are to meet state and residential clean fill requirements and be preapproved by CSXT’s representative.

CSXT does not require a specific testing requirement or standard for stone.

24) Track monitoring: prior to commencing jack & bore operations, contractor shall be required to conduct and submit a baseline survey along the top of each rail under CSXT flagger protection and in accordance with the preapproved settlement monitoring construction submittal. Additional survey data shall be collected and submitted once each day during casing pipe installation, or as directed by CSXT representative.

Contractor shall also take elevation shots at top of tie and top of casing pipe before starting the bore to verify depth of cover proposed for the work has been met.

25) Projects that generate soils from CSXT property must adhere to CSXT’s soil management policies. CSXT requires soils generated from its property to either be reused on CSXT property or properly disposed in a CSXT approved disposal facility. CSXT environmental department will handle waste characterization and profiling into an approved disposal facility. CSXT prohibits any environmental sampling on its property unless granted through a written environmental right-of-entry or approved in writing by the CSXT environmental department. The management of soils generated from CSXT property should be planned for and properly permitted (if applicable) prior to initiating any work on CSXT property. A list of CSXT approved laboratories and/or disposal facilities may be obtained from the CSXT manager environmental pro

26) CSXT does not represent or warrant the right-of-way dimensions depicted on these drawings. A third party survey is recommended for verification and accuracy.

27) Upon completion of project construction, contractor must submit to CSXT the as-built plans showing the final alignment on CSXT property, including actual depth of facility and any field change to location on CSXT property, pipe materials, number of innerducts, etc.

CSX1003321 Exhibit A 08/19/2024

M

AJ

O R

S R

D

MMMMMMMMMMMMMMM

AAAAAAAAAJJ

OOOOOO

RRRRRRR

SSSSSSSS

RRRRRRRRR

DDDDDDDDDDD

M

AJ

O R

S R

D

23+00

24+00 25+0023+00

W

W

50' 50'

100'

25'

20'

25'

20'

Project Number:

Date:

Drawn By:

Sheet:

R E

V

IS

IO

N

D A

TE

N

O

Designed By:

Checked By:

S U

M M

IT

B

O U

LE

VA

R D

SU

IT

E

PE

N

SA

C O

LA

, F

LO

R

ID

A

PH

O N

E:

(8

) 3

-7

C

ER

TI

FI

C

AT

E O

F

AU

TH

O

R

IZ

AT

IO

N

220803

JANUARY 2024

F.E.A./ C.E.S.

F.E.A.

J.L.L.

O A

K

FI

EL

D

N

P A

LA

FO

X S

T D

R A

IN

A

G E

IM

PR

O V

EM

EN

TS

B

O A

R D

O F

C O

U N

TY

C

O M

M

IS

SI

O

N

ER

S

ES

C A

M B

IA

C

O U

N

TY

, F

LO

R

ID

A

EN

G

IN

EE

R

IN

G

D

EP

A R

TM

EN

T

PR

EL

IM

IN

A R

Y

Location: ____________________________________

Latitude: N____:______:______.__________

Longitude: W____:______:______.__________

Drawing No.: _________________ Sheet: _____ of _____

Drawing Date: ____/____/____ Revised: ____/____/____

Drawing Scale: V _______ Inches = _______ Feet

Drawing Scale: H _______ Inches = _______ Feet

LEGEND

Letter Description

(a) Distance from centerline of track to CSX R/W

(b) Distance from base-of-rail to top-of-casing [See CSXT Pipeline Spec. page 6, C)]

(c) Distance from base-of-ditch to top-of-casing [See CSXT Pipeline Spec. page 6, C)]

(d) Total length of pipe on CSX R/W [See CSXT Pipeline Spec. page 13, C), i), (f)]

(e) Distance from centerline of nearest track to face of pits at a 90 degree angle to the track(s)

(f) Distance from top-of-vent pipe to ground surface (4' minimum required) [See CSXT Pipeline Spec. page 20, F)]

(g) Distance from centerline of track to vent pipe at a 90 degree angle to the track(s) [See CSXT Pipeline Spec. page 20, F)]

(h) Theoretical Embankment Line: Starts 12' from centerline of track and extends away from track at a slope of 1.5' over and 1' down [See CSXT Pipeline Spec. page 14, C), i), (f), B.P. # 6]

(i) Carrier pipe diameter

(j) Casing pipe diameter

(k) Depth of Launching/Receiving Pit

NOTES:

CSXT Pipeline Spec. Reference DRAINAGE - STORMWATER PIPE SYSTEM

Commodity Description:

Maximum Operating Pressure:

Is Commodity Flammable: Yes No

CARRIER/CASING PIPE DETAILS

Carrier Pipe Casing Pipe Page 13, C); & 17, D) Pipe Material:

Page 13, C); & 17, D) Material Specifications & Grade:

Page 13, C); & 17, D) Specified Minimum Yield Strength:

Nominal Size Outside Diameter (Inches):

Page 14, ii), (d) Wall Thickness (Inches):

Page 13, C); & 17, D) Type of Seam:

Page 13, C); & 17, D) Type of Joints:

Page 16, v) Tunnel Liner Plates Required: Yes No Cathodic Protection: Yes No Type: ____________________

Protective Coating: Yes No Type: ____________________

Temp. Track Support or Rip-Rap Req.: Yes No Must Describe & Show on Dwg.

"THE FRONT OF THE CASING PIPE SHALL

BE PROVIDED WITH MECHANICAL

ARRANGEMENTS OR DEVICES THAT WILL

POSITIVELY PREVENT THE AUGER FROM

LEADING THE PIPE SO THAT NO

UNSUPPORTED EXCAVATION IS AHEAD OF

THE PIPE"

CSXT PIPELINE SPECS. PAGE 23, A), ii) (c)

LOCATE CSX'S SIGNAL FACILITIES AND/OR

WARNING DEVICES AT PROPOSED FACILITY

CROSSING LOCATION, I.E. CANTILEVERS,

FLASHERS, GATES AND SHOW CLEARANCES.

CASING PIPE ENDS MUST BE SEALED.

CSXT PIPELINE SPECS. PAGE 19, E)

YOUR DRAWING MUST SHOW ALL SETS

OF TRACKS PRESENT AT THE PROPOSED

CROSSING LOCATION.

N / A

CONCRETE STEEL

66.5'' 74'' 1''

35,000 psi x x

WELDED

x

MAJORS ROAD, PENSACOLA, FL 32503

30 28' 56 8518''

-87 14' 37 0638''

PLAN SHEET 1 2

10 03 23 01 05 24

1 20

ASTM C497, ASTM C76

6.25'' x

4000 psi

SEE ASTM C-443

EXISTING CSX ROW EXISTING CSX ROW

(a.)(a.) (e.)

x

C

SX

S C

H E

M A

T

IC

(e.)

(d.)

N / A N / A

CSX1003321 Exhibit A 08/19/2024 c8735 No Exceptions

117' of 54" RCP @ 0.31%

100' 50' 50'

(a.)

(b.)

(c.)

D

EP

TH

.3

2'

D

EP

TH

9.

D

EP

TH

9.

100'

(e.)

(d.)

C

O F

TR

AC

K L

(h.)

54'' CARRIER PIPE

72'' CASING PIPE

(i.)

(j.)

D

EP

TH

.0

9'

(k.)

D

EP

TH

.8

4'

(a.) (e.)

(c.)

(h.)

(k.)

1:

5:

1 1:5:1

Project Number:

Date:

Drawn By:

Sheet:

R E

V

IS

IO

N

D A

TE

N

O

Designed By:

Checked By:

S U

M M

IT

B

O U

LE

VA

R D

SU

IT

E

PE

N

SA

C O

LA

, F

LO

R

ID

A

PH

O N

E:

(8

) 3

-7

C

ER

TI

FI

C

AT

E O

F

AU

TH

O

R

IZ

AT

IO

N

220803

JANUARY 2024

F.E.A./ C.E.S.

F.E.A.

J.L.L.

O A

K

FI

EL

D

N

P A

LA

FO

X S

T D

R A

IN

A

G E

IM

PR

O V

EM

EN

TS

B

O A

R D

O F

C O

U N

TY

C

O M

M

IS

SI

O

N

ER

S

ES

C A

M B

IA

C

O U

N

TY

, F

LO

R

ID

A

EN

G

IN

EE

R

IN

G

D

EP

A R

TM

EN

T

PR

EL

IM

IN

A R

Y

Location: ____________________________________

Latitude: N____:______:______.__________

Longitude: W____:______:______.__________

Drawing No.: _________________ Sheet: _____ of _____

Drawing Date: ____/____/____ Revised: ____/____/____

Drawing Scale: V _______ Inches = _______ Feet

Drawing Scale: H _______ Inches = _______ Feet

LEGEND

Letter Description

(a) Distance from centerline of track to CSX R/W

(b) Distance from base-of-rail to top-of-casing [See CSXT Pipeline Spec. page 6, C)]

(c) Distance from base-of-ditch to top-of-casing [See CSXT Pipeline Spec. page 6, C)]

(d) Total length of pipe on CSX R/W [See CSXT Pipeline Spec. page 13, C), i), (f)]

(e) Distance from centerline of nearest track to face of pits at a 90 degree angle to the track(s)

(f) Distance from top-of-vent pipe to ground surface (4' minimum required) [See CSXT Pipeline Spec. page 20, F)]

(g) Distance from centerline of track to vent pipe at a 90 degree angle to the track(s) [See CSXT Pipeline Spec. page 20, F)]

(h) Theoretical Embankment Line: Starts 12' from centerline of track and extends away from track at a slope of 1.5' over and 1' down [See CSXT Pipeline Spec. page 14, C), i), (f), B.P. # 6]

(i) Carrier pipe diameter

(j) Casing pipe diameter

(k) Depth of Launching/Receiving Pit

NOTES:

CSXT Pipeline Spec. Reference DRAINAGE - STORMWATER PIPE SYSTEM

Commodity Description:

Maximum Operating Pressure:

Is Commodity Flammable: Yes No

CARRIER/CASING PIPE DETAILS

Carrier Pipe Casing Pipe Page 13, C); & 17, D) Pipe Material:

Page 13, C); & 17, D) Material Specifications & Grade:

Page 13, C); & 17, D) Specified Minimum Yield Strength:

Nominal Size Outside Diameter (Inches):

Page 14, ii), (d) Wall Thickness (Inches):

Page 13, C); & 17, D) Type of Seam:

Page 13, C); & 17, D) Type of Joints:

Page 16, v) Tunnel Liner Plates Required: Yes No Cathodic Protection: Yes No Type: ____________________

Protective Coating: Yes No Type: ____________________

Temp. Track Support or Rip-Rap Req.: Yes No Must Describe & Show on Dwg.

"THE FRONT OF THE CASING PIPE SHALL

BE PROVIDED WITH MECHANICAL

ARRANGEMENTS OR DEVICES THAT WILL

POSITIVELY PREVENT THE AUGER FROM

LEADING THE PIPE SO THAT NO

UNSUPPORTED EXCAVATION IS AHEAD OF

THE PIPE"

CSXT PIPELINE SPECS. PAGE 23, A), ii) (c)

LOCATE CSX'S SIGNAL FACILITIES AND/OR

WARNING DEVICES AT PROPOSED FACILITY

CROSSING LOCATION, I.E. CANTILEVERS,

FLASHERS, GATES AND SHOW CLEARANCES.

CASING PIPE ENDS MUST BE SEALED.

CSXT PIPELINE SPECS. PAGE 19, E)

YOUR DRAWING MUST SHOW ALL SETS

OF TRACKS PRESENT AT THE PROPOSED

CROSSING LOCATION.

N / A

CONCRETE STEEL

66.5'' 74'' 1''

35,000 psi

MAJORS ROAD, PENSACOLA, FL 32503

30 28' 56 8518''

-87 14' 37 0638''

PROFILE SHEET 2 2

10 03 23 01 05 24

1 4

ASTM C497, ASTM C76

4000 psi

6.25''

WELDED

WELDED

x x x x

SEE ASTM C-443

EXISTING CSX ROW

EXISTING CSX ROW

x

C

SX

S C

H E

M A

T

IC

N / A N / A

CSX1003321 Exhibit A 08/19/2024

MAJORS RD

M

AJ

O R

S R

D

MAJORS RD

M

AJ

O R

S R

D

26+ 00 22+00

23+00

24+00 25+00 26+00 00 22+00

23+00

+0

S-107

S-105

S-103 S-101

S-107 S-103 S-101

S-107 S-103 S-101

S-203

43' of 42" RCP @ 0.30%

W W

W

WWWWWWWWW

S

21+00 22+00 23+00 24+00 25+00 26+00 26+50

EX

:1

.0

PR

:1

.3

EX

:1

.9

PR

:1

.2

EX

:1

.8

PR

:1

.1

R O

AD

EX

:1

.7

PR

:1

.0

D

IT

C

H

EX

:1

.7

PR

:1

.5

EX

:1

.6

PR

:1

.0

EX

:1

.5

PR

:1

.1

R O

AD

EX

:1

.3

PR

:1

.2

D

IT

C

H

EX

:1

.0

PR

:1

.2

EX

:1

.9

PR

:1

.6

EX

:1

.5

PR

R O

AD

EX

:1

.9

PR

D

IT

C H

EX

:1

.7

PR

EX

:1

.0

PR

EX

:1

.2

PR

R O

AD

EX

:9 5.

PR

D

IT

C

H

EX

:8

6.

PR

EX

:8

6.

PR

EX

:8

5.

PR

R O

AD

EX

:8 5.

PR

D

IT

C

H

EX

:8

5.

PR

127' of 54" RCP @ 0.30%

117' of 54" RCP @ 0.31%

36' of 54" RCP @ 0.30%

69' of 54" RCP @ 0.30%

S-107

CONSTRUCT TYPE "D" INLET

PER FDOT INDEX NO 425-052

STA:22+22.21 OFF:-19.37L

TOP:106.96

SLOT:106.46

INV IN:99.07 54" RCP

INV OUT:99.07 54" RCP S-105

CONSTRUCT TYPE "D" INLET

PER FDOT INDEX NO 425-052

STA:23+49.28 OFF:-19.42L

TOP:107.11

SLOT:106.61

INV IN:98.69 54" RCP

INV IN:102.00 42" RCP

INV OUT:91.86 54" RCP

S-103

CONSTRUCT TYPE "D" INLET

PER FDOT INDEX NO 425-052

STA:24+66.58 OFF:-20.48L

TOP:105.60

SLOT:105.10

INV IN:91.50 54" RCP

INV OUT:82.80 54" RCP

S-101

CONSTRUCT STORM MANHOLE

PER FDOT INDEX NO 425-001

STA:25+03.05 OFF:-20.88L

TOP:95.18

INV IN:82.70 54" RCP

INV OUT:72.21 54" RCP

-0.4% -1.4%

6.0%

-3.1%

C

SX

R .O

.W

C

SX

R .O

.W .100'

D

EP

TH

.2

1'

117' of 54" RCP @ 0.31%0

-0.43% -10.00% 10.00% -10.00% 10.00%0.43% -0.08% -1.63%

M A

JO

R

S R

D P

LA

N

-P R

O

FI

LE

Feet

80400

EXISTING POWERPOLE

(TO BE PROTECTED)

REMOVE AND REPLACE 41

LF OF 3' WIDE SIDEWALK

APPARENT R.O.W.

APPARENT R.O.W.

EXISTING GASLINE (TO

BE LOCATED PRIOR TO

DIGGING CSX R.O.W. (TO BE

STAKED PRIOR TO

CONSTRUCTION

CSX TRACKS

Project Number:

Date:

Drawn By:

Sheet:

R E

V

IS

IO

N

D A

TE

N

O

Designed By:

Checked By:

S U

M M

IT

B

O U

LE

VA

R D

SU

IT

E

PE

N

SA

C O

LA

, F

LO

R

ID

A

PH

O N

E:

(8

) 3

-7

C

ER

TI

FI

C

AT

E O

F

AU

TH

O

R

IZ

AT

IO

N

220803

JANUARY 2024

F.E.A./ C.E.S.

F.E.A.

J.L.L.

O A

K

FI

EL

D

N

P A

LA

FO

X S

T D

R A

IN

A

G E

IM

PR

O V

EM

EN

TS

B

O A

R D

O F

C O

U N

TY

C

O M

M

IS

SI

O

N

ER

S

ES

C A

M B

IA

C

O U

N

TY

, F

LO

R

ID

A

EN

G

IN

EE

R

IN

G

D

EP

A R

TM

EN

T

PR

EL

IM

IN

A R

Y

EXISTING HYDRANT (TO

BE RELOCATED, IF

NESSECARY)

CONSTRUCT 54'' MES

PER FDOT INDEX NO.

430-022

INV ELV. 72.00

EXISTING WATERLINE

(REMOVE & REPLACE

350 LF, IF NESSECARY)

EXISTING POWERPOLE (TO

BE BRACED,IF NESSECARY)

100' OF 72'' STEEL CASING (I.D.)

100' OF 72'' STEEL CASING

POND BOTTOM ELV :

72.00'

HORIZONTAL SCALE : 1'' = 40'

VERTICAL SCALE : 1'' = 8'

EXISTING ROADWAY CL

EXISTING

GRADE

ABOVE 54"

PIPE

EXISTING

GRADE

ALONG

ALIGNMENT

M

AT

C H

LI

N

E

ST

A

+0

FO

R

C O

N

TI

N U

AT

IO

N S

EE

S

H

EE

T

PRELIMINARY

CSX1003321 Exhibit A 08/19/2024